Specifications (52) Cms zr-o\G- o
EIVED
MAR 0 7 2019
Polygon Northwest i 1 i tvi-it
oN
�
gY F
v.f«s
Z! r"" / '
Structural Calculations
Roshak Sales Trailer
Structural analysis and design for community sales trailer
REVIEWED BY: Dennis Heier, PE
--:rkg,15-F-71R
• ,�r� t of\o„a\
7
(t. / 85273
\ OREGON
7 -
02/1 51' r—.
EXPIRES:8/301201
Project No: 2062
Note: Our firm has reviewed the attached plans from Modern Building Systems for the
28'x35' modular office, dated 11/30/15. The design meets or exceeds all current codes as
adopted by the city of Tigard and our firm stands behind the design of the building provided
on the attached plans.
i
IPROJ:
[ Roshak Sales Trailer 11
V I
A
DATE:
[ 2;13/2019S
2062 - STRUCTURAL UCTUR.
L
ENGR: �"I ..«.�EINJOINEER. ING ,
� ✓
;�� 'r
J fitte
. v
; , c
.
ti �j� y
.
it
.
P
2X6 GLG. JOISTS @ 24" O.C. 5
TOTAL , 19.4 ' :
•
1 i- ;
E t
kiir''''k6 ' '')-1,0
,) :
`— S ? - i , Tiffi, ;1,/1(o i ,.
�' .4' 1 i � ,�
TOTAL
i
b a
{
.
..m _ , ..... a
f
t
,
I
r
i
t
i
Y:
Vista Structural Engineering,LLC Project Title: Polygon at Rnshr.k,Sales Tr- er
j
14718 NW Delia Street Engineer. DMH
Portland,Oregon 97229 Project ID: 2062
Project Descr:Sttuctr ras C1an cs
www.vistastructural.com j 9
dennis@vistastructural.com
�. _;... (971)645-0901
World Beam File=C UsemZei:alsOropaoxsy1ISTA5-pViSrr Crd'RCA 112062.PCti
Software 9htS'iLPCALC.IN(.;1 ,. +318;Build 10.1812.13,
Lic #:KW-06010623 ''•,� a v' tce tee:.:1 sta ,tsuctu I EngitrUtirir ,LLC
Description: HEADERS ABOVE NEW WINDOW OPENINGS IN LEFT WALL(OFFI 1 AND 2)
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10
Load Combination Set:ASCE7-10
Material Properties
Analysis Method: Allowable Stress Design Fb+ 900.0 psi E:Modulus of Elasticity
Load Combination ASCE7-10 Fb- 900.0 psi Ebend-xx 1,600.0 ksi
Fc-Pill 1,350.0 psi Eminbend-xx 580.0 ksi
Wood Species : DouglasFir-Larch Fc-Perp 625.0 psi
I Wood Grade :No.2 Fv 180.0 psi
Ft 575.0 psi Density 32.210pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling ,11
�...r.. ��a_... D(0,0535)
1
2-2x4
As
Span =4.0 ft
i
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Uniform Load D=0,020, S=0.0250 ksf, Tributary Width=2,0 ft
DESIGN SUMMARY .," •,..11441.ti *
Maximum Bending Stress Ratio = 0.227: 1 Maximum Shear Stress Ratio = 0.107 1
Section used for this span 2-2x4 Section used for this span 2-2x4
fb:Actual = 352.65 psi fv:Actual = 22.15 psi
FB:Allowable 1,552.50 psi Fv:Allowable = 207.00 psi
Load Combination +D+S+H Load Combination +D+S+H
Location of maximum on span = 2.000ft Location of maximum on span = 3.723 ft
Span#where maximum occurs = Span#1 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.017 in Ratio= 2841 >=360
Max Upward Transient Deflection 0.000 in Ratio= 0<360
Max Downward Total Deflection 0.030 in Ratio= 1578>=240.
Max Upward Total Deflection 0.000 in Ratio= 0<240.0
Maximum Forces&Stresses for Load Combinations
Load C,.. . _�.. . . _ _..
ombination Max Stress Ratios Shear
lu
,,,,, x_,,,,,_,__ Moment Values Shear Values
Segment Length Span# M V Cd CFN C i Cr Cm C 1 CL M F'b V . Fv
0.00 0.00 0.00 0.00
Length=4.0 ft 1 0.129 0.061 0.90 1.500 1.00 1.00 1.00 1.00 1.00 0.08 156.73 1215.00 0.07 9.84 162.00
+D+L+H 1.500 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=4.0 ft 1 0.116 0.055 1.00 1.500 1.00 1.00 1.00 1.00 1.00 0.08 156.73 1350.00 0.07 9.84 180.00
+D+Lr+H 1.500 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=4.0 ft 1 0.093 0.044 1.25 1.500 1.00 1.00 1.00 1.00 1.00 0,08 156.73 1687.50 0.07 9.84 225.00
+0+S411 1.500 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=4.0 ft 1 0.227 0.107 1.15 1.500 1.00 1.00 1.00 1.00 1.00 0.18 352.65 1552.50 0.16 22.15 207.00
+D+0.750Lr+0.750L+H 1.500 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=4.0 ft 1 0.093 0.044 1.25 1.500 1.00 1.00 1.00 1.00 1.00 0.08 156.73 1687.50 0.07 9.84 225.00
+D+0.750L+0.750S+H 1.500 1.00 1.00 1,00 1.00 1.00 0.00 0.00 0.00 0.00
Length=4.0 ft 1 0.196 0.092 1.15 1.500 1,00 1.00 1.00 1,00 1.00 0.16 303.67 1552.50 0.13 19.07 207.00
i
Vsta Str:t urat Engineering,LLC Project Title: Polygon at RoshaklSales Trailer
yg
�, 14718 NW Dee Stleti Engineer: DMH
*461' Portia^a,Grego+l 97223 Project ID: 2062
a Project Descr:Structural Changes
+ www.vistastructural coin
dennis@vistastructural,corn
(971).,8t`'•'1901
W"OCI Beam: C:1Users vDennisvDropboxlVISTAS 21VISTAJ-11ENERCA 112082.ec6,
Softwareoep '. iENERCALC INC.1s83470100,Build.10.18.12.13.
Lie, 11:MW360108Q3 iii . _`• ,• •, Licensee:ViStratNatUral Engirieerirrg,`LLC
Description: HEADERS ABOVE NEW WINDOW OPENINGS IN LEFT WALL(OFFII' 1 AND 2)
Load Conbi,,atio Ma;,Ct,ass Palos Moment Values Shear Values
Segment Lengt!) Span# Ai; V Cd C FN Ci Cr Cm C t CL M fb F,b V fv F'v
+D+0,60W+H 1.500 1.00 1,00 1,00 1,00 1.00 0.00 0.00 000 0.00
Length=4.0 ft 1 0.073 0,034 1.60 1,500 1.00 1.00 1.00 1,00 1.00 0.08 156.73 2160,00 0.07 9.84 288.00
+D+0.70E+H 1,500 1.00 1.00 1.00 1.00 1,00 0.00 0.00 0,00 0.00
Length=4.0 ft 1 0,073 0.034 1.60 1.500 1.00 1.00 1.00 1.00 1,00 0,08 156.73 2160,00 0.07 9.84 288.00
+D+0.750Lr+0.750L+0.450W+1-1 1.500 1.00 1.00 1,00 1.00 1,00 0.00 0.00 0,00 0.00
Length=4.0 ft 1 0,073 0.034 1.60 1.500 1,00 1.00 1.00 1.00 1.00 0.08 156.73 2160.00 0.07 9.84 288.00
+-D+0.750L+0.750S+0.450W+H 1.500 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0,00 0.00
Length=4.0 ft 1 0.141 0.066 1,60 1.500 1.00 1,00 1.00 1.00 1.00 0.16 303.67 2160.00 0,13 19,07 288.00
+D+0.750L+0.750S+0.5250E+H 1,500 1.00 1.00 1,00 1.00 1.00 0.00 0.00 0.00 0.00
Length=4.0 ft 1 0.141 0.066 1.60 1.500 1.00 1.00 1.00 1.00 1,00 0.16 303,67 2160,00 0.13 19.07 288.00
+0.600+0.60W+0.60H 1.500 1.00 _1.00_ _1.00-_1.00 1.00 0,00 0,00_- 0.00. .-0.00
Length=4.0 ft 1 0.044 0.021 1.60 1.500 1.00 1.00 1.00 1.00 1.00 0.05 94.04 2160.00 0.04 5.91 288.00
+0.60D+0.70E+0.601-1 1.500 1.00 1,00 1.00 1.00 1,00 0.00 0.00 0.00 0.00
Length=4.0 ft 1 0,044 0.021 1,60 1.500 1.00 1.00 1.00 1.00 1,00 0.05 94.04 2160.00 0.04 5,91 288.00
Overall Maximum Deflections
Load(ornbinationSpan Max., ... �. M ,.. .�. _ .
.""Deft Location in Span Load Combination Max."+"Defl Location in Span
+0+S+H i 0.0304 ..._ 2.015 _.M ....._._..... . ._•........ 0.0000 0.000
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination Support 1 Support 2
OverallMAXmum 0.180mm 0,1'$0
Overall MINimum 0.100 0.100
+D+H 0.080 0.080
+D+L+H 0.080 0,080
+D+Lr+H 0.080 0.080
+D+S+H 0.180 0.180
+D+0.750Lr+0.750L+H 0.080 0.080
+0+0.750L+0.750S+H 0.155 0.155
+D+0.60W+H 0.080 0,080
+D+0.70E+H 0.080 0.080
+D+0.750Lr+0.750L+0.450W+H 0.080 0.080
+0+0.750L+0.750S+0.450W41 0.155 0.155
+D+0.750L+0,750S+0.5250E+H 0,155 0.155
+0.60D+0.601N+0.60H 0.048 0.048
+0.60D+0.70E+0.60H 0.048 0.048
D Only 0,080 0.080
Lr Only
L Only
S Only 0.100 0.100
W Only
E Only
H Only
II
II
I
,
i
i
Vista Structural Engineering,LLC Project Title: Polygor,at Rrshck'Salas Tr- er
14718 NW Delia Street Engineer: DMH
Portland,Oregon 97229 Project ID: 2062 ,
111
www.vistastructural.com Project Descr:Structural Cnangcs
i 4.r.14,140dennis@vistastructuralcom
{971)645 0901
Wood Beam Fiie c,a ersZer.,alatJrnpunxxViS'rAS ?Ni$Tt ENwRCA 1t208 e'.
software mt>^ght 1ERCALC.INC..1! r le,Ouib10,18.12.13.
Lic.#:KW-06010523 °+., '�4: 0 1 H", ,7!:.. , . 1 • LICE S+ :1 sta$tsactur II Engitl• tin ,LW
Description: Existing Ridge beam with additional covered entry overframing dead load(Allowable deflections:Snow load only=LI240,snow+dead=U180)
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013,,...x_
ASCE 7-10
Load Combination Set: ASCE7-10
Material Properties
Analysis Method: Allowable Stress Design Fb+ 3,100.0 psi E:Modulus of Elasticity
Load Combination ASCE7-10 Fb- 3,100.0 psi Ebend-xx 2,000,0ksi
Fc-Pill 3,000.0 psi Eminbend-xx 1,036.83 ksi
Wood Species : Murphy Douglas Fir LVL Fc-Perp 750.0 psi
Wood Grade :LVL 2.0E 3100 Fb Fv 285.0 psi
Ft 1,950,0 psi Density 41.750 pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
D(0 0750)
_,mm_
D(0.2716)S(0.3 a a a
r
6.0 X24 0
Span=35,0 ft
Applied Loads Service loads entered.Load Factors will be applied for calculations.
Beam self weight calculated ,..... .._-.w... , _ _ ., ..._._...rv... ._._.�...,_ . ..
and added to loads
Uniform Load: D=0.01940, S=0.0250 ksf, Tributary Width=14.0 ft
Uniform Load: D=0,01080 ksf,Extent=18.170->>28,170 ft, Tributary Width=7.0 ft ,
DESIGN SUMMARY :.. Desi•n OK'
Maximum Bending Stress Ratio = 0.620: 1 Maximum Shear Stress Ratio 0.344 : 1
Section used for this span 6.0 X 24.0 Section used for this span 6.0 X 24.0
fb:Actual r. 2,210.34 psi fv:Actual = 112.90 psi
FB:Allowable = 3,565.00 psi Fv:Allowable .. 327.75 psi
Load Combination +D+S+H Load Combination +D+S+H
Location of maximum on span .. 17.883ft Location of maximum on span = 33.084 ft
Span#where maximum occurs = Span#1 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.860 in Ratio= 488>=380
Max Upward Transient Deflection 0.000 in Ratio= 0<360
Max Downward Total Deflection 1.700 in Ratio= 247>=240.
Max Upward Total Deflection 0.000 in Ratio= 0<240.0
Maximum Forces & Stresses for Load Combinations
Load Combination Max Stress Ratios Moment Values Shear Values
Segment Length Span# M V Cd C EN Ci Cr Cm C t CI_ M fb F'b V fv F'v
+p+H 0.00 0.00 0.00 0.00
Length=35.0 ft 1 0.392 0.219 0.90 1.000 1.00 1.00 1.00 1.00 1.00 52.56 1,094.94 2790.00 5.38 56,08 256.50
+D+L+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0,00 0.00
Length=35.0 ft 1 0.353 0.197 1.00 1.000 1.00 1.00 1.00 1.00 1.00 52.56 1,094.94 3100,00 5.38 56,08 285.00
+D+1_r+H 1.000 1.00 1.00 1.00 1.00 1,00 0.00 0.00 0.00 0.00
Length=35.0 ft 1 0.283 0.157 1.25 1.000 1.00 1.00 1.00 1.00 1.00 52.56 1,094.94 3875.00 5.38 56.08 356.25
+D+S+H 1.000 1.00 1.00 1,00 1.00 1.00 0.00 0.00 0.00 0.00
Length=35.0 ft 1 0.620 0.344 1.15 1.000 1.00 1.00 1.00 1.00 1.00 106.10 2,210.34 3565.00 10.84 11190 327.75
+D+0.750Lr+0.750L+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0,00 0.00
Vista St uoture!Engineering.LLC Project Title: Polygon at Roshak Sales Trailer
', 1471E NW De!''?Street Engineer: DMH
, 144* Portla 1d,Oregon 9722' Project ID: 2062
www,vistastructural com Project Descr:Structural Changas
Bennis@vistastructural.com I
coW , d ?earnFile=C\Users\Dennis\Dropbox\VISTAS 2\VISTA) 1\FNERCA 12062,oc6,
L Software r py ht ENERCALC,INC.1983-2018 Buiud:10.18.12.13.
Lie.> ; .06010023 « a "` . . -,.; n., ,.'1 Licensee Vhsta Structural Engineering,LLC
Description Existing Ridge beam with additional covered entry overframing dead load(Allowable deflections:Snow load only=L/241,snow+dead=L/180)
Load Combi.ration Max.3t,ess I'a5os Moment Values Shear Values
Segment Seng h par# M V Cd C FN C i Cr C m C t C L M fb F'b V fv F'v
Length=35,u ft 1 ('''83 0,157 1.25 1.000 1,00 1.00 1.00 1,00 1.00 52.56 1,094.94 3875.00 5.38 56,08 356,25
+D+0.750L+0.750S+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=35.0 ft 1 0,542 0.301 1.15 1.000 1.00 1.00 1.00 1.00 1,00 92,70 1,931,34 3565.00 9.47 98.69 327.75
+D+0.60W+H 1.000 1.00 1.00 1.00 1.00 1,00 0.00 0.00 0.00 0.00
Length=35.0 ft 1 0.221 0,123 1.60 1.000 1.00 1,00 1.00 1.00 1.00 52.56 1,094.94 4960.00 5.38 56,08 456.00
+D+0.70E+H 1.000 1.00 1,00 1.00 1.00 1.00 0,00 0.00 0.00 0.00
Length=35.0 ft 1 0.221 0.123 1.60 1.000 1.00 1.00 1,00 1.00 1,00 52.56 1,094.94 4960.00 5.38 56.08 456.00
+D+0.750Lr+0.750L+0.450W+H 1,000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=35.0 ft 1 0.221 0.123 1.60 1.000 1.00 1.00 1.00 1.00 1,00 52.56 1,094.94 4960,00 5.38 56.08 456.00
+D+0.750L+0.750S+0.450W+H 1.000 1.00 1.00 1.00 1.00 1,00 0,00 0.00 0.00 0,00
Length=35.0 ft _ 1 0.389 0.216 1.60 1,000 1.00 1.00 . 1.00 __1.00__ 1.00.__ 92.70 1,931.34 4960.00 9.47-_98.69 456,00
+D+0.750L+0.7503+0.5250E4l 1.000 1.00 1.00 1,00 1.00 1.00 0,00 0.00 0.00 0.00
Length=35.0 ft 1 0.389 0.216 1.60 1.000 1.00 1.00 1.00 1,00 1.00 92.70 1,931,34 4960,00 9.47 98.69 456.00
+0.60D+0.60W+0,60H 1.000 1,00 1.00 1.00 1.00 1.00 0.00 0.00 0,00 0,00
Length=35.0 ft 1 0.132 0.074 1.60 1.000 1.00 1.00 1,00 1,00 1.00 31.53 656.96 4960.00 3.23 33.65 456.00
+0,60D+0.70E+0,60H 1.000 1.00 1.00 1.00 1.00 1,00 i 0,00 0,00 0.00 0.00
Length=35,0 ft 1 0.132 0.074 1.60 1.000 1.00 1.00 1.00 1.00 1.00 31,53 656.96 4960.00 3,23 33.65 456.00
Overall Maximum Deflections
Load Combination Span Max. "Defl Location in Span Load Combination Max."+"Defl Location in Span
+O+S41 1. .. 1.7003.. .. ._, 17.628 0.0000 0.000
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination Support 1 Support 2
...� � �W _. . ...,_,..w..
Overall 11$54 1 .109
Overall MINimum 6.125 6.125
+D+H 5.739 5.984
+D+L+H 5.739 5.984
+O+Lr+H 5.739 5.984
+D+S+H 11.864 12.109
+0+0,750Lr+0.750L+H 5.739 5.984
+D+0.750L+0.750S+H 10.333 10.578
+D+0.60W+H 5.739 5,984
+13+0.70E41 5.739 5.984
+D+0.750Lr+0.750L+0.450W+H 5.739 5.984
+D+0.750L+0,750S+0.450W+H 10.333 10.578
+D-+0,750L+0.7505+0,5250E+H 10.333 10,578
+0.60D+0.60W+0.60H 3.443 3.590
+0,60D+0.70E+0,60H 3.443 3.590
D Only 5.739 5,984
Lr Only
L Only
S Only 6.125 6,125
W Only
E Only
H Only
� . ,.
.
11
�
1
Vista Structural Engineering,LLC Project Title:
1��8�NDo�S8�o DMH , , ` . '
.04 Portland Oregon 97229 Project ID: 2062 . `
ProjectDeorc8tructuad
' Wood Beam
, Description: Ridge beam at overframed area
CODE
Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10
Load Combination Set:ASCE7-1 0
Material Properties
Analysis Method: Allowable Stress Design Fb+ 1.000.8psi E:Modulus of ElastIcity
Load Combination ASCE7-1 0 Fb- 1.000'0 psi Eb d'xx 1. i
7OU0k. o
Fo-Pd| 1,500.0 psi Eminbond'xx 820.0koi
^ Wood Species : Douglas Fir-Larch Fo°Perp 625.0 psi
Wood Grade :No.1 Fv 180.0 psi
Ft 675.0 psi Density 31.20pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
.)DESIGN SUMMARY � |
iik
Span = 13.750 ft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Load for Span Number 1
' '
Maximum BendingStress Ratio = 0.96a 1 Maximum Shear Stress Ratio - 0.360 : 1
Sa��nused�n��span 2n10 Sao�onused�n��span 2u18
m:Actual = 1'217.90poi fv:Actual = 74.53psi
FB:Allowable = 1,265.00 psi Fv Allowable = 207.00 psi
Load Combination +D+S+H Load Combination +D+S+H
Location of maximum on span = 5.821M Location of maximum on span = 0.000 ft
Span#where maximum occurs = Span#1 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.301 in Ratio= 547^=3O0
Max Upward Transient Deflection 0.000 in Ratio= 0<360
Max Downward Total Deflection 0.431 in Ratio= 382>=240.
Max Upward Total Deflection 0.000 in Ratio= 0<240.0
|!
