PFI2019-00178 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
s COMMUNITY DEVELOPMENT
Permit#: PF12019-00178
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 06/13/2019
TIGARD 13125 SEG1063
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: Comcast PFI
Project Description: Overlash 1-48ct fiber to existing aerial facilities, route 1 -48ctt fiber through existing underground
facilities.
Owner: FEES
Description Date Amount
PFI Permit Fee 06/12/2019 $300.00
PHONE
Contractor:
PHONE
FAX:
Applicant:
ALEX SILANTIEV
11308 SW 68TH PARKWAY
TIGARD, OR 97223
PHONE: 503-596-3733
Total $300.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: See application
Issued By: _
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PFI2019-00178
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area.Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign
at each end of the construction area 72 hours(min.)before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches,etc.)as may be necessary, as determined by
the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>, to establish a preconstruction meeting.
PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector.
PFI_Utilities 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to
obtain or provide for proof of right-of-entry or easements.
PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI_Utilities 28-AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
PFI_Utilities 31 -OTHER Applied Notice
Other
RECEIVED
JUN 11 2019• a�.y
City of Tigard p� CITY OF TIGARI� PFI#: i�i� 001 15
IIIIENGINEERING DEPARTMENT'ANNING//EN(;1NFF 9 ;IG
TIGARD Public Facilities Improvement (PFI) Permit
PROJECT INFORMATION
74520 Cable-Fiber Plant Extention TYPE OF WORK
Project name: — Ii TYPE 1—Franchise Utility Work
Brief description of project: Overlash (1)-48ct fiber to existing ` performed by NWN,PGE, or utility
ency
aerial facilities, route (1)-48ct fiber through existing underground ❑ TYPE2—ROW Sidewalk/Driveway/Sewer
facilities. Work performed for the purpose of:
• Sidewalk installation or repair
• Driveway approach installation and repair
SITE INFORMATION • Sanitary sewer lateral installation and
Location (address if available):
7117 SW Beveland Rd. STE 201 main line tap
a TYPE 3—Full Scale Development Work
Tigard, OR 97223 s'e() 10 Co 3, r ( r coIperformed with land use approval which
Y includes any of the following:
• Subdivisions or Partitions
APPLICANT INFORMATION • Street widening
Comcast • Mainline installation for sanitary sewer,
Name: storm sewer, Tigard water, and Tigard
Mailing address: 11308 SW 68th Parkway water service area
City/State: Tigard, OR Zip: 97223 ❑ TYPE 4—Small Cell Technology
Phone:
(503) 941-8656 ❑ TYPE 5—Tigard Triangle
Alexander_Silantiev@comcast.com (503) 596-3733
Ercall: Phone: NOTE: 'Type 1 and 2 applications may be
Contact name:
Alex Silantiev emailed to rowpermits(a,tigard-or.gov.
Phone: (503) 941-8656 Email: Alexander_Silantiev@comcast.com
CONTRACTOR INFORMATION ❑ Same as applicant
Name: Texstar Enterprises CCB Number: 178798
Mailing address: 14122 Arndt Rd City/State: Aurora, OR Zip: 97002
Phone: (503) 793-3109 Email: Jim.miner@texstarenterprises.com
ENGINEER INFORMATION
Name: K&B Technical Solutions
Mailing address: PO Box 2529 City/state: Clackamas, OR Zip: 97015
Phone: (503) 650-6041x204 Email: Jack_Nygard@kbmail.net
ADDITIONAL INFORMATION
Estimated value of work is required(if over$5,000):$ (within the public right-of-way)
Is work related to a LAND USE DECISION? ❑Yes I■i No Case number:
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4
APPLICANTS
NOTE: Person specified as"Applicant" shall be designated"Permittee" and shall provide financial assurance for
work,if required by the city pursuant to TMC 15.04.140.
* With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant
are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this
application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application.
I, the applicant, certify that:
• To the best of my knowledge,all the information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted, I will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
Jack Nygard DigitaDate:Ily signed 2019.06.11y10:205-0077''00' Jack Nygard for Alexander Silantiev 06/11/19
Applicant's or authorized agent's signature Print name Date
06/11/19
Property owner's signature (if required) Print name Date
Case No: Prj ZU 1 C7—001 7e6 Permit fe . 3c,::%i Received by: L� U Date:kJ �Ci
Approved by: .E%-cwy Date: (o//2//9 Notified by: 644 Date: (0 (2I 11
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-otgov • 503-718-2421 • Page 2 of 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PFI)Permit:
INITIAL PFI PERMIT FEE
Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300.
