PFI2019-00200 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
N . COMMUNITY DEVELOPMENT
Permit#: PF12019-00200
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 06/26/2019
T"I
r';;l 1'.Dg Parcel: SEG2553
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE M2725517
Project Description: SEG2553 and SEG2563, associated with Tigard High School. Pulling wire thru conduit on southern
perimeter of High School.
Owner: FEES
Description Date Amount
PHONE: Total
REQUIRED INSPECTIONS
Contractor:
PHONE:
FAX:
Applicant:
LUIS MENDIVIL
10800 SW AVERY STREET
TUALATIN, OR 97062
PHONE: 5034647777
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant / r1
Signature: C �pi9L-4(cid 1-4 /"`�1
Issued By: ttitO
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PFI2019-00200
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced, with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area.Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign
at each end of the construction area 72 hours(min.)before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by
the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>, to establish a preconstruction meeting.
PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector.
PFI_Utilities 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to
obtain or provide for proof of right-of-entry or easements.
PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI_Utilities 28-AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
PFI_Utilities 31 -OTHER Applied Notice
Other
RECEIVED
JUN 252019 ,p�
INd City of Tigard CITY OF TIGARD PFI#: i r"��,O�q�O®��
ENGINEERING DEPARTMEN ,LANNING/ENGINEERING
TIGARD Public Facilities Improvement (PFI) Permit
PROJECT INFORMATION
TYPE OF WORK
Project name: M2725517 E) TYPE 1—Franchise Utility Work
performed by NWN,PGE and/or
Brief description of project:
utility agency
pulling wire thru conduit on southern perimeter of Tigard High School ^ TYPE 2—ROW
Sidewalk/Driveway/Sewer Work
performed for the purpose of:
• Sidewalk installation or repair.
SITE INFORMATION • Driveway approach installation
9000 SW DURHAM RD,TIGARD 97224 and repair
Location (address if available): • Sanitary sewer lateral installation and main
cross street SW 92nd ave R.-.0--2s -7-)J Se-G�SS line tap
❑ TYPE 3—Full scale Development
Work performed with Land use
APPLICANT INFORMATION approval which includes any of
PORTLAND GENERAL ELECTRIC the following:
Name: • Subdivisions or Partitions
Mailing address: 10800 SW AVERY ST • Street widening
TUALATIN,OR • Mainline installation for Sanitary
City/State: Zip: 97062 sewer,Storm sewer,Tigard water and
Tigard Water Service Area
Phone: 503.464.7777 PGE emergency number
❑ TYPE 4—Small Cell Technology
Email: prereqcoord@pgn.com Phone:
❑ TYPE 5—Tigard Triangle
Contact name: Luis Mendivil
Phone: 503.672.5454 Email: luis.mendivil@pgn.com
CONTRACTOR INFORMATION 0 Same as applicant
Name: Linescape Inc-Contact Doug Russell CCB Number: 140408
Mailing address: 19100 SW 51st Ave City/State: Tualatin.OR Zip: 97062
Phone: 5039695204 Email: oregon@linescapellc.com
ENGINEER INFORMATION
Name:
Mailing address: City/State: Zip:
Phone: Email:
ADDITIONAL INFORMATION
Estimated value of work is required(if over$5,000):$ 9,175.91 (within the public right-of-way)
Is work related to a LAND USE DECISION? 0 Yes El No Case number:
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of 4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for
work,if required by the city pursuant to TMC 15.04.140.
* With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant
are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this
application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application.
I,the applicant, certify that:
• To the best of my knowledge, all the information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
- Linda Ott for Luis Mendivil 6/25/19
Applicant's or authorized agent's signature Print name Date
Property owner's signature (if required) Print name Date
STAFF USE ONLY
Case No: 1P1'LZolq-GOL1)() Permit fee: 13k Received by: C Date:
Approved by: g(*Ai Date: G2174/ oZO lq Notified by: Date:
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-orgov • 503-718-2421 • Page 2 of 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PFI)Permit:
INITIAL PFI PERMIT FEE
Part 1: Required submittal fee is 10%of the Net PH Permit Fee.See below for calculations.Minimum of$300.
NET PFI PERMIT FEE
Part 2: All non-water system improvements engineer's estimate X 7% (less the initial PFI Permit Fee).
WATER LINE CONSTRUCTION FEE
Part 3: All public water system improvements engineer's estimate X 12%.
