PFI2019-00249 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
I. . COMMUNITY DEVELOPMENT Permit#: PFI2019-00249
and OR 97223 503.718.2421
13125 SW Hall Blvd.,Ti Date Issued: 09/17/2019
TIC;AI<'.T) 9
Parcel: SEG933
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: Electrify America
Project Description: SEG 933. Install conduit under SW 72nd Ave for electric power run (PGE).
Class of Work: FEES
Type 1 -Utilities(gas,electric,data) Description Date Amount
PFI Permit Fee 09/17/2019 $300.00
Owner: Total $300.00
REQUIRED INSPECTIONS
Call 503-639-4175 for the IVR inspection request line or visit the City of
PHONE: Tigard website at www.tigard-or.gov to schedule inspections online.
Contractor:
PHONE:
Applicant:
KEVIN MARTIN
5885 MEADOWS ROAD
LAKE OSWEGO,OR 97035
PHONE:5034434474
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature:
Issued By: 1/1/1 • I I
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PFI2019-00249
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code,and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs,pavement markings,mailboxes,etc.shall be
reinstalled or replaced,with like kind of material.Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S.Dept.of Transportation, FHWA,current edition,American Traffic Safety Services
Association[ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area.Traffic control devices,flag persons,etc.,shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic,at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses,residents and
area wide Emergency Services:503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign
at each end of the construction area 72 hours(min.)before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times,including normal delivery service and mail service.Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m.Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m.unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m.unless authorized
by the City Engineer.
PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property,public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080.Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary,it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary,as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector,<Insert Name>at<Insert
Phone#>,to establish a preconstruction meeting.
PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work,prior to any staged
inspection,and after completing work covered by the permit.
Contact Ken fisher at 503 816 6146 or Kenny@tigard-or,gov
PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance,and all attachments,and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and
provisions and to the City approved permit plans,and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City,in advance of work
performance.
PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports,on a weekly basis,to the City's Inspector.
PFI_Utilities 23-MONUMENT PROTECTION Applied Notice
Existing monuments,property corners,and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24-VALIDATION OF MATERIAUCONSTRUCTION Applied Notice
The City's Inspector may,at his discretion,require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector,in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems,take corrective action and,in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector,in writing,of any/all assignment changes.
PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements,shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to
obtain or provide for proof of right-of-entry or easements.
PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI_Utilities 28-AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements,including any revision made to the previously approved
construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements,including any revision made to the previously approved
construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
One as-built drawing showing all new public improvements,including any revision made to the previously approved
construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
PFI_Utilities 31 -OTHER Applied Notice
Other
RECEIVED
i iii 71 City of Tigard= ENGINEERING DEPARTMENT AUG 01 2019 PFI#: 201 -0O249
CITY OF TIGAEERING
TIGARD Public FacilitiesLI ement (PFI) Permit
PROJECT INFORMATION
TYPE OF WORK
Project name: Electrify America
X TYPE 1-Franchise Utility Work
Brief description of project: install conduit under SW 72nd Avenue performed by NWN,PGE, or utility
agency
for electric power run (PGE) ❑ TYPE 2-ROW Sidewalk/Driveway/Sewer
Work performed for the purpose of:
• Sidewalk installation or repair
• Driveway approach installation and repair
SITE INFORMATION • Sanitary sewer lateral installation and
Location (address if available): 11985 SW Dartmouth Street main line tap
❑ TYPE 3-Full Scale Development Work
-‘CG°133 (cross-street SW 72nd Avenue) performed with land use approval which
includes any of the following:
• Subdivisions or Partitions
APPLICANT INFORMATION • Street widening
Name: Electrify America do Kevin Martin, Black&Veatch • Mainline installation for sanitary sewer,
storm sewer, Tigard water, and Tigard
Mailing address: 5885 Meadows Road water service area
Zip:
City/State:
Lake Oswego OR 97035 EITYPE 4-Small Cell Technology
Phone:
503.443.4474
El TYPE 5-Tigard Triangle
Email: martink@bv.com Phone: NOTE: Type 1 and 2 applications may be
Contact name: Kevin Martin
emailed to rowpermits(atigard-or.gov.
