Loading...
Permit (108) CITY OF TIGARD MECHANICAL PERMIT COMMUNITY DEVELOPMENT Permit#: MEC2019-00636 Date Issued: 09/04/2019 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1 S 135AB04500 Jurisdiction: Tigard Site address: 10250 SW GREENBURG RD 110 Project: MiaDonna Subdivision: 1991-055 PARTITION PLAT Lot: 1 Project Description: Installing 5 ton heat pump to existing ductwork. Contractor: OREGON AIRE INC Owner: LINCOLN CENTER LLC 7715 NE 33RD DR STE A BY SHORENSTEIN PROPERTIES LLC PORTLAND, OR 97211 555 CALIFORNIA ST 49TH FL SAN FRANCISCO, CA 94104 PHONE: 503-335-2222 PHONE: FAX: 360-423-1978 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 09/04/2019 $398.51 Class of Work: ALT Type of Const: VB Plan Review 09/04/2019 $99.63 Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 09/04/2019 $47.82 Stories: Info Process/Archiving-Sm$0.50(up to 09/04/2019 $20.50 11x17) Project Valuation: $12,000.00 Fuel Air Handlers Fuel Types: Electricity Units< 10000 cfm: Gas Pressure: Units> 10000 cfm: Furnaces Boilers&Compressors Furnaces< 100K BTU: 0-3 HP: Furnaces>= 100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: Vent Systems: Total $566.46 Hoods: Comm Incinerators: Required Items and Reports(Conditions) Woodstoves: Gas Fireplaces: Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: 1 Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rule adopttied by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-00100_ through OAR 952-001-0090. You may •btain a .opy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.80Q352.2344. Issued By: Permittee Signature: `II,' atila Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. LINGo-N ti Mechanical Permit Application FOR OFFICE USE ONLY City of Tigard Received iiiii 't 13125 SW Hall Blvd.,Tigard,OR 97223 Date/By: g� �� 4 , 1 e e1 7►/�X�3c. r Plan Review ' ^� """���///��- Phone: 503.718.2439 Fax: 503.598.196 r=j" ,3 - , ) •-dp�r /)J C,-e)/TC Date/By: Ul VG / t/[/ / TIGARD Inspection Line: 503.639.4175 ,. Date Read Tom: Internet: www.tigard-or.gov C° 'F ' Ready/By: H See Page 2 for hfied/Meth • / `/ Supplemental Information TYPE OF WORK OMMERC P. FEE* SCHEDULE -USE CHECKLIST Mechanical permit fees*are based on the value of the work ❑New construction IXAddition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all ❑Demolition El Other: mechanical materials,equipment,labor,overhead,and profit. Value:$ 12,000. 1 CATEGORY OF CONSTRUCTION RESIDENTIAL EQUIPMENT/SYSTEMS FEES* 0 1-and 2-family dwelling J Commercial/industrial 0 Accessory building For special information use checklist. 0 Multi-family ❑Master builder ❑Other: Description P Qty. Ea. Total 10?.. c o JOB SITE INFORMATION AND LOCATION Heating/cooling: '� Air conditioning 46.75 Job site address: i' ZL0. eleetawgve..G RD Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP: T.t pn4D Off,/q 3-Z Z3 Furnace 100,000+BTU(ducts/vents) 54.91 Suite/bldg./apt.no.: D Project name: Heat pump 61.06 Duct work 23.32 Cross street/directions to job site: AA;A 0W !'�J!` n A a n O'et Hydronic hot water system 23.32 �'s Residential boiler(radiator or ghydronic) 23.32 1/.... Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 SLot no.: Other: Subdivision: 23.32 Other fuel appliances: Tax map/parcel no.: Water heater 23.32 N. DESCRIPTION OF WORK Gas fireplace/insert 33.39 ll Flue vent for water heater or gas SN I S ut.. mH 5 ^ N e R)I..AP "Ca exxsm1361 fireplace 23.32 Dk)C -W 0 RZV... Log lighter(gas) 23.32 Wood/pellet stove 33.39 4-1 Wood fireplace/insert 23.32 a, Chimney/liner/flue/vent 23.32 'F XPROPERTY OWNER CI TENANT Other: 23.32 Environmental exhaust and ventilation: Name: 5 of-0491-01.) / `. =, ,v - Range hood/other kitchen equipment 33.39 Address: Clothes dryer exhaust 33.39 S( City/State/ZIP: Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:( ) Fax:( ) Attic/crawlspace fans 23.32 W INC APPLICANT 0 CONTACT PERSON Other: 23.32 Business name: Oteazo -Atm 'oco Fuel piping: $14.15 for first four;$4.03 for each additional Contact name: M,GDOr4A(.0 Furnace,etc. J Address: x"115 we 337tic . t &V( n Gas heat pump f'( Wall/suspended/unit heater City/State/ZIP:eq R. r 412,1 t Water heater 12. Phone:(503 )335-222.'