FOR STAFF USE ONLY FOR STAFF USE ONLY
TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3:DETAILED SUBMITTAL
CHECKLIST REQUIREMENTS
Does applicant have a right-of-way license? ❑Yes 0 No TYPE 1 AND TYPE 2-Must include a sketch
showing:
Under the wireless facilities standards,is the proposal
El Dimensions
considered?(check all that apply): 0 Small Cell 0 Macro ❑ Street Name
❑ Site Address
How many install sites are proposed as part of this permit
application?
TYPE 3-Must provide 4 sets of plans (sized 24 x 36
or 22 x 34) and an electronic version of all submittal
The proposed equipment is located on which of the following: items. The plans must that include:
0 Public Right-of-Way ❑Private Property
❑ Cover—Site,Vicinity,Abbreviation,Legend
If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.)
type&use: ❑ Street(Plan,Profile)
❑ Water,Storm and Sanitary(Plan Profile)
El Water Quality Facilities
❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,
Sanitary,Water,Signage,Street Lights,etc.)
❑ Details
❑ Traffic Sight Distance
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and plan
log block,dates and sheet numbers.)
❑ Engineer's Construction Estimate
Additional Submittals
(per land use conditions,if applicable)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design
❑ Water Provider Approval
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4
9 S ‘‘ ) S
Edge of Pavement
'�� L'itcli ''''""411.'C 7 t r N a t!�7�1� , _.
. r .
// ..�w
1 F..m Drag, i; y
f; � Drag, ;
1t. 1' O •°�1
I
T– mmol ego n–n a-- L
1 r. 1 j cu
. •
;.,1. I Existing House
I
4 1•
Existing
�. `� 1Driveway
d) v: I 1
crl!)
,e( t;
a'
gi or"
I
:11
.
a1
0 , \ Existing Shop I
J
Powerpole i I = I d 1
1 -—-—-—-7-7ft-T a it,-1-7,,-—-—.—..2.....____
I I o
ICDI Fire Hyarart tF H.
f I
Sr
I I
i I
I I
1 I
TYPE 1 AND TYPE 2:
MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable)
North arrow Property lines&dimensions Existing utilities locations
(sewer, storm,water)
Street&street names All existing structures
Proposed work Existing curb or edge of pavement Utility&street light poles
Existing S/W or D/W apron Slope of property Trees
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 4
COMMERCIAL LEGEND
NEW PGE FACILITIES TO BE INSTALLED
(UNLESS OTHERWISE SPECIFIED)
mem FACILITIES IN GREEN ARE TO BE REMOVED
A 509-0GE SWITCH VAULT.WITH 55-332P-PGE TOP
PROVIDED B INSTALLED BY CUSTOMER
PGE TO INSTALL 1-4 WAY LATERAL TAP
UJ 444-PGE PADMOUM VAULT,
PROVIDED 8 INSTALLED BY CUSTOMER
INSTALL CUTOUT
6d4F
512E FUSING AB NOTED
INSTALL 1-X2 AL-EPR JET PRIMARY IN 1-2"PVC CONDUIT
PROVIDED 8 INSTALLED BY CUSTOMER
91X O -INSTALL 1.410 AL-TX SECONDARY IN 1-3"PVC CONDUIT
PROVIDED 8 INSTALLED BY CUSTOMER
INSTALL 2"POLE CONDUIT UNIT
ON EXISTING 12"BRACKETS,
1-142 C/O F6T
&LIGHTNING ARRESTER
/
• INSTALL:
C 0 25KVA
PAD MT 120/240V
t0 CONDUIT 7200V,120/240V,1 0,3W 200AMP
I
1111 C2 1-14A 1.02%FLKR _..._.
�'�� 7,899A AFC
16585 4
VT55 - RD 56.
200.
360' II� 120'
1426T 1111
740 2
0.
C 10 60734 4.249IT
.rip 2 el4X -' Hak 9111
e 9(11° 6041 ,...._
4830.. �iy9 .... 8981 8967 5943 921
8599. .
50'3 8905
7 2013 'P!
E 2014 9'OL,,4q I • M
199a Gr A 50 33098 " 4,7
1 + PD-4 a Y
A 50 3277
p II `I PF 'i 9NSTRUCTION NOTES: CMDEV
A UNK A UNK
r v A UPR( CLAS OMER IS RESPONSIBLE FOR ALL TRENCH TH 30INC VAl1',IV'DS ANO ROr1D
CROSSINGS.ALL CONDUIT TO BE INSTALLED M/IIH SO INCHES COVER AT TOP
r/ A 4(0 AL-Tx 11 'A 10 CU TX A PSE STUNT FROREW IS GRADE.