Maximum Forces &Stresses for Load Combinations
Load Combination Max Stress Ratios Moment Values Shear Values
Length=13.750 ft 1 0.26' 0.100 1.25 1.100 1u0 1/0 1x0 1.00 1.00 0,65 367.41 1375.00 0,21 22,48 225.00
+D+S+H 1,100 1.00 1.00 1.00 1.00 1l0 0.00 0.00 0.00 0.00
Length=13J5 ft 1 0.963 0.360 1.15 1,100 1I0 1l0 1,00 100 1l0 2.17 1.217,90 1285.00 0.69 74.5 207,00
+D+0.750Lr+0.750L+H 1.100 1.00 1.00 1.00 1.00 1.00 0.0 0.00 0.00 0.00
'
'
i
'
'
1
� 1 ,
itoo, Dista Structural Engineering,LLC Project Title: Polygon at Roshak Sales Tra1r
1411E NW Delia Scee; Engineer: DMH
Atkost7Port129d,Oregon 97229 Project ID: 2062
040
'`www.vistastructural coin Project Descr:Structural Changes
dermis@vistastructural coo
1 IN �. _..rc(,°71)C45-0901 pili, {...<<serstf�nrs'ssthtopboa<tVt
CC1C ec1CP� TAS}21Vt$TAJ' NE1cA 112062ec6,
soft.. r°_hI ENE• .,Le,INC.19:z 118,Build 10.18.1213,
I Llc"!P'.lt006411$ 3 , °" • • Licensee:VI to Structure Englneertng ,LLC
Description Ridge beam at overframed area
It
Load Cc,nbi.tatibn Ma 3t esr Pptios Moment Values Shear Values
Segrrant Leng'I' Span# 1. V C d C FN C I C r C m C t C L M fb --F'b V fv F v
L
+DLenghL+0.7 1.100 1.00 1.00 1.00 1.00 1.00 ..... 1_. �
Length 0.7500 ft 1 0.795 0,2970 1.15 1 1,25 .100 1.00 1.00 1.00 1 00 1.00 0.65 367.411 0 1370.00 0.00 202.00 220.000
0.00 0.00 0.00 0.00
1.100 1.00 1.00 1.00 1.00 1.00 1,79 1,005.28 1265,00 0.57 61.52 207,00
+D+0.60W+H 1.100 1.00 1,00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=13.750 ft 1 0,209 0.078 1.60 '1.100 1.00 1.00 1.00 1.00 1.00 0.65 367.41 1760.00 0,21 22,48 288.00
+D+0,70E+H 1,100 1.00 1.00 1.00 1,00 1.00 0.00 0.00 0.00 0,00
Length=13.750 ft 1 0.209 0.078 1.60 1,100 1.00 1.00 1.00 1,00 1.00 0.65 367.41 1760.00 0.21 22,48 288.00
+0+0.750Lr+0,750L+0.450W+11 1.100 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=13.750 ft 1 0.209 0.078 1.60 1.100 1.00 1.00 1.00 1.00 1.00 0.65 367.41 1760.00 0.21 22.48 288.00
+D+0,750L+0.750S+0.454W+H 1.100 1.00 1.00 1.00 1.00 1,00 0.00 0.00 0.00 0.00
Length_=13,750ft 1 0,571 0,214 1.60 1.100 1.00 1.00 1.00___1.00 1.00__ .__1.79__ 1,005,28 1760.00 0.57 _61.5 _288,00
+0+0,750L+0.750S+0,5250E+H 1.100 1,00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=13.750 ft 1 0.571 0.214 1.60 1.100 1.00 1.00 1.00 1.00 1.00 1.79 1,005,28 1760.00 0,57 61.52 288.00
+0.60D+0.60W+0.60H 1.100 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=13.750 ft 1 0.125 0,047 1.60 1.100 1.00 1.00 1.00 1.00 1.00 0,39 220.45 1760.00 0.12 13.49 288,00
+0,60D+0.70E+0.60H 1.100 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=13.750 ft 1 0.125 0.047 1.60 1,100 1.00 1.00 1.00 1.00 1.00 0,39 220.45 1760.00 0.12 13.49 288.00
` Overall Maximum Deflections
Load Combination Span Max Defl Location in Span Load Combination Max."+"Deft Location in Span
'D+S+H 1 0.4314 6.624
0.0000 0,000
Vertical Reactions Support rotation:Far left is#1 Values in KIPS 'i
Load Combination
Support 1 Support 2
_. _..
Overall Marr um 0.820 0.410
�_..,.�._ �...�.. _ . ._ ._ . .. �.
.
Overall MINimum 0.573 0.286
+D+H 0.248 0.124 i
+D+L+H 0.248 0,124
+D+Lr+H 0.248 0,124
+D+S+H 0,820 0.410 a
+D+0.750L1+0.750L+H 0.248 0.124
+D+0.750L+0,750S+11 0.677 0.339
+D+0.60W+H 0.248 0.124 ,,
1 +D+0,70E+H 0.248 0.124
+D+0.750Lr+0.750L+0.450W+H 0,248 0.124
+D+0,750L+0.750S+0.450W+H 0.677 0.339
+D+0.750L+0.7505+0.5250E4I 0,677 0.339
+0.60D+0.60W+0,60H 0.149 0.074
+0.60D+0.70E+0.60H 0.149 0.074
u Only 0.248 0.124
Lr Only
L Only
{ S Only 0.573 0.286
W Only
i E Only
H Only
Vista Structural Engineering,LLC Project Title: Polygon at Roshak_SalnF,Trailer
14718 NW Delia Street Engineer: DMH
Portland,Oregon 97229 Project ID: 2062
�F Project Descr:Structu:.al Cl'ange$
11 I� www.vistastrucfuraLcom
dennis@vistastructuraLcorn
971 645-0901
1 Wood Beam File C+OsorstC r�#xst O'Ox4V18TAS 2W3TAr 1tcNFRC.H +t2{$ w(€
Software Cvp rr hl rNE CALC,INC 19t` , 18,84iikf 018.1?.'t
jL c.# :KW-06010523 .. . ° ° s'. :° iris ;.L1ca sse.4++eta tr 4tt lL, n�yO(�iwwm
Description: Header above new double 3-0 entry doors
CODE E REFERENCES
Calculations
per NDS 2012, IBC 2012, CBC 2013, ASCE 7-10
Load Combination Set:ASCE7-10
Material Properties
Analysis Method Allowable Stress Design Fb+ 900.0 psi E:Modulus of Et ity
Load Combination ASCE7-10 Fb. 900.0 psi Ebend-xx 1,600.0 ksi
Fc-Prll 1,350.0 psi Eminbend-xx 580.0 ksi
Wood Species : DouglasFir-Larch Fc-Perp 625.0 psi
Wood Grade :No.2 Fv 180.0 psi
Ft 575.0 psi Density 32.210 pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
e
D(0.378)8(0 875)
D(t} r 56J
6x6
Span=8.0 ft
k -,._
Applied Loads Service loads entered Load Factors will be applied for calculations.
Point Load: D=0.3780, S=0.8750 k @ 3.0 ft
Uniform Load: D=0,01080 ksf, Tributary Width=7.0 ft
Li
DESIGN SUMIfiMAI'Y ' Teri°, De s t
Maximum Bending Stress Ratio = 0.928; 1 Mcimum Shear Stress Ratio = 0.196 : 1
Section used for this span 6x6 Section used for this span 6x6
fb:Actual _ 960.59 psi fv:Actual _. 40.67 psi
FB:Allowable _ 1,035.00 psi Fv:Allowable = 207.00 psi
Load Combination +D+S+H Load Combination +D+S+H
Location of maximum on span = 3,000ft Location of maximum on span - 0.000 ft
Span#where maximum occurs Span#1 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.056 in Ratio= 1284>=360
Max Upward Transient Deflection 0.000 in Ratio= 0<360
Max Downward Total Deflection 0.098 in Ratio= 731 >=240.
Max Upward Total Deflection 0.000 in Ratio= 0<240.0
Maximum Forces&Stresses for Load Combinations
Load Combination Max Stress Ratios Moment Values Shear Values
Segment Length Span# M V cd C FN C i C r C m C t C L M fb F'b V fv F'v
+D+H 0.00 0.00 0.00 0.00
Length=6.0 ft 1 0.485 0.117 0.90 1.000 1.00 1.00 1.00 1.00 1.00 0.91 392.60 810.00 0.38 18.98 162.00
+D+L+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=6.0 ft 1 0,436 0.105 1.00 1.000 1.00 1.00 1.00 1.00 1.00 0.91 392.60 900.00 0.38 18.98 180.00
+D+Lr+-1 1.000 1.00 1.00 1.00 1.00 1,00 ' 0.00 0.00 0.00 0.00
Length=6.0 ft 1 0.349 0.084 1.25 1.000 1.00 1.00 1.00 1.00 1.00 0.91 392.60 1125.00 0.38 18.98 225,00
+D+S+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=6.0 ft 1 0.928 0.196 1.15 1.000 1.00 1.00 1.00 1.00 1.00 2.22 960.59 1035.00 0.82 40.67 207.00
+D+0.750Lr+0.750L+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=6.0 ft 1 0.349 0.084 1.25 1.000 1.00 1.00 1.00 1.00 1.00 0.91 392.60 1125.00 0.38 18.98 225.00
+0+0.750L+0.750S+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Vista Structural Engineering,LLC Project Title: Polygon at Roshak Sales Trailer
1471tNW Delia S,rect Engineer: DMH
Portland Oregon 97229 Project ID: 2062
''W l www.vistastruc,ural ccm Project Descr:Structural Changes
dermis@vistastructural.com
AP71145-0901
5=090
Ut�ood;B ars
File C,IUseist>i3ennls1Dropbo0Vlf1AS-2\VfSIA.t 1\ENERCA 142062ec6.
Softwere0c'r. t.rht.BNERCoAIC,INC.16812018,BuiId:1018,12.13,
* �
Lie**:II 0601 t• .',it.",.,: * °* Licensee:Vista'Structur it Engineering,LLC
Description° Header above new double 3-0 entry doors
Load Ccmbnation Mr(S'resc Ratios Moment Values Shear Values
Segment Lenc'th Span 4 f 1 V Cd C FN C i C r C m C t C L M fb Ft V fv F v
Length-6,0 ft 1 0.791 0.170 1.15 1.000 1.00 1,00 1.00 1,00 1,00 1.89 818.59 1035.00 0,71 35.25 207.00
+D+0.60W+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=6.0 ft 1 0.273 0.066 1.60 1.000 1.00 1.00 1.00 1,00 1.00 0,91 392.60 1440.00 0.38 18.98 288.00
+D+0,70E+H 1.000 1,00 1.00 1.00 1,00 1.00 0.00 0.00 0.00 0.00
Length=6.0 ft 1 0.273 0.066 1.60 1.000 1.00 1,00 1.00 1.00 1.00 0,91 392.60 1440.00 0,38 18,98 288.00
+D+0.750Lr+0.750L+0.450W41 1.000 1,00 1.00 1.00 1.00 1.00 0.00 0.00 0,00 0.00
Length=6.0 ft 1 0.273 0,066 1.60 1.000 1.00 1.00 1.00 1,00 1,00 0.91 392,60 1440.00 0,38 18.98 288.00
+D+0.750L+0.750S+0,450W+i1 1.000 1.00 1,00 1.00 1.00 1,00 0.00 0.00 0,00 0.00
Length=6.0 ft 1 0.568 0,122 1,60 1.000 1.00 1.00 1.00 1.00 1.00 1.89 818,59 1440.00 0.71 35,25 288.00
+D+0.750L+0.750S+0.5250E+H 1.000 1.00 1.00 1.00 1,00 1.00 0.00 0.00 0.00 0.00
Length=6.0 ft 1 0.568 0.122 1.60 1.000 1.00 _1.00 1.00 1.00 1.00 1,89. 818,59 - 1440,00 - 0,71__35,25 --288,00
+0,60D+0.60W+0.60H 1,000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=6.0 ft 1 0.164 0.040 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0.54 235.56 1440.00 0,23 11.39 288,00
+0.60D+0.70E+0.60H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=6.0 ft 1 0.164 0.040 1.60 1.000 1.00 1.00 1.00 1.00 1.00 0,54 235.56 1440.00 0.23 11,39 288.00
Overall Maximum Deflections.
Load Combination Span Max. ='Defib ".-�� __��W, _,� -.. .._•.__�_-•._._•__..__ ..�.�..._ - � m,-_,.,_.��.
Location in Span Load Combination Max. +'Defl Location in Span
+ +S+HVertical Reactions �. �.a... Support notation Far left is#1 Values in KIPS II
Load Combination Support 1 Support 2
Overall MAX rnum ..........
0.853 0�5r.__
Overall MINimum 0,438 0.438 I
+D+H 0.416 0.416
+D+L+H 0.416 0.416
+D+Lr+H 0.416 0.416
+D+S+H 0,853 0.853
+D+0,750Lr+0.750L+H 0.416 0.416
+1)+0.750L+0.750S41 0.744 0.744
+0+0.60W+H 0.416 0.416
+0+0.70E+H 0.416 0.416
+D+0.750Lr+0.750L+0.450W+H 0,416 0.416
+D+0.750L+0.7505+0.450W+H 0.744 0.744
+D+0.750L+0,750S+0,5250E+H 0.744 0.744
+0.60D+0.60W+0.60H 0.249 0.249
+0.60D+0.70E+0.60H 0.249 0,249
D Only 0,416 0.416
Lr Only
L Only
S Only 0,438 0.438
W Only
E Only
H Only
I
1 Vista Structural Engineering,LLC Project Title: Polygon at Roshak Sales,Trailsr
14718 NW Delia Streetito
Engineer: DM
Portland,Oregon 97229 Project ID: 2062 •
OS •, 4iiiwww.vistastructural.com,..._,..)
Project Descr:Structu,at h,an�e-1
Bennis@vistastructural.corn
j971)645-0901
Wood @21111 Filo=C;luserstDenkiit?o,0 t IS 1 ti 2v71 Tk 11,;NFRCA it7067 eeE
k Softwarec,pYrfahr .:.: CPLC INL 1 31'3.2{'1 ,9uu�Ed.'11812'a.
Lic.#:KW-06010523
.,: . �v��*;„ •;,..•4 �"lwlearlsoff,-T" :`,lir:et 7 ngtrailngoLLC:'
Description: Header above windows at sides of entry doors
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10I ,
Load Combination Set:ASCE7-10
I Material Properties
Fb+ 900.0 psi E Modulus of Elasticity
`��Analysis Method. Allowable Stress Design
Load Combination ASCE7-10 Fb- 900.0 psi Ebend-xx 1,600.0 ksi
Fc-Pr!! 1,350.0 psi Eminbend-xx 580.0 ksi
' Wood Species : DouglasFir-Larch Fc-.Perp 625.0 psi
Wood Grade :No.2 Fv 180.0 psi
Ft 575.0 psi Density 32.210 pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
op 1051$(0 175)
I
2-2x6
Span=3.Oft
Applied Loads Service entered.Load ct,rs will be applied for calculations.
Uniform Load: D=0.0150, S=0.0250 ksf, TributaryWidth 7.0 ft
Service loads entered Load Fact
DESIGN SUMMARY
Maximum Bending Stress Ratio = 0.18& 1 Maximum Shear Stress Ratio = r 0.129 : 1
Section used for this span 2-2x6 Section used for this span 2-2x6
fb:Actual = 249.92 psi iv:Actual 26.76 psi
FB:Allowable = 1,345.50 psi Fv:Allowable _ 207.00 psi
Load Combination +D+S+H Load Combination S +D+S+H
Location of maximum on span = 1,500ft Location of maximum on span = 0,000 ft
Span#where maximum occurs = Span#1 Span#where maximum occurs = ? Span#1
Maximum Deflection
Max Downward Transient Deflection 0.005 in Ratio= 7468>=360
Max Upward Transient Deflection 0.000 in Ratio= 0<360
Max Downward Total Deflection 0.008 in Ratio= 4667>=240,
Max Upward Total Deflection 0.000 in Ratio= 0<240.0 ,
Maximum Forces &Stresses for Load Combinations
Load Combination Max Stress Ratios Moment Values Shear Values
Segment Length Span# M V Cd C FNC i Cr C m C t C L M fb F'b V fv F'v
0.00 0.00 0.00 0.00
Length=3.0 ft 1 0.089 0.062 0.90 1.300 1.00 1.00 1.00 1.00 1.00 0.12 93.72 1053.00 0.11 10.03 162.00
+D+L+H 1.300 1.00 1.00 1.01 1.00 1.00 0.00 0.00 0.00 0.00
Length=3.0 ft 1 0.080 0.056 1.00 1.300 1.00 1.00 1.00 1.00 1.00 0.12 93.72 1170.00 0.11 10.03 180.00
+0'.Lr+I1 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0,00 0.00 0.00
Length=3.0 ft 1 0.064 0.045 1.25 1.300 1.00 1.00 1.00 1.00 1.00 0.12 93.72 1462.50 0.11 10.03 225.00
+D+S+11 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=3.0 ft 1 0.186 0.129 1.15 1.300 1,00 1.00 1.00 1.00 1.00 0.32 249.92 1345,50 0.29 26.76 207.00
+0+0,750Lr+0.750L+1-1 1.300 1.00 1.00 1.00 1,00 1.00 0.00 0.00 0.00 0.00
Length=3.0 ft 1 0.064 0.045 1.25 1.300 1.00 1.00 1.00 1.00 1.00 0.12 93.72 1462,50 0.11 10.03 225.00
+D+0.750L+0.750S+H 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=3.0 ft 1 0.157 0.109 1.15 1.300 1.00 1.00 1.00 1.00 1.00 0.27 210.87 1345.50 0.25 22.57 207.00
,I
II
i
II
i'
I
Vista Structur,aIEngineering,LLC ;Project Title: Polygon at Roshak Sales Trailer
14713 NW Delia S:rect Engineer: DMH
14104.
Port'arid,OregJn 97229 Project ID: 2062
www,vistastruciuraLcom Project Descr:Structural Changes
,........)
den n is@vistastructu ral.com
(071)645-0901I
WnJd B i File-C:1Users\Denms\Dropbox\VISTAS'-21VISTAJ 11ENERCA 112062ec6
Software Copt hi ENERCALC,INNC.1S83-2018,Build 10181213
Ltcc :K' 0601t«23* + r M r • Licensee.Vis..a Structural Eng neeritit:1
Description: Header above windows at sides of entry doors
I Load Crmb'natiori Mrx Stress Ratios Moment Values Shear Values
Segrnen Lenatl, Cpan# fl V Cd C FN C i Cr Cm C t CL M fb 'b V fv F'v
+D+0.60W+H 1.300 1.00 1,00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=3.0 ft 1 0.050 0.035 1.60 1.300 1.00 1,00 1,00 1.00 1,00 0,12 93.72 1:72.00 0.11 10.03 288.00
+13+0.70E+F1 1.300 1,00 1.00 1,00 1.00 1.00 0.00 0.00 0,00 0,00
Length=3.0 ft 1 0.050 0.035 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.12 93.72 1872.00 0.11 10,03 288.00
+D+0.750Lr+0,750L+0.450W+H 1.300 1.00 1,00 1,00 1.00 1,00 0.00 0.00 0.00 0.00
Length=3.0 ft 1 0.050 0.035 1,60 1,300 1.00 1.00 1.00 1.00 1.00 0.12 93,72 1872.00 0.11 10,03 288.00
+D+0.750L+0.750S+0.450W+H 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=3.0 ft 1 0.113 0.078 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.27 210.67 1872.00 0.25 22.57 288.00
+D+0.750L+0,750S+0.52.50E+H 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0,00 0.00 0.00
Length=3.0 ft 1 0.113 0.078 1.60 1.300 1.00 1.00 1.00 1,00 1.00 0.27 210.87 1872.00 0.25 22,57 288,00
+0.60D+0,60W+0.60H_ 1.300 1.00 1.00_-1,00._ 1.00 1.00 0.00 0.00 0.00 0.00
Length=3.0 ft 1 0.030 0.021 1,60 1.300 1.00 1.00 1.00 1.00 1.00 0,07 56.23 1872.00 0.07 6.02 288,00
+0.60D+0.70E+0.60H 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=3.0 ft 1 0.030 0.021 1,60 1.300 1.00 1,00 1,00 1.00 1,00 0,07 56.23 1872.00 0.07 6,02 288.00
Overall Maximum Deflections
Load Combination Span Max.""Deft Location in Span �Combination ��� _ Span
Load Combination Max,"+'Dell Location in
+D+S+#i,.._._ 1. m_ 0.0077 ,. .. . _.1.511_._ mr.. ..._,.... 0.0000 0,000
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination Support 1 Support 2
Overall MAXimum 0.420 0.420
Overall MINimum 0.263 0.263
+0+1-I 0,158 0.158
+D+L+H 0.156 0,158
+D+Lr+H 0.158 0.158
+D+S+H 0.420 0,420
+D+0,750Lr+0.750L+H 0.158 0.158
+D+0.750L+0.750S+H 0.354 0,354
+D+0.60W+H 0,158 0.158
+D+0.70E+H 0.158 0.158
+D+0.750Lr+0.750L+0.450W+H 0.158 0.158
+D+0.750L+0.7505+0.450W+4'l 0.354 0.354
+D+0.750L+0.750S+0.5250E+H 0.354 0.354
+0.60D+0,60W+0,60H 0,095 0.095
+0.60D+0.70E+0.60H 0,095 0,095
D Only 0.158 0.158
Lr Only
L Only
S Only 0.263 0.263
W Only
E Only
H Only
Vista Structural Engineering,LLC Project Title: Polygon at Roshak Sales Trai -r
14718 NW Delia Street Engineer: DMH -, , . , •
Portland,Oregon 97229 Project ID: 2062
`n. 4 www.vistastructural.com Project Descr: tru turd hnnge '
dennis@vistastructural.com
...,-__._ (971)6450901.