Phone: 503.443.4474 Email: martink@bv.com
CONTRACTOR INFORMATION 0 Same as applicant
Name: to be determined CCB Number:
Mailing address: City/State: Zip:
Phone: Email:
ENGINEER INFORMATION
Name: PGE
Mailing address: City/State: Zip:
Phone: Email:
ADDITIONAL INFORMATION
Estimated value of work is required(if over$5,000):$ (within the public right-of-way)
Is work related to a LAND USE DECISION? EA Yes 0 No Case number: MMD2018-00030
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4
APPLICANTS
NOTE: Person specified as "Applicant"shall be designated"Permittee"and shall provide financial assurance for
work,if required by the city pursuant to TMC 15.04.140.
* With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant
are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this
application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application.
I, the applicant, certify that:
• To the best of my knowledge, all the information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
Kevin J. Martin August 1, 2019
Applicant' or authorized agent's signature Print name Date
Property owner's signature (if required) Print name Date
STAFF USE ONLY
Case No: W(20161-002.1-tq Permit fee: . •d3 Received by: AL Date: 8 I
Approved by: I.<•(i 0.. Date: q- q-17 Notified by: ')w Date: k r
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4
NOTES PROPOSED tea: L
1.THE UTILITY DESIGN DETAILS SUMMARIZED ON THIS SHEET ARE FOR SWITCHBOARD INS IL.. Y i
PROPERTY OWNER REVIEW.THE CONTRACTOR SHALL REFERENCE THE ASSEMBLY •" (t)PROPOSED 4"CONDURUTILITY DESIGN PACKAGE(UDP),PROVIDED WITH THE"ISSUED FOR :11: mi 9 7FROM EXISTING VAULT TO 0CONSTRUCTION"DRAWINGS FOR BIDDING.THE CONTRACTOR SHALL INSTALL1ItlII PROPOSED TRANSFORMER
THE UTILITY RELATED SCOPE OF WORK PER UTILITY CONSTRUCTION (16)PROPOSED 3"UNDERGROUND Igo 3'-0" I 1:Pi electrify
SPECIFICATION REQUIREMENTS. SERVICE CONDUITS FROM nMM 4 PROPOSED 1600KVA /'
TRANSFORMER TO SERVICE �.M -__ ®• / O UTILITY TRANSFORMER america
2.UTILITY EQUIPMENT INSTALLATIONS AND PREP WORK AND TERMINATION OF EQUIPMENT SWITCHBOARD 4p 480/277V,3�,4W ON
SERVICE CONDUCTORS SHALL BE COORDINATED WITH THE APPROPRIATE '111111
10'-8"xB'-8"X6'-3"
I UTILITY ENGINEER AT TIME OF PRE-CONSTRUCTION MEETING TO ENSURE '-NM.-_ I'■' CONCRETE VAULT
ELECTRIFY AMERICA
LLC.
ACCURACY OF INSTALLATIONS, tl(( .1 sop;
2003 EDMUND HALLEY DRIVE
"((■ III pP 2003.TRANSFORMER BOLLARD PROTECTION TO BE INSTALLED PER UTILITY NN���__ � REsiox,RDIMA 20191
THE DISCRETIO.OF THIS UTL ITY FIE D NSPECTIONN MAY N EEpUIRED AT r• TRANSSED
FORTHE DISCRETION OF THE UTILITY FIELD INSPECTION PERSONNEL. ��� ' TRANSFORMER
CLEARANCE
PLA A-A
A SCALE:NO SCALE
lam !