•0 20 A4/0 AL-TX •_ PGE STANDBY CREW IS REQUIRED FOR OPENING ALL ENERGIZED PGE VAULTS
i 20,4 ALIO AL-TX F J X - SERVICE COORDINSTION AT 501]236100 TION
TO
LE
j 1994 ,x A5033120`',�5 A' 1• (' A} 3.
ALLSCGE CIONOUTORS TO BEV4STALLEDI GRAY.SCHEDULE 4A ELECTORA.GRADE
TION BOXES AND EQUIPM)RCA CLRIE3 INCLUDING CONNE C61?nit
tA'LA
] le il'
Q p 12 'S1- q Cry
9D80 80061 0- O! Q 1994 8.5A 2` 60 33109 E)'1 QO fr PVDCONDUITWTH NYLON PULL STRINGS(MIN.00 LBS.TEST) PGE TO DETERMINE
Rad gide 24 _ Spvll --' ` 6�F I �p' 8932 5'101991 3 ..696 5P,1fj2THEOR AND NUMBER OF CONDUITS REWIRED.MAINTAIN 12 VERTICAL INCHES AND
— 4HORIZONTAL INCHES CLEARANCE BETWEEN GAS AND OTHER UTILITIES ALL ELBOWS
41NCH 8 SMALLER TO BE 35 INCH RADIUS.ALL BENDS MUST BE FACTORY MADE.
' I_—TrcJ y ALLRSVED.IBERGL THAN 4INCH TO BE d01NLH ORRUN RIGID STEEL OR PGE
O FOR
AN.LENGTH RUN WITH
ITS AOR THAN10 DEGREESGRSN BENDS.
SCHEDULE OR FORANYLENGTHRUNWITHMORETHAN.0 FEET
SBENDS MAXIMUM
MTOTALE
LEGEND B BENDS ARE CONDUIT RU FOR RUNS RE1S0 FEET OR LESS.THE MA%IMUM TOTAL
99 O PGE Prim.ry BENDS IN ANY CONDUIT RUN IS 770 DEGREES.
36•• Miv 3ecavdvsy Csble 4.DIRECTIONAL BORING REQUIREMENTS:BLACK HDPE(HIGH DENSITY POLYETHYLENE) DUCT
Min
Cover Ineide Dust OR SCHEDULE 40 PVC WITH A MECHANICAL CONNECTION(CERTA-LOK OR LIKE MECHANICAL
CONNECTION PRODUCT) AS AN ALTERNATIVE TO HDPE DUCT.HDPE SHALL MEET THE
Trench / O Telco'CATV ,R C` QUREMENTS OF PGE SPECIFICATION LC70515(AVAILABLE ON REQUEST FROM PGE PROJECT
♦' JJ 504-PGE VAULT MANgGEmm FOR SAFETY REASONS THE DUCT SHALL BE BUCK WRM THREE EQVALLY SPACE
HxpRUOED RED STRIPES(WHICH I3 A SPECIFICATION REQUIREMENT) MANDREL TEST OF
j ]4„ ®Beet811 55-332P-PGE DIAMOND PLATE DOOR Is REQUIRED AFTER INSTALLAnoN wDH`PPF ecSPEcroR PaESENT
C I I Seleel Letflll NOTES: S-
BUILDING.EWALL OR X MUST N ABE INSTALLED
D I FEET E(MII�p FROM ANY FIRLH COMBUSTIBLE
DRA HYDRANT.4"M " d TO BE ALWAYS NSFIXtMERS MUST BE NATIICF I F RO T FALL TRANSFORM
LL"MN p�14h /� SEI EAPPROVEDB IGF ALWAYS MAINTAIN 10 FEET CLEARANCE IN FRONT OF All TRANSFORMERS.
FMLGRAD. PNMARE TO BE SETSOTHAT THE TOP15ICATED IABOVE
2.TOP b W I S FINAL GRADE.CON WIT IS TO BE INSTALLED IN PAD AS INDICATED IN DETAL
John Use Trcveh w,o Cu I 5'''''''A
Y Sfl AT FINAL ANO TO EXTEND 1 INCH ADOVE THE PAD.