Ale-CtUsersvDeanislaropb,xtVISTAS 21VU"1A FNERCr.•'`.20,52..x6
Wood Beam
Software o'itea"Y:r'Ca{,.0 1%, 1983-261A seald1 ti le 1)°3
Lic,# KW-06010523 '''(..t..%"'',: ,,," , ;VA Lice s . v fa StousituriaI En;.I :rk C
Description: Header above windows in back wall of restroom
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013, ASCE 7-10
Load Combination Set:ASCE7-10
" Material Properties
y 9 Fb+
. 900.0 psi
E.Modulus o
, _.. __rm. ..,...4....,
Analysis Method: Allowable Stress Design f Elas ty
Load Combination ASCE7-10 Fb- 900.0 psi Ebend-xx 1,600.0 ksi
Fc-Pill 1,350.0 psi Eminbend-xx 580.0 ksi
Wood Species : DouglasFir-Larch Fc-Perp 625.0 psi
Wood Grade :No.2 Fv 180.0 psi
Ft 575.0 psi Density 32.210 pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
1.
n{0.10,51Aits1753,
2-2x6
• Span=2.0ft
t
I Applied Loads Service loads entered Load Factors will be applied for calculations
Uniform Load: D=0.0150, S=0,0250 ksf, Tributary Width=7.0 ft
DESIGN SUMMARY 1:1 !_� .`. .,n_a_e..
Maximum Bending Stress Ratio = 0.081 1 Maximum Shear Stress Ratio _ 0.067 : 1
Section used for this span 2-2x6 Section used for this span i 2-2x6
fb:Actual _ 111.07 psi fv:Actual .. 13.93 psi
FB:Allowable _ 1,345.50 psi Fv:Allowable _ 207.00 psi
Load Combination +D+S+H Load Combination +D+S+H
Location of maximum on span 1.000ft Location of maximum on span 1.547 ft
Span#where maximum occurs _ Span#1 Span#where maximum occurs -- Span#1
Maximum Deflection
Max Downward Transient Deflection 0.000 in Ratio= 0<360
t Max Upward Transient Deflection 0,000 in Ratio= 0<360
Max Downward Total Deflection 0.002 in Ratio= 15753>=240,
Max Upward Total Deflection 0.000 in Ratio= 0<240,0
I
Maximum Forces & Stresses for Load Combinations
Load Combination Max Stress Ratios Mol
Moment Values Shear Values
Segment Length San# M V CdC C• Cr C C _..... _. ... v... F v
9. 9._.� �....p FNI r m t L M fb F'b V N F'v
+D+H 0.00 0.00 0.00 0.00
Length=2.0 ft 1 0.040 0.032 0.90 1.300 1.00 1.00 1.00 1.00 1.00 0.05 41.65 1053.00 0.06 5.23 162.00
+0+L+H 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=2.0 ft 1 0.036 0.029 1.00 1.300 1.00 1.00 1.00 1.00 1.00 0.05 41.65 1170.00 0.06 5.23 180,00
+D+Lr+H 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=2.0 ft 1 0.028 0.023 1.25 1.300 1.00 1.00 1.00 1.00 1.00 0,05 41.65 1462,50 0.06 5.23 225.00
+D+S+H 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=2.0 ft 1 0.083 0.067 1.15 1.300 1.00 1.00 1.00 1.00 1.00 0,14 111.07 1345.50 0.15 13.93 207.00
+D+0.750Lr+0.750L+H 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=2.0 ft 1 0.028 0.023 1.25 1.300 1.00 1.00 1.00 1.00 1.00 0.05 41.65 1462.50 0.06 5.23 225.00
+D+0.750L+0.750S+H 1.300 1.00 1.00 1.00 1.00 1.00 0,00 0.00 0.00 0.00
Length=2,0 ft 1 0.070 0.057 1.15 1,300 1.00 1.00 1.00 1,00 1.00 0,12 93.72 1345.50 0.13 11.76 207.00
II
Vista Structural Engineering,LLC Project Title: Polygon at Roshak Sales Trailer
13713 NW Oel,a Strut Engineer: DMH
thiatPortfart,Oregon 97229 Project ID: 2062
+f
www.Vl,tastructural.r 7m Project Descr.Structural Changes
Pr'' dennis@a vistastructur ll,COSI
.... (9 r 1 j 645.090.1
1 1ttft3Ad BeamFlla-Gitlsersi0ennlslDropboxVV18TAS 21VISTAJ 11ENERGA 1\2062,ec6 .
1 r Software€o=yo ittENE*. LC,INC,1x33 .2018,Build.10.18.12.13.
L • :.8,i-06011061E3* • .�;_ " Licensee:Vista Structural Engineering,;LiLC
Description: Header above windows in Lack wall of restroom
Load Coaltinatic.1 Max Stress Ratios Moment Values Shear Values
Segi.ien:Le.lgtt. 'pan# M V Cd C FN CI Cr Cm C t CL M fb F'b V fv F'v
+D+0.6t,W,H 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=2.0 ft 1 0.0z2 0.018 1.60 1.300 1.00 1,00 1.00 1.00 1.00 0.05 41,65 1872,00 0.06 5.23 288,00
+D+0,70E+H 1.300 1,00 1.00 1.00 1,00 1.00 0,00 0.00 0,00 0.00
Length=2.0 ft 1 0.022 0.018 1.60 1.300 1.00 1.00 1.00 1.00 1,00 0.05 41.65 1872.00 0.06 5,23 288.00
+D+0.750Lr+0.750L+0.450W+H 1.300 1.00 1.00 1.00 1.00 1.00 0,00 0,00 0.00 0.00
Length=2.0 ft 1 0.022 0.018 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.05 41.65 1872,00 0.06 5.23 288.00
+0+0.750L+0.750S+0,450W41 1.300 1.00 1.00 1.00 1,00 1.00 0.00 0.00 0.00 0.00
Length=2.0 ft 1 0.050 0.041 1.60 1.300 1.00 1,00 1.00 1.00 1.00 0,12 93.72 1872.00 0.13 11.76 288.00
+D+0.750L+0.750S+0.5250E+H 1.300 1.00 1.00 1.00 1,00 1.00 0,00 0.00 0.00 0.00
Length=2,0 ft 1 0.050 0,041 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.12 93,72 1872.00 0.13 11.76 288.00
+0.60D+0.60W+0.60H__ 1,300 1.00._- 1.00 __1.00-.1.00- 1.00__ _ ---_ --- _-- - 0,00----- 0.00-----0:00-----0.00---
Length=2.0 ft 1 0.013 0.011 1,60 1,300 1,00 1.00 1.00 1.00 1.00 0.03 24.99 1872.00 0.03 3.14 288,00
40.600+0.70E+0.60H 1.300 1,00 1.00 1.00 1.00 1,00 0.00 0.00 0.00 0.00
Length=2.0 ft 1 0.013 0.011 1.60 1.300 1.00 1.00 1.00 1.00 1,00 0.03 24.99 1872.00 0.03 3.14 288.00
Overall Maximum Deflections
Load Combination Span Max."-"Defl Location in Span Load CombinationMax. +' Defl Location in Span
+5 0.0015 1.007 ......_... �.._. _ .....M_. . .��.,.,. .. -___._ .. ._ ._r __ 0.0000 0.000 ._.
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination Support-1- Support 2
Overall MAXImum 0.280_ 0;280
_..�..__.._._. .�._,..,. ..._
Overall MINimum 0.175 0,175
+D+H 0.105 0.105
+D+L41 0.105 0,105
+D+Lr+H 0.105 0.105
+D+S+H 0.280 0,280
+D+0.750Lr+0.750L+H 0,105 0.105
+D+0.750L+0,750S+H 0.236 0.236
+D+0.60W+H 0.105 0.105
+D+0.70E+H 0.105 0.105
+D+0,750Lr+0.750L+0.450W+H 0.105 0.105
+0+0.750L+0.750S+0.450W+H 0.236 0.236
+D+0,750L+0.750S+0.5250E+H 0.236 0.236
+0.60D+9.60W+0.60H 0.063 0.063
+0.60D+0.70E+0.60H 0.063 0,063
D Only 0.105 0.105
Lr Only
L Only
S Only 0.175 0.175
W Only c
E Only
H Only
j I
tfI ,
i l
li l
,
Vista Structural Engineering,LLC Project Title: Polygon at Rosha�C Sales Trailer
14718 NW Delia Street Engineer: DMH ,
Portland Oregon 97229 Project ID: 2062
Project Descr:Structurll' hnge:,;
kk4to,,,,,,...„..")
www,vi stastructural.com
dennis@vistastructural.com
(971)6454901
WOOd BeamF�=C•vUsercTennusic�ropbwi 5iA5 'lk�rl:Tt ITNERC� 2082,?c6 ,
Softwarecc2y� `IE=ChCA C INS 1481.20'8 mold t}18,12,'3
Lie #x;i4W-06010623 4 -',:i' ' M,'� ° : :' ',w Lice s,e: ifata stoustum Eno n C
Description: Header above window at front of office 1
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013, ASCE 7-10
Load Combination Set:ASCE7-10
Material Properties
Analysis Method: Allowable Stress Design Fb+ 900.0 psi E.Modulus of Elasticity
Load Combination ASCE7-10 Fb 900.0 psi Ebend-xx 1,600.0ksi
Fc-Prll 1,350.0 psi Eminbend-xx 580.0 ksi
Wood Species DouglasFir-Larch Fc-Perp 625,0 psi
Wood Grade No.2 Fv 180.0 psi
Ft 575.0 psi Density 32.210 pcf
Beam Bracing Beam is Fully Braced against lateral-torsional buckling
D(0.105)S(9 175)
t
2-2x6
Span=5.0ft
Applied Loads Service loads entered.Load Factors will be applied for calculations.
Uniform Load: D=0.0150, S=0.0250 ksf, Tributary Width=7.0 ft
DESIGN SUMMARY , .r1 OK
Maximum Bending Stress Ratio = 0.516: 1 Maximum Shear Stress Ratio - 0.251 : 1
Section used for this span 2-2x6 Section used for this span 2-2x6
fb:Actual = 694.21 psi fv:Actual 52.02 psi
FB:Allowable = 1,345.50 psi Fv:Allowable -. 207.00 psi
Load Combination +D+S+H Load Combination +D+S+H
Location of maximum on span = 2.500ft Location of maximum on span _ 0,000 ft
Span#where maximum occurs = Span#1 Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.037 in Ratio= 1613>=360
Max Upward Transient Deflection 0.000 in Ratio= 0<360
Max Downward Total Deflection 0.060 in Ratio= 1008>=240.
Max Upward Total Deflection 0.000 in Ratio= 0<240.0
fktaximum Forces &Stresses for Load Combinations
Load Combination Max Stress Ratios Moment Values Shear Values
Segment Length Span# M V Cd C FN Cl Cr C C t CL M ib Fb V fv Fv
+D+H 0.00 0.00 0.00 0.00
Length=5.0 ft 1 0.247 0.120 0.90 1,300 1.00 1.00 1.00 1.00 1.00 0.33 260.33 ,1053,00 0.21 19.51 162.00
+0+L+H 1.300 1.00 1.00 1,00 1.00 1.00 1 0.00 0.00 0.00 0.00
Length=5.0 ft 1 0.223 0.108 1.00 1.300 1.00 1.00 1.00 1.00 1.00 0.33 260.33 1170.00 0.21 19.51 180.00
+D+Lr+H 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=5.0 ft 1 0.178 0.087 1.25 1.300 1.00 1.00 1.00 1.00 1,00 0.33 260.33 11462.50 0.21 19.51 225.00
+D+S+H 1,300 1,00 1.00 1.00 1.00 1.00 0.00 0,00 0.00 0.00
Length=5.0 ft 1 0.516 0.251 1.15 1.300 1.00 1.00 1.00 1.00 1.00 0.88 694.21 1345.50 0.57 52.02 207.00
+D+0.750Lr+0,750L+H 1,300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=5.0 ft 1 0.178 0.087 1.25 1.300 1.00 1.00 1.00 1.00 1.00 0.33 260.33 1462,50 0.21 19.51 225.00
+0+0.750L+0.750S+H 1.300 1.00 1.00 1,00 1.00 1.00 0.00 0.00 0.00 0.00
Length=5.0 ft 1 0.435 0.212 1.15 1.300 1.00 1.00 1.00 1.00 1.00 0.74 585.74 1345.50 0.48 43.90 207,00
to, Vista Structural Engineering,LLC Project Title: Polygon at Roshak Sales Trailer
11719 'W'9el'a Stte-:t Engineer: DMH
, S Portia^r,Orecw 9ri29 Project ID: 2062
i0 wwv:.victastru'tural.com Project Descr:Structural Changes
6.
dennis@vistastructural.com
�..�_ (971)_ta4 iJ901 _..�..__
V9Qi9�6 43�'�tn File=C:\Users\Dennis\DropboxtVISTAS-2IVISTAJ-ftENERCA-112062.ec6 .
Software,,s. '!ht ENE LC,INC.19r' r18 Build:10.18.12.13.
E~ : oV-060,0: ::,; r ar „ • Licensee:Vi;uta Structur<<En s ineering,LLC
Description: Header above window at front of office 1
Load Cor L;natic-r Max Stress Ratios Moment Values Shear Values
_e.
5 rer Lei tb- 'i an# �'A �. __ ..._.
e9 9 p V C d C FN C i C r C m t...�L M fb F b V iv F
1.300 1.00 1.00 100 1.00 1.00 0.00 0.00 0.00 0.00
Length=5,0 ft 1 0.1.,9 0.068 1,60 1.300 1.00 1.00 1.00 1.00 1.00 0.33 260.33 1872.00 0.21 19,51 288.00
+0+0.70E+H 1.300 1.00 1.00 1.00 1,00 1,00 0.00 0.00 0.00 0.00
Length=5.0 ft 1 0.139 0.068 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0,33 260,33 1872.00 0.21 19.51 288.00
+D+0.750Lr+0.750L+0.450W+H 1.300 1,00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=5.0 ft 1 0.139 0,068 1,60 1.300 1.00 1.00 1.00 1.00 1.00 0,33 260.33 1872.00 0.21 19.51 288.00
+1J+0,750L+0.750S+0.450W+H 1,300 1.00 1,00 1.00 1.00 1.00 0.00 0.00 0,00 0.00
Length=5.0 ft 1 0.313 0.152 1.60 1.300 1.00 1,00 1.00 1.00 1.00 0.74 585.74 1872.00 0.48 43.90 288.00
+D+0.750L+0,750S+0.5250E+H 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0,00
Length=5.0 ft 1 0.313 0.152 1,60 1.300 1.00 1.00 1.00 1.00 1.00 0.74 585.74 1872,00 0.48 43.90 288.00
+0.60D+0.60W-0.60H 1.300 1.00 1.00 .1.00._ 1.00._1.00. 0,00-_ 0.00 0.00 0,00
Length=5.0 ft 1 0.083 0.041 1.60 1.300 1,00 1.00 1.00 1,00 1.00 0.20 156.20 1872,00 0,13 11.71 288.00
+0.60D+0.70E+0.60H 1.300 1.00 1.00 1.00 1.00 1.00 0,00 0,00 0.00 0.00
Length=5.0 ft 1 0.083 0.041 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.20 156.20 1872.00 0,13 11.71 288.00
Overall Maximum Deflections
Load Combination __.. .
Span Max Deft Location in Span Load Combination Max '+"Deft Location in Span
+D+S+H...__ 1 0.0595 2.5180.
0.000000 0.000
.
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination . ......_ �.
fOverallMAktmum �._ _.
Support 1 Support 2
11'706- 0:766�
Overall MINimum 0.438 0.438
+D+H 0,263 0,263
+D+L+H 0.263 0.263
+D+Lr+H 0.263 0.263
+0+3+H 0,700 0.700
+0+0.750Lr+0.750L+11 0.263 0.263
+D+0.750L+0.750S+41 0.591 0.591
+D+0,60W+H 0,263 0.263
+D+0.70E+H 0.263 0,263
+D+0.750Lr+0.750L+0.450W+H 0.263 0.263
+D+0.750L+0.7505+0,450W+H 0.591 0.591
+D+0.750L+0.7505+0.5250E+H 0.591 0.591
+0.60D+0,60W+0.601-1 0.158 0.158
+0.60D+0,70E+0.60H 0,158 0.158
D Only 0,263 0.263
Lr Only
L Only
U
S Only 0.438 0.438
W Only
E Only
H Only
I
,
Vista Structural Engineering,LLC Project Title: Polygon at Roshak Sales''aiter
14718 NW Delia Street Engineer: DMH
tik, Portland,Oregon 97229Project ID: 2062 w
7 1 www.vistastructural.com Project Descr.Structural hanger
dennis@vistastructuraLcom
,(971)645-0901. ..
Wood Beam File oAulerAoernis�4ViSTAS 2\Vrt' WNcRCA ft62at6
Software et +y1 MErt,:f.GAA.0 lN�;1 40 f.,Ltwfd 1 q.18.12
Lic.#:KW=060105235'' .. a ;� _'
; ? .,
'� ' r��'� •; 00 see;�' 61.4 .Winn " I a T "k1iltait, C
Description: Floor joists supporting walls at front and back of office#2
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10
Load Combination Set :ASCE7-10
Material Properties
Analysis Method: Allowable Stress Design Fb+ 900,0 psi E:Modulus of Elasticity
Load Combination ASCE7-10 Fb- 900.0 psi Ebend-xx 1,600.0ksi
Fc-PrIl 1,350.0 psi Eminbend-xx 580.0 ksi
Wood Species : DouglasFir-Larch Fc-Perp 625.0 psi
Wood Grade :No.2 Fv 180.0 psi
Ft 575,0 psi Density 32.210pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling Repetitive Member Stress Increase
taxf0, t;
it
DR.0133R 0,05332)
S
iaAC
2x8
Span=7.0 ft
Applied Loads Service loads entered.Load Factors will be applied for calculations.
Uniform Load: D=0.010, L=0,040 ksf, Tributary Width=1,333 ft
Point Load: D=0.1070 k @ 3.50 ft,(wall dead load)
Point Load: D=0,210 k @ 3,50 ft,(Ceiling Load)
DESIGN SUMMARY
Maximum Bending Stress Ratio = 0.705 1 Maximum Shear Stress Ratio 0.270 : 1
Section used for this span 2x8 Section used for this span 2x8
fb:Actual = 879.39 psi fv:Actual = 48.64 psi
FB:Allowable _ 1,242.00 psi Fv:Allowable -. 180.00 psi
Load Combination +D+L+H Load Combination +D+L+H
Location of maximum on span = 3.500ft Location of maximum on span _ 6,412 ft
Span#where maximum occurs = Span#1 Span#where maximum occurs - Span#1
Maximum Deflection
Max Downward Transient Deflection 0.038 in Ratio= 2209>=360
Max Upward Transient Deflection 0.000 in Ratio= 0<360
Max Downward Total Deflection 0.099 in Ratio= 847>=240.
Max Upward Total Deflection 0.000 in Ratio= 0<240.0
Maximum Forces &Stresses for Load Combinations
Load Combination ...-.. Max
__. ....._. _... .�_......-.._ _.,...,,� _.:.______.-..... _._.._ �.�...
Stress Ratios Moment Values Shear Values
Segment Length Span# M v 0d CFN Ci Cr Cm C I CL M fb F'b V fv F'v
Length-_7.0 ft 1 0.5200.1680.90 1,2001.00 1.15 � 1.00 �1.001.00 0.64 581.1611100.00 0
+D+H 0.00 0 00 0.00
0.20 27.22 162.00
+D+L+H 1.200 1.00 1.15 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=7.0 ft 1 0,708 0.270 1.00 1.200 1.00 1.15 1.00 1,00 1.00 0.96 879.39 1242.00 0.35 48,64 180.00
+D+Lr+H 1.200 1.00 1.15 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=7.0 ft 1 0,374 0.121 1.25 1.200 1.00 1.15 1.00 1.00 1.00 0.64 581.16 1552.50 0.20 27.22 225.00
+3+S+4-1 1.200 1.00 1.15 1.00 1.00 1.00 0,00 0.00 0.00 0.00
Length=7.0 ft 1 0.407 0.131 1.15 1.200 1.00 1.15 1,00 1,00 1.00 0.64 581.16 1428,30 0.20 27.22 207.00
+D+0.750Lr+0.750L+H 1.200 1.00 1.15 1.00 1.00 1.00 0.00 0.00 0.00 0.00
1i
Vista Structural Engineering,LLC Project Title: Polygon at Roshak Sales Trailer
1116(10)'', 1.3718 hW Oel;a Ctret Engineer: DMH
Portia,u:,OreSpn 97229 Project ID: 2062
4 www,vistastru�,tural,com
46 Project Descr:Structural Changes
‘44 00dennis@vistastructural.com
. (971)645-0901 .. . ..._. _-_o n
g � _ File C1UsersvDennisvDropboxvVISTAS-2VISTAJ11ENFRCA 112062.ec6 ,
f= Softwareco��ytioh,ENERCALC,INC.1983 2018,Build 10,18.12.13.