-2 (#1404)/I Fax::( ) Fireplace Range E-mail:figmill ^ 2 O �_• t ' coma, Barbecue (.�' CONTRACTOR Clothes dryer(gas) Business name: opt Goa-. A me. I KG. Other: j(? N E MECHANICAL PERMIT FEES* Address: J 33 ) -' 1 tj( A- Subtotal City/State/ZIP:T�.A,Op /M / 1j Z11 Minimum permit fee($90.00) VIS �L ( _i Plan review(25%of permit fee) Phone:(1o5)33 2222 (*1q e cd Fax:( ) State surcharge(12%of permit fee) CCB lic.: 4(4 23 JT TOTAL PERMIT FEE This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. i&4\i5k...) iiteDj..." Authorized signature: * Fee methodology set by Tri-County Building Industry Service Board Print name 0 (DD)Fr p Date: $3.2'.II I:\Building\Permits\MEC PermitApp_040113.doc 440-4617T(11/02/COM/WEB) Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial & Multi-Family Fee Schedule: Total,Valuation: Permit Fee: $0.00 to$500.00 Minimum fee$69.06 $500.01 to$5,000.00 $69.06 for the first$500.00 and $3.07 for each additional$100.00 or fraction thereof,to and including $5,000.00. $5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and $2.81 for each additional$100.00 or fraction thereof,to and including $10,000.00. $10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and $2.54 for each additional$100.00 or fraction thereof,to and including $50,000.00. $50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and $2.49 for each additional$100.00 or fraction thereof,to and including $100,000.00. $100,000.01 and up $2,608.71 for the first$100,000.00 and $2.92 for each additional$100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. I:\BuildingTermits\MEC PermitApp_040113.doc 2 City of Tigard IN . COMMUNITY DEVELOPMENT DEPARTMENT . . . TIGARD Building Permit Review — Commercial - No Land Use Building Permit #: 3./P(Z(`'AO(' — 006,3 Cv Site Address: /0 c7 <j,O (ii- d)G Suite/Bldg#: //(; Project Name: (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review f"ExiProposal: ) r2y Axe/oil/ea/ (,ln d--- Existing sting Business Activity: (/c Pro.3 sed Business Activity: // ra V-rift'site address/suite# exists and active in permit sys . '10' r:ver Terrace Neighborhood: ❑ Yes No PI onmg: E-1 7 ermitted Use: Yes ❑ No ❑ Spec Space firm :;us2_rec Exists: Yes ❑ No,applicant notified to obtain business license Notes: Approved by Planning: _ _ �< Date: / `� , Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: ! Site Plans: 7,7_, , Building Plans: Building Permit#: I' nter building permit#above. a. Workflow Routing: /I Planning ❑ Perdinator ,wilding Workflow Sign-off: i— ign-off for Planning(include notes from planning review) Route Application Documents: ►.' :uilding: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable, etc. Notes: 1. By Permit Technician: /4 �` Date: /,.2., 7i7' ti t 1:\Building\Fonns\BldgPennitRvw_COM_NoLandUse_060116.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved, NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Ap• . ant: Revision Notice 2: Date Sent to % splicant: Revision Notice 3: Date Sen o Applicant: ❑ SDC Fees Entered: Wa Co Trans Dev Tax: ❑ Yes ❑ N/A 'tgard Trans SDC: El Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved byermit Coordinator: Date: ziv I:\Building\Forms\BldgPermitRvw_COM NoLandUse_070915.docx