/ AIYROV 0 BR IGF. 7.STEEL BARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED
4'I[ �, 3MU VAULTS CM>CS TO VEHICLES.
1 I.
ALL SWITCH VAULTS TO BE SET AT FINAL GRADE WRHBINCH GRAVEL BASE AND
2.TO A2• CdIWRSALIGNED TO ENTER THE VAULT END LOWER KNOCKOUTS(TERMA-DUCTS).
(sEE DETaIs oN s1u.Tcro
PD 56 Q a- ♦ O,s_On I6VI�VINST. U 9.PGE TO BE NOTIFIED AND INSPECT qLL CONDUIT.VAULT AND PAD MSTALIATONS
P/ VRI'll H M1C WITH POEAG FILL.ALLNEWVAIRT4PADLOCATIONSTOBEc.ECDVERIFIED
444-PGE VAULT wIrH PGE AND cusroMER REPRESENTAnv,:
W/PAD MOUNT LID O Q 0 Q IO.REFERTO PGE ELECTRICAL SERVICE REQUIREMENTS BOOKFOR FURTHER DETAILS
4-4•M PD— 0 vain TO&: 0• •0 2"TO 6 SPECIFIC REQUIREMENTS.UNK TO W 6022013n sunrcxc
Fe
1 OG1191 YE MINIS 54' "".'.. 5d• PL 453f' 11.DESIGN IS BASEOON STANDARD UNDERGROUND EQUIPMEM NOKSTANDARD
SET
AT IO 4t'POE. CBKHED 40[K UNDERGROUND EQUIPMENT IMY BE AN OPTION AT 4 ADDRIONAL COST TO
ON AU
WA US I.TOP OF w 70 1'•DEEP(MONO 1 j THE CUSTOMER.
SE SET AT FINN / 12.THEPOINTOFDEIIVFet aDIVISION TERMS
PGE WILL BE AT THE LINE SIDE OF THE NEW CUStOMER FRONDED SWITCH GEAR.
AMOVLOE. N PGE.
T'ToPGE CONSTRUCTION DRAWING
METER 1111 ,400,0,./----1 0MALL CONTACT SERVICE COORDINATOR EATE:05/23/2019 SCALE:NTS lACCOUNT 1070001 155000 1000004599 )JOB No.M2725517
eBRN4 BOO LB ANY DEVIATION FROM THIS DESIGN MUST TRENCH N000NOAIT IH OT0T0NPTIOR
TOLE
1FST LULL- MIR
BACKFlLL P!£WAL INSTALL WINE
MG IN EAa rvc. BE APPROVED BY PGE PROJECT MANAGER UNTA TRENCH IS,4MBACKF Le TIGARD SCHOOL DIST 23J--HIGH SCHOOL
9 • - A ® SERVICE COORDINATOR /` CIRCUIT SIZE
4 B, , 503-323-6700 OR 800-542-8818 DURHAM-SATTLER 17922
6♦ I ATTENTION: CALL 811 BEFORE YOU DIG PG E LOCATION
S OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED Ij' 9000 SW Durham Rd,TIGARD
,i •• THINK BY THE OREGON UTILITY NOTIFICATION CENTER. @ ` DESCRIPTION
2"TO THOSE RULES ARE SET FORTH IN OAR 952-001-0010 10 PROVIDE 100E 1201240 lEG OH SERVICE TO STORAGE SHED
auSHED 6"OOP s
VT 55 SAFETY THROUGH 952-001-0090.YOU MAY OBTAIN COPIES OF
p STI THE RULES BY CALLING THE OREGON UTILITY COUNTY HI SECTION-1 (5) WORN WITH SEET
FIRST! NOTIFICATION CENTER ADMINISTRATION a 1503-232-198n BCREW CON WASHINGTON C21-14A OF 1
LINE CREW CENTER DESIGN BY PHONE503 DRAWN BY
TO REQUEST UTILITY LOCATES CALL THE OREGON Knew what's below. Luis Mendivil 672-5454 I Marius LBOatusu
UTILITY NOTIFICATION CENTER,911 AT LEAST Ca beldig. BEAVERTO OEs OCE
2 BUSINESS DAYS PRIOR TO EXCAVATION. ere you 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED
Page 118 2011 Edition
Lane Closure at Intersection with Flagging Diagram 620
Diagram 620 covers work within an intersection when normal traffic control
must be interrupted. Work vehicles may or may not be in the work space.
