PFI2019-00296 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PFl2019 00296
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 09/10/2019
T I i_,A R n 9 Parcel: 2S111 CC03000
Jurisdiction: Tigard
Site address: 10330 SW CENTURY OAK DR
Subdivision: SUMMERFIELD Lot: 53
Project: Swerdlik
Project Description: Replacement of driveway apron and sidewalk
Class of Work: FEES
Description Date Amount
Type 2-Sidewalk/Driveway Approach PFI Permit Fee 09/09/2019 $300.00
Total $300.00
Owner:
REQUIRED INSPECTIONS
Call 503-639-4175 for the IVR inspection request line or visit the City of
PHONE: Tigard website at www.tigard-or.gov to schedule inspections online.
Contractor:
PREMIERE CONCRETE LLC
PO BOX 230783
TIGARD, OR 97281
PHONE: 5038103752
Applicant:
MAUREEN SWERDLIK
10330 SW CENTURY OAK DR
TIGARD, OR 97224
PHONE: 5037475654
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: See application
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PFI2019-00296
Type: Condition Name: Status: Severity:
PFI_Sidewalk/[ 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Sidewalk/[ 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Sidewalk/[ 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Sidewalk/[ 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Sidewalk/[ 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Sidewalk/[ 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices,flag persons, etc.,shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Sidewalk/[ 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Sidewalk/[ 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign
at each end of the construction area 72 hours(min.)before initiation of construction work.
PFI_Sidewalk/[ 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Sidewalk/[ 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Sidewalk/[ 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Sidewalk/[ 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Sidewalk/[ 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Sidewalk/[ 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense
PFI_Sidewalk/[ 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Sidewalk/[ 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Sidewalk/[ 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches,etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Sidewalk/[ 18-SEWER SYSTEM TEST Applied Notice
A sewer system air-test and/or DVD T.V.test report and one set of"As-Builts"shall be provided for review and approval.
PFI_Sidewalk/[ 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>,to establish a preconstruction meeting.
PFI_Sidewalk/[ 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI_Sidewalk/[ 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Sidewalk/[ 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports, on a weekly basis, to the City's Inspector.
PFI_Sidewalk/[ 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Sidewalk/[ 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Sidewalk/[ 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Sidewalk/[ 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to
obtain or provide for proof of right-of-entry or easements.
PFI_Sidewalk/[ 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI_Sidewalk/[ 28-AS-BUILT DRAWING Applied Notice
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
PFI_Sidewalk/[ 31 -OTHER Applied Notice
Other
City of Tigard RECEIVED
"" PUBLIC WORKS —ENGINEERING
ill
Public Fac•il•
ity Improvement (PFLaNircaiiiSEP 0 9 2019
TIGARD
to
TYPE OF WORK
DESCRIPTION OF WORK(in the right-of-way) ❑ TYPE 1–Franchise Utility Work
Check one: ❑ Utilities `g Sidewalk/driveway approach ❑[_Streettiimprovements performed by NWN, PGE
�Q_ (p_co.m.P. ± a'I d P)�U)til�/ and/or utility agency.
Detailed description: /
ee %TYPE 2–Sidewalk/Driveway/Sewer
a P rD A v.a S G ^ ccwcL k Work performed for the purpose of:
//�� • Sidewalk installation or repair.
/0 3 3 a Gtr Carr I • Driveway approach installation
Property address/location(s): S x t^y ki) and/or repair
—T–j.0 Ae a ? V / • Sanitary sewer lateral installation
and/or main line tap
a U l ee,v� Car t SWf d///l ❑ TYPE 3–Full scale Development
Applicant: nn'', y \ Work performed with Land use
Address: /0 3 3 0 S U.) �.�Lti ry ,9 tk 1) r approval which includes any of
City/state: `Ti G et_r e) , O R. // Zip: 1 7 D-D-c' the following:
Pho2:3 7 N 7-56,541 Email: p'1 LSw`RJ L 1 1 'u COM • Subdivisions or Partitions
Contact name: Maof A Phone: SD3-3I 9-
/CZ • Street widening
• Mainline installation for Sanitary
P j ,1, C J,,,�- CI-C. sewer, Storm sewer, Tigard water
Contractor: �S- F%!'� f 1`-' and/or Tigard Water Service Area
CCB#: i, / 0 2-` _ 1 Expiration:
Address: 0 ( o,X7.,3()7 g3 SUBMIT COMPLETED APPLICATION TO:
City/state: 'TI 5tk-(l Zip: 4 7 ! City of Tigard
Planning/Engineering
Phone:.S3 gh.)-3.-/'S2.Email: j�.,e `Z;01\54-rt, c.`,4v hyt!tC4Nt 13125 SW Hall Blvd.
Contact name: L-e ( 1 Phone: ¶D 3.S/O"3 7S2 Tigard,OR 97223
Applications for"minor work in right-of-way"
only may be emailed to:
Engineer: rowpermits(itigard-or.gov
Address:
FON sl.xi+ l Si. ONLI'
City/state: Zip:
Phone: Email: Case No.: ,P12 OQ
I 9"�2 c
Contact name: Application submittal fee(.007%of
Engineer's Estimate) $ 6(J —P�®
c�
Estimated value of work is required(if over$5,000):$ e, >OO Additional fees: $
(within the public right-of-way) Applica 'on accepted: �h9/l 1
By: Date:
Is work related to a LAND-USE DECISION? El Yes ig No
Application reviewed:
If so,please specify (MLP,SDR,SUB,etc.) case #: 9 j0 IC)
By: 15 Date:
Is work related to a BUILDING PERMIT? ❑ Yes 1 . No Applica t notified:
If so,please specify(BUILDING PERMIT)case#: By: Date: h
4
I:\ENG\PermitApplications\pfi_application Rev.10/16/2017
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of4
•
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if
required by the city pursuant to TMC 15.041.140.