NET PFI PERMIT FEE
Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee).
WATER LINE CONSTRUCTION FEE
Part 3: All public water system improvements engineer's estimate X 12%.
POR SIAI'I 1 SI;ONI.l I OR S l AI I l SI. ONLY
TYPE 4: SMALL,WIRELESS FACILITY TYPE 1 —3: DETAILED SUBMITTAL
CI IECKLIST REQUIREMENTS
Does applicant have a right-of-way license? 0 Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch
showing:
Under the wireless facilities standards,is the proposal
Dimensions
considered?(check all that apply): 0 Small Cell 0 Macro ❑ Street Name
❑ Site Address
How many install sites are proposed as part of this permit
application?
TYPE 3-Must provide 4 sets of plans (sized 24 x 36
or 22 x 34) and an electronic version of all submittal
The proposed equipment is located on which of the following: items. The plans must that include:
❑Public Right-of-Way 0 Private Property
❑ Cover—Site,Vicinity,Abbreviation,Legend
If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.)
type&use: ❑ Street(Plan,Profile)
❑ Water,Storm and Sanitary(Plan Profile)
❑ Water Quality Facilities
❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,
Sanitary,Water,Signage,Street Lights,etc.)
❑ Details
❑ Traffic Sight Distance
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and plan
log block,dates and sheet numbers.)
❑ Engineer's Construction Estimate
Additional Submittals
(per land use conditions,if applicable)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design
❑ Water Provider Approval
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of 4
I
i
I
___,,L,.. .o.
8 Q w E y o1 ZL. 7157 7117 7095 a.N
I" m— K1M NIII
— N >05
CO 0 03 Ce
EXIT CITY OF TIGARD ROW ~ LL Q
IA H
r
S1 7065 4 O.,N,,,,, 11:1
'IAN
p R0 N
SW BEVELAND RD
*oxo 119' 162' WOW MON
ou— tap — •eil 1643/381;7 p M .oR ger--�—�o mos r
0 95/593969 4054/38458 R
®25 1 B
END AERIAL OVERLABN AT EKIBTRAT UTILITY POLE.
SEMI UNDERGROUND ROD/ROPE. ,
---- __ 1063/NT
--- --_— 7110 7500
1 7060 1 i
F- 55 . . .
V
7690 P.
P. BEGALOVERLABNATEX$TNU I 1 ———— ————T————— 1ht,
UruTY POLE IN CITY°RIVARD ROW d rl
Cl) g A
61/NT 11 m w
8
12800 7095
7025 E
v
Qa E
hi CO
oN
00aI
SW GONZAGA ST a
(y 1q 1.ALL WORK AREAS TO BE RESTORED TO LIKE OR BETTER 11180080
oll a
po F. .ou ANI .ov wR U i. CONDITION.
2.ALL OTHER UTILITIES ARE BASED OFF EXISTING LOCATES RP 1
I I OR UTILITY STRUCTURES.
3.IT IS THE CONSTRUCTION CONTRACTORS SND
...=..>.11.7:..... RESPONSIBILITY TO CALL FOR LOCATES BEFORE DIGGING. CMME.14450.10159
O
z
E. o3
N J
u
1— Z 0
N y W 1-
6 N x 2
CC 0, W W
g0 “,5
vg0
DESCRIPTION: EXAMPLE DESCRIPTION: EXAMPLE: >Cr n
IX
o
W Q W 0
BORE/DRILL —-----—--— JOINT USE POLE m C7 CO a l
TRENCH JOINT USE POLE W/TRANSFORMER Co r E LL
- V0
EXISTING CONDUIT POWER POLE W/TRANSFORMER ® Y
STRAND - POWER POLE X U
RIGHT OF WAY VP CABLE POLE •
PROPERTY LINE TELEPHONE POLE 0 i `
PUBLIC UTILITY EASEMENT nc PEDESTAL,VAULT OD 135
d
CENTER LINE vt MANHOLE
FACE OF CURB Fec CATCH BASIN g y
EDGE OF PAVEMENT .- VALVE(WATER.GAS,ETC) N 1
EDGE OF GRAVEL to. METER(WATER,GAS,ETC) p
B
EDGE OF SIDEWALK s/. FIRE HYDRANT 'r•
EDGE OF DRIVEWAY —cop—
REMOVE&REPLACE LIMITS.