1. During flagging, traffic signals shall be turned off. Contact the road
jurisdiction for approval and assistance (see Chapter 3).
2. For multi-lane facilities, traffic approaching the intersection shall be
reduced to a single lane on each approach. See Chapter 3 for
information on flagging through intersections.
3. There should be one flagger for each approach. One flagger may
control two adjacent approaches if sight distance, low volumes on side
roads, and flagger position allows for safe operation and clear direction
to motorists. For low traffic volume intersections (fewer than 400
entering vehicles per day), one flagger may be used.
4. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should
be considered on high volume or high speed roads, or when extended
queues may be expected.
Sign Spacing and Buffer Lengths(feet)
Posted Spacing Between Signs "Buffer"
Speed A B C Space
20 50
25 100 100 100 75
30 100
35 125
350 350 350
40 150
45 180
50 500 500 500 210
55 250
60— 285
65 700 700 700 325
70 365
Chapter 5 September 2016
2011 Edition Page 119
Lane Closure at Intersection with Flagging Diagram 620
(00 3-.4
4
lii) 0vROW
E AD
BE MEAD
PREPARED ROAD
TO STOP WORK
AH:AD
A BIB C
Butler .ice ----� --
4— i 4—
• •••
—+ •�''' ID —4 .
L1008 H I
CBB A+
ROAD BE 1
WORK PREPAR-. •
AHEAD TO STOP® 10011.Mar
ORE LAN
lir
W E
ROAD •
AHEAD
cop.) ,A •
B
PE
PREPARED
TO STOP
B (00110"0.0
• 1 AN;
1 t AROW
HEAD
C
v
_.__.- .. ,70A:(�.
AHEAD
September 2016 Chapter 5
Page 54 2011 Edition
Pedestrian Accommodation Diagrams
See Diagrams 5-7 and 5-8, below, for pedestrian accommodations in work
zones.
Pedestrian Accommodation Principles:
1. If the work impacts the sidewalk or pedestrian facility, provide a safe,
accessible path, where practical, in accordance with the requirements
of the ADA.
2. If not practical to match the width of the existing pedestrian facilities,
maintain a 4-ft minimum width.
3. Unless a reasonably safe route can be provided through the work
space, pedestrians should be appropriately directed with advance
signing to cross the road. Do not divert pedestrians into travel lanes.
4. Install pedestrian closure or detour signing on Type II barricades.
Make every practical effort to satisfy the following:
• If work closes a sidewalk or sidewalk ramp, close sidewalks at a point
where an alternate crossing point or route can be provided. Minimize
the amount of out-of-direction travel for pedestrians.
• Use a combination of"SIDEWALK CLOSED" (R9-9), "SIDEWALK
CLOSED USE OTHER SIDE" (R9-10), "SIDEWALK CLOSED AHEAD
CROSS HERE" (R9-11), and "SIDEWALK CLOSED CROSS HERE"
(R9-11a)signing to direct pedestrians to an alternate facility.
• Where there are business destinations between the nearest crosswalk
and the work area, close the sidewalk at the business access nearest
the work area, where practical using the SIDEWALK CLOSED sign.
o Include the SIDEWALK CLOSED AHEAD CROSS HERE sign at the
Q nearest crosswalk prior to the closure.
To
U
Q
F-
Chapter 5 September 2016
Page 56 2011 Edition
Pedestrian Accommodation, Intersection Diagram 5-8
For work near an intersection, close crosswalks and/or sidewalks as
necessary when safe passage cannot be maintained.
SIDEWALK CLOSED
USE OTHER SIDE
24x12
Type"W1"
(Mount on B(II)LR)
ROAD
WORK •
AHEAD
(Optional) If %Z�����
SIDEWALK CLOSED
SIDEWALK CLOSED CROSS HERE
44(
USE OTHER SIDE /, SIDEWALK 24x12
24x12 CLOSED Type"W1"
Type"W1„ (Mount on B(II)LR)
24x12
(Mount on B(II)LR) Type"W1"
(Mount on B(II)LR)
•
SIDEWALK CLOSED
N AHEAD
4111
0_
0_ CROSS HERE
24x18
Type"W1"
T (Mount on B(II)R)
...
ROAD
WORK
AHEA/
(Optional)
Chapter 5 September 2016