Loading...
PFI2019-00131 phCITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT e! COMMUNITY DEVELOPMENT Permit#: PF12019-00131 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 06/04/2019 TtC;ARD Parcel: SEG3417 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Project Description: SEG 3417. Install street light poles, no top required as work is done inside subdivision.. Owner: FEES Description Date Amount PHONE: Contractor: PHONE: FAX: Applicant: RICO SOLIS 10800 SW AVERY STREET TUALATIN, OR 97062 PHONE: 503-672-5417 Total $0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: 01:}9`'Or Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12019-00131 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicants expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other I City of Tigard PFI#: 9): FFAYC�51 " ENGINEERING DEPARTMENT APR 17 2019 TIGARD Public Facilities Improvement (py P�Fr- �. G PROJECT INFORMATION TYPE OF WORK Project name: M2574739 j] TYPE 1-Franchise Utility Work Brief description of project: performed by 1VWN,PGE and/or utility agency install street lights on poles J TYPE 2-ROW Sidewalk/Driveway/Sewer Work no tcp needed as work being done inside of of subdivision performed for the purpose of: • Sidewalk installation or repair. SITE INFORMATION • Driveway approach installation S-VGI -{,ii and repair Location (address if available): • Sanitary sewer lateral installation and main SW 74th Ave and Red Cedar Way, Tigard OR 97223 line tap ❑ TYPE 3-Full scale Development Work performed with Land use APPLICANT INFORMATION approval which includes any of Portland General Electric the following: Name: • Subdivisions or Partitions Mailing address: 10800 SW Avery ST • Street widening Tlatin OR ua • Mainline installation for Sanitary City/State: Zip: 97062 • sewer,Storm sewer,Tigard water and Phone: 503.672.5417 Tigard Water Service Area prereqcoord@pgn.com 503.464.7777 ❑ TYPE 4-Small Cell Technology Email: Phone: ❑ TYPE 5-Tigard Triangle Contact name: Rico Solis Phone: 503.672 5417 Email: prereocoord©pgn nom CONTRACTOR INFORMATION ❑ Same as applicant Name: PGE crew doing work CCB Number: Mailing address: City/State: Zip: Phone: Email: ENGINEER INFORMATION Name: na Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ 6085.45 (within the public right-of-way) Is work related to a LAND USE DECISION? 0 Yes 13 No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant" shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I, the applicant, certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted, I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. Ott- Linda Ott for Rico Solis 4/1 7/1 9 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: 1". « • -0C*3 Permit fee: �� Received by: -- Date: } 17 19 Approved by: '401101." Date: 614Vir Notified by: Date: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3:DETAILED SUBMITTAT_ CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑Yes 0 No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell 0 Macro ❑ Street Name How many install sites are proposed as part of this permit 111 Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: 0 Public Right-of-Way 0 Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the El General Notes (City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4 