E5 ,
BORE PIT a 3
SEWER
m
STORM so
ola
WATER v
GAS _,,,.._______. 'n i
POWER P i Ili' I
TELECOMMUNICATION m ` S w
—;ten g
CAW
TRAFFIC CONDUIT TEr
STEAM n m o
ti)ill m
FENCE LINE -s s- Q N 'E)GUARD RAIL o 0 0 Rte' 0 yM 6 6
Q
RAILROAD TRACKS IIIIIIIIIIIIII , O u=a
O�
otNl
Voa
a
SHEET NO
RP-L
PERMIT NO
CMME-14450-10159
Page 80 2011 Edition
5.3 Two-Lane, Two-Way Roads
Shoulder Work w/ Minor Road Encroachment Diag. 300
Use this detail for non-freeway work which extends into a travel lane and
maintains a minimum 10 foot travel lane. If a minimum 10 foot travel lane
cannot be maintained, or when traffic cannot safely pass by in both lanes
simultaneously, use the appropriate lane closure diagrams—for example,
Diagrams 310 through 350.
A lane closure may be appropriate for conditions such as high traffic
volumes, high speeds, and inadequate approach sight distance to the work
space, or heavy equipment adjacent to the travel lane.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3— Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Cones shall be placed along the entire length of the work space. If a
protection vehicle is used and work is in place one hour or less, the
taper and tangent devices may be omitted.
4. If the speed is 45 mph or higher, volumes exceed 2000 ADT, or there
is limited sight distance, consider placing cones or tubular markers on
centerline.
5. An arrow board in caution mode or truck-mounted PCMS with
"SHOULDER WORK" or other appropriate message may be used for
higher visibility.
Sign Spacing and Buffer Lengths(feet)
Posted Spacing Between Signs "Buffer"
Speed A B C Space
20 50
25 100 100 100 75
30 100
35 125
350 350 350
40 150
45 180
50 500 500 500 210
55 250
60 285
65 700 700 700 325
70 365
Chapter 5 September 2016
2011 Edition Page 81
Shoulder Work w/ Minor Road Encroachment Diag. 300
ROAD\
WORK •
AHEAD 7—*
•
Initial
Warning A •
Sign
iI •
• %%/
(Optional) •
• •
• • • pal
. IES
• Ill
Protection Vehicle
w/TMA(both Optional)
See Chapter 4 - • Buffer
•
10' •
minimum • 143
•
A
ROAD
NARROWS)
(Optional)
B
1ROAD
1 WORK
AHEAD
Initial
Warning
Sign
September 2016 Chapter 5
Page 106 2011 Edition
Diversion into a Continuous Left Turn Lane Diagram 430
Diagram 430 shows work in the travel lane(s) next to a continuous two-way
left turn lane with one direction of traffic diverted into the continuous two-way
left turn lane.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. When two or more travel lanes are reduced to a single lane before the
diversion, each lane shall be closed separately. Layout traffic control
according to ODOT Standard Drawing TM 852 for 5-lane sections.
4. A shifting taper(L/2) may be added in the diverted traffic direction
across the continuous two-way left turn lane (as shown). This option is
recommended when the speed is 45 mph or greater.
Sign Spacing and Buffer Lengths(feet)
Posted SpadngBetweenSigns "Buffer"
Speed A B C Space
20 50
25 100 100 100 75
30 100
35 125
350 350 350
40 150
45 180
50 500 500 500 210
55 250
60 285
65 700 700 700 325
70 365
Chapter 5 September 2016
2011 Edition Page 107
Diversion into a Continuous Left Turn Lane Diagram 430
ROAD
WORK 1 X
AHEAD A
IhI
B 1
' CENTER
AHEAD
A
II
1
1 •
L/2 1 • I
•
1 •
r 1 Buffer
r Protection Vehicle
• w/TMA(both Optional)
See Chapter 4
T nn /
n
• w
Buffer
r 1
•
•
• L/2
11 •
1 •
.