M^ \ ®� EXISTING EXISTING EXISTING •1 �,.�gW DARTM
I 0 d fir,lair , TRANSFORMER BUILDING(TYP) TREE(TYP) 0 �C OUN7gT__
I • EXISTING 1 '
FIDO'S „/ SANITARY-SEWER EASEMENT _
TAPHOUSE
\_!I I a 81: TTCT
/ 1� ../ : - - "
5 1 (1)1MMM!!/"CONDOR EXISTING
7 '." FROM EXISTING VAULT TO PRIMARY
I i t I II �. Q 9 p ' 'PROPOSED TRANSFORMER' ®i VAULT
E44:3••^122/31= : I BLACK&VEATCH
i I 1 ' (1 IRLBf_i.i 1111 gV :� = �� _ ,,�! DY �115tt:SSTT SUITE 2202
I4 PROPOSED 7'-0"x1'-0"'. IIs 2tt
, do5S 55 I - SWITCH VAULT(TYP)
�I P ER 1915)45&2000
EXISTING GRASSY \ I . '710).' _-,�� . . .'
AREA ITW) I 0 9 d 9 8 9 '-(i)PROPOSED 4'CONDUIT -
m ' - ' ' FROM E%ISTING VAULT TO I
_ I_-- 1 P "- PROPOSED TRANSFORMER _
— 111 PROPOSED 4"CONDUIT . . . . . . . . - . . - . . watt xO. ma
FROM E%ISTING VAULT TO
it ' • 11_ • PROPOSED TRANSFORMER - DRAWN BY
— J y II I :, , . . . . SHOO
I G I CHECKED BY. NMB
I I I __SW '� .� it
...
'EXISTING UNDERGROUND.• • • • • EXISTING GRASSY I.E 4
�- I _ ftu�J;P' —Amp ! 'ELECTRIC LINE(PYP) EA(PYP)
__ " T -gyp
(p ) (1'.1 (♦•e) (1*:) f !% •,. P;'1,, E%ISTINGUNOERGROUND.
EXISTING LIGHT i .;I- STORM LINE(PYP)
POLE(TYP) >< \ \' . . . . .
6 w IMED ill 41111111 EXISTING UNDERGROUND + 19/1 REISSUED FOR CONSTRUCTION
-•-- ITR D wows ISSN FOR CONSTRUCTION
,r - .WATER LINE(TYP)
' �.r.... r _ ' rr.r.r•,. .r r,y.% p Lm REV DATE DESCRIPTION
_ EXISTING PARKING• { \ ?
4 Td•1.4 I I I ,. UNE(TYP) _ ............. _ ., .. .
.®v. . . - :' -. . . . . . 'E gS� NE
p 'L'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.-....•.-.-.-..' -. . . ,}tr t,•01 PN
-I. .®. - .®. .. . > Ry 91378PE
I ' I ;•••-••:--• '- .-'-:.'.'-'.'..-.•_-.-.•..........".•••••••• -.-.-.-.-.-.'- -'.' 4Qp �G
ON Aif.
WALMART SUPERCENTERSI - IT - - �j,+ EXPIRES:8130/19
'•T• .'.' • • • • • • • • :,:.:.:� // R 6130
018
C.EXISTNG CONCRETE..:.:':':.:•:• '•�. - •. F
'CURB(TYP) ..Ate, . . . - . . . . . . .;•.'®• '.�.'-'.'. LCFTin,.Acnoc MM.THE 011.C11011.A
xsEO PROFESSIONALooc0xex.. To xLreR SxN p
- {'EXISTING PROPERTY •,',-,',•,-,-,- ',-,' ,-,',',-.'-- _ OR100061 TIGARD
rs,,,,,,..eaa' _ -'.'•'•'.'. ,J' LINE ITYP) - WALMART 5935
\ � / .-�___ ' - /• ' '. .w. ' `.'.'.Hu.'.'.'...'.'.'.'.'.'.'.".'.'.'.'- 4 7600 SW DARTMOUTH STREET
_..'.'.'.'.'.- 1 ITIGARD.OR 97223
dre.roeemacavvervacev�a®u�s emr�ue�/ �?y ®'- ,em SHEET TITLE
UTILITY PLAN
. : . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . .
