PFI2019-00168 PUBLIC FACILITIES IMPROVEMENT PERMIT
III _ CITY OF TIGARD
•' ' COMMUNITY DEVELOPMENT Permit#: PFI2019-00168
Date Issued: 06/11/2019
T f(;A I'f) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421
Parcel: 1 S136CB02900
Jurisdiction: Tigard
Site address: 8355 SW PFAFFLE ST
Subdivision: STEVE&HUGHIE'S PLACE Lot: 1
Project: Bradea Driveway Approach
Project Description: Adding a driveway approach to be used with proposed ADU
Owner: FEES
Description Date Amount
PFI Permit Fee 06/11/2019 $300.00
PHONE:
Contractor:
PHONE:
FAX:
Applicant:
BENJAMIN BRADEA
10770 SW WALNUT ST.
TIGARD, OR 97223
PHONE: 971-506-5592
Total $300.00
Please sign below to indicate .- epta ce of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible p. ies befi re beginning work.
Permittee/Applicant i ,
Signature:
Issued By: AT .-C) (90r fl—‘,
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PFI2019-00168
Type: Condition Name: Status: Severity:
PFI_Sidewalk/[ 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Sidewalk/[ 02-WORK SITE AREA •
Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Sidewalk/[ 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Sidewalk/[ 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc.shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Sidewalk/[ 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept.of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Sidewalk/[ 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Sidewalk/[ 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Sidewalk/[ 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign
at each end of the construction area 72 hours(min.)before initiation of construction work.
PFI_Sidewalk/[ 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Sidewalk/[ 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Sidewalk/[ 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Sidewalk/[ 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Sidewalk/[ 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Sidewalk/[ 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense
PFI_Sidewalk/[ 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Sidewalk/[ 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Sidewalk/[ 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by
the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Sidewalk/[ 18-SEWER SYSTEM TEST Applied Notice
A sewer system air-test and/or DVD T.V.test report and one set of"As-Builts"shall be provided for review and approval.
PFI_Sidewalk/[ 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>,to establish a preconstruction meeting.
PFI_Sidewalk/[ 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
Contact Ken fisher at 503 816 6146 or Kenny@tigard-or.gov
PFI_Sidewalk/[ 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Sidewalk/[ 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports,on a weekly basis, to the City's Inspector.
PFI_Sidewalk/[ 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Sidewalk/[ 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Sidewalk/[ 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Sidewalk/[ 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to
obtain or provide for proof of right-of-entry or easements.
PFI_Sidewalk/[ 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI_Sidewalk/[ 28-AS-BUILT DRAWING Applied Notice
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
PFI_Sidewalk/[ 31 -OTHER Applied Notice
Other
RECEIVED
City of Tigard JUN 0 2019 PFI#: 0/?-00/
z ENGINEERING DEPARTMENT
Public Facilities p CITY OF TIGARD
TIGA viem t (PFI) Permit
PROJECT INFORMATION 4proi ( TYPE OF WORK
Project name: Dr I Ue 4�G• cI n ��VCj 'I G� �0'0 111YPE 1-Franchise Utility Work
Brief description of project: �'i C A d�' CU/y performed by.NWN,PGE, or utility
_I agency
Af ifoiG `C1 �J U y pro r S D V1 S ❑ TYPE 2-ROW Sidewalk/Driveway/Sewer
f I Work performed for the purpose of:
• Sidewalk installation or repair
• Driveway approach installation and repair
SITE INFORMATION • Sanitary sewer lateral installation and
Q 3 S 1-\)12&() �l/e •
main line tap
Location (address if available): l� "�/( /(j1(T( 0 TYPE 3-Full Scale Development Work
performed with land use approval which
includes any of the following.
• Subdivisions or Partitions
APPLIC INFORMATIO • Street widening
Name: ..e,v) )01.vi‘,N 1'-Cwl,P-A_ • Mainline installation for sanitary sewer,
I C , 1 1 storm sewer, Tigard water, and Tigard
(O
Mailing address: 7 10 V iV v� I✓1 l� �� water service area
City/State: i ,/ C' re- Zip: 77 V-5 0 TYPE 4-Small Cell Technology
C I\
Phone: /� I ` 7 0 TYPE 5-Tigard Triangle
I,,,, J (� J
Email: 4 l'iy a { . ele-f., Phone: NOTE: Type 1 and 2 applications may be
Contact name:
cO lei 1•L emailed to rowpermitsna,tigard-or.gov.