•
U2 1. 1 A
•
1 •
11
lht
141 ROAD
WORK
1 v \AHEAD
September 2016 Chapter 5
Page 108 2011 Edition
5.5 Multi-Lane Roads
Right Lane Closure, Multi-Lane Non-Freeway Diag. 500
Diagram 500 covers work which closes the right lane of a multi-lane non-
freeway road.
If closing more than one lane on a multi-lane road, provide a minimum
tangent distance of 2L between the end of the first lane closure taper and the
beginning of the second lane closure taper.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
o mode may be used.
3. When the posted speed is 40 mph or less, the RIGHT LANE CLOSED
AHEAD signs may be omitted.
4. Placement of signs in a non traversable median or other median that is
not a two-way left turn lane is required for lane closures any time there
is room for a truck to be parked on the left, out of the travel lane.
When there is no room for a truck to be parked on the left an additional
RIGHT LANE CLOSED AHEAD sign should be placed on the right side
and placement of signs in the median is optional.
5. If flagging is needed for work vehicle ingress/egress, use Flagger
Layout Detail (see Inset).
Sign Spacing and Buffer Lengths(feet)
Posted Spacing Between Signs "Buffer"
Speed A B C Space
20 50
25 100 100 100 75
30 100
35 125
350 350 350
40 150
45 180
50 S00 500 500 210
55 250
60 285
65 700 700 700 325
70 365
Chapter 5 September 2016
2011 Edition Page 109
Right Lane Closure, Multi-Lane Non-Freeway Diag. 500
1 4 t t
• Protection Vehicle
• w/TMA(both Optional)
• See Chapter 4
K
f m
D
11 Il II
• r O
N
Ill a
t •Tir
1�
1
1v 1.
.v 1m •
• BE •
• PREPARED • L
• — L \TO STOP •
IIIII
• 1 •.crcrc�4 (Optional)
Flagger Layout •• us
Detail • _—
A
* 1 N
e
*See Note 4 RIGHT LANE
1 1 t 1 t
C
ROAD
* WORK
AHEAD
September 2016 Chapter 5
Page 118 2011 Edition
Lane Closure at Intersection with Flagging Diagram 620
Diagram 620 covers work within an intersection when normal traffic control
must be interrupted. Work vehicles may or may not be in the work space.
1. During flagging, traffic signals shall be turned off. Contact the road
jurisdiction for approval and assistance (see Chapter 3).
2. For multi-lane facilities, traffic approaching the intersection shall be
reduced to a single lane on each approach. See Chapter 3 for
information on flagging through intersections.
3. There should be one flagger for each approach. One flagger may
control two adjacent approaches if sight distance, low volumes on side
roads, and flagger position allows for safe operation and clear direction
to motorists. For low traffic volume intersections (fewer than 400
entering vehicles per day), one flagger may be used.
4. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should
be considered on high volume or high speed roads, or when extended
queues may be expected.
Sign Spacing and Buffer Lengths(feet)
Posted Spaang Between Signs "Buffer"
Speed A B C Space
a)
20 50
25 100 100 100 75
30 100
35 125
350 350 350
40 150
45 180
50 500 500 500 210
55 250
60 285
65 700 700 700 325
70 365 c
Chapter 5 September 2016
2011 Edition Page 119
Lane Closure at Intersection with Flagging Diagram 620
A
ONE LANE C I * j t
( ) ROAD
AHEAD
B
BE
PREPARED -
TO STOP I W
. opoDnoB
J.
• Be ONE LAN
RDOD
100SC '
1 MPREPARED AI.AO ROAD
I TO STOP WORK
AHEAD
I A B B C
I
Buffer
—+ IA ..,
•
!.: K . K4
,I ®.
1000.Mmt.H 1
C B B ABE I
PREP- •
T
TO STOP • 1.....
• •
ONE LANE
\ROAD
•• '
AHEAD
,A 4>
V I _ PREPARED
TO STOP
B ( (
M I ONE
ROAD
1 t • C MEAD
ROAD
V -- WORK
AHEAD
September 2016 Chapter 5