A%t f.0011 ,. 3'jeor".' i w
.::m 4.,.a, tavista- tktu�tat En t.1 + tier ;,LLC:'
Description: Floor joists supporting walls at front and back of office#2
Load Cnnibination Max Stress Ratios Moment Values Shear Values
Seginen,Leoatl. Span# M V Cd C FN Ci Cr Cm C t CL M fb F'b V fv F'v
Length=7.h ft 1 0.518 0.192 1.25 1.200 1.00 1.15 1.00 1.00 1.00 0.88 804.83 1552.50 0.31 43.28 225.00
+D+0,750L+0.750S+H 1.200 1.00 1.15 1.00 1.00 1,00 0.00 0.00 0.00 0.00
Length=7.0 ft 1 0.563 0,209 1.15 1.200 1.00 1.15 1.00 1.00 1.00 0.88 804.83 1428,30 0.31 43.28 207,00
+D+0.60W+H 1.200 1,00 1,15 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=7.0 ft 1 0,292 0.095 1.60 1,200 1.00 1,15 1.00 1.00 1.00 0.64 581.16 1987.20 0.20 27,22 288.00
+D+0,70E+H 1,200 1,00 1.15 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=7.0 ft 1 0.292 0.095 1.60 1,200 1.00 1.15 1.00 1.00 1.00 0.64 581.16 1987.20 0,20 27.22 288.00
+0+0,750Lr+0.750L+0.450W+H 1.200 1.00 1.15 1.00 1,00 1.00 0.00 0.00 0.00 0.00
Length=7.0 ft 1 0,405 0,150 1.60 1.200 1.00 1.15 1.00 1.00 1.00 0,88 804.83 1987.20 0.31 43,28 288,00
+D+0.750L+0.7505+0.450W+H 1.200 1.00 1.15 1.00 1.00 1.00 0.00 0.00 0.00 0,00
Length=7.0 ft 1 0,405 0.150 1.60 1.200 1.00_ 1.15 1.00..._._1.00_ 1,00__-0.88-- -- --804.83- 1987:20- -- 0.31-43.28 288.00
+D+0.750L+O.750S+0.5250E+H 1.200 1.00 1.15 1.00 1.00 1.00 0.00 0.00 0.00 0,00
Length=7.0 ft 1 0.405 0,150 1,60 1.200 1,00 1.15 1.00 1,00 1.00 0.88 804.83 1987.20 0.31 43.28 288,00
+0.60D+0.60W+0.60H 1,200 1.00 1.15 1.00 1,00 1.00 0.00 0,00 0.00 0.00
Length=7.0 ft 1 0.175 0.057 1.60 1,200 1.00 1.15 1.00 1.00 1.00 0.38 348.69 1987.20 0.12 16,33 288.00
+0.60D+0,70E+0.60H 1.200 1.00 1.15 1.00 1,00 1.00 0,00 0.00 0.00 0.00
Length=7.0 ft 1 0.175 0.057 1.60 1.200 1.00 1.15 1.00 1.00 1.00 0.38 348.69 1987.20 0.12 16.33 288.00
Overall MaximumDeflections'
Load Combination Span Max."-"Defl Location in Span Load Combination Max.'+"Dell Location in Span
+D+L+H_ 1._. .- 0.0992 3.528 I...,. 0.0000 . ... 0.000
Vertical Reactions Support notation:Far left is#1 Values in KIPS
Load Combination Support 1 Support 2
Overall iNAXinum '...-._:. - .' ..._..._...-. 0.392.-_w...._0:392'`�..
Overall MINimum 0.187 0.187
+D+H 0.205 0.205
+D+L+H 0.392 0.392
+D+Lr+H 0.205 0.205
+D+S+H 0.205 0.205
+D+0.750Lr+O.750L+H 0.345 0.345
+D+0.750L+0,750S+H 0.345 0.345
+D+0.60W+H 0,205 0.205
+D+0.70E+H 0.205 0.205
+D+0.750Lr+0.750L+0.450W+H 0.345 0.345
+0+0.750L+0,750S+0.450W+H 0.345 0.345
+D+0.750L+0.750S+0,5250E+H 0.345 0.345
+0,60D+0,60W+0,60H 0.123 0.123
+0.600+0.70E+0.601-1 0.123 0.123
D Only 0.205 0.205
Lr Only
L Only 0.187 0.187
S Only
W Only
E Only
H Only
Roshak S | Trailer
1 Project Title: Polygon at
%Pr.. Portland,Oregon 97229
Description: Floor beam supporting new ceiling loading
, CODE REFERENCES ,
Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10
' Load Combination Set:ASCE7-10
Material Properties „,.. ,_AnalysisMethodAllowable Stress Design Fb+ 900.0 ��
� of
LoadModulusx
CombinaUonASCE7'1O Fb' 900.0poi Ebend'xx 1'oou.okm
Fo~Prli 1,350.0 psi Eminbemd'xx 580,0 ksi
' Wood Species : DouglasFir-Larch Fc-Perp 625.0 psi
Wood Gra :No.2 Fv 180.0 psi
Ft �
575.0pni Density 32�21O�
. Beam Bracing : Beam is Fully Braced against lateral-torsional bucklingU
0 0135
^
" °
_=� �
l
�� 4x8
�~ A
span~*»n
° -- ` � ___ _ ^
- Applied Loads Service loads entered.Load Factors will be applied for
calculations.
Uniform Load: D=0,010 ksf, Tributary Width=8.0 ft,(wall dead load)
Uniform Load: D=0,0150 ksf, Tributary Width=9.0 ft
�
' ' `
air fitOKR*,
� , - ` `.` ` �^ "_-__--'�-'_ �_____�-___���� -_�� � _ _ �
Maximum Bending Stress Ratio = 0.37R1 Maximum Shear Stress Ratio = 0.260 : 1
Section used for this span 4x8 Section used for this span 4x8
(
lb:Actual ~ 442.25 psi fy:Actual = 46.81 psi
FB:Allowable = 1,170.00 psi Fv Allowable = 180.00 psi
Load Combination +D+L+H Load Combination +u+L+n
Location of maximum on span = 2.00# Location of maximum on span = 3.401 ft
Span#where maximum occurs = Span#1 Span#where maximum occurs = Span#1
Maximum Deflection I
Max Downward Transient Deflection 0.009 in Ratio= 5262>=360
Max Upward Transient Deflection 0.000 in Ratio= 0<360
Max Downward Total Deflection 0D18 in Ratio= 2607>=240.
Max Upward Total Deflection 0.000 in Ratio= 0�24O�0
� v
Maximum Forces &Stresses for Load Combinations
Load Combination Max Stress Ratios Moment Values Shear Values
,
In
Vista Structural Engineering,LLC Project Title: Polygon at Roshak Sales T iler
14718 NW Deia Street
`' Engineer: DMH
js Porticni,Oregon 91''29 Project ID: 2062
ww�r,viatastruauralrom Project Descr:Structural Changes
,„,,,,,...,,,,..)
den n is@vistastructu ral.com
(911j 645-0901_
�GO� Beam Nie CIUsats1Dannsl0ropbe)AydiuTAS-2WIS1'` 11ENERCA-112062ec6
4 Y�f f. SoftwarecopyrightENERCALC,INC.19: •2018 Budd:10.181213.
Description: Floor beam supporting new ceiling loading V,.!..; ie :. ineern �',
Load Coy iijnatii,r Max Stress Ratios Moment Values Shear Values
Seg nett Lc,ngth Span# M V Cd C FN Ci Cr Cm C t CL M fb F b V
iv F'v
Lenyth-4.J ft 1 0 265 0.182 1.25 1.300 1,00 1.00 1.00 1.00 1,00 0.99 387.46 1462.50 0,69 41.01 225.00
+0+0.750L+0.750S+H 1.300 1.00 1.00 1.00 1.00 1.00
Length=4.0 ft 1 0.288 0.198 1.15 1.300 1.00 1.00 1.00 1.00 1.00 0.99 387.46 1345,50 0.69 41.01 2077.00
+1D+0.60W+1-1 1.300 1.00 1,00 1.00 1,00 1,00 0.00 0.00 0.00 0.00
Length=4.0 ft 1 0.119 0.082 1.60 1.300 1.00 1.00 1.00 1,00 1.00 0,57 223.08 1872.00 0.40 23.61 288.00
+D+0.70E+H 1.300 1.00 1.00 1.00 1.00 1.00
Length=4.0 ft 1 0,119 0.082 1.60 1.300 1.00 1.00 1,00 1.00 1.00 0.57 223.08 1872,00 0,40 233,611 288.00
+D+0.750Lr+0.750L+0.450W+H 1.300 1.00 1.00 1.00 1.00 1,00
Length=4.0 ft 1 0.207 0.142 1,60 1,300 1.00 1.00 1.00 1.00 1.00 0.99 387.46 1872.00 0.69 41.01 288.00
+D+0.750L+0.750S+0.450W+H 1.300 1.00 1.00 1.00 1.00 1.00
Length,=4,0 ft 1 0,207 0,142..__1.60 1.300 1.00 1.00 1.00__1.00. __1.00__ _0.99__ 387.46 1872.00 - 0.69 _411,010__288,00
+0+0.750L+0.750S+0.5250E+H 1.300 1.00 1.00 1.00 1.00 1.00
0.00 1100 0.00 0.00
Length=4.0 ft 1 0,207 0.142 1.60 1.300 1.00 1.00 1,00 1.00 1,00 0.99 387.46 1872,00 0.69 41.01 288.00
+0,60D+0.60W+0.60H 1.300 1.00 1.00 1.00 1,00 1,00 0.00 0.00 0.00 0.00
Length=4.0 ft 1 0.072 0.049 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.34 133.85 1872,00 0.24 14.17 288.00
+0,600+0.70E+0.60H 1.300 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length=4.0 ft 1 0.072 0.049 1.60 1.300 1.00 1.00 1.00 1.00 1.00 0.34 133.85 1872.00 0.24 14.17 288,00
Overall Maximum Deflection s
LoadDCombination Span an Max Defl Location in Span Load Combination Max + Defl Location in Span
1 0.0184 2.015 �_.
Vertical Reactions Support notation Far left is#1 0,000
'0.0000
-�.�. �.... values in KIPS
Load Combination t.......
Support 1 Support 2 + �....._ .__,._...�
OveralP MAXimum
1,130 0
0.560
Overall MINimum 0.560
+D+H 0.570 0.570
+D+L+fi 1.130 1,130
+D+Lr+H 0,570 0.570
+D+S+H 0.570 0.570
+D+0.750Lr+O.750L+H 0.990 0.990
+D+0.750L+0.750S+H 0.990 0.990
+D+0.60W+H 0.570 0.570
+D+0.70E+H 0,570 0.570
+D+0.750Lr+0.750L+0,450W+H 0.990 0.990
i +D+0.750L+0.750S+0.450W+H 0.990 0.990
+D+0.750L+0.750S+0.5250E+H 0.990 0,990
+0.600+0,60W+0.60H 0.342 0.342
+0.60D+0.70E+0.60H 0.342 0.342
D Only 0.570 0.570
Lr Only
L Only 0.560 0.560
S Only
W Only
E Only
H Only
i! `
,
v.
Polygon @ Roshak Sales
5/2019 1/
Trailer
.
DATE:. r
1 s .
i
4....4f4
2/1
I
....
2062
ENGREININE EI;tf Pia : LLC
. DMH *.s.
..... ..,-
, * ,
I .
New loading at ends of LVL ridge beam, P = 12,109#
Required footing size, given existing (2) 6x8 footing shown on approved plans dated 11/30/15:
A(req'd) = 12,109#/ 1,500 psf = 8.07 ftA2
A(req'd) = L x W
Given W = 15" -'7.- 1 .25', 11
L(req'd) = 6.46'
install new footing: (2) 6x8 x 7'-0" long
4'ta ,
tf ; /
,t- !-',74)(r-J7,- fi-c.610' e\ct• si.5.1t.„Pyv, e_., o .,\:-/-o 60veC e,,,A.
1
401- i-rf i.e. '
\ IV °
I- 5-4? , • , i
7--57e:..„;
, 1
.... , ;
/, /14) rtnit IA 4
. 04
1 ; . .........„,:-
... _ ,....,,,....., ,
...._. _
WootlWorks® Sheanivalls SOFTWARE FOR WOOD DESIGN
WoodWorks®Shearwalls 10.31 Mar. 10, 2016 16:08:22
Level 1 of 1
40'
58.7
.....
20.1 480 35'
f ,
30'
. . . ... .....,. .. . • , ,
i 923 8-1
.. 25'
N
..,.
4,.
'T i
n 2N4
•:' 2
. . C.O.
..,- 20'
0-., ii in
4 r$
V.- 15'
) 0
c4s
- :
10'
N. 14 . ......... c.o.
';`. .....-•
‹:,) k LO
. .....,
i•.',.
0 4.0
ai Y. ,
r•-: 5'(- i''
cs4
C)
5,
7-
4 t
923
A-1 ..._,.......
. , ,5".5'. —-, . , - ,,, - - ..... . , -,. --_,<,.. . 17
r
I_
40.7
-10'
-15'
-5' 05' 10' 15' 20' 25' 30' 35' 40' 45'
--s- Factored shearline force (lbs) t_Lti Unfactored applied shear load (plf) i
Factored holddown force(lbs) 0-0 Unfactored dead load (plf,lbs)
*C Compression force exists 0-,-® Unfactored uplift wind load (plf,lbs)
a Vertical element required ---.1 Applied point load or discontinuous shearline force (lbs)
Loads Shown: W; Forces: 0.6W+ 0.6D. Orange
.
Level 1 of 1
co
30'
fl
F ------------: 1
,,. ,,_
,-,,.. i
r. ,,. it
tt
::
-5'
58.7
-10'
-5' 0' 5' 10' 15' 20' 25' 30' 1 35'
--0- Factored ahaodineforce (|bs) Liii Unfgctoredapplied shear load /p|�
6. Factored holddown force (lbs) 0-0Untactored dead load (plf,lbs) `
a C Compression force exists ~1,--4-11 Applied point load ordiscontinuous ahear|ineKrce (/ba\
Vertical element required
'~ '
Loads Shown: Oe; Forces: 0.7E + 0.8O; E = pC)e + 0.2 Sds D; p(NS) = 1.0; p(EVV) = 1.0; Sds = 0.73. (}range
r
Perforated Shear Wall
Job: Roshak Sales Trailer
Client: Polygon Northwest Company
Area of_hou-e: R`ght rr4rtorWalr t ° 7/18"Panel w/Edge Fastener Spacing as noted with 12"inter nedit�le
l.alarat tf o 10564 spacing(8d common or galvanized box nails)
Wind FRIce(1)or Seismic Pore.(2' 1 eisWH/W .:
Maximum H/W vVah Segmeru ratio: + 3.5:1 Edge nailing v Edge nailing v ,
Maximum Allowable Shear per sheathed face: 1218#/tt 61n. 240#/ft 6 in 335#/ft
Faces of wall with APA-Rated sheathing: 1 in 4 m 35D#fft 4 in 490#!It
Nominal width c f ivoodev"ll: 6 in3 in, 450#/ft 3 in. 830#/ft
y...2ln 585 Mt2 in. 820#/ft
Verify . Sheathed both faces Sheathed both fares
1)Full-width segrlem wlcrouf opening areach-end of=hear wall? Y 6 in 480#/ft 6 In. 670#/ft
2)H/W Ratio of all segments within limitations'! Y 4 in 700#/ft 4 In 980#/ft
3)Top and bottom of entire wall have uniform elevations? Y 3 in. 900#/ft 3 in 1260#/ft
4)Lateral force does not exceed maximum allowable shear? Y 2 in-,._„ 1170#lft . 2 in7- 1840#/tt
5)Wall height is less than or equal to 20 feet Y
Overall Wall Height 8 ft
Maximum Opening Clear Height 6.67 ft
Overall Wall Width 28 ft H/W Ratio
Wall Segment#1 Length 8.25 ft 0.97 OK
Wall Segment#2 Length 18.75 ft 0.48 OK
Wall Segment#3 Length 0 ft N/A OK
Wall Segment#4 Length 'ft N/A OK
Wall Segment#5 Length ft N/A OK
Wall Segment#6 Length ft N/A OK
EL, 25 ft
Unfactored Floor&Roof Dead Load: 15#111
Unfactored Self Weight Dead Load: 98#/ft
OK TO PROCEED WITH DESIGN
Nominal Shear Capacity: V.=vCd;L, Arlghor a otts/N its r?cgitiretf
full-height sheathing 89% Minimum sill plate thickness: 2 x
opening ratio: 83% 112"dia.Anchor bolt capacity: 1040#
Co 0:715/8"die,Anchor bolt capacity: 1488#
q(Service level unit shear): 42#/ft 16d common nail capacity: 226 4
q(from wall above) 0#/ft
q'(.eq/Co) 59#/fl
Total no.of 1/2"dia.Anchor bolts required: 2
far,Deslons Qcverrtect by Widtt Total no.of 5/8"dia.Anchor bolts required: 1
7/16"APA-Rated Sheathing with 80 common or galvanized box nails at:
—Ail Panel Edges: 6"0.C, ix dia,Anchor bolt spacing: 720,C.
Intermediate Framing Members: 12"O.C. 618"dia.Anchor bolt spacing: 72"O.C.
Wall Sheathing On: ONE FACE led common nail spacing: 4$"0,C.
for Dexforte Governed ttt Seismic Gross uplift force at ends of perforated shear wall: 476
7/18"APA-Rated Sheathing with 8d common or galvanized box i Rif: at: Applicable uplift force from wall above? 0#
All Panel Edges: SEE ABOVE"r).0 Net uplift force at ends of perforated shear wall: 456#
Intermediate Framing Members: 12"0.C. Note:a negative net uplift force at ends denotes no hold^down inquired
Wall Sheathing On; ONE FACE Held•drawn required at ends on new foundation: Nolte Required
C-pgcit of 6/8'die F1554 F1554 w1 SET-XP,tr embed 1775#
Note:For walls sheathed on both faces with edge nail spacing less than Hold-down required At ends on existing foundation
6"OC,edge framing members shall be 3x or(2)2x nominal None Requited
Trod
Floor-to•Floor strap required at ends: Nene Required
Number of 22s4's rec Uteri at each end of wall: f'
Number of 2xt9's required at each end of wall' 1'
n�cuu'Ewros vb..-
"Table 4.3:3.5(American Wood Council SOPWS)
Co
%full height h13 h/2 2h/3 5h/6 hL
20100 089 .,_
053 . 0.43.....„....„. ...._.„„......_ ________- 036 r ay ,rao
10%
% 1 00 0.71 0,56 0.45 0.38 " ;>€ssu +sti v a' �
�-
W 30"% 1.00 0.74 0.59 0,49 _0.42
40% 1,00 0.77 0.63 0.53 0.45
50% 1,00 0.80 0.67. 0.57 0.50 /
86/ 1.00 083 071 063 0S6 r'
707; 1,00 0 87 0:77 --0.89.— 0 63 f •'
80% 1.00 091 083 077 071 )
90% 1.00 0 95 0 91 0,87 0.83 I v?,' 3
100% �� 1,00 —1,00 100�'� 1.00 1_00 a
I y
i tt\
f#
Per/oratea Shear Wall
Job.' Roshak Sales Trailer
Client: Polygon Northwest Company
Ares of house. Leif Exterior Wall 7116"Panel esti Edge Fastener Spactrg a,nc*ea with 12"int,rmJlis.e
Lateral Farce 1056# stesta.(8d common or atvvnls ou t,ox nails)
Wind Force(1)or Seismic Force(2): 1 Seismic
Maximum H/W Wall Segment ratio: 3.5:1Edge Win
Euge naflin
Maximum Allowable Shear per sheathed face: 1218#/ft v
+ 6 n 335
Faces of wall with APA-Rated sheathing: 1 In 4 n 490#
Nominal width of wood wall 8 in
+#M 3.r 630
Verify In, 2 in 820 4
Sheathed both faceS Shalhtsd'r 11.fao4.,
1)Full-width segment without opening at each end of shear wall'? Y
2)HMI Ratio of all segments within limitations'? 6 In. 480#!ft
Y 4 in � 700#/ft
._._ 3 in 980#/ft
4
3)Top and bottom of entire wall have uniform elevations? Y 3 in. 900#/lf
iii 11..4 •,n 1.280#%R
4)Lateral force does not exceed maximum allowable shear'? Y 2 in. 1170#/ft
2 in, 1840 Mt
5)Wall height is less than or equal to 20 feet Y
1-
Overall Wall Height 8 ft
Maximum Opening Clear Height 4 ft
Overall Wall Width 28 ft I-i/W Ratio
Wall Segment#1 Length 6.87 ft 1.20 OK
Wall Segment#2 Length 9.58 ft 0.84 OK'
Wall Segment#3 Length 0 ft N/A OK
Wall Segment#4 Length ft N/A OK
Wall Segment#5 Length ft N/A OK
Wall Segment#6 Length ft N/A OK
LL; 16.25 ft
Unfactored Floor&Roof Dead Load: 15#/ft
Unfbctored Self Weight Dead Load: 98'#/ft
OK TO PROCEED WITH DESIGN
Nominal Shear Capacity: V„=vC,EL, An6hor Bola/tags Requlraq
full-height sheathing 58%'' Minimum sill plate thickness: 2 x
opening ratio: 50% 1/2"dia.Anchor bolt capacity: 1040#,
Co 0.8 5/8"dia.Anchor bolt capacity: 1488#
q(Service level unit shear): 65#/ft 16d common nail capacity: 226#
q(from wall above) 0#/ft
q'('c1/C0) 81 #/ft
Total no.of 1/2"dia.Anchor bolts required: 2
forp#slrfns Governed Or ysr{It j Total no„of 518"dia.Anchor bolts required: 1
7/16"APA-Rated Sheathing with ed contrnon et Calvi rar:,a box naffs at:
All Panel Edges 6"n r" 112
.- 1f2"dfa;,Anchor bolt spacing: 72"0,C.
Intermediate Framing Members. 12"O.C. 518"dia.Anchor bolt spacing: 72 O.C.