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
. . SHEET XUMBER
50 25' 0 Sm 1011.
UTILITY PLAN ` 2
ICOMMERCIAL LEGEND
(1V1.92 NEW PGE FACILITIES TO BE INSTALLED__
12103 888m 1
I ..A5.3
1 ABC 150 33930 _._J 2a04
/ABG.'AL-TY r
15
1981
i' 1 1-36C i:;7-961?
VT-7,1 Vi-91
III
• 17
1994
18
I 10
25,4
1995 1 G
► 'i
_ARC 15B 04298
N l
3 2 g
PO-45 �RTR7 •0 ABC 1501172 "
UrHS7 35'-None C ABC 2AI.-TX ■
TM A
24 A 25 97062 9010 3s--tons SAP Tl
1)P8-94 2�}4 P1489 1
VT-.100M C
A2 AL VT-114
RS ABC 15,34234
0r
PD 44 0./,m
..... ...... ........ ue.• 4-1e E M..
V7.421 1II j
1. 35-Nan j Q.�
C2 I-018 • 5In _--- mt 1 •,,..
C21-01A —WE—. Vf-M ocr
• VT-112 �u�
2,R
e m 1 ' CONSTRUCTION NOTES: 0.ew
foi
•
L.�O R.orAu oPn�I p.:.. ""`'.rg.:...«.�..��7:5:."`„ee,
K/ ��r as-Ni. 111 °"" :t'^w�^ .�_ Mi .,a^.ca' .
,-
810--PGE VAULT GREAR WALL en u, ei ""'�'0 ,,r1'1r ._ „..... "y V
3 PHASE,PADMOUNTED I��////////.I I'J '"•'°""",..., "•1' yr m' �S aS': �' M'
so AT LOCATIONS 6000066® F7hM L won's To RE
a1'svenal +,o ami m.o.+e
APPROVED MY IGF.
2 Tor Gr sro TO FRONT sEr.at .TO VT De I .,... ..,.a....,.�.,.;;: *"..
'k RN AT FINAL 7.mdrw EST nuc "1D`MOi'�
ED
\�FJ NAOY®/Y/GE mw..c4rn�w�*Yr'.
1sa•TO V,/J!'/ 5»a'GF 5wna VAULT 571-EGe s enol NON' a '°""""""'«'^"a'"'®"""`�'°
OO NOT 0104
GLST GFtl �t'y MU RE111'EB! v e.m w'> NMTRuC1KKI OrAVImO V.'latiita74.24",=.1r7404.4.1«::`'
�I' MULTI Er`�� r a m w�\� 'n AS-81)11T VERIFICATION 6...E VIOLATIONS CORRECTED
I..5. _`11 y INSTALL l� ♦ e"" ANY DEVIATION TNM TMS DESIGN MUST RIFICA I a.&NESS MO ATIONS
n° R°'°' °• =0 W rvG Viol' w ...«...�a RE AIYNVED RY TOE PROM MANAMA /G"� ^.-ow
um
``� •�°�� PD-741S'S ..e. �I "` +.r.w aYaurc 1kc ammm..e�,w.trod .R.N..'en�..dm]
\ ./°P°' '"°r I;r9s r� �� 738s M g^ 1 'AMU n 0wcr a:
° \ � a Mw.ANG RrMww..t.mor MOM.,. 0»01 I^^R00oms» 1d�'m.,>v
r TO .•R ".uc"" r mm
T.
Yr DI Y r s. "jC, m colt -.re[tmx alc.dw Gil 8111619.r00 01.10-10.111
a MQ 4E' a.m.n
N.