* With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different
people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the
owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised
Utilities are not required to obtain the owner's signature on the application
BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT:
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject
property.
• If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
• All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and
the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application,including the policies and criteria,and understands the
requirements for approving or denying the application.
Paar
� S�eA ] 6b-1)1
`Applicant/Authorized Agent's signature rint name
Date
SIGNATURES of each owner of the subject property, if required.
fix_ �& - '- . Mattree ,i ccverd tic 9(942,07?
Owner's signature Print name Date
` La rry S Weed 1,k q/9&)/9
Owner's si ature Print name/ Date
Owner's signature Print name Date
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of
DEVELOPMENT ENGINEERING FEES FOR STAFF t SE ONLY
Public Facility Improvement(PFI)Permit: DETAILED SUBMITTAL
APPLICATION FEE REQUIREMENTS
Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITY AND SIDEWALK/
DRIVEWAY AND UTILITY
PERMIT FEE CONNECTIONS,ETC.
Part 2: All non-water system improvements (work in the right of way)
Engineer's estimate X 5%(less$300.00 minimum
submittal fee) Sketch
Engineer's estimate X 2%Plan Review (including information below)
❑ Dimensions
WATER SYSTEM FEE ❑ Street Name
Part 3: All public water system improvements ❑ Site Address
Engineer's estimate X 12%
FULL SCALE DEVELOPMENT
PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements)
There will be no permit fee charged,or assurance required
for the following types of work: Design Plans
• Sidewalk repair(less than 20 lineal feet) (4 sets,24x36 or 22x34)
• Relocate or replace mailbox ❑ Cover—Site,Vicinity,Abbreviation,Legend
• Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.)
• Weep hole repair ❑ Street(Plan,Profile)
• Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile)
• Lawn sprinkler system installation or repair ❑ Water Quality Facilities
• Street tree pruning or planting ❑ Grading
• Planter strip landscape maintenance ❑ Landscaping/Tree Plan
• Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas,
Storm,Sanitary,Water,Signage,Street Lights,etc)
❑ Details
Note: A cash/bond assurance may be ❑ Traffic Sight Distance
required per TMC 15.04.140. ❑ Signing and Striping
(customer deposit) ❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and
plan log block,dates and sheet numbers.)
❑ Engineer's Construction Estimate
Additional Submittals
(per Land Use conditions)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design(if applicable)
❑ Water Provider Approval
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of4
SAMPLE SKETCH:
4,•
9 .s. wSS\1 Edge of Pavement
'.b16‘
Streetlight 4_. Ditch — PP" .
I (----
4 it..1 Raaf Dzaai le^li
'
I--P oopos?d"Selweirinne" 1
I ht-, I
• I
I CD Ns 1 1
►� ;,,1 , Existing House
Existing
I �1 1
,. TA • Driveway
,ii VII ' I
o d - ,
_�'
:i-,1 I '1
g I .
a I �y A ". I
�I � �° 1
m
al 1 1
61 Existing Shop 1
1 • C '
Powerpole iI -
� 1
� o . 0
95' 1
I —-—-—-FiopeityL-ine----------
I•
�-
� l
i0 ' Fire Hydrant(FH)
I
I Scale: 'I"=30'
•
I I
•
I !
I
I I
I
MINIMUM SKETCH REQUIREMENTS (Put"N/A"if Not Applicable):
North arrow Property lines & dimension Slope of property
Street &street name(s) Existing building, structures Utility&street light poles
Proposed work Existing curb or edge Trees
Existing S/W or of pavement Existing utility locations
D/W apron (sewer,water,storm)
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of4
F
Premiere Concrete LLC CCB#210271 �� OX Z 3 g 3
Estimate Approved Total $9,300.00
Financing available-Pay over time with low fixed monthly payments 56 ✓3 5-j„
Maureen/Larry Swerdlik,here's your Estimate Summary
Premiere Concrete LLC CCB#210271
Estimate#53
Description Amount
Contractor will demo and haul away the following areas:Driveway/approach,sidewalk,and front porch 9,300.00
area.Approximately(1100 sqft)Contractor will regrade,remove roots,lay gravel base,form and compact
prior to pouring the concrete.Contractor will pour 3000psi concrete with a light brush finish,approach and
sidewalk areas will be pour to meet/exceed city of Tigard specs.Please add to contract:
Contractor will create ramp from front door in entry way.
Contractor will remove,replace and clean pavers bordering driveway and sidewalk.Contractor will handle
all communication with the city.Contractor is responsible for all labor and materials to complete the
project,homeowner is responsible for pulling and paying the permit.
1 x$9,300.00
Subtotal 9,300.00
TAX 0% 0.00
Total 9,300.00
Total(USD) $9,300.00
estimate 53.pdf
Powered by
More than 250,000 businesses trust us with their invoices.
English(United States)