Wall Sheathing On: ONE FACE 16d common nail spacing„ 88 0O.C.
forPeSlttns Governed by Seismic Gross uplift force at ends of perforated shear wall' 650
7/16"APA-Rated Sheathing with 8d common or galvanized box nods ab Applicable uplift force from wall above? 0#
Ail Panel Edges: SEC ABOVE"0.C. Net uplift force at ends of perforated shear wall -283#'''
Intermediate Framing Members: 12"0.C. Note;a negative net uplift force at ends denotes no hold-down re"aired
Wall Sheathing On; ONE FACE Hold-down required at ends en new foundation: None Required
Capacity of 6/8 dia F1554 w/SFTXP 8 embed: 1775,#
'Note:For walls sheathed on both faces with edge nail spacing less than Hald•dowrr required at ends on existing foundation:
6"OC,edge framing members shall be 3x or(2)2x nominal Nunn tae ufied
Floor-to-Floor strap required at ends: None Roz)ulred
Number of 2x4's required at each end of wall: 1
Number of 2x8'e required et each end of wall' I
Table 4.3.3.5(American Wood Council SDPWS)
Co ._...... z.
%fu 1-heht h/3 h/2 2h/3 5h/6 h
i
10% 1.00 0 69 053 0.43 0.36 1 r$
20% 1 00 0.71 17.56 0A5 0:3$ -w«mexv $$0.1 ¢a �fl v
' frAt rri #:•r
30% 1 00 0 74 0,59 0.49
0.42
40% 1 00 0.77 0,63 0.53 0 45 J.,
50% 100 0.80 067 0.57 0.80 Ij'
..z.A_.a ,�....... _ r
80% 1.00 0.83 0 71 0 63 0„58 ` .A
70% 1.00 0.87 0.77 0,69 0.83 e r
80% 100 091 083 677 0.71 ,
90°/ 1.00 0.95 0.91 0.87 0.83 I
100/ 1::00 1:00 1 o0 "1,x70 --' 1 Too - a''' °
-
p
6
Perforated Shear Well -. """" --....-
Job: Roshak Sales Trailer
Client Polygon Northwest Company
Area of.rou.,e: P,ar Sxt"norWafl 7/16"Panel w/Edge Fastener Spacing as noted with 12"Interco to
Lateral Feece 923# spacing(8d common or galvanized box nails)
Wind Furce(1)01 Seismic,,"orca(2): 1 Seismic Wind
Maximum H/VV Wall Segment ratio: 3.5:1 Edge nailing , v Edge nailing, v
Maximum Allowable Shear per sheathed face: 1218#111 6 in, 240#/ft 5 in, 335#/ft.
Faces of wall with APA-Rated sheathing: 1 in 4 in. 350#/ft 4 in. 490#/ft
�,_.. e - --.�..
Nominal width bf wood ti #1 ill: 6 in 3 In, 450#/ft 3 in. 630#/ft
2 in. 585#/ft 2 in. 820#ift
Venfy Stteettted both faces W Sheathed both faces
1)Full-width seamen.wimo1' opening ai each end of.;hear wall? Y 6 in, 480#/ft 6 in. 670#/ft
2)HIW Ratio of all segments within limitations? Y 4 n. 700*ft 4 in 9 0#1
9 80#/R
3)Top and bottom of entire wall have uniform elevations? Y 3 in 900#ift
3 m, 1260#/ft::
4)Lateral force does not exceed maximum allowable shear? Y 2 1nln,_ 1170#!ft 2 in. 1640#18
5)Wall height is less than or equal to 20 feet Y
Overall Wall Height 8 ft
Maximum Opening Clear Height 6.67 ft
Overall Wall Width 35 ft H/W Ratio
Wall Segment#1 Length 15.17 ft 0,53 OK
Wall Segment#2 Length 3.83 ft 2.09 OK
Wall Segment#3 Length ft N/A OK
Wall Segment#4 Length ft N/A OK
Wall Segment#5 Length ft N/A OK
Wall Segment#6 Length ft N/A OK
ELI 19 ft
Unfactored Floor&Roof Dead Load: 15#111
Unfactored Self Weight Dead Load: 96#/ft
OK TO PROCEED WITH DESIGN
Nominal Shear Capacity: V.=vCoal 4nch9r Bolts/Nails Rsctuiretj
%full-height sheathing 54% Minimum sill plate thickness: 2 x
opening ratio: 83% 1/2"dia.Anchor bolt capacity: 1040#
Co 47.5 5/8"dia.Anchor bolt capacity: 1488#,
q(Service level unit shear): 49#01 16d common nail capacity: 228#
q(from wall above) 0#/ft
rj(=n/Cc) 97 Mt
Total no,of 1/2"dia.Anchor bolts required: 1
Fa/Des/00S Governed 4Y I/VIN/ Total no.of 5/8"dia,Anchor bolts required: t
7/16"APA.Rated Sheathing with 8d common or galvanized box nails at:
All Panel Edges: 6"Pt. 1/2"dia,Anchor bolt spacing: 72"D,C.
Intermediate Framing Members: 12"0.0 5/8"dla,Anchor bolt spacing: 72"O,C.
Wall Sheathing On: ONE FACE 16d common nail spacing. 28"O.C.
forGeSiwts Governed by Seismic Gross uplift force at ends of perforated shear wall: 777#
7/16"APA-Rated Sheathing with 8d common Of galvanized bex nails at; Applicable uplift force from wall above? 0#
Ali Panel Edges: SEE ABOVE O.C. INet uplift force at ends of perforated shear wall: -388#
Intermediate Framing Members: 12 0.C. I Note.::a negative net uplift force at ends denotes no hold-down required
Wan Sheathing Ort: ONE FACE j htofd•dosvn required at ends on new foundation: None f8amrlr'ad
Capacity of Sir,die Ftt554or/SET XP 8"embed 1775#
'Note:For wails sheathed on both faces with edge nail spacing less than MOId.clown required at ends on existing(aundalian:
6"00,edge framing members shall be 3x or(2)2x nominal None Required
Floor-to-Floor strap required at ends: None Required
Number Of 2x4's required at each end of wall: 1
Number of 2x0's required at each end of wall 1
Table 4.3,3,5(American Wood Council SDPWS) i1 1 ^Co .
, 1
°/n full height h/3 h/2 2h/3 51#6 h
10% 1 UU 069 -0-65 043 —6.36
avant t.4,'*a
20% 1.00 0 71 0.56 0A5 0.38 t+a�>r'iavolei11
_
30% w mm 1.00 0.74 0.59 0.49 0.42
407/ -....f:66----071f- 0 63 --676i 0 45 ""
50/ 100 080 067' 057 050
60/ 100 083 071 063 0.56 °`4 .''' 6 r
:..,., a
,,, „ \\6, /
70/° 1 00 0 07 0 77 0 69 0 63
80% -1,00-- 0 91 0 83 0 77:7_70.71 { i ''
/° T e
90
100 095 091 067 083 r
900/ 1.00 1.00 t 06 1.00 00 1.a
•
. awe... 7_,.. t^ iia"°'' , 41
u
1
•
Perlora to d Shear Walt
Job: Roshak Sales Trailer
Client: Polygon Northwest Company
Agee of haute:: Front Exterior Wall 7116"Panel wt Edge f-a:;18:ier.,paring as nntgc with 12'intermediat
Lateral Force tt2S It spacing(ad common or(elvanized box nails)
Wind Force(1)or Seismic Force(2): 1 SeIsmtc , !hind -
Maximum H/W Wall Segment ratio: 3:5:1 Edge nailing v Edge nailing v
Maximum Allowable Shear per sheathed face: 1218#/ft Bin 240#111 x in33''#/
Faces of wall with APA-Rated sheathing: 1 in 4 in 350#/fta n 49U only
Nominal width of wood wall: 8 in 3 in 450 Riftin. 130,.o.
2 In, 585#lft .... -' 2 in, 820#t.w
it
Verify Sheathed,bath faces Sheat tied both faces
1)Full-width segment without opening at each end of shear wall? Y 6 in 480#/ft 6 In. 670#/ft
2)H/W Ratio of all segments within limitations? Y _4in 700#/tl 4 in.. 980#/tt
3)Top and bottom of entire wall have uniform elevations? y 3 In 900#/ft 3 In. _1260#/ft
4)Lateral force does not exceed maximum allowable shear? Y 2 in, 1170#/1l 2 in. 1640#/ft
5)Wali height is less than or equal to 20 feet Y
OverallWall Height 8 ft
Maximum Opening Clear Height 6.67 ft
Overall Wall Width 35 ft H/W Ratio
Wall Segment#1 Length 8.33 ft 0.96 K
Wall Segment#2 Length 3.83 ft 2.09 K
Wali Segment#3 Length 2.83 ft 2.83 OK
Wall Segment#4 Length ft N/A OK
Wall Segment#5 Length ft N/A OK
Wall Segment#6 Length ft N/A OK
EL; 14.99 ft
Unfactored Floor&Roof Dead Load 15#/fl
Unfactored Self Weight Dead Load: 96#/ft
OK TO PROCEED WITH DESIGN
Nominal Shear Capacity: V"=vC,EL, Anchor Belt alts fteg(rirer
%full-height sheathing 43W Minimum sill plate thickness: 2 x
opening ratio: 83% 1/2"dia Anchor bolt capacity: 1040#
Co 0,45 5/8"'dia.Anchor bolt capacity: 1488#
q(Service level unit shear): 62#/ft 16d common nail capacity: 226#
q(from wall above) 0#/ft
q'(=q/Co) 137#/ft
Total no.of 1/2"dia.Anchor bolts required: 1'
FArOesiens GOVergod be Ind Total no.of 5/8"dia.Anchor bolls required: 1
7/16"APA-Rated Sheathing with 8d common or gnivxrlie 1 box nails at:
All Panel Edges: 6"0.C: 112"dia.Anchor bolt spacing: 72"'O.C.
Intermediate Framing Members 12"O.C. 5/8"dia.Anchor bolt spacing: 72 'O,C.
Wall Sheathing On: ONE FACE 16d common nail spacing: 20"O,C.
ForOesloris governed by Seismic Gross uplift force at ends of perforated shear wall: 1095#1
7/18"'APA•Rated Sheat With$d common or ,rsiv:hmleed liox nails at Applicable uplift force from wall above? 0#
All Panel Edges: SEE ABOVE"0.C: Net uplift force at ends of perforated shear wall: -71 #
Intermediate Framing Members 12"U.C. Note:a negative net uplift force at ends denotes no tiara-:Sown re aired
Wall Sheathing On: ONE FACE Hold-down required at ends on new foundation: None Required
Capaat'of 51,3 dia F1554 w/SET-XP 8 embed 1775# »
"Note:For walls sheathed on both faces with edge nail spacing less than Hold-down required at ends on existing foundation.
6"OC,edge framing members shall be 3x or(2)2x nominal None,Required
Floor-to-Floor strap required at ends: None Required „
1 Number of 2x4's required at each end of wall: 1
Number of 2x6's required at each end of wall; 1
s4V.":tBtt.V",mom
` Table 4.3,3.5(American Wood Council SDPWS)
co
r%fail hetght h/3 ht2 2h13 5h/6 h
10% -T.-6.6-""- lila- 0 53 043 0.38z z a,„tr8
20% » 1 00 0.71 0.56 0.45 0.38 "tor zs p L }
30/ 1.00 0.74 0.59 0,49 0.42 `
40% 1.00 0.77 0,63 0.53 0.45
50% 1.00 080 067 057 0.50 �_._,. \h
w N,.."»._..
60% 1.00 0.83mm 0.71 0 8383 0.56 Z4 / i 1
"70%w 1 00 0.67 0,77" 0,69 0 83 /
130% rn»1.f19� b.9t 0 63 0 77 0 71' Wiz\ Xi
90% 120 0.95 0,91 0.87 0.83 A�f
100°/0 - 1.00 1.00 1.00 1 00 1 00 4 4 s
i �/
(
�, fi Pyo F '''' �ex o +
s#;; s.�.,,,,,-,,$;wry a',,,,,,,,k,,;..,"z 1 ;S ice' hrr z
dN,'
4
,„-i::::.,ti,s:t,„a
*t..).;-'• TABLE 2
r�
SHEAR Vl.\LLS- RECOMMENDED SHEAR(POUNDS PER FOOT) FOR APA PANEL SHEAR WALLS WITH F• ' ING OF
' DOUGIA"s-Frit,t.AAFIC:t OR S(st:11-IFRY PINE(a) FOR WIND OR SEISMIC LOADING(b)
.rte: .. .._... ....,w-_ ..-,.,,..„..,44
......_. ...:..: � r- '.
Panels •pplied Over
Panels Applied Direct to Framing 1/2"or 5/8" ypsum Sheathing , ,
Minimum Minimum
Nominal Nail Nail Size Nall Spacing""at Nail Size_ Nail Spacing
at 'R.
Panel Penetration (common or Panel Edges(in.) (common or Panel Edges in.)
Panel Grade Thickness in Framing(h) galvanized galvanized
(in.) (in.) box) 6 4 3 21e) box) 6 4 3 2(e) ;"'1
ki4 it
5/16 1-1/4 6d 200 300 390 510 8d 200 300 390 510
` APA 3/8 230(d) 360(d) 460(d) 610(d)..
STRUCTURAL I 7/16 1-1/2 8d 25501 395(dl 505(dl
670(4) 10e280 430 550 730
grades qt. '
15/32 280 430 550 730
15/32 1.5/810d1Fl 340 510 665 870
5116 or 1/.4(c) .,.
184 270 350 450 180 270 350 450
3 1-114 6d
APA RATED 3/8 200 300 390 510 8d 200 300 390 510
+ " SHEATHING,APA
RATED S1D)NGis) 3/8 220(41 320ie1) 410(4) 530(d)
and other APA 7/16 1-1/2 8d 240(4) 350(4) 450141 585(4) 10d(t) 260 380 490 640
4440 grades except 15/32 260 380 490 640
species Group 5 15/32 310 460 600 770
1-5/8 10d(F)
19/32 340 510 665 870 � _._
PA'RATED, Nail Size Nail Size
.•t s1 (galvanized (galvanized '€
�'`
S
easing)
casing)
r� +,
.5/10;1 1-1/4 6d 140 210 //5 60 Stt 14th; 210 ''../ :,..$60
'9:!":7 3/5 1-1/2 8d 160 240 310 410 10c'' 160 240 31C 410
(a)For framing of other species;(1)Find specific gravity forspecies of lumber in (d)Shears may be increased to values shown for 15/32-inch sheathing with
the AFPA Notional Design Specification,(2)(o)1 z>r cnmnxon or galvarri eed box some nailing provided(1)studs ore spaced a maximum of 16 inchrs a.c.,or
nails,find shear valve from table above for nog)size for STRUCTURAL I panels (2)if panels are applied with long dimension across studs. "r(
i (regardless of actual grade).(b)For golw:nired casing nails,take sf r n value
d�emcity worn ta61a above; 3)Multi this value b 0.82 fors (e)Framing at adjoining panel edges shall be 3-inch nominal or wider,and
( PIY y penot wh) specific nails shall be staggered where nails are spaced 2 inches o.c.
�F gravity of 0.42 or greater,or 0.65 for all other species.See iootnoie(N.
a (b)All panel edges backed with 2 inch nominal or wider framing.Install pan- (t)Framing at adjoining panel edges shall be 3-inch nominal or wider,and
(obis)
either horirgritally or vertically Space nails maximum 6 melte:o.c,along nails shall be staggered wirers 10d nails having penetration into f{aming of
' ' intermediate framing members for 3/8•inch and 7/16•inch panels installed mare than 1-5/8 inches are spaced 3 inches o.c.
on studs spaced 24 inches a.c.For other candelorts and panel thicknesses, (411 Values apply to all-veneer plywood APA RATED SIDING panels poi Other
space nails maximum 12 inches o.e.on intoratediate supports At�A RATED SIDING panels may alta quality an a proprietary ball APA w
RATED SIDING 16 ac plywood may be 11/32 inch.3/8 inch at thitker.
(c)3!8-inch or APA RATED SIDING 16 oc is minimum recommended when Thickness at paint of noilwng on panel edges governs shear value
applied direct to framing os exterior siding.
(h)Contact APA for engineered alternatives, ;E t
tri
Typical Layout for Shear Walls
‘„?''.1,,t. Load homing Slag
cki±sg Frdmin gr„
f lkt _ sii.Lso
1111.111 I ���F
(; 116,1111 4 4-*
IIII 11111
� ■
.4174
,.111111111111111i 1 mill ii -ti ,
Shear wall boundary Foundation resistance
_ a .'r w,Ti x; $+ $? "afi �: 'x say ten
t Y. a,.
u
sr P 1 ;. ° f ri t d a ',€
�`�r ya. aurae ud ,
/ � , r.'
f
i
1
JOB #7,01,6-03 POi.YGON
,./.- , /- ----7--".' ' [ 1 ' 1\614:2 :C.,7'• pf SHEET NO 1
/I,/ — L:..e.y- `Av ; V
/
,. _ E., ,A, \.,
t /7 (/// BUILDING SYSTEMS Or
CALCULATED BY MCL DATE 11/20/2015
PO Box 310•9493 Porcr Rd.Aurnsvalle,OR 97325
CHECKED BY DA IE
800.682.1422 Moder natalldingSweins.com
SCALE
RECEIVED
APR 1 1 2019
STRUCTURAL CALCULATIONS FOR CITY OF TIGARD
BUILDING DIVISION
28' X 35MODULAR
MATERIAL SUMMARY MS-1 --> MS-3
BENDING STRESS 85-1. --> B5-2
ROOF FRAMING ANALYSIS RF-1--> RF-4
EXTERIOR WALL STUD STUD-1
FLOOR FRAMING ANALYSIS FLR-1 --> FLR-5
LATERAL FORCE ANALYSIS LFA-1--> LFA-4
FOUNDATION ANALYSIS FDN-1 --> FDN-6
LOADING ANALYSIS L-1.. --> L-5
'"',.00.,, ,:„ '‘.:'',/ e ' ' •.*; ''
7 ,, - , : JOB 2.01.E-Ct t�UI.Y ON
- n
`,; faE :::,111,,,, - .' ° N SHEET NO MS-J. OF MS1:3
T _ [M3 lrJ I I DING YS'J EMS .. . . / ._
f/.': .>- ,���� .. .�. _ c�trUl��r�r� r�� MCI. DATE � � ,� � ����
Po[lox 110.9493 Porter Rd•Aurnsvllle,OR 97325 CHECKED BY DATE.
800.682,1422 Modernt3uHdingSystems.com SCALE
MATEMA1, SUMMARY FOR
8' X 35' MODULAR
ROOF FA 'IING.
TYP RE RAFTER USE 2X10 HF I1-2 O 24" 0,c.. ' '>L1 I'd---i
TYP 6'-0" OR LESS OPENING USE (2) 2 x P,`DI It? SITE if;:-2
H DR
RIDGE BEAM USE ('i)MURP Y LVL :1.60 r17 - SEE RE 3
2, E, %'' W (LA) r24'' n
COLUMNS,
ENDWALL COLUMNS USE •(2)4X6;DI=192. y,�,.,: SEE RF-4
MIDSPAN COLUMNS USE ;N/A
EXTERIOR WALL STUD USE :2146:,H,,,it STUD GRADE, .26"',STUD-i
r 0.0 --,
FLOOR FRAMING:
TYP FCR JOIST USE 7X8'OE 112` *1.6'0,C, SEG: FM-1.-
II TYP FLR JOIST SUPPORT BEAM USE AX8 DE 112 - SFC ELR-S
1
1j
11
it
1II
i
II
1
I
11
l
III
I
'f
II
I
JOB 020.5-03' t.O Y'3O
N
„ ._..« ..,..«..a.y.,..
SHEET NO MS-2.
OF MS-3
_...._a.�m. ...�.
, CALCULATE[ BY MCL DAf'E 1 of 2... Hu H I)IN Y I t Intl' .. D
_
PO Dux 110.9493 Porter Rd.Aumsvllle,OR 97325 CHECKED BY DATE
800.682,1422 ModernDuildtngSystems.com SCALE M
SHEATHING:
ROOF USE 1JSE MIN 7/16' SHTG w/ 15 GA STAPLES`,SEE LFA-1,2
AT 6" EDGE &'1.2" H Li) (UNBLOCK CD)
(ESft453J, TABLE 6) !J GRADL TO 4"
8".A) ROOF
EXT ENDWALLS USF USE MIN :L /32uSH I'G w/8d (.11.3) AT SEE LFA-1
6 EDGE & :12" HELD (BLOCKED) (CSR-
1539, TABLE R)
EXT SIDEWALLS USE USE MIN 15/32" SF1T w/Bcf (,113) AT SEE LFA-2
6" EDGE & :12" FIELD (131 OCKED) (ESR-
1 39,TABLE f )
FLOOR USE USE MIN 19/32" `I`HIG w/Sd (.113)AT SEE LFA-1,2
6EDGE& :1.2" FIELD (Uf 1F3LO( 1 U) (ES
1539,TABLE 6)UPGRADE TO 23/32
SHTG AT 6" & 8". AT FLOOR
MOBILE UNIT TO CHASSIS USE N/A SEE FDN-4
II
IOB ;`r2t):L .J POLYGOi11
,`` ✓ [1 .77i:,,,,,.,57‘
::: SHEET NO MS J Or Ms
(/.. i'$s }31. 1 ..,DI N YSTFMS :CAI GULATED BY MCI. DATF 11/20/2011!