Phone: Email:
CONTRACTOR INFORMATION 0 Same as applicant •
Name: CCB Number:
Mailing address: City/State: Zip:
Phone: Email:
ENGINEER INFORMATION
Name:
Mailing address: City/State: Zip:
Phone: Email:
ADDITIONAL INFORMATION
Estimated value of work is required(if over$5,000):$ (within the public right-of-way)
Is work related to a LAND USE DECISION? 0 Yes 0 No Case number:
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4
I
APPLICANTS
NOTE: Person specified as"Applicant"shall be grated"Permittee"and shall provide financial assurance for
work,if required by the city pursuant to TMC 15.04.140.
* With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant
are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this
application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application.
I,the applicant,certify that:
• To the best of my knowledge, all the information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
C )
.,).A\ )c‘v`1t✓► A AL0_1_
Applicant's or authorized agent's signature Print name Date
Property owner's signature (if required) Print name Date
STAFF USE ONLY
Case No: /A20l 006 'Permit fee: 3D Q., Ems?' Received by: -CAD Date: (( 3 ,iq
Approved by: • 1514 Date: 4 -/e,-/1 Notified by: 4_,2 Date: (Q//NII9
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4
'SCJ V&A Le Wv-6`t Mi A 4 rEop>" %mt....,e-I.i.-1-.5
Existing
8355 SW Pfaffle St
a)
C
J
Current Home > N
a )
CI. Cr,'
J p
i
N OZ
a) N
0
d Cl..
"' Current driveway
27'6"
4 ►
24'
Sidewalk Wing Wing
6' 6'
SW 83rd Ave
SW 83' street
SW 83rd
4
106'
5IT KAY N015 PLAN-1 I- GNI2 G�N1?AL INFO:MA110N
0 rF0rFFTY LINF SHFU135(710f4-) OWNEF: (3ENJAMIN 6RA7EA
0 MIN,PULPING 5E113ACK PEP DEVELOPMENT CODE, 0 1UFiFD HARGRA55(4) A855: 8355 5W PFAFFLE STSEET
0(E)CUM CUT TO REMAN, 11GA?D,OI GON 97223
0(E) ELFC11?ICAL POLE&OVE51 A17 itt. DOUGLAS 5f'IFIFA(2) TAX L0f 0: 151360602900
ELECTRICAL&COMMUNICATION SERVICE, PROPERTY 0: 5283687
0(E) 50A17, PLANTS(160) PFOPERTY CLASSIFICATION: 1010-M511EN1IAL IMPROVED
0(F) DRIVEWAY AND PATH o OI GON 1515(48) NEIGH605HOOP CODS: WSMZ
0(F) HOUSE • CAMAS LILY(46)
0(5) WATER LINE AND METER • COMMON CAMAS(46) LEGAL; STEVE&NUGNIE'S PLACE Lot:l
0(N)PROPOSED LIRA SYSTEM-NON-S1RICTURAL LOT SIZE: .28 ACM5
PLANTER/RAN GARDEN ELANt CALCUL-AI-ION 1,15P: WASHINGTON
io (N) FSMCH MAN OVERFLOW DRAIN MAP NUMSFF: 1513601302900
0(N) 550505ED DRIVEWAY LOA AMA:140 5F
0(N) PROPOSED CUM CUT PLANTS FPI':100 SF:
0(E) 5OEWALK 100 HEMACEOUS PLANTS
4 SH5UC35 .
REQUIRED PLANTS:
140 HEMACEOUS PLANTS
6 SHSU35
517%%L%VAVION 220' 517E%LEVA110N 221'
.. IIb'i0" a.
1 r\
NNHkNHNIfM.'O:
.moi:
} 45
4 3"1
•:.4.:
11 �5'-b''}.
/ Ti'-IO" C
// 1 P
O I, 1
F 1
I I
>—@
MO/ 12'H ____1 Iv
55050MP 2U \ - - 4—°
z
1 a
I I Via.,: coco
o-11
�/'!*:o...
ti "1i ; } -
1 - -0 =I
L °J
•
o.