140 SW nutroovw
�.R+,,.., ry..re.,,e., s
.. *mow.owe.erenx r0.-w Moen matoo
i
illIllIllilliil 'r
_ � �,
.w
44
it
r s
.r h;,
F
R. ,,,:4:,.„ - '' .z.,,
'‘.-.1`..'„ SYR �.
r
`1
n
•
,
� �lf
u
s jj
o-. J d }Y 5r'"s"
l� $ t
,4.t.-
'Y ,@i2M- 4
44
it' '-- ' 3'. 1
It'':;•':.:; � ' 1( T. a
4.er� ''!;'",''''.;r4::::1,". yr:, :.':'1'.,.7--
. ` x.sY:..�.a�uwa,...a
m
yy
fi
t. ,yw
ti •
•. RR mm
CD
_.� II - o
..
cott
ff -I N co
to
CD 1
R,. .. "" i R 1 y a^ ,y
,,...4.,,,,,,„..„,„,.., ,,,_
.,
t > fir..
1/6/2019 11:42:00 AM
OR100061 Tigard - Utility Design Package (UDP) - 010619
UTILITY DESIGN DETAILS:
1. Our utility contact for the construction phase is(reference additional inspection request format below):
James Chrisman
0:503-736-5749
M:971-238-9975
James.Chrisman@pgn.com
2. The PGE utility design is attached below:
3. Please reference the utility specifications located at"https://www.portlandgeneral.com/construction/electric-
service-requirements"for the most current revision. NOTE:The contractor is to reference the entire utility
specification documents for any additional utility requirements that might be necessary.
4. The EA site specific address is, "7600 SW Dartmouth St.,Tigard,OR 97223",which has been provided to the
utility for billing. Please ensure the electrical inspection documents reflect this address,as to avoid difficulty with
scheduling the utility meter.
SUMMARY OF CONSTRUCTION RESPONSIBILITIES:
SCOPE OF WORK: BY UTILITY: BY CONTRACTOR: ADDITIONAL COMMENTS:
PRIMARY SIDE X
EXCAVATING/BACKFILL:
PRIMARY SIDE
CONDUITS: X PER PGE DESIGN
PRIMARY SIDE STRUCTURES: X (2)PRIMARY VAULTS
PRIMARY SIDE X
WIRING:
NOTES: REFERENCE UTILITY DESIGN FOR ADDITIONAL DETAILS
TRANSFORMER: X 1500KVA
TRANSFORMER X
VAULT:
SECONDARY SIDE X
EXCAVATING/BACKFILL: _
SECONDARY SIDE
CONDUITS: X PER PGE DESIGN
SECONDARY SIDE X
WIRING:
NOTES: REFERENCE UTILITY DESIGN FOR ADDITIONAL DETAILS
GENERAL COMMENTS:
UTILITY: PORTLAND GENERAL ELECTRIC
UTILITY DESIGN REFERENCE#: JOB#:M2493753
ATTACHMENTS:
lib
POF
M2493753JobSketch.pdf
III
PDF
OR100061 Tigard - C - 151255260-10 - Final Switchgear Layout.pdf
COMMERCIAL LEGEND
NEW PGE PA1-1101E5 TO BE INSTALIPD
ABC 160 33930 /,,,)u,)x r 2.. r........or....nese I...
1ED , eew,.anA...a..
0
24
1°qT(11.36C C 1-36U ,..,761Y1.)•
•
2474
n'
a• i
g 8
vo•s - A Ma._ ' _ ABC 160 TTL 3 ueczuttw
^WA25970112
A. CAS— 1i.
.n noa M0
a,0 Pow vT.
1 013F 2Y"
w>u
n ABC 1- 38333
Po
aaw
113H
O#,
'ter-C lb l _..
----------------------- �e
CE 141A e... �";�;
Y JA
Ter 4 CONSTRUCTION NOTES: wee.
v•et Q m :
810-PGE VAULT GREAR WALL 6.-- PD'""1 VT IN v'� "`� "~
3 PHASE,PADMOUNTED 1///l/////./.lNone """"'�""=Irm W^•S�^ � �� p
e)4 S 4 3 3 1 – • ,�'t 83.R L' 9%S u:,:: "FC.G.
`.-#:.4
MI31/1313 It 109 •�. �..W.�.. .�.