PO Box 110.9493 Porter Rd.AurnsvIlle,OR 9732•, CHECKED BY 1)/,TL Wm m _ _, ,,, ._„_._.
800.682.1422 ModernUulldingSystems,com SCALE
SHEAR WALL HOLD DOWNS USE USE MIN SIMP S-1.8 w/ (4) SEE LFA-3
N-10's EA END
SIDEWALL TOP PLATE SPLICE USE I1SF MIN 4 ft SPLICE w/ SEE. I_F.FA-4
(12) 12ci'c (,131.) EA END
ENDWALL TOP PLATE SPLICE USE I.,JSE MIN SIMP CS-1.8 w/ (4) SEE LFA-4
N•-:10's EA END
RIDGE BEAM TO RIDGE BEAM USE USE MIN (:3)-.5/8 in DIA SEE LFA-4
CONNECTIONS ME3,'s AT RIDGE BEAM
FOUNDATION:
TYP EXT FTG USE USE+/-:16 in,SO. PADS OR 2 x 1.2 x 24 SEE ''DN-1
in, P.T. PADS AT 5' O.C.
TYP INTERIOR FTG USE USE+/.. 16 In,SO. PADS OR 2 x 12 x 24 SEE FDN-1
in. P.T. PADS AT 4' O.C,'
ENDWALL COLUMN FTG USE (2) (FLAT) P,T. HE 1/2, 6 x 8 SEE FRN-3,4
x 45 ' L
PIT SET BRACES MOD USE P,T 7x6 RRACLS w/SIMP SEE FDN-5
SIDEWALLS A35 w/(6),N-8's EA LEG C2
5' 0,`C, PER DETAIL
PIT SET BRACES MOD USE P,T, 7x0 BRACES w/-SIMP SEE FDN-5
ENDWALLS A35 w/(6):Nw8's EA LEG @
5' D.C. PER DETAIL.
1
`
'
v
�
o
BENDING �TRES���
R�K�K�E���� ����|L��I���� SYSTEMS, INC.
9493 Porter Road SE * PO Box 110 Si!LET 8S-1. OF os-2
AMSV|LLE OREGON 97325 CALCULA1 ED BY MCL DATE
0 3/13
503-749-4949' CHECKED BY ATE
Fax 503-749-4950 ocALs
ALLOWABLE BENDING STRESS F'b= Fb( CuCwCt CL CF Citi C|Cr)
Fb- BENDING STRESS DESIGN VALUE
C0- LOAD DURATION FACTOR
CF-SIZE FACTOR
C REPETITIVE MEMBER FACTOR BASED ON 2012 NOS
� `
- FLOORS OR
ROOFS ROOFS
_—
Fib W/0 rib W/
DURATION
M.O.E. DURATION ,,,,. ._.,
SIZE SPECIES («10^6) FP (psi) CF Cr (psi) C"(S .o—'' (psi)
JOISTS AND RAFTERS _ _ � ' ,
��
��Q DF#1Btr 1.D 1200 l
.2 1.15 1556 l.1G 1904
— — 12 115 1380 1I5 .
DF#1 1J 1000 . � ~ . _,'- - � �� 1242 1-15 1��8
OF#2 1.G ' 900 1.2 l. ~ _ - ~ _
875 12 -'� 1.15
1208 1.15 1389
5PF#l /#2 1�� . .��
' 1.3 850 1,2 �1.15 1173 1.15 � 1349
HE#2 _ ___ �.� _ __ . _ ,
-- — ^ - — - ---
3xlO — �el Struct 1.9 . 2182
1.1 1.15 1898 1.15
18 1200 11 1L15 1518 115 1746
DF#10iGtr . . - ~ . _
- --- l 1S 1��5
l 1 1-15 1265
DF#1 1,7 1000 . _ �'�� - ^�^~
1- 975 1 � --' 1 - 1233 1.15 1418
HF#1 S '� ��z .
1309
l 1 1,15 1139
DF#2 1,6 900 . 1.15 _ _
~ 1.4875 l l 1.15 1107 1 15 1273
SPF#1 /#2 . .
'
HF#2 3 850�. 1.1 1,15 1075 1.15 1237
HEADERS - '
.5 N/A 1350 1.15 1553
4�4 QF#3 1.6 ��0U1
.
N/� 1170 1.15 1346
1 � 900 l �
4x� DF#2 . . �/°
_-� -
...
` 13 1
4x8 DF#2 1.6 900 . N/A __�1170 1.15
S 1346
`
4X lU DF#2 l.6 900 N/A 1080 1
. 1.� .15 1242
i
N
SR-2013 1 Most t+tidei Accepted and Misled f'ego IBS-2 Z of LAS»
r
5.4 Evaluation of the effect at Ore-retardant or 6.0 EVIDENCE SUBMITTED
preservative treatment on LVL Is outside the scope of Data In accorda,icti wit," the iCC-ES A.,tceptaroe Cribria
this report. for Structural WLod-based I',oduc's (AC47), noted
0.5 Installation, fabrication, Identification and connection October 2009,(corrected December 2009),
details must bo in accordance with this report, the 7.0 IDENTIFICATION
manufacturer's published installation instructions and
the applicable cods, This report must govern if`there Tho Murphy L9 t imtst bt ic#ea#if;eti wen ,i nes Leming
the Murphy Engineo,ed W
are conflicts between the manufacturers published neud')a:;•,lt,t°,N,ani,for the name
Installation Instructions and this report, of one of the listees noted at the beclnr.ing,al this report):
grade; evaluation report number (L: 13-2913); the
5.6 Murphy LVL is produced in Sulhertin,Oregon,under a production shift and date of manufacture; and the name of
quality control program with Inspections by APA—The the inspection agency (APA—'lite Engineered Wood
Engineered Wood Association(AA-6411), Association(AA-649)].
i
TABLE 1—DESIGN PROPERTIES(ALLOWABLE STRESS DESIGN)FOR MURPHY LVL9'1" V
PROPERTY DESIGN STRESS(psi)'
W2,260Fs-1,5E 2,750Fb•1.8E 2,850 Fb.1.9E v 2,950 Fa-2.0E 3,100 Fb•2,0E
Joist4 2,250 2,750 2,850 2 950 3 100
Bending(F5) _ _ a _
Plank 2,200 2,750 7,800 2 950 3,100
Tension parallel to grain(t",)s 1,350 1,950 1,950 2,109 2,100
Longitudinal shear(F) Joist 285 285 285 200 200
Plank 160 150 150 150 —150
Compression parallel(lot) 2,350 2,350 2,350 3,200 3,200
Compression Joist 750 750 750 760 750
perpendicular(Fel) Plank 450 450 550 550 550
Modulus of Elasticity,E Joist 1,5 x 106 1,8 x 10e 1.900$00$ 2.0 x 106 2.0 x 10°
Plank 1.4X10A 1.8x105 1.9x106 2.0x106 2,0x106
For SI:1 psi-8.9 kPa.
1The tabulated values are design values for normal duration of load.All values,except for E and Fr4;may be adjusted for other load durations
as permitted by the code,The design stresses are limited to conditions in which the average equilibrium moisture content of solid-sawn lumber
Is less than 16 percent
zReferenca design values must be adjusted,as applicable,In accordance with Section 8.3 of the NDS,
4'.telst w load parallel to glueline.Plank=load perpendicular to giuottno..
4The tabulated values are based on a tolerance depth of 12 inches.lot other depths,when loaded edgewise.the hila=tyable banding stress
'TI�e)shaft be modified by(12Jd)°r`whom d-depth in inches.For depths less than 214 in:iies,the factor tot the 29/k-inch depth most be used
he values published in Table 1 are based on a reference length of 3 feet.For other lengths,the allowable tensile stress must be modified by
(3flf 1S whore t length in feet,For lengths loss than 3 feet,the unadjusted allowable tensien stresses In Table 1 are used.
TABLE 2—FASTENER DESIGN FOR MURPHY LVL:EQUIVALENT SPECIFIC GRAVITY'
NAILS BOLTS
Withdrawal Load Lateral Load Lateral Load
Installed In Edge Installed In Face Installed in Edge Installed in Faceinstalled In Face
Parallel to Grain Perpendicular to Grain
0.49 0.50 0.50 0.50 0.50 _ 0.50.
9Faataner values based on the equivalent specific gravities in the above table are for normal load duration end may be adjusted using the load
duration factors in accordance with the code.
,
Project Title; POL'(30N
�. ,.. - ,� ,, Engineer: .1,)L Propel'L": 2016-03
✓, Project Descn 2E'x 35'MOdUtAk Ot•FI E
': //r z//
� Hu i!,- �N G .e.7Y 'M S �.�V"."' (J
pd,.. fl i 'ti"2k16�8$1Fu
w'or u�, i tcn ilF.Jt 5,isa i CCS
I (1nd 3 tn - it' r:cnro,s1.c.i'a�•zofs u *.r.sts* ,va mm.in.
ti
Miot#t K '00 tf09251 - , 4 • ; , �( Y Ohs. 11 o R,,. �i{►I sT .
Description: 1YP ROOF RAFT ER-2016 03
i
I c4IbE R !- 'RkNCE'.
Calculations per NDS 2012, IBC . ..-.., ._a.. -.. _.� �.--. ,__.-� .....,�.. _ _ �_ �_
�-0 1 2012, CBC 2013,ASCE 7-10
Load Combination Set: IBC 2012
Material _ __ _
Analysis Method: Allowable Stress Design Fb-TOfr81r3fl 850 psi E;Modulus of Elasticity
Load Combination IBC 2012 Fb-Cempr 850 psi Ebend-xx 300ks1
Fc•Pill 1300 psi Eminbend-xx 470ksl
Wood Species : Hem Fir Fc-Pore 405 psi
Wood Grade : No,2 Fv 95.0 psi
Ft 525 psi Density 8.83 pcf
Beam Bracing : Beam Is Fully Braced against lateral-torsion buckling Repetitive Member Stross Increase
0 0.024 S e,08
l, F� t.f t� , #!:4{o li!!� / * >f:f It .i 9 f .r ,S.t 1 ..1:. . .f'.5.:0 't i : } S , 1 t:t f :
::� .,:r.:'k *:::* 1 : �.'or sr :::e♦ .: :�t.� axyp �.� ,it:i .:r : . :rrx���.
*!:':. r:Yv"^> ;: , :*s,!! :f:.: ;:<s a r._ri s r i*:'*: s `r r .t .:f.. °, : . r a .r�r .,+.:'. .*.. .r wi ,:
A
2xiO
i
Span=13,500 ft
WALL_
"' � ./-4 "� ,..-r2,-
e Service toads entered, Load Factors v.411 be appiled for calculations,
Beam self weight calculated and added to loads
Uniform Load D 0 0120, S=0,030 ksf, Tributary Width=2,0 ft,(Roof Dead Load and Snow Load)
Maximum BendingStress Ratio = 0.90a 1 � Maximum Shear Stress Ratio - � 0.518
ESIGN' � k j & , 1
Section used for this span 2x10 Section used for this span 2x10
fb:Actual _ 1,119.72 psi fv:Actual 56.60 psi
FB:Allowable = 1,236.54 psi Fv:Allowable _ 109,25 psi
Load Combination +D+S*H I Load Combination +D+S fH
Location of maximum on span - 6.790f! .Location of maximum on span w 0.000 ft
Span#where maximum occurs = Span#1 Span#where maximum occurs Span#1
Maximum Deflection
Max Downward Transient Deflection 0,359 in Ratio= 453
Max Upward Transient Deflection 0,000 in Ratio' 0 <240
Max Downward Total Deflection 0.518 In Ratio= 314
Max Upward Total Deflection 0.000 in Ratio= 0 <180
(Vepflca)i7eactloils_ < .,,:4..,:...,,,,-;,,:3„.„:,1!,,,.,z.,4,,,,,-,,,.df Support notation:Far left'sill Values in KIPS
Load Commination Support 1 Support 2
UveraitICOJmum 0,588 --0:5813
Overall MINtmum 0.181 0.181
+041 0,181 0.181
+D+S+H 0.588 0,688
0 Only 0.181 0.181
S Only 0.407 0,407
Project Title: P(h.ti'GO^1
/ I ./ ' j --—. Eft 1ileer: MCt. Pro(ect 10. 20'16 03
�''/` f s Project Descr: 2d'x 35'MODULAR OFFICE
' b�
r' .' Ul[�_DIN(-1SYSIFM iiI . r,, ; >;"'..'1
r,stcd 19x1("/ '76,2:ASf41
VIIU t Bea — Elio ,.0 v' ' fRCA V1C16.t is l6tf.'tEC6'
ti
OU,ps�r �r !t t I'ILIdfA:C=Is,:py2015 t)uytk].G iv ir�,9,'kr61510s
tile #t":KWk06I O92iiin. ; m3, �: . x, _ fk i 1.4 ,41600.1r QP R 0 V1.12.9„ ,...111.41.,°
Description: UP TO 6'0'OPENING i1C R.2016 03
I CODE' F RENG3 5 _ ....__ _._ _ _
Calculations per NDS 2012, IBC 2.012;CBC 2013,ASCE 7-10
Load Combination Set:IBC 2012
Material Properties _
Analysis Method: Allowable Stress Design Fb Tension 000.0 psi E:Modulus of Elasticity
Load Combination iBC 2012 Fb-Compr 900.0 psi Ebend-xx 1,600.Oksi
Fc-Pril 1,350.0 psi Eminbend-xx 550.Oksl
Wood Species : Douglas Fir- Larch Fe-Perp 025.0 psi
Wood Grade :No.2 Fv 05.0 psi
Ft 575.0 psi Density 32.210pcf
Beam Bracing : Beam bracing Is defined as a set spacing over all spans
,,.., the -- '4 v - ,First Brace starts at ft from Left-Most support
.e ..
Regular spacing of lateral supports on length of beam a 1.330 ft
to 1515 , LM
v w "✓a;:;1:xr eW:t s 4 yftirw xvv sy:F:n r#4,f i4 : tv.X.. aTrv^rrr,Yrr , :
1 Y1 fb4/ '44l If iff Rt ff f ,:
f � f'• 1 , til 4f 4 f 4 i if f t 1!Y I 14 i ,
t a. . .'0,2x4.ix �,A�"IatAI,..}♦ w✓..x ........w...-.. ......,,,..,............y.,,,......
4 w w ar.b sv.w. w..xn a v,a s .w an. A
2-2nD
Span=8.60 ft
( ` * o 5 E ;` t . ,; Service loads entered;Load Factors will be applied for calculations
Beam self weight calculated and added to loads
Uniform Load: D=0.0120, 5=0,030 ksf, Tributary Width=8.420 ft,(1/2 Roof span and max 18"overha)
it DESIGN UMMA 4 , ;.1,,,,,,, r .,. , r.., 1 j :64 `r.. .::
Maximum Bonding Stress Ratio = 0.097 1 Maximum Shear Stress Ratio = 0.601 : 1
Section used for this span 2-2x8 Section used for this span 2-2x8
fb:Actual _ 864,50ps1 Iv:Actual _ 65.60 psi
FB:Allowable .. 'I,2'10,67psi Fv:Allowable _ 100.25 psi
Load Combination 40.4-s+1-1 Load Combination -10+51-1-1
Location of maximum on span •- 3 260f Location of maximum on span - 5.907 ft
Span#where maximum occurs = Span of 1 Span#where maximum occurs ._. Span it 1
Maximum Deflection
Max Downward Transient Deflection 0.067 In Ratio= 1165 •
Max Upward Transient Deflection 0.000 In Ratio= 0<360
Max Downward Total Deflection 0.095 in Ratio= 820
Max Upward Total Deflection 0.000 In Ratio= 0<240
`,Vs rtkat R coil 7"S „," , 4"r , z, Support notation:Far left Is 41 Values In LIPS
Load Combination Support 1 Support 2
75iiiiifliim
1.16_-`_"`"1.;
Overall Mihiintum 0,344 0.344
•#t3+if 0.344 0.344
+D i-S lit 1.165 1.165
O Only 0.344 0,344
S Cindy 0,621 0,821
r—
1
1
Project Title: POLYGON i
/I '1` v `---- Pn itletrr: MCL rol ctID: 2016.03
, � r. Projectt)fzscr; 28'x 35'MODULAR OF ICE
L° a, r � ' ) )k''--.
. �.,1" f
/1„)
.tri' ._ BUILDING SYSTEMS
`2 ' �... t
na6fi19SOY NS,tr:u,rti,i
Aill'D SC Boat)) roe O"P a tr ,iv iv a- 2n+,,n t
GrtC't�tcC'. £s37e3is,timida, 1a.6.VFts`6.t£105
loi 4.li.. -j 00 61 V , A oo o 1 MQD Nt; Ult!?t c- "..T ANI;
Description: (4)LVL RIDGE OEAh1-2016.03
t:0DE!7E.1- 'IZE'NCES ' .,� :'
e,
Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10
Load Combination Sot:IBC 2012
Material Properties _
Analysis Method: Allowable Stress Design Fb-Tension 2,736.40 psi E:Modulus orElasllell
Coad Combination IBC 2012 Fb-Compr 2,736.40 psi Ebend-xx ,000.Oksl
Fc-PO 3,200.0psi Eminbend-xx ,800.0 ksi
Wood Species ; Murphy LVL 3100Fb-2.0E x 24"Deep Fc-Perp 750..0 psi
Wood Oracle :Manufactured Fv 290.0 psi
Ft 2,100.0 psi Density 35,0 pot
Beam Bracing : Beam bracing Is defined as a set spacing over all spans i
First Brace starts at ft from Lett-Most support i
Regular spacing of lateral supports on length of beam=4.0 ft I
1°,,0,1343 S 0.4140
f". fie'! �, e ri A e, r xra•:e w , f .;,,-.Frt ! t
fr
F 3 ♦ f 1
Y♦f 1f t t ;. f :' :: •F'f t::% S f E ♦l frill It ! $N f Y :' 1` f A %:
,, .*:4..f:+: ! t t .f,.t,Y t! ♦!r ,i f i f k!Y t t C "0.:.!f,iF♦Y it '"o 1 :* , - f ! !!< , t! !t!
bF<..,*>...vZx..x..tt..,:. :....� 1..:.a.^it....wa».;r0f .1,, x.wnww .+n..+exsL.14.1r ... ':X<:, ...t.X Z �. ..a ♦ -.t,.,wn..l1-X,•w:t1;;V.4:ftr ;...t.. r..«041,1
(4)Murphy LVt.24"Deep
Span',35.0 ft
... . x- . 5t.. w..�.at :Ee'.
iiad r 5ervlce loads entered Load Factors wit(be apptie. or calculations.
I Beam self weight calculated and added to loads
Loads on all spans...
Uniforrn Load on ALL spans: D=0,010, S.0,030 fest, Tributary Width=13.830 It
.-
Maximum Bending Stress Ratio 0.601: 1 Maximum Shear Stress Ratio - 0.286 : 1
Section used for this span (4)Murphy LVL 24"D Section used for this span (4) Murphy LVL 24"D
fb:Actual . 1,876.42 psi fv:Actual -. 95.48 psi
FB:Allowable _ 3,123.39 psi Fv:Allowable - 1333.50 psi
Load Combination +D+S+}{ Load Combination NDi-S+H
Location of maximum on span 17.50011 Location of maximum on span = 0.000 ft
Span#where maximum occurs = Span#1 Span If where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 1.019 In Ratio= 412 il
Max Upward Transient Deflection 0,000 in Ratio= 0 <240
Max Downward Total Deflection 1.445 In Ratio= 290
Max Upward Total Deflection 0.000 in Ratio= 0 <180
Verticalactio.,,,,' `_.. ,..;..'",.,gyri- ,k. .� ___..__...7.1 Support notation,Far left Is#t VAfuas In KIPS
Load Combination Support 1 Support 2
"Overaii mum_. .10.29 10.294 ) .......
Overall MINlmum 3.033 3,033
+0+H 3,033 3.033
+0+S+H 10.294 10.294
0 Only 3.033 3,033
S Only 7.261 7.261
ProsectTilte: POLYc-ON
,';',.-1':",.: ry ` ` Engineer; MGL Protect ID: 2013-33
(( i Pro'Jeot Descr: 28'x 35'MODULAR OF ICE
\ 1, .. . t�
:. BUILDING SYSTEMS
Prin'd IINOV::0t5,P.4.P,.'
Ood (TTIU1t111 ftitr,CIACil0,10 .a.i5ii .tS15.ICGVOTtlti0G
:l*. 1;Kw 6or r . ' '` = - ,''-. . - < . VO_sem .¢,D ,8..140R. .t.
Description END COLUMN FOR RIDGE BEAM 1 OF 2 REQ'D FA END-2010 03
ao
ode'Rios per 2012 NDS,
,.� ... ` '° �.-.-
..•- �__ .. __._ _.