-•.- __0 I\_o
517E ELEVATION 224'
517E EIEVAVON 225' �-0 517E&%VA9ON 225'
SW PFAFFLE ST1 FI N
517E PLAN -HO'-1/32" '
I. GN12 L01"AJ A I.IbA CALCULA11ON5
LOT COVERAGE:12,342 5F NEW IMPERVIOUS AEA: 2,309 5F
rR05551Y LINE COVE5AG% 521951,16(sr) 17EM0( ) 22%12(5') NEW tura.<sr) UDA MAX AMA FOR CA-C: 2,640 5F
--—- SITE CONTOUR 9JILn1NG COVE : 1566 306 1818 3078 1I12A 51ZIN6 FACTOR: 0.06
1 1 I I I I 1 1 1 I I I I I Inv SERVICE F%Fc%NrcoV%FAtb 13' 25% UDAPAFA: 140 SF
R IMP%8VI0U15AMA 731 0 491 1222
® WATER METE —.-._.
FEI?cENr 1MFERV1G11s bi loz, - 15.UNE
N1-°' ELECTR1CAL POLE
WEST COAST DESIGN&GRAPHICS,I-LC PFAFFLF A01.1 AD191110N 55050551517E PLAN 04,1419
SEAVFRTON,OR 97006 8355 5W PFAFFLF 515551
19:503-741-9234 110440,OREGON 97223
F:nrotta@wc-dq,can W:www wc-dq,can 5:971506.5592 _ ><
511 KEY NO1E5 PLANT LEGEND GENERAL INEOf;MA110N
0 P80pFRTY LINE. 51-1E05(6 TOTAL) OWNER: BENJAMIN BRADEA
MIN,BUILDING SETBACK PER DEVELOPMENT CODE. TUFTED HAI8GEA55(4) AOBM55: 8355 5W PFAFFLE 511 F'1
0(E) CURB CUT TO REMAIN. 11GAR12,OREGON 97223
0(E) ELECTRICAL POLE&OVERHEAD DOUGLAS SPIRIEA(2) TAX LOT ID: 151360802900
ELECTRICAL&COMMUNICATION SERVICE, PLANT5(140) PROPERTY ID: 8283687
0( ) ROAD, o OREGON IRIS(48) PROPERTY CLASSIFICATION: 1010-8E51DENTIAL IMPROVED
(E)DIRWEWAY AND PATH • CAMAS LILY(46)
0(E) HOUSE • COMMON CAMAS(46) NEIGH ORHO0D CODE: WSMZ
0(E)WATER LINE AND METERLEGAL: STEVE&NUGNIE'5 PLACE Lot:1
0(N)PROPOSED LIDA SYSTEM-NON-STRUCTURAL PLANT CALCULATION LOT SIZE: .28 ACRES
PLANTER/RAIN GARDEN LIDA AREA:140 5F UM: WASHINGTON
+o (N) FRENCH DRAIN OVERFLOW DRAIN PLANTS PER 100 5F: MAP NUMBER: 15136CB02900
11 (N) PROPOSED DRIVEWAY 100 HERBACEOUS PLANTS 1 4 SHRUBS
,2 (N) PROPOSED CURB CUT REQUIRED PLANTS:
0(E) SIDEWALK 140 HERBACEOUS PLANTS 1'6 SHRUBS
OVERFLOW TO CONVEYANCE. MAINTAIN MAXIMUM LINEAR HIGH DENSITY JUTE OR COCONUT MATTING
SEPARATION FROM ALL STORM INFLOW POINTS 6" MIN-
• FREEBOARD 3:1 (H:V) MAXIMUM SLOPE
3 `- i_S
�� IIT,E 11
r`MIN
-----13" MIN GRWO , MEDIUM
�. _ __, r DEEP (3/4" - 1/4'•)
is+_ �
-. _- I CLEAN CRUSHED DRAIN ROCK
=\'9' DEEP (1-1/2" - 3/4")
__ _�_ CLEAN CRUSHED DRAIN ROCK
_ - .-_ __ - OVERFLOW
��CONVEYANCE
NATIVE ZZZZZj CC))
SUBGRADE 1 1 TONER OFABRICEOTEXTILE
NOTES:
1. PUBLIC WATER QUALITY AND/OR QUANTITY SYSTEM .
2 PROVIDE OVERFLOW CONVEYANCE SYSTEM,OVERFLOW CONVEYANCE HEIGHT TO ALLOW 6°MAXIMUM PONDING,PIPING TO A MINIMUM OF THE PLUMBING CO E OR CONVEY THE 25 YEAR STORM.
3. IF USING THE NATIVE SOIL INFILTRATION FOR SIZING,THE RATE SHALL BE DETERIANED BY ASTM STANDARD TESTING METHODS.
4. FLOW DISSIPATORS SHOULD BE USED IF ENTRY SLOPE TOVHE BASIN IS GREATER THAN 3:1. FLOW DISSIPATORS SHALL BE CONSTRUCTED ALT OF ROCK CR GRAVEL PER DESIGN FLOW VELOCITY AT ENTRY OF THE FACILITY.
5. TREATMENT AREA SHALL HAVE HIGH DENSITY JUTE OR COCONUT MATTING OVER 18"MINIMUM CF GROWING MEDIUM OR BASE STABILIZA➢ON METHOD AS APPROVED BY THE DISTRICT.
6. VEGETATON TO BE USED IN WET AREAS OF THE BASIN IS PER APPENDIX°A"OF MO 07-20 FOR THE WET MOISTURE CONDITIONS.
7. VEGETATION TO BE USED IN OTHER AREAS OF BASIN CONFORMS TO PLANT LIST OF THIS HANDBOOK AS APPROVED BY DISTRICT.
NON—STRUCTURAL PLANTER/RAIN GARDEN LIDA HANDBOOK c_
DRAWING NO. 797 •REVISED 05-16 C1eanWater Services
STORMATER FACILITY BLENDED SOIL PROVIDED BY THE VENDOR.
FURNISH IMPORTED BLENDED SOIL FOR ALL VEGETATED LIDA FACILITIES CONFORMING TO THE FOLLOWING: • 100%OF THE MATERIAL MUST PASS THROUGH A 1/2-INCH SCREEN.
• GENERAL COMPOSITION-USE MATERIAL THAT IS ANY BLEND OF LOAMY SOIL SAND,AND COMPOST THAT IS 30-40% • THE PH OF THE MATERIAL SHALL BE BETWEEN 6 MIN.AND 8.5 MAX.
COMPOST(BY VOLUME)AND MEETS THE OTHER CRITERIA IN THIS SPECIFICATION. • MANUFACTURED INERT MATERIAL(PLASTIC,CONCRETE,CERAMICS,METAL,ETC.)SHALL BE LESS THAN 1.0%BY
• ANALYSIS REQUIREMENTS FOR THE BLENDED MATERIAL: WEIGHT.
PARTICLE GRADATION-A SIEVE ANALYSIS OF THE BLENDED MATERIAL INCLUDING COMPOST,SHALL BE CONDUCTED IN • THE ORGANIC MATTER CONTENT SHALL BE BETWEEN 30 AND 70%(DRY WEIGHT BASIS).
CONFORMANCE WITH ASTM CI17/C136,AASHTD TTT/T27,ASTM D422/D1140,OR ASTM D6913.THE ANALYSIS SHALL • SOLUBLE SALT CONTENT SHALL BE LESS THAN 6.0 MMHOS/CM.
INCLUDE THE FOLLOWING SIEVE SIZES: 1 INCH,3/8 INCH,#4,#10,#20,#40,#60,#100,#200.THE GRADATION OF THE 'MATURITY INDICATOR SHALL BE GREATER THAN 80%FOR GERMINATION AND VIGOR.
BLEND SHALL MEET THE FOLLOWING GRADATION CRITERIA. • STABILITY SHALL BE'STABLE'TO'VERY STABLE'.
SIEVE SIZE PERCENT PASSING • CARBON/NITROGEN(C/N)RATIO SHALL BE LESS THAN 25:1.
1 INCH 100 • TRACE METALS TEST RESULT="PASS."
#4 75-100 CONSTRUCTION
#10 40-100 STORMWATER FACILITY BLENDED SOIL:
•
N 40 15-50 • PROTECTION OF THE SOIL-THE MATERIAL SHALL BE PROTECTED FROM ALL SOURCES OF CONTAMINATION,INCLUDING
#100 5-25 , WEED SEEDS,WHILE AT THE SUPPLIER,IN CONVEYANCE,AND AT THE PROJECT SITE.
#200 5-15 • WET AND WINTER CONDITIONS-HAULING AND PLACEMENT OF THE MATERIAL WILL NOT BE ALLOWED WHEN THE
• THE MATERIAL SHALL BE LOOSE AND EASILY BROKEN INTO SMALL PIECES WEATHER IS TOO WET OR THE GROUND IS FROZEN OR SATURATED AS DETERMINED BY THE OWNERS REPRESENTATIVE.