.,� FRONT OZ
,O
\ re 5.77JOE SWITCH WYO. MN.rl .ro yr
c4.41
_Q —-14-- '::''''Tk:''w'''4 i*i 1 4'I I 1 i it. e- r•:°-*!. :'-'7 • ItIS-11(1 I 1‘.., ,,,,.::NESC VIdATIONS CORRECIV)tow
4
ii I:.
.,:,,,.. ,,, PD-141
,7.... . 811 - .
tisn
tSwchboa Conduit Detail -,---,„ 1,1'°
SEE RAN MEW
Total Line Up VNdth: 195 pA"sasteas» .m.
Top Conduit Area ..;....„........______40,-(TM
F-51°*n M Sactlon 02 Section 03 Section 04 Section 05
30 30 45 00 50
(5In)� 4
r 5{ 8{
Candle Nu
31I1124W C30 39W 3ClD NMW
40 i 2,3. 2 I. 2 4,3
i 5"i 11L 40 15-1
{ T l 4 1"SLOPE
{ t T
11\\ SCREEN
93314"
Front Plan View 90"
Y 92 3/4"
Bottom Conduit Area
1 40
1
} 3
31 T { 1
Cmd i 34 Cmdil Ana
COOIN 34D,24W Ca4urt Nu 340044W
2 1 22W 3 3,Ca39W yg
.� 2 _" £ T
I
SIDE VIEW
18
1 3
11
Front Plan View
JOB NAME:EA166661 CUSTOMER:Electrify America PLANT6ANTERREY MARK,OR100061 TIGARD
MADE BYM.Attlee ISSUED:66121/2019 CUST.ORDER NO: 151255260
REON.NO:0110213346 R 8121118 Release to Manufacturing. MA
REL BYMA ORDER NO:1$118261 NO DATE REVISIONS NITIALS SHEET 10-CD1 rrEM II
HIR.7.0.1092
Jon McNealy /�
D&HG Office:(503)232-2488 [T1
N
„„0„0n o.,nen i„n;in".r: Fax:(503)234-4572 a-!
1 plans@d-hflagginq.com I
Plan Not To Scale
DAH PLAN#8229-1
September 9 2019
Contractor ADK Electric
Contact Person: Lars Larsson
Phone: 1360)450-7586 40' i II
Email: LarsLN'teamadk coin 8
Job Location: SW 72nd Ave 6 SW Dartmouth St
City.State Tigard OR
Type of Work SitlewaM,Replacement ®-.
Job Duration 5 Days
• 10a
,ti
..er—a
s
it MOS
••, h Q 30
Q; + i
Contractor shall contact local
"Q y` ? t trallic signal authority 7 days in
Q jg111et 4 = J I advance to coortlinatr signal
'�i j modifications
~ 1
•!' . ' ::. ' - - d COM
Ijb
• �+ 8 Ilia.«..«
��-
'�'``r•.tt, b b
~ 'If a _
/1.111100 MOM _ Q 35IT i : ++lR 1y 'lia
1
isF ' • \
•
Qfe\
4
I
i ji
30) Q j
ti
J
a
b
y i 8\1 J t.n
Equipment List
5 Road Work Ahead
I Right Lane Closed Ahead
I Right Turn Lane Closed Ahead
I Right Turn Lane Closed
Legend
I Type II-Sidewalk Closed Ahead Cross Here I'-)
I Type II-Sidewalk Closed Ahead Cross Here 1-.I Notes /± 48"a 48"Signs w'F lags
2 Type!! Crosswalk Closed 1.---) I, Maintain 4'minimum unobstructed width for temporary bike lane at all tins • 28"Cones
2 Type II-Sidewalk Closed
2 Maintain II'minimum lane width for auto traffic at all times
I Type II-Bikes Keep Lett
3 Cone spacing at c 35 MPH Taper=20' Tangent=20'1 Corner/Access/Bike/Ped=10' — Type II Barricade
45 28"Cones 4 All traffic control shall adhere to current MUTCD 6 OTTCH quidellnes
5. Adjust to held conditions Work Zone