IBC 2012,CBC 2013,ASCE 7-10
Load Combinations Used : IBC 2012
enOcal ifi rttialtai r ?� __ _.: �__ �.__-.......—_
Analysis Method: Allowable Stress Design Wood Section Name 4x6
End Flxilles Top&Bottom Pinned Wood Grading!Manuf, Graded Lumber
Overall Column Height 10.170 ft Wood Member Type Sawn
(Used for;non-slender calculations) Exact Width 3.50 In Allow Stress Modification Factors
Wood Species Douglas Fir-Larch Exact Depth 5.50 in Cf or CV for Bending 1.30
Wood Grade No.2 Area 19,260 1n*2 Cf or CV for Compression 1,10
Fb-Tension 900.0 psi Fv 95.0 psi Ix 48.526 In*4 Cf or Cv for Tension 1.30
Fb-Compr 900.0 psi Fl 575.0 psi ty 19,651 h Cm:Wet Use Factor 1.0
Fc-Prll 1,350.0 psi Density 32.210 pcf Ci:Temperature Factor 1.0
Fc-Perp 625.0 psi Clu:Flat Use Factor 1.0
E:Modulus of Elasticity,., x-x Bending y-y Bending Axial Kf:Built-up columns 1.0 Nos 15,32
Basic 1,600.0 1,600,0 1,800.0ksi Use Cr:Repetitive? No(non-gib only)
Minimum' 580.0 580.0 Brace condition for deflection(buckling)along col[irnns
X-X(ividIii)axis: Unbraced Length for X•X Axis buckling=1 ft,K=1.0
Y-Y(depth)axis: Untraced Length forX- A:zis buckling=10.170 ft,K=1.0
�A.p 1- ti Service loads entered.Load Factors wiII be applied for calculations.
ACDlumn self wefghtinclud..a_d..... �....._�.�. �n.
Included 43.791 lbs*Dead load Factor
AXIAL LOADS...
1/2 of Ridge Beam Rxl na;end:Axial Load al 10.170 ft,Xeco 1.0 in,D=1.516,S=3,630 k
1 i O .1GN SOMA g � �° 4 t ,',,,,,,,,;0
Bending&Shear Check Results
PASS Max,Axlal+Bending Stress Ratio = 0,4492:1 Maximum SERVICE Lateral Load Reactions..
Load Combination +0+5+11 Top along Y.Y 0.0 k 8011e111 along Y-Y 0.0 1
Governing NDS Fonrmla Comp+Myy, NDS Eq.3.9-3 Top along X•X 0.04217 k Bottom along X-X 0.04217 k
Location of max,abovo base 10.102 ft Maximum SERVICE Load Lateral Deflections,.
At maximum location values are.., Along Y-Y 0,0 In al 0,0 It above base
Applied Axial 5,190k for load combination: Na
Applied Mx 0.0 k-ft Along X X 0.1577 In at 5,936 ft above base
Fe:Allowable 895 est for load combination:+D+S+FI
Fc: 817.95 psi
Other Factors used to calculate allowable stresses..
PASS Maximum Shear Stress Ratio= 0.02005:1 8err,iN Q picssion Tension
Load Combination •rD+S+H
Location of max,above base 10.170 ft
Applied Design Shear 3.266 Psi
Allowable Shear 109.250 psi
Kaxi .11.:nsi ell ctlCf1S fOr.Lda C Miibbinatkns' x t,ir< # ak_...1 ,...
Lead Combination Max X..X Deflection Distance Max.Y-Y Deflection Distance
,...._
+0+}1 •04465 In 5;938 ft 0.000 In _,.:.0.000 ft
40+S+H 41577 in 5,938 ft 0.000 In 0,000 ft
D Only -0,0465 in 5.938 It 0,000 In 0.000 ft
S Only 01.1113 In 5.038 ft 0.000 In 0.000 ft
i
4
il
Project Title: POLYCCP.'
/ — ,------, . Engineer: MCL Pr. got ID: 2015-03
r.
�' 1 Project Doscr; 28'x 35'MODULAR OF ICE
`'' I . BUILDINC► SYS FM I t� t t it, k t,�,' 1
'VVC► 7t s"C? ld 1I1 i" IFS a rf o i5rs�NCA t1 1 0-2),J..),../-1.0„.t.:
tmgcAt(,,,i C t9832ofa,na,14lx 0.&vt+rcn me
'16PK 460092 1 - g..M 1, ."° a. * > t : I0'E. A ..IL XNGISYSTE Tli
Description: I X U'RIOR WALL STUD,2016.03
..-
`Codti °t 1'e0 e
ronc4i1,° x, :
Calculations per 2012 NDS, IBC 2012, CBG 2013,ASCE 7-10
Load Combinations Used: IBC 2012
` nrallttforma#lof ` .. `' _
Analysis Method: Allowable Stress Design Wood Section Name 2x6
End Fixilles Top&Bottom Pinned Wood Grading/Manuf. Graded Lumber
Overall Column Height 8.0 ft Wood Member Type Sawn
(Used for non-slender calculations) Exact Widthin Allow Stress Modification tors
5
Wood Species Hem Fir .50
Wood Grade Stud Exact Depth 5i 5Q In Gi or Cv for Sending 1.0
Fb Tension 675 psi Fv 95,0 psi Area 8.250 inA2 Cf or Cv for Compress!. 1.0
Ix 20.797 I04 Cf orCv forTenslon 1.0
Fb-Compr 675,psi Ft 400 psi ly 1,547 InA4 Crn:Wal Use Factor 1.0
Fc-Frit 800 psi Density 26.83 pcf Ct:Temperature Factor 1,0
Fe-Perp 405 psi Cfu:Flat Use Factor 1,0
E:Modulus of Elasticity... x-x Bending y-y Bending Axial
Basic 1200 1200 1200 kslKf:Built{up columns 1,0 NDS 1xb onity53.2
Minimum 440 440 Brace condition fordefiection(buckling)alongUse coCrlumns:Repetitive 7 No(non-B
X.X(Whitt))axis: Fully braced against buckling along X-X.
Y-Y(depth)axis Fully braced against buckling along Y-Y.
I.
ICoiumn soil included:12,207 lbs Dead Load
---t--NI 5a applied .r calouiations.
t pd' tt Service loads entered.Load Factors
` * Factor -...�_...�._..__�.__,. .._.._.�._ _. _��_
AXIAL LOADS,..
SL=30 psf,0.1-1.=up to 18":Axial Load at 8,0 ft,Xecc=1 A in,D=0,2410,S 0.3360 k
BENDING LOADS...
C&C wind;Lat.Uniform Load creating Mx-x,W=0.0640 klft
[„`�DE UC9hf`SUMMARY` ' i'° 4. s r r
--
B ending&Shear Check Results
PASS Max.Axlal+8ending Stress Ratio = 0.5076:1 Maximum SERVICE Lateral Load Roacttons..
Load Combination -}0+0,60W4H Top along Y-Y 0.2560 k Bottom along Y-Y ,2560 k
Governing NDS Fonlmlanp+Mxx+ Myy, NDS Eq, LO- Top along X-X 0.006010 k Balkan along X-X 0,E 06010 k
Location of max.above base 4,242 ft Maximum SERVICE Load Lateral Deflections,..
At maximum location values are... Along Y-Y 0.2389 In al 4.027 ft above,bait
Applied Axial 0,2633k for load combination:W Only
Applied My 0.3061 k-ft Along X-X -0.1854 In al 4,671 ft above bass
Applied My 0., 280.0 psi for load combination:+O+S+H
Fc:Allowable 1, 8tt.0 psi
Other Factors used to calculate allowable sttessesi,,
PASS Maximum Shear Stress Ratio= 0,1225:1 I1endirrg Campfg� Tension
Load Combination +D+0,60W+Hi
Location of max.above base 0.0 ft
Applied Design Shear 27.927 psI
Allowable Shear 152.0 pat
Maxilttltliiibol(ectlotls.tor,LLdiici.Cot tlbtnati rt s ; :7 ~,'
Load Combination Max.X•X Deflection Distance a. ._
Max,Y-Y f3efiecUon Distance
40+1.1 -0.0774 In 4.671 ft 0.000 In 0.000 It
40+-'t1 -0.1854 In 4.671 ft 0.000 In 0,000 ft
+0+0.60W4t!: -0.0774 In 4.671 ft 0.143 In 4.027 ft
'0.60D+0,60W+0.60H -0.0466 in 4.671 ft 0.143 in 4.027 It
0 Only -0,0774 In 4.671 It 0.000 in 0.000 it
S Only -0.1079 In 4.671 ft 0.000 In 0.000 ft
W Only 0.0000 in 0.000 ft 0.239 In 4.027 ft
Project Ulu: POLY3CN
7'1 al Engineer: MCL Pto;e Ib: 2010-03
Frr�{ Project ticscr: 2$'x 3u'fv�OCJLAR OFFICE
, , _
t/ r/ / I._. I :1ILDING SYSTEMS 1,:,i,,,,,— ,, '�r'�.,�?.-.. ,t
_.. le-1 t"aro,"eci':Sfr'3Cd ti:;1It 7ur.1C4-1.$0,r
1'i QCc neat), tt'r`1iCALS,"rC.f OI* iluzd.Ll r,6Yer&16ion' ,.
)! l i tW.O a t'. :wa z . '"t'c 00. -a LC .OA"Y TEM
� Description: TYP i l 00 JOIST--DIST LOAD(OFFICE')-2016 03
CODE 1RE 'ERENC S ,-, .,,.. ,.. ...�..-
Calculations per NDS 2012, IBC 2012, CBC 2013,ASCE 7-10
Load Combination Set: IBC 2012
ii Material Properties
Analysts Method: Allowable Stress Design Fb-Tension 900,0 psi E.Modulus of Elasticity
Load Combination IBC 2012 Fb-Cornpr 900.0 psi Ebend-xx 1 00.Oksl
Fc-Pili 1,350.0psi Eminbend-xx 80.0ks1
Wood Species :Coughs Fir-Larch Fc-Perp 625.0 psi
Wood Grade :No.2 Fv 95.0 psi
1-1 575.0 psi Density 32.21Upcl
Beata Bracing : Foam bracing Is defined as a set spacing over all spans Repetitive Merter Sirens Increase
Untaracett La ths.-._..-_ �14:u .i
First Brace starts at tt front t.ofi iviost rtirport
Regular spacim of tater at supports on length of beat=2.0 it
0.•.013330 1.r 0.05650
' r "..t 2.1:,-......._. i pic..t.�.. ,../ t.�a «�;_.._ »dM.•.. .....,.,..._......._..A....,..5:' .'i
2x8 2x8
Span=6.920 ft Span=6.920 ft
1 A lied Loads l z ' i ' 1 ""A Service loads entered.Load Factors will be applied for calculations
Beam self weight calculated and addedto loads
Loads on all spans...
Uniform Load on ALL spans D=0.010, L=0.050 ksf, Tributary Width=1.330 it
Maximum Banding Stress Ratio - 0,303 1 Maximum Shear Stress Ratio - 0.447 : 1
Section used for this span 2x8 Section used for this span 2x8
fb:Actual 449.50psi fv:Actual = 42,48 psi
FB:Allowable - 1,237.63psi Fv:Allowable -- 95,00 psi
Load Combination +p+{+H Load Combination -0
Location of maximum on span = 0.00011 Location of maximum on span = 6.920 ft
Span#where maximum occurs - Span#2 Span#where maximum occurs -- Span it 1
Maximum Deflection
Max Downward Transient Deflection 0.019 In Ratio= 4387
Max Upward Transient Deflection 0,000 In Relie T. 0<360
Max Downward Total Deflection 0.023 In Ratio= 3547
Max Upward Total Deflection 0.000 In Rano= 0<240
Vet[teal i e et t tf ' s ¢ Support notation:Far left Is#1 Values to KIPS
Load Combination Support i Support 2 Support3
' iynratl # mtrm 0.213 _0.71 '_,.--... 0,2.3.. _d. I -�.._
Overall MINImum 0.041 0.136 0.041
+1741-1 0,041 0.136 0.041
-04LitI 0,213 0,711 0,213
DOnly 0.041 0.136 0,041
L Only 0.173 0.575 0.173
I ,
Protect Title: POLYCOI I
i:nrvifreer: MCL P act iD: 2016 03
/ — ' ' i 11Zr" f f'rra,ec€Desch ?.8'x 35'MODULAR OFFICE
't 4 .a �/ �?K31J 1l]I N SYSTEMS ; ,1g .. ,f� �� 1� f, P t ..
T S
' tR1- St)—'1%,:a S 1td, r;u,-- matt.' CA.
,
—IN ad BtFitit rt f tte4.0 040103.201a,3.2015 ou . 16.10C,Vat 1610,0
Llo • 61092611,.Aft.� '• 7 �; , .: `, .. €>?.t it 1. aY f .% . " r "
Deecriptirtn: 1 Y FLOOR JOIST-PT LOAD at SUPPORT(OFFICE)-2016 03
COP 1 FE NCE .
Calculations per NDS 2012, IBC 2012,CBC 2.013,ASCE 7-10
Load Combination Set: IBC 2012
Material Pro ernes
Analysis Method Allowable Stress Design Fb Tension 1900,0 psi F:Modulus of Elastic
Load Combination IBC 2012 Fb-Compr 900.0 psi Ebend-xx 1,600.0 ksl
Fc-Pill 1,350.0 psi Emlnbend-xx 580.0 ksl
Wood Species : Douglas Fir-Larch Fc-Perp 625.0 psi
Wood Grade :No.2 Fv 100.0 psi
Fl 575,0 psi Density 32.210pcf
Beam Bracing : Beam bracing Is defined as a set spacing over aft spans Repe€it:ve Member tress Increase
Unbineeci Lengths „ .,afgr .. A'3._..__ '
First Brace starts at ft frons left-Most support
Regular spacing of lateral supports on length of beam=0.0 ft
L0.4
, t)c l33o
,-r r f:'7 ,''.. c'i d F P i Ci i J i: 1'1`7`1 f:f7`t'i:.?.T y'. ..f"f"r X<'fl x t t i F f 7/"Y t.,:l Y"%"r,-,Y[f f F`Ci i t ,i^N'R y'fit`F: „'..;1:::;;:j.;t 7
s r 1' i r+r �. r
.,',fi,..3.... .l., . ..::.,1...,.>:..t... ... ...n,.,.....,t"...,;..�:f......,....,,��.,., '�: .:. T<�».,..,�....'a,1,t,Q,!.,.... _� .'.d M.... ,.. -. .,4,�*'sfa,,L:::;:
C"y�7 2x8 ({,EJ 2x6
I
Span=6.920'11 Span=8.920 ft
,-,,,,r7.-"W,;:”` r
FlQfi VddW�s�at�11 3•L; ...5aYu«"wW.t..: _. Service loads entered,Lod Factors will be applied for calculations,
.. ..� .......,...�,.._. .... ,.....- ". -.,..
Beam self weight calculated and added to loads
Loads on all spans.,.
Uniform Load on ALL spans: D--0,010 ksf, Tributary Width=1.330 ft
Load for Span Number 1
Uniform Load L=
�/0 40 kilt,Extent 00,,60 >>3.10 ft, Tributary Width=1,0 ft,(1k p1 load over 2 foists;0.5k o) �p
r l ES t"7f1t1'SUlyr t:;.•5` " ,, 'ra".e �tk """ ," "`p. _ M Js€.
reps
„:::kgm,____/, .�.,,r .x#Y�v-�':"k ,. 4y1 ��` ,�,..„ ,..a,�" :=�' :;.�.. x 't iJ 3:
Maximum Bonding Stress Ratio -. 0.771: 1 Maximum Shear Stress Ratio = 0.1972 : I
Section used for this span 2x8 Section used for this span 2x8
fb:Actual = 932.98ps1 fv:Actual = 97,17 psi
Fla:Allowable - 1,209.82psi Fv:Allowable _ 100,00 psi
Load Combination +0+4.+H Load Combination 40+L+N
Location of maximum on span = 2,281 ft Location of maximum on span = 0,000 ft
Span#where maximum occurs - Span#1Span ff where maximum occurs Span#1
Maximum Deilection
Max Downward Transient Deflection 0.084 In Ratio= 993
Max Upward Transient Deflection -0.029 In Ratio= 2836
Max Downward Total Deflection 0.088 In Ratio= 942
Max Upward Total Deflection -0.026 In Ratio= 3240
Viiiical iaatrdt ":A>
Support notation:Far left is#1 Values to KIPS
Load Comb&ralian Support 1 Support 2 Support 3
Oveitril MA M-um "0.7i' -1,6n -0.000 U
Overall MINimum 0,041 0.136 -0.019
+D-r{-i 0.041 0.136 0,041
-10+L+11 0.714 0.623 -0.019
D Only 0.041 0,136 0.041
Project Tiko: POLY ^h! Pro!: ID; 2016 03
:—. 7*—'`"' 'Agit l' ,' Cn ff�o4r: MCL
Prot Casa; 28.x 35'MODULAR OFFICE.
ei,,,z7)
` . BUILDING SYSTEMS
MS rz 1Y: r.
-. ..__. _r . .. . ;��uu'';tet`tffcttr ' •.,2,i-,,e-11:c6
- � r
�tttf "clYl ChBitCALC ri.`C.f8832iEl6 titltkE0.1 +.B.Ic�6 f510G
.pit i UI 20;i t,, ..
Dascri iIIo;t TYt•'f°LOW JOIST-PT LOAD at CN1 R(OFFICE)-2016 03
i
I GOC?t"tt !"E'fL" fOE S
Calculations per NDS 2012, IBC 2012,CBC 2013,ASCE 7-10
Load Combination Set:IBC 2012
Material Pro•erties _. _ , .„
Analysis Method: Allowable Stress Design Fb-Tension 900.0 ps E:Modulus of Efasticify
Load Combination JBC 2012 Fb-Compr 900,0 ps Ebend-xx 1,600.0 ks1
Fc-Pill 1,350.0 ps Erninbend-xx 580,Oksi
Wood Species ; Douglas Fir- LarchFc Perp 625. ps
Wood Grade ; No.2 Fv 5' ps
Ft 575,0 ps Density 32,210pcf
Beam Bracing : Beam bracing Is defined as a set spacing over all spans Repetitive Member Stress increase
Uu r cci L r g the �.
First Brace starts at ft from Lett-Most support
Regular spacing of lateral supports on length of beam =6.0 ft 1 ,-.., ___
1
I. 0.4
allitilliat2111111.111 q0 01'3301
wi"Y IrY'Y"r"t P7ro"Y"rP t)rs t"i rrr' r7{Y'Yi YtY ,s rr -rr r rir t.e.tw 'r'*' +r. r r rrrWeir x"4`f" ."T'r"r trry Trf rr +' r' r .
r r e s 4 .+ r s� rr r
R r i. '. r r r r +y �
' ,s.2l—''''..xau s r .s _ ... . .. . ..._...w.,..a.,.._.,,.<.=...r..S.r>.. `�!...,..... . s.x.. .x ek3:xM i'*°.a e,'w.°.xbif:.'.w�<..+.ads.Rsa ..:,a . .'
A ' d7a,
2x8 2x8
Span=6.920 ft Span=6,820 fl
x x nr- '°4 Service loads entered.toad Factors will be applied for calculations.
AQP}led ..okds . w..' _ .. red o _...,.. l
Beam self weight calculated and added to loads
Loads on all spans.,.
Uniform Load on ALL spans s 0=0,010 ksf, Tributary Width=1,330 ft
Load for Span Number 1
Uniform Load L=0,40 klft,Extent=2.20 >>4.7011, Tnbulary Width=1,0 ft,(111pt load over 2 foists;0.5k o)
1. E9tCt SMJMh1ARY `7. ..,.. >fsJ 1pK
IMuxlnturn 13csndintg Stress Ratio - -'0.882 1: Maximum Shear Stress Ratio 0.939 . 1
Section used for this span 2x8 Section used for this span 2x8
fb:Actual = 1,066.64psl fv;Actual = 89.25 psi
FB;Allowable = 1,209.82ps1 Fv;Allowable - 95.00 psI
Load Combination +D+1,4-14 Load Combination .t-r344N
Location of maximum on span - 3.209I1 Location of maximum on span - 6.340ft
Span#where maximum occurs = Span#1Span#where maximum occurs = Span#1
Maximum Deflection
Max Downward Transient Deflection 0.106 In Ratio= 780
Max Upward Transient Deflection -0.044 In Hallo= 1895
Max Downward Total Deflection 0.111 In Ratio= 749
Max Upward Total Deflection -0.040 In Ratio= 2070
I
0 c�f h �r Support notation;Far left is#1 Values 1n KIPS
Load Combination Support 1 Support 2 Supparl3
_(3vrrali f rine . -x40 0.81
Overall MINlnmrn 0.041 0.136 0.041
40 0,041 0.136 0.041
40+141i 0,453 0,814 -0.049
D Only 0.041 0,136 0.041
tErtto}ectrineefTll#ri; POLYGON
Protect ID; 21116-03
i
- t " t roiect Deson 28'x 35'MODULAR OFFICE
r
J
} DING SYSTEMS r
�.,. CAPro;aiskt-�rr;:cn :��. aaicL
I k°II t,r
FINood'fOdir� cm:ficrsr itli:t96340'1s aJ>t ,.ta. 4.we-s.16.1
Description, TYi'FLOOR JOIST-DJSi I..OAI)(L01*0')-2016 03
cOD 4trOgAC S.z,. ' _ _.._._ _.. __ _ -
Calculations per NDS 2012, IBC 2012,CBG 2013,ASCE 7-10
Load Combination Set: IBC 2012
Material Properties .-.... ,
Fb-Tension 900.0 psi E:Modulus of Elasticity 00.0 ksl
cad Co binati : Allowable Stress Design Fb-Corner 900:0 psi Ebend-xx
Load Combination IBC 2012 Fc-Pill 1,350.0 psi Eminbend-xx 80.Oksi
Fc-Perp 025.0 poi
Wood Species :Douglas Fir-Larch Fy 25.0 psi 2.210 f
Wood Grade :No.2 Ft 575,0 psi Density pc
Beam Bracing : Beam bracing is defined as a set spacing over all spans Repetitive Member S ss Increase Uttihr _ •.___
aco>r Lottt .` __.,...... I
_..._. .. .
