Permit (135) CITY OF TIGARD BUILDING PERMIT
gi
COMMUNITY DEVELOPMENT Permit#: BUP2019-00241
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 09/09/2019
Parcel: 1 S 136ACO2200
Jurisdiction: Tigard
Site address: 7303 SW SPRUCE ST
Project: Topping Subdivision Subdivision: METZGER ACRE TRACTS Lot: 6
Project Description: Demolition of(1)2,400 sq.ft. house connected to sewer. UPON FINAL INSPECTION,DEMO CREDITS FOR SDC
FEES WILL BE AVAILABLE FOR FUTURE CONSTRUCTION.
Contractor: STAFFORD HOMES& LAND LLC Owner: TOPPING, RICHARD
8840 SW HOLLY LANE KEMP, KATHERINE
WILSONVILLE, OR 97070 1726 SE UMATILLA ST
PORTLAND, OR 97202
PHONE: 503-305-7647 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: SF
Class of Work: DEM Type of Const: Permit Fee-Additions,Alterations, 09/09/2019 $180.17
Demolition
Occupancy Grp: Occupancy Load: Erosion Control w/Development 09/09/2019 $80.70
Dwelling Units: 0 Info Process/Archiving-Sm$0.50(up to 09/09/2019 $0.50
Stories: 0 Height: 0 ft 11x17)
Bedrooms: 0 Bathrooms: 0
Value: $7,000
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $261.37
Required: Required Items and Reports(Conditions)
1 Ersn Cntrl 503-639-4175
Fire Sprinkler: Parapet:
FTr Alarm: -Profecfed •Corridors
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: L , Permittee Signature: i" .if/
all 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
--conmcial ,t'I )44 C FOR OFFICE USE ONLY
City of Tigard RECEIVED Received /�� 'JL
DateBy: (/ 1/t`/ "J//
Permit No.: f; Qr«r/ ��-&t `"7
w 13125 SW Hall Blvd.,Tigard,OR 97223 n Plan Review v I
N . Phone: 503-718-2439 Fax: 503-598-194U G 2 7 2019 Date/By: Related Permit:
�.I�, }�l) Inspection Line: 503-639-4175 Date ReadyBy: -Juris: H See Page 2 for
Internet: www.tigard-or.gov CITY OF TIGARD Notifiod/Method: /� Supplemental Information
BI HI DING DIVISION 0/404,4 67,..
TYPE OF WO REQUIRED DATA:1-AND 2-FAMILY DWELLING
0 New construction Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
1-and 2-family dwelling 0 Commercial/industrial Valuation: $
lJ
❑Accessory building ❑Multi-family Number of bedrooms:
❑Master builder ❑Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: 7 303 SU P�Spri;t._ St- New dwelling area: square feet
City/State/ZIP: �. Gv 6 r , )Q el 7 2.2 J Garage/carport area: square feet
Suite/bldg./apt.#: Project name: -1;p(3; {� ,,c..4,$) t!d✓,.S,[ J Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
J kr.6 i- 0 of 4 i et Fee-Sec f-,t,An b ko 72" Other structure area: square feet
Ave- C.w � Si- REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: ro ppi I Lot#: Permit fees*are based on the value of the work performed.
l Z � Indicate the value(rounded to the nearest dollar)of all
Tax map/parcel#: i �(� 2 equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Valuation: $7,000
6,.44. t. ect4 e O# 6 to tot ,.
pl i A.4 OcSer„ tcev- _ Existing building area: t?O square
quare feet
j- �, �i
77, /4 Clks.c. New building area: square feet
PROPERTY OWNER 0 TENANT Number of stories: 2.
Name: ,tt°t CO7' r){uc Coir+-lt: LLC, Type of construction:
Address: g gy() SU) uo[( I yl Occupancy groups:
City/State/ZIP: Ode, ,1 Ui 11 e, 0 e 9 7 0'70 Existing:
Phone:(505) 50i5 -71-1 7 Fax:( )
New:
0 APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES*
(Please refer to fee schedule)
Structural plan review fee(or deposit):
Contact name:
FLS plan review fee(if applicable):
Address:
Total fees due upon application:
Amount received:
Phone:( ) Fax::( )
E-mail: �Y1 G0 S r i t �.r ,<�,yvi PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
i Cr+- \
CONTRACTOR Commercial and residential prescriptive installation of
roof-top mounted PhotoVoltaic Solar Panel System.
Business name: S,� Submit two(2)sets of roof plan with connection details
I-. �i`'� �s� and fire department access,along with the 2010 Oregon
Address: e 0 1O S L y °l Solar Installation Specialty Code checklist.
City/State/ZIP: K/' (5(:yill -I/t ® C 7e)7c� Permit fee(includes plan review $180.00
]( ( and administrative fees):
Phone:56 )3c,5 _76E4 j 7 Fax:( ) State surcharge(12%of permit fee): $21.60
CCB Lic.: 1,oq2e(et ,,,
Total fee due upon application: $201.60
Authorized signature: ...z. /Pr ` This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: pet i_ Ve-1-'6- Date: $j..7. 20t� * Feemethodology set by Tri County Building Industry
�V Service Board.