Edge of Pavement Streetlight Ditch --61~- I 1 T`�roposrd"Se1werTiig-- I it Q.) -I l I �� Existing House dI Existing F I �r� Driveway II dl o1 C1 .' ■ "in;w I i ri w. of 1 l 1 I Existing Shop I I • Powerpole I = I L 0 ...,....a. r=1 Ia- 95' 0-------137474Yrrie"—-—'—-P—-—- 1 I Fire Hydrant(FH) I c I • Scale: 'I"=30' I I I I I I I I TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines&dimensions Existing utilities locations (sewer, storm,water) Street&street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 4 9655 LIGHTING LEGEND (UNLESS OTHERWISE SPECIFIED) 69 35.-Unknown 972 CNDLLIT1..ROVDSi NSCACD BNY ICUSSTGMRPV U 2007 9706 a INSTALL 1-R10 CU-TX ST LT CIRCUIT IN 1-1'SCH40 PVC U CONDUIT,PROVIDED&INSTALLED BY CUSTOMER 9715 VT-71 0 CUSTOMER INSTALLED 1730 SECONDARY VAULT 2061 14 6 T 40'4 I 3.0.BRONZE47W LED POLTE(29 MTG HGT) 1957 -, 76 WITH B'MAST ARM.SET 2'FP-EC,CONNECT 260 VOLTS 142 40 T 30'-UnkrX7 9734 7556 / PGE TO PROVIDE BOTTOM PIECE OF POLE FOR CUSTOMER /_7 TO INSTALL AT THE SAME TIME AS THE CONDUIT. CAUTION 2 FEED S=OPEN 2007 INSTALL 30AMP FUSES IN SECONDARY PEDESTALS OR SECONDARY VAULTS(WHICHEVER IS ST LT POINT OF ATTACHMENT) FOR EACH STREET LIGHT PER PGE TOD CONSTRUCTION STANDARD LC-11550 PD-1 9777 0 t CONSTRUCTION NOTES: SLCST 7546 1 CI 1-250 9750 011-250 A P CUSTOMER TO ALL JOINT uHING.BACKFILLING.CONDUIT.ELBOWS.JUNCTION n BOXES VAULTS AND PADS JOINT USE TRENCH WITH GAS TRENCH TO BE A 48INCHEC DEEP AND 30 INCHES WOE,MEASURED FROM FINAL GRADE. --.'•'''. 1' /424 3 ALL PGE CONDUINE TH TO BEI ID MJ ED IN GRAY,SCHEDULE UI ELECTRICAL y GRAPE.PJC CONDUIT WITH NYLON PULL STRINGS(MIN 500 40,TEST) • �.y__ PGE TO CETERMINE THE SUE AND NUMBER OF CONDUITS REQUIRED 2 '7D MNNTMN 12 VERTICAL INCHES AND 24 HORIZONTAL INCHES CLEARANCE BETWEEN GAS AND OTHER UTILITIES ALL ELBOWSSSS BEN SMALLER TO BE 381NCH RADIUS. -. RIGID STEEL OR POE APPROVED FIBEftOLA3S BENDS ARE REQUIRED FOR RUN30F 151 FEET OR LONGER OR FOR ANY LENGTH RUN WITH MORE THAN 180 DEGREES • IN BENDS.PVC SCHEEULE 40 BENDS ARE ACCEPTABLE FOR RUNS OF 150 FEEL OR • PL 136 4b,�OVT 134 1E35.THE MAXIMUM TOTAL BENDS IN ANY CONDUIT RUN IS 270 DEGREES.ALL MJF'® BENDS MUST BE FACTORY MADE.REFER TO LETTER OF RESPONSIBILITY FOR //' T , FURTHER DETAILS. 1 ' C. JUNCTION 6ROOXES AND EOUIPMEI MIFACILRIES INCLUDINGCONNECTION OAR INSTALLATION 7530 OF CON WITS ANA::::PULL STRMGS.CALL SERVICE COORDINATION AT 50}323Fr10 $ TO SCHEWLE E STANDBY CREW. ALL CONCRETE TINGS NEED TO BE INSTALLED WITH TOP OF BASE ,g5'' 5 5.DIRE CARED OM SEWALK 9810 130'1 t F CASH TO CURB 4.CUSTOMER RESPONSBLE FOR ROAD CROSSMOS ALL CROSSMOS MUSE EXTEND e FROM PROPERTY UNE O PRO ERTY LME CROSSINGS TO BE l8 MDHE$DEEP FINA G E. PD-52— 6 T 02362672 ENTs BLACK HDPE I HIGH DENSITY POLYETHYLENE/ DUCT �' 4 OR NI L CONNECTION( ERTA;OK OR LIKE MECHANICAL 1 - O E E E D E HALL MEET THE Ly QUEST FROM PGE PROJECT 1 VSD MANA HREE EQUALLY SPACE 11 050 ...115 (( P912�. y N RID SENT EL TEST OF 7524 air- ?,.7._�^_"_`_ _!�VT 133 225. I/ P()121 VT-72 8.TRNI9FOR ER A05 E O ESE 50 OP 1321 C ES ABOV£ �ij� FMALGMDE.CONDURI3TOBEIN3TALLEPINVL:IZINDICATEDINDETAIL PND TO EXiENOt INLH ABOVE THE PAP. 9640 PD-51' VT 132 J. 7 PL 135 7.ALL PGE TRANSFORMERS TO BE INSTALLED 8 FEET(MIN FROM ANY COMBUSTIBLE BUILDING,WALL OR OVERHANG ANP6FEET I1NTI FROM ABV Fma--- SW feFO CEDAR WAY Lp � PGETRANSFO 1121,1112 ITHINISFEETO Award ALWAYS MAINTAIN 10 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS. 751 16 8.STEEL BARKER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED 1,.