First Brace starts at 0.0 ft from Loft.Most support
Regular spacing of lateral supports on length of beam 2,0
0'r.01330 I.0.133{} i
P3 "•�^ -.r r ° , -r" r 0 1,±� r r r r 41°..
F Y r.4%: "T*:t:.: x e r r r r r ° a ,a > ..i
rr srler�rra rrrrr � rr � rt err �* X1 4.1.,.t.,:.r�W±,r i°�
r t r 3 S I rr° .., .ev✓,..•, a......u- ........«. ..
� �rrr i r sir ......ru.......... � � �S �'�.,........L.-......... .�(rb4f...,.l.r,gf b.R.t,t.. ,..
2x8
2x8
Span=8.920 ft
Span=6.020 ft
r* - :*si n x r . 2
Service loads entered.Load Factors will be applied far calculations.
_. ..s ._
Beam self weight calculated and added to loads
Loads on all spans...
Uniform Load on ALL spans D=0.010,
L=010 ksi, Tributary Width 1.330 ft ,s
itte
1t &tl �" g � r�
M : "_ �..-. �M _ __ 0 809 ' 1
Maximum Bending Stress Ratio -- 0.657.1 Maximum Shear Stress Ratio 2x8
Zx8 Section used for this span
Section used for this span 813 01 psi fv;Actual 76.83 psi
fb:Actual Fv;Allowable 95.00 psi
FB:Allowable = 1,237.63pS1 ��+�
Load Combination *D+L+H Load Combination 6.920 ft
Location of maximum on span Span 6.#t
Spano # of maximummum on span = Spa 0.#2ft Span#where maximum occurs
#where occurs - y
=
Maximum Deflection Ratio7.183 R
Max Downward Transient Deflection 0,038 in
Max Upward Transient Deflection 0,000 in Ratio= 0<360
Max Downward Total Deflection 0,042 In Ratio:--• 1961
Max Upward Total Deflection 0,000 in Ratio= 0<240
P «� ,� x44 " " � L
Support nolalion far left is If1 Values in KIPS
Load Combination Support 1 Support 2 Support 3 _���
t3vorati�trftum 0.af16 1.267 0.39$ ._____�__
Overall W Nimltnl 0.041 0,136 0.041
40.4-1 0.041 0.136 0.041
+04.L41 0.386 1.287 0.386
0 Only 0,041 0.136 0.041
1.Only 0.345 1.150 0.345
s
Project Title: POLYGON
>_ by ie(rr: MOL Pra;��cI I0: 201G 03
,„'',.'" , - r A 'Melt k b„,7-
Prget;l Descr: 28 x 35`MODULAR FICE
/ " R U i l.C)11N G tl's�f'E=Evl S I..f> �; f.�r .f ,;,..t_,�'
r? i t^rov;1rs �-if.1,
iia CAP 06 ,d11L ftp-,t�G.4. 16;4t CS
Wood Beam rrtrrtrntoi3 ._1#33-20°5WI. 6.10 vt.6.16.1Gs
t) t,". . 0.6088 ti .,. .,y�. .. .. :. .�= fit ' r .°.DE.1l fltC li ;S G '+
Description: TYP f L0o17 JOIST-SUPT BEAM(LOOBY)-2016-03 _
f QDIi FERi N C S
Calculations i;;;—NDS-20:12,—IBC 2012,CBC 2013,ASCE 7-10
Load Combination Set IBC 2012
Material properties_
Analysis Method. Allowable Stress Design _ Fb-Tension 900.0 psi E:Modulus of Elasticity
Load CombinationIBC 2012 Fb-Compr 900.0 psi Ebend-xx 1,600,0 ksi
Fc-Pril 1,350,0 psi Eminbend-xx 580.0 ksi
Wood Species Douglas Fir-Larch Fu•Par@ C2 ,0 psi
Wood Grade :No.2 Fv 115.0 psi
Ft 575,0 psi Density 32.210pct
Beam Bracing : Beam bracirq is defined as a scat spacing over all sprlr�s
.
.lt ibrac - R -'',.
PU.1 mace starts at ft from Loft-Most supper# _...__.. _
Regular spacing of'alma!supports an length of beam 2.0 ft
0 oq_ G 9 C5O)
- rr> i t * t t 'tr 4 1 l.,:il:-ii:.::I.)ii
AX'
tAl 1 ! * 4 t Yr ! 1 1 ♦: fi ;: FYf'! 4I(
‘ •1
1 : S( , f 1, `'>t'
1'♦ , tj:::fro : 1:
't ... . .c
.w';':`%«c.1,:z .... . .a*....r.,............w ...,...u1 .. ... d..a....+...w -4.+c+4r".�w�.... .. .f+....:.a
,
it
4x8 4x8
Span�4.0ft Span.4 Oft
r Apptleit i°aadg„ Service loads entered Loyd Factorawlfl be applied for calculations.
Beam self weight calculaled and added to loads
Loads on all spans...
Uniform Load on ALL spans: 0=0.1020, L=0.8650 klft
1 l , y a
M�xSIGNlmun�i3oSUMr�i �Y�� =---'� � �-a-r— �__..��._.��.._ 1. �,. e�litr�t�1 � �'x:,
g Stress�Ratio . . 11.651: 1 Maximum Shear Stress Ratio
- 0.948 : 1
Section used for this span 4x8 Section used for this span 4x8
tb:Actual ._ 701.35pst fv:Actual - 109.05 psi
FB:Allowable _• 1,168,68psl Fv:Allowable _ 115.00 psi
Load Combination 40+1.41 Load Combination 10+1.+1-1
Location of maximum on span = 4.0000 Location of maximum on span 4 3.397 ft
Span#where maximum occurs = Span#1 Span#where maximum occurs y Span#1
Maximum Deflection
Max Downward Transient Deflection 0.012 In Ratio= 4074
Max Upward Transient Deflection 0.000 In Ratio= 0 <360
Max Downward Total Deflection 0.013 In Ratio= 3623
Max Upward Total Deflection 0.000 In Ratio 0<240
Vertical iacttnrts' 3< t M Support notation:Far last Is#1 Values in KIPS
toad Cornbinalsos Support 1 Support 2 Support 3
fall i Ciln i 1A59
4163 -11
Overall MINI:num 0.162 0,538 0.162
40+ti 0.102 0.536 0.162
+OIL+ft 1.459 4,863 1,459
D Only 0,162 0,538 0.162
I.Only 1.268 4.325 1.298
ly
W
° ‘,a) • 1.10B-it1016-03
' 11' f?-:— ;toil
— A,* SHEET NO LFA-1 OF. LFA-4
1. BUILDING SYSTEMS 'CALCIJLi\TEDIW MCI. ',DATE 131/19/2615'
Po fox 110•9493 Porter Rd.Aums4le,0R97325
CI-1ECKED BY DAt
800.682,14ZZ Modereli3vIldingSYstems•corn "
SCALE
SHEAR DIAPHRAGM DESIGN
BUILDING INFORMATION;
BUILDING LENGTH (L) H 35.00,):
BUILDING WIDTH (B) 27.67 '°
SHEAR WALL PLATE HEIGHT 8.00
ROOF OVERHANG =i 0.00
TRANSVERSE LOADING SFISMIC.:- 268011:
LONGITUDINAL LOADING SEISMIC 2.680 It
TRANSVERSE (SEISMIC CONTROLS)
SEISMIC ROOF = 2680#
77 plf
35.00 "
Vrf = ROOF/ 2 WALLS = 1340 It 1340 #
Lrf = 27.67 '
t-0,c ti TFOlt? (FIF),,(4g4W1).!(1 .••
v •-
... . • ••., .
USE rvlIN 7/16"'S(1-TG Cit fl At 6"
. .
FIELD (UNBL( CIED) (ES13-1539/ TABLE (i) LJP(. RADE
. .
TO 4" &'8". AT ROOF.'
SHEAR WALL PIER LENGTHS
0 Lwail = 20.171
',AZZ-Nrf:
OQ 0 aD,
v Wall .= 66 plf
USE MIN 15/3 ,.., .51--tiGi 8d (.113) AT'6" EDGE:84 12'
. .
„ . .
FIELD (BLOCK D) (Es.1 -153.,), TABLE E) .
. . . -
VfIr = 13404!
LfIr 27,67
„. .
v fir = 48 Pif I (SEISMIC
USF MIN 19/32'"'SLIT6'4 (.113) AT 6!) EDS;
Z 12
-
FIELD (LINBLOD'KEL)) (ESR-139, TABLE,(;) OpG DF TO
S1-11(j AT AT FLOOR
. ,
I
-- - - . ., JOB it 2016-03
,- ,./- . .,.,.., i,,,,..1W VA .,.,,z_e_st...: :,,e, :
----]
/ /7- ) i .--- i'llf ' ' <- --- - -
:14, ,, *, SHEET NO LFA-2 OF LFA4
..
1/. / e.„../ , BUILDING SYSTEMS CALCULATEDBY1VICL DATE iiii9/2ois
PO flax 110.9493 Porter Rd•AtinIsvnle,OR 97325
CHECKED BY DAT;=_
800.682,.1422 modernnulidlogsystemsxorn —
SCALE
SHEAR DIAPHRAGM DESIGN CONT
LONGITUDINAL (SEISMIC CONTROLS)
SEISMIC ROOF = 2680 if
96 plf
2767 ' T
Vrf = ROOF/ 2 WALLS= 1340 # 1340#
Lrf = 35.00 '
... ,
v rf --, 38 p If $:9:0*:!'',.„,:—'',' cl1r, M#'41010171iffrta..,TSVg:7,
rtv
USE MIN 7/16" SHTG w/15 GA STAPLES AT 6" EDGE&
12" FIELD(I.JNBLOCKED) (ET 519, 'FABLE 6) UPGRADE
TO 4" &8",.A1 ROOF
SHEAR WALL PIER LENGTHS
•-•*-,,,;;;,, ,„...,,Ax
:3,
,
66:" Lwa II 7.-' 2700 '
26 ,..
,4
143e..7,4*i:44,011! . ;y:,5,,,tian sk.al, v wall = 50 calfR-1:6El'i.)-,i1r24ii.,splf .-oi-/---sft-viE)=-A1:$1,0,ic) QR:;:;\
[
USE MIN 15/32"SI-I EG w/8d (.,113) AT 6" .1)CE 12"
HELI) (BLOCKED) (ESR-1539,TABLE 8)
Vflr z: 1340#
Lflr ,t, 35,00 '
1
ii v fir --,.. 38 plf "Atki,(0:ii-fro-11 -.6tNlv.-ITRA-176.1(4 't-tEsit',t:7•:;'1F--' ,;'.- Cgr
USE MIN 1.9/32.11,SHTG w/8d (.113) AT 6" EDGE & 12"'-
FIELD,(UNBLC)CI<E )) (1::.SR-.1.539, TABUPGRAE)E 10
23/32" SI ITG Al 6' & . Ai FLOOR
I
JOB it 2016'03
U � 1� ~-- --~
NiS 5HEETNO LEA-3 0F LFA-4
[]I[-[]\hJG S\/ST'/E M CALCULATED BY MCL DATE 11 S
roBox 1`v,xm,poun
°rno.�". s,me'oxyrazy '---------------'-'-------'-'' '--------
8o0.682.1422 mvuemamu/,u5vm°m,.cvm
.CHECKED BY ��TE_______
SCALE
~---- -SHEARWALL HOLD DOWNS (TRANSVERSE)
UNIT SHEAR
PIER WIDTH =
ROOF TRIB WIDTH =' �����
���. .
Mot= 66plfX10` X8' = 5315 lb-ft
Mr [31(12oxf +8'/ X1U'AZ/ZX[iS 3480lb'f
/5315 ' 3480A\b-t / /10- 0.5y 193 #
PER NAIL VALUE (SIMP C-2015 PG 189) 17l#
N193# /171# EA .7-- 4NAI L5
.
18
/ (4
USE MIN SIMP ' END
SHEARWALL HOLD DOWNS (LONG1T)
UNIT SHEAR =
PIER WIDTH :=
ROOF TRIB WIDTH
Mot = 50pIfX/' X 8' = 1688I b-ft
K4[= |6.92'/l2psR+8`(1OnnOlX4/1'2/2X0J6 7821b-ft
T=C=M/b (1588_ 783)|b4t/ /4_ 0.5y Z30#
PER NAIL VALUE (SIMP C-2015 PG 189) 171# DF
N = 2300 / 171# EA = 4NAJL9
(MIN)
-------`^--~-~--`------~ - -~~---~-- . .---
USE MIN SIMP C3-1N-10�
` |
� ^
JOB # 2016-03
,,,," ) "1" w` %.,
SHEET NO LFA-4 OF LfA4
/ ;,.; .w:'
BUILDING SYSTEMS CALCULATED BY MCI_ DATE 11/19/20J";
t>o pox 110,9494 Porter Rd•nur„s nto,OR 97325 CHECKED BY DATE_DA i E
800.682.1422 talodernf3ulldtngSyslerns.corn
SCALE
SIDEWALL TOP PLATE SPLICE
T=:C=M/b (77p1f X 35'A2)/(8 X 27.67') 424#
PER NAIL VALUE (NDS 2012 TABLE 11N, Cc1=1.6) = 155 # DF
N = 424#/ 155# EA = 12 NAILS .k... ro
(MIN)
USE MIN 4 ft SPLICE vv/ 12 12d's .131 EA END
ENDWALL TOP PLATE SPLICE
T=C=M/b (96pIf X 27.67'^2)/(8 X 35') 263 #
PER NAIL VALUE (SIMP C-2015 PG 189) 171 # DF
N = 263#/ 171# EA
4 NAILS r X4712;:
(MIN)
USE MIN SIMP CS-18w/ 4 N-10's EA END
SHEAR TRANSFER AT M.L.
v =Vay' = 1340#X(35' X 27.67'/ 2)(27,67'/4) =_ 73 plf
I (35' X 27.67'A3)/ 12
V = 73pIfX (351/2)/ 2X2 = 1271#
PER BOLT VALUE (NDS 2012 TABLE 11A) (6004 X 1..6), 960# LVL or GLB: G=0.50
N= 1271#/960# EA= 3 BOLTS(..'
(MIN)
USE MIN (3)
-ri/S in DIA M.B.'5 AT RIDGE BEAM ,,
JOB it
2016-03 l'
/ z/
SHEET NO IDN-1 C.F ,'DI',!-
t ..../ .`. ff Uii._l7{NCti SYSTEMS F (AICIJLATLD BY PML 11./.4e15
PO Dox 110•0493 Ptirter tid.Aurnsv)fie,OR 9/325
CHECKED. BYDATE
800.682.9.422 MoticrnDuildIng'gsteins,uorn ,._.�...�., ... �. -_ _ ... . . .._.._ _...,
FOUNDATION DESIGN . -HULA w..:.
BUILDING LENGTH (L) -3-5-.00'
SITE TYPE_" GRAN/EL
BUILDING WIDTH (B) = ' 27.67', MAX BRG PRESSURE _ .1800 psf
FRAME RAIL OFFSET= N/A?
FLOOR TRIB WIDTH =r6.92 ''
ROOF OVERHANG =i 0100"
ROOF TRIO WIDTH = 6.92 '
WALL PLATE HEIGHT= 8,00'(ABOVE F.F.)
TRANSVERSE WIND/SETS -) 5318 It
LONGIT. WIND/SETS. _' 4692 it
WIND UPLIFT=--1 :. 13465 if:
SNOW LOAD =l; '"'25 psf;
BUILDING WEIGHT= ` 27006 it'(No Snow)
F,F, HEIGHT! 1.00' (ABOVE GRADE)
AVG, ROOF HEIGHT''- ` 1 .a0'''(ABOVE GRADE)
PIER PAD AREA ali 1 ^,••j
AT EXTERIOR FIG
LOAD TO SKIRTWALL„" O'pIf
DL= 6.92'(12 psf)+8`(10 psf)+6.92'/2(10 psf) = 198 plf
LL= 6,92'/ 2 X 100 psf= 346 pif
SL= 6.92' X 25 psf= 173 plf
D + L = 543 pif
D +S = 370 pif
D+0,75L+0.755 = 587 plf CONTROLS
PIER SPACING -t`rSO.Oµ"-- a ... a��� t.-�` ' `.:... PI,
lau,.
q = (587pif- Oplf) X (5')/ 1.78 ft^2 = 1648 psf
.'. .;on GRAVEL
USE +/- 16 in. SQ. PADS OR 2 x 12 x 24 in. P.T. PADS AT 5' O.C.
AT INTERIOR FTG
DL = 6,92' (10 psf) = 69 plf
LL= 6,92' (100 psf) = 692 plf
D+ L= 761 plf CONTROLS
PIER SPACING =1400' a. 7
q = 761.pIf X (4') /1.78 ft^2 = 1709 psf
, C on GRAVEL
USE +/- in. SQ. PADS OR2x12x241n. P,T.
PADS AT 4' 0,C.
/A 1 Str4 _ JOB ft 2016-03
1./
/7/ SHEETNO FDN72 FDN..14)
BUILDING SYSTEMS CALCULATED B17MCL .1.1/19/7015
P0 0ox 110.9493 porter Rd•AunlxvIlle,OR 97325
CHECKED BY DAvE
B013.682..1422 ModeraDutidIngSystems.com
SCALE
AT ENDWALL COLUMN FTG
COLUMN DL= 3033 it
COLUMN SL=;6051'it::
DL [3 (10 psf) 10.51 (10 psf)] X 6.92' = 934 ft
LL 3' (100 psf) X 6.92' = 207514
D+ L= 6041#
D+S = 10018 #
D +0,75L+0,75S= 10061# CONTROLS
<10125#Therefore OK. (See FDN- 3,5 )
AT MIDSPAN coLumNrs
coLuPirkRZI,z, 10 it
COLUMN SL
DL= 6..92711Q,esf) (41 = 277
LL 6.92' (100-1'34 = 2766 #
D+ L 3043 ft CONTROLS
+S
D+ 0.75L+0.7,55..ze2351 ft
--<26094/VPherefor&OKF(Seer-FDN.A6rk)
_m JOB # 2016-03 w_
/f - -
. r /: a( SMEET NO FDN-3 Uc Ft�# i
;.f7BUILDING SYSTEMS _ CALCULATED_ CALCULATED BY MCL11/19/. 15
PoOox110.9493PorterRd.AuntsvlllerOn97325 ( !ECKED BY �WDATF.
800.682..1422 ModerriuuIIdIngsystems.corn SCALE
@ ENDWALL COLUMN FOOTING
..ar`n l' u a 'M mw�Tf"r,.»µ»r � , "*,,;li;0 t.t.� K2
TRY[ A' , � ` FSA' tyr. i.4. ,12r> , n L
Width (b) each = 0.63
Pmax = 1800psfX2X0,63' X4.5' = 10125 `
DL% = 40%
SL % = 60%
W oL= 1800psf X 0.63' X 0.4 = 448 plf
W SL= 1800psf X 0.63'X 0,6= 677 plf
@ MIDSPAN COLUMN FOOTING
IPY tG T _m' - 1111 JL dx 3 x,46alo ..� L
Width (b) each = 0,60 'x
Pmax = 1800psf X 6 X 0,6' X 4' = 26093#
DL% = 100% -,yam '
SL% = 0% �r--
W ot_= 1.',.000 X 0,6'''X'1„.= 1087 plf
W sL= 1800psf X 0.6' X 0= O pif
b
@ MIDSPAN INTERMEDIATE POST '`,
0:—..,,,44,-, +*, w. I! 6111 ; "t x r
TRY .*. .4 .4 1 L
... Width (b) each = 0.46 '
W Dt.= 180Op f»X.t ',X 1/ 2 MEMI3EI S .. "-1 3600 pif
W sL= l800psf X 4' "0,-/:Z. l MBI;RS = 0 plf
� '
I .
� .
.
POL
----• - MCL
� ' � Pu�m|D. 2016-03
28"x35'MDDULAROF ��
, t, ,•4:''' "IT! 4
/-
OescaptIon; ENOWALL COLUMN FTG-2016 03
_ CODE, -�—~�� ---------- ~ '
Calculations per NDS 2012, IBC 2012,CBC 2013,ASCE 7-10
Load Combination Set...IBC 2O12
Material Ert|
Allowable S�000Des�n Fb 750.0 E/Mo��xofBox��
Load Combination
Analysis^—~--' IBC 2012 PbFh 750.0 Ehnnd•xx 1,300.0kni
Fr- 7UO.V' Endnhund-xx 470.0kd
Wood Species Larch:Douglas Fir' Fe Fv''e' 02595'
O psi
Wood Grade :
deNo.2 '~ppi
Ft 475.0 psi Density 32.21Op:[
Beam Bracing i3oam is Fully Braced against lateral-torsion buckling
-------- --- ---------------- �8�. ' ------ --------� ��
^^~. — .'_
80(FLAT) 8x8(FLAT} 84(FLAT)
Spun~1w^oSpan.0.620 ft Span~1amo ____
�a��e|�dn en���.Lood Fumom*i|�mwpp||nu��rnn�u|ui�os
c�/~~ --- --' ---'--- ----- --- --�- _____.
Loads on all spans..
Uniform Load on ALL spans: D~V.44OO, G=0.O77VNM
i ___ ________ __��04D��( �