I:\Building\Permits\BUP_COM PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB)
City of Tigard
q COMMUNITY DEVELOPMENT DEPARTMENT
■
T 1 c A R o Building Permit Review — Residential
Building Permit #: r:/I, c)II,-oo
Site Address: 13 0 3 S W low Li2 S+
Project Name: - 'p p p ivii D-e_rn 0 Lot #:
(New dwelling=sub ision name;Addition or Alteration=last name of owner)
Planning Review
Proposal: Demo 00 (nJ Cq 1 I bvi Id wit).S
9(Verify address/suite#active in Accela. / In River Terrace: /1 No ❑ Yes, River Terrace Review Addendum
Site Plan Elements:
rosion Control
ft73 copies of site plan on 8-1/2"x 11"or 11 x 17"paper Retained trees with drip line and tree protection measures
/ raven to scale(standard architect or engineer scale) R.H print of new structure(including decks)and FFE
orth arrow rtility locations&easements(required for new and additions)
ite address,project or subdivision name and lot number
idewalk/driveway approach
/1Applicant information(name and phone number) Eincrmion of wells/septic systems
Lot dimensions and building setback dimensions —E-Street tree size,type and location
00 are footage of buildings to be demolished 'Street names
K Existing structures on site Corner elevations (2'contours if more than 4'differential)
Lot area,building coverage area,percentage of coverage and >1,000 sf of impervious area created or replaced? ❑ s ❑NoAC4-
impervious area(applicable if R-7,R-12,R-25&R-40) If yes,is a storm water quality facility shown? Yes o
XClean Water Services—Service Provider Letter(lot platted prior to 9/10/1995):
Required: ❑ Yes,applicant was notified 1:1No Received: ElYes ❑ No
/ Public Facilities Improvement(PFI) Permit:
Required: ❑ Yes,ap licant was notified ❑ No Applied For: ❑ Yes ❑ No,stop intake
?'Land Use Case#: 0�' 1 t ��� I ❑ Zoning:
❑ Require. etbacks: Front: Rear: Side: Street Side: Garage:
❑ Building Heig . Max. Height: Actual Height:
❑ Landscape Area: % CILot Co .ge"1 ax: % NIA
-
Entrance
1
Entrance ❑ Set back no more ...n 8'from street-facing . :1 ❑ Parallel to street or offset 45 degrees or less
Windows ❑ Minimum 12%of area o .11 street-fa -• facades
Garage ❑ Garage door is behind widest -t-facing wall ❑ Yes ❑ No,one of the following is met:
❑ Door extends no e than .m wall and there is a covered porch extending beyond garage.
❑ Door exten• o more than 5'from and there is a 12 sq ft.window above garage on 2nd floor.
❑ Garage doo •th is ❑ 12'or less ❑ 50% • -ss of facade ❑ 60%or less and includes 7 of following:
❑ : ered porch ❑ Recessed entrance ❑ W.. - fset ❑ 1'Roof eave ❑ Roof offset
ire s g es -- ■ Lap Siding ■ 'oo pitch ■ C—Lie,liTr,or gambreTroo la-Dormer
❑ Accent siding ❑ Window trim ❑ Window recess ❑ Window projection ❑ Balcony
❑ V' . Clearance ❑ Urban Forestry Plan
❑ Sensitive Lands: ❑ Yes ❑ No Type:
❑ Conditions met prior to issuance of building permit
Notes:
Approved By Planning: 11/1 &'L '— Date: 8 /1--7
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
I:\Building\Forms\BldgPermitRvw RES_022819.docx
Building Permit Submittal
Original Submittal Date: ?/(/
Site Plans: #
Building Plans: # Ail-
Building
Permit#: nter building permit�# above.
Workflow Routing lanning I9"<ineering ermit Coordinator ❑ Building
Workflow Sign-off: H.-5in--off for Planning(include notes from planning review)
Route Application Documents: engineering: (1) copy of permit application, (1) site plan, (1) building plan and
aon al plan review routing form.
uilding: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes: 1977e10 (41/17 .
By Permit Technician: � Date: r
.9
tEngineering Review
Slope at building pad: 5
Cir-0,.._.Conditions "Met"prior to issuance of building permit
Easements (encroachments)per engineering conditions of approval and plat
Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: ❑ Yes 2-- o
Assess Water Quantity Fee in-lieu: ❑ Yes 2"-No
LIDA Facility on lot: ❑ Yes B'No
) Final Plat Recorded: 14 I A
'')C- ❑ NOT Approved by Engineering: Date:
ZNotes:
71 ,l
L Approved by Engineering: V.S.K3 F s rk tjL., Date: 9 -4--t Q
Revisions (after Building Submittal only) Reviewer Date
.,. Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
4
t. Permit Coordinator Review
1 ❑ Conditions"Met"prior to issuance of building permit
,° ❑ Approved,NOT Released: Date:
-. Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
4k Revision Notice 2: Date Sent to Applicant:
1 vision Notice 3: Date Sent to Applicant:
SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes
Tigard Trans SDC: ❑ Yes p/A
/A
Parks SDC: ❑ Yes CYN/A
/ LIDA ❑ Yes 2/N/A
OK to Issue Permit 4rDate:
1/1(/)
/� )>
Approved by Permit Coordinator: 1
I:\Building\Forms\BldgPermitRvw_RES_022819.docx