* O VEHICLES. 9680 P 7466 9.ivisoEGFRONTLOT PUB LIC UM,EASEMENT(P.U.EJ TO BE 8 FEET(MIN 7496 PO-21 10 FEET(PREFERRED) A 50 64779 tO.CON9UlT WITH PGE REPRESENTATIVE 2 WEEKS BEFORE STARTING(MIN POWER TRENCHING FOR A PRECONSTRUCTON CONFERENCE.INCLUDED IN THIS CONFERENCE WILLBE FJ(CAVATOR PGE,TELCO,CAN,AND GAS. _o VER.TRENCH AND ELDON CONFIGURATIONS.ALL CONDUIT.VAULT AND PAD Rv sAjd°4 AJirrynroTEa SIVSTnLLAT10NTI3 COF.I'P �IEf, n.p R Anovn+. P TO 'N-IR A:DAY F: ALL�03 3f 5 5r NSPECTION TO UR OPONNONOOMPHLLEO el 12.REFER TOOR SO PGE ELECTRIC SERVICE REQUIREMENTS(BOOKLET FOR SPECIFIC REQUIREMENTS. POO 5MReTUWrIOIL ROMlr _ DAA y 13.DESIGNISBASEDONSTANDARD UNDERGROUNDEQUPMENT.NON IT'uttRDUNDER- w vow. .~ GRWND EQUIPMENT I.UV BE AN OPTION AT AN ADDITIONAL COST TO THE CUTOMER. 2 PIECE FIBERGLASS(COMPOSITE)POLE =-a-.... .R..CA�,a A I n,,,..... .100111......1.0........11,4wwei..r,.. .... r 0...1 SideM„ Mid Ma Sa al JUNCTION BOX INSTALLATIONS j 8R.R LEGEND "°EU 'II Gm. FINAL STREET�PPR L ED M NG ,„R j TN.... ,..... 0"os..a.v c.M. N� CONTACT PGE FOR APPROVED MANUFACTURERS PGE CONSTRUCTION DRAWING II 1 "A . AS—BUILT VERIFICA710N & NESC VIOLATIONS CORRECTED Thrs document accurately represents FIELD PAPPEuclion. IL ■IIS■ 'e.l,.P um. —� �_._. Foreman: Dote: T-- ...fa N —1r1.—... General Foreman: Date: I' oETERMNm BY I.C. «« n-NM I.. 1— ,-- - (Signature only required for field construction changes.) 3I .-RapRs aR§Exn Ton SDPASENG REVIEW: IASBUILT BY DESIGNER: 'r INr r MNM Tn+A A1� ro oPrwNu sr Lr P«E °E PGE CONSTRUCTION DRAWING R « CONTACT SERVICE COORDINATOR wTE:9439019 SCALE NTS IAou0rr:7070007 1000'7000004600 lune NO.M2574739 CA,,,,,,d ' TOS 001 RY ANY DEVIATION FROM THIS DESIGN MUST roto e".`6ir"N0 �"n ll mill MaAIIn , BE APPROVED BY PGE PROJECT MANAGER I IT SMITH COMPANIES/CRY OF TIGARD/RED CEDAR ESTATES BOTTOM PIECE POLE INSTALLATION ,°-rERAD00500 rOOR1RUNS OVER I.OR1MEBops I SERVICE COORDINATOR 603-323-6700 OR EDM-54zame(SALEM) /`. WEST PORTLAND-NORTH 17x22 N,A. COMPACTED LOCATION torn*sw.�..�.,.„,Me,>.e.Bma ° L CALL 811 BEFORE YOU DIG PGE/ ...sired�,M,Fp.,,,,4 ANVN• ARouNOANo ATTENTION: 9777 SW 74111 Ave TIGARD OR 97223 , dey ,,,to,,,...4,,,,,, tMDER SPIKE BOX THINK OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED we..aw.Mmiw• EY THE OREGON UTILITY NOTIFICATION CENTER. `/ DESCRRION Install2-47W LED CREE lights on 30'2 PC FG Bronze poles(MH 29 MH) 2. SAFETY THOSE RULES ARE SET FORTH IN OAR 952-001-0010 w/e-MA,connect @ 240V i 00 101 MI„oIA:y,J.«R _ O..NF• ZEE FIRST! THROUGH 952-001-0090.YOU MAY OBTAIN COPIES OF 'Com. (51 WOR:W DI SHEET ®R,IDA«P.,.,,e,Wm dp.«R FIRO E I NOTIFILES BY CAWNG THE OREGON UTILITY CATION ON CENTER ADMINISTRATION H ((S03-332-1987) b ONE MAMMON WASHINGTON Cn25D M25746/3 tAP I Dn -54(503) DRAWN BY TO REQUEST UTILITY LOCATES CALL THE OREGON Rodrigo o Torres Solis 672-5417 SUjalha Noroyvnon UTILITY NOTIFICATION CENTER.ST AT LEAST i,,,,,wh0lrf bei.„. 04,moa 2 BUSINESS DAYS PRIOR TO EXCAVATION. Call before yen dlg• 0 PORTIAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED