Permit (122) CITY OF TIGARD MECHANICAL PERMIT
• ' ' COMMUNITY DEVELOPMENT Permit#: MEC2019-00638
T I(,;A tt ID 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 09/05/2019
Parcel: 2S101DC04601
Jurisdiction: Tigard
Site address: 7409 SW TECH CENTER DR 155
Project: Snyder Roofing Subdivision: TECH CENTER BUSINESS PARK Lot: 2
Project Description: Installing 2 ton ductless split system.
Contractor: OREGON AIRE INC Owner: WPC TIGARD LLC
7715 NE 33RD DR STE A 307 LEWERS ST 6TH FL
PORTLAND, OR 97211 HONOLULU, HI 96815
PHONE: 503-335-2222 PHONE:
FAX: 360-423-1978
FEES
Specifics: Description Date Amount
Type of Use: COM Permit Fee 09/05/2019 $207.21
Class of Work: ALT Type of Const: VB Plan Review 09/05/2019 $51.80
Occupancy Grp: Occupancy Load: 12%State Surcharge-Mechanical 09/05/2019 $24.87
Stories: Info Process/Archiving-Sm$0.50(up to 09/05/2019 $4.00
11x17)
Project Valuation: $5,000.00
Fuel Air Handlers
Fuel Types: Electricity Units<10000 cfm:
Gas Pressure: Units>10000 cfm:
Furnaces Boilers&Compressors
Furnaces<100K BTU: 0-3 HP:
Furnaces>=100K BTU: 3-15 HP:
Floor Furnaces: 15-30 HP:
Unit Heaters: 30-50 HP:
Vents w/o Appliances: 50 or Greater HP:
Air Conditioning:
Heat Pump: 1
Appliances
Vent Fans: Vent Systems: Total $287.88
Hoods: Comm Incinerators:
Woodstoves: Gas Fireplaces: Required Items and Reports(Conditions)
Clothes Dryers: Other Mech Units:
Gas Outlets: Other Desc:
Fire/Smoke Dampers:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other
applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of
issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the r adopted by the Oregon
Utility Notification Center. Those rules ark set forth OAR 952-001-0010 through OAR 952-001-0090. You '.y obt•'n a copy = the rules
or direct questions to OU y c , 503.2/.1987 or '10.33A,2344.
Issued By: Permittee Signature: iodulk
r
gar
Call 503.639.4175 by 7:00 a.m.for the next available ins.-ction date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Mechanical Permit Application - City of Tigard
Page 2 - Supplemental Information
Commercial & Multi-Family Fee Schedule:
Total Valuation: Permit Fee:
$0.00 to$500.00 Minimum fee$69.06
$500.01 to$5,000.00 $69.06 for the first$500.00 and
$3.07 for each additional$100.00 or
fraction thereof,to and including
$5,000.00.
$5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and
$2.81 for each additional$100.00 or
fraction thereof,to and including
$10,000.00.
$10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and
$2.54 for each additional$100.00 or
fraction thereof,to and including
$50,000.00.
$50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and
$2.49 for each additional$100.00 or
fraction thereof,to and including
$100,000.00.
$100,000.01 and up $2,608.71 for the first$100,000.00 and
$2.92 for each additional$100.00 or
fraction thereof.
Note: All new commercial buildings require 2 sets of plans.
I.\Building\Permits\MEC_PermitApp_040113.doc 2
City of Tigard
1111 N COMMUNITY DEVELOPMENT DEPARTMENT
C
T1cARD Building Permit Review — Commercial - No Land Use
Building Permit #: .44 ��/ - 003&:1
Site Address: 7101 cl✓ let,i‘ CulOr. Suite/Bldg#:
Project Name: l jr
(Name oT commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: JAM L10 hn 66)-111S Soli-,0rh
Existing Business Activity: Nit
Proposed Business Activity: -
Verify site address/suite# exists and active in permit syst
L 'er Terrace Neighborhood: ❑ Yes No
1L Zoning: 1.4
:7 P rmitted Use: CIYes ❑ No ❑ Spec Space
7°nfirm no land use required.
Business License:
Exists: Yes ❑ No,applicant notified to obtain business license
Notes: U4art Ei.punil &y 61)-11 pa A-47,6144tvtaj flif91f\
Approved by Planning: .s...,..i.iC Date: 3`I1
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: P // ,
Building Plans: #
Building Permit#: Ptnter building permit#above.
Workflow Routing: Si lanning ❑ Per r 'nator ,uilding
Workflow Sign-off: ► Sign-off for Planning(include notes from planning review)
Route Application Documents: PJ Building: original permit application, site plans,building plans, engineer and
beam calculations and trust details,if applicable,etc.
Notes:
ByPermit Technician: / '' ' Date: /111/7/
X
I:\Building\Forms\B1dgPennitRvw_COM_NoIandUse 060116.docx
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
•
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to .avant:
Revision Notice 2: Date Sen :• Applicant:
Revision Notice 3: Date s-'nt to Applicant:
❑ SDC Fees Entered: ash Co Trans Dev Tax: ❑ Yes ❑ N/A
Tigard Trans SDC: ❑ Yes ❑ N/A
Parks SDC: ❑ Yes ❑ N/A
❑ OK to Issu 'ermit
Approv,:. by Permit Coordinator: Date:
I:\Building\Forms\BldgPermitRvw_COM NoLandUse_070915.docx