Loading...
Report (61) CTed CS* T 2. uponol 1r, h V � FIRE SAFETY SYSTEMS AQUASAFErm FLOW TEST VERIFICATION t FORM • AquaSAFErm Flow Test Verification Form Alliance Important:Installing contractor must submit this Member ID: completed form.Failure to do so nullifies the Company Name: f3/i 41.-er 9114, system warranty.E-mail or fax completed form to the Uponor Fire Safety Design Department Contact: 6kti soh .1-1-16,241,5 at technical.services@uponor.com or 952.997.1731. `��� For questions,contact Uponor Technical Services at Phone: 888.594.7726 or technical.serrvices@uponor.com. Fax: n Color of test orifice used: eeei Job Name: l� 'i- I ' Tom€ — Static pressure(not flowing)reading at incoming Project Number: 35.7$-p water supply into home or at main shutoff: 1 Job Address: 1(4j Li.. /(A) Cekt5t`1 J Residual pressure(flowing)reading at incoming water City: supply into home or at main shutoff: tIS j State,ZIP: What time of day was the flow test taken? `cA44., For designs not provided by Uponor,complete the following information. Flow test method used? %1 Bucket CU Flow Meter Designers Name: Flow test gpm: 3 Company: How many gallons of water did the design predict as required? 13 Phone: Did the test meet or exceed design flow? S'r'es CU No Fax: Which sprinkler did you flow? Number: 1'2-- Is Is the warning sign permanently attached close to the Location of head: --ref Poor- Pkte s1-41- main shutoff valve? L1 .Yes U No Date left in service with all valves open: Was this system required by code? Yes Cl No Npp Test Witnessed and Verified by: Name Signature Occupation Date italictriepirk 0 0 Additional Explanations and Notes LL Uponor,Inc. Tel:800.321.4739 5925148th Street West Fax:952.997.1731 Apple Valley,MN 55124 USA Web:www.uponor-usa.com