:IT SHALL BE WELL MIXED AND HOMOGENOUS. I PLACEMENT OF THE SOL-PLACE THE MATERIAL IN LOOSE LIFTS,NOT TO EXCEED 8 INCHES EACH AND EACH LIFT
• IT SHALL BE FREE OF WOOD PIECES,PLASTIC,AND OTHER FOREIGN MATTER. SHALL BE COMPACTED WITH A WATER-TILED LANDSCAPE ROLLER.DO NOT OTHERWISE MECHANICALLY COMPACT THE
• IT SHALL HAVE NO VISIBLE FREE WATER. MATERIAL.
COMPOST • TIMING OF PLANT INSTALLATION-WEATHER PERMITTING AND AS APPROVED,INSTALL PLANTS AS SOON AS POSSIBLE
THE COMPOST SHALL BE DERIVED FROM PLANT MATERIAL AND PROVIDED BY A MEMBER OF THE US COMPOSTING AFTER PLACING AND GRADING THE SOIL IN ORDER TO MINIMIZE EROSION AND FURTHER COMPACTION.
COUNCIL SEAL OF TESTING ASSURANCE(STA)PROGRAM.SEE WWW.COMPOSTTNG000NCIL.ORG FOR A LIST OF LOCAL • EROSION CONTROL-TEMPORARY EROSION CONTROL MEASURES ARE REQUIRED UNTIL PERMANENT STABILIZATION
PROVIDERS. MEASURES ARE FUNCTIONAL.
THE COMPOST SHALL BE THE RESULT OF THE BIOLOGICAL DEGRADATION AND TRANSFORMATION OF PLANT-DERIVED •PROTECTION OF THE INSTALLED SOIL-IN ALL CASES,THE PROTECT INSTALLED MATERIAL FROM FOOT OR EQUIPMENT
MATERIALS UNDER CONDITIONS DESIGNED TO PROMOTE AEROBIC DECOMPOSITION.THE MATERIAL SHALL BE WELL TRAFFIC AND SURFACE WATER RUNOFF.INSTALL TEMPORARY FENCING OR WALKWAYS AS NEEDED TO KEEP WORKERS,
COMPOSTED,FREE OF VIABLE WEED SEEDS,AND STABLE WITH REGARD TO OXYGEN CONSUMPTION AND CARBON DIOXIDE PEDESTRIANS,AND EQUIPMENT OUT OF THE AREA:UNDER NO CIRCUMSTANCES SHOULD MATERIALS AND EQUIPMENT
GENERATION.THE COMPOST SHALL HAVE NO VISIBLE FREE WATER AND PRODUCE NO DUST WHEN HANDLED.IT SHALL BE STORED ON TOP OF THE INSTALLATION AREA.
MEET THE FOLLOWING CRITERIA,AS REPORTED BY THE US COMPOSTING COUNCIL STA COMPOST TECHNICAL DATA SHEET
BLENDED SOIL SPECIFICATION FOR VEGETATED LIDA FACILITIES LIDA HANDBOOK /-�
DRAWING NO. 798 06-16 C1eanYY�x�
aber\?` '. ervices •
LEGENn LOT"AMA LIDA CALCULA110N5 •
PROPERTY LINE LOT COVERAGE:12,342 5F NEW IMPERVIOUS AMA: 2,309 5F
—————— 51TE CONTOUR COVES EXISITNG G 5P) CEMO(YF) *TO( NEW TOTAL(YF) LIDA MAX AREA FOR CALL: 2,640 5F•
11 1111 111 I 1 111 UpLITy SERVICE PULPING CO EPEA •: 1566 306 1818 3018 LIDA SIZING FACTOR: 0.06
® GERCEMICOVERPLt 3 25% LIDA AREA: 1405F
WATER METER IMPEKVIOUS AITA 731 0 491 1222
CA' ELECTRICAL POLE PEDCENEIMPETVIOLIS 6% Loi ---
__-
12,5.LINE
WEST COAST DESIGN&GRAPHICS,LLC PFAPFLE AITU ADDITION PROPOSED LIDA PLAN-DETAILS 6,2,19
DEAVERTON,OR 97006 8355 5W PFAFFLE STREET
P:503-741-9234 TIGARD,OREGON 97223
E:nrotta@wc-dq.com W:www c-dq com P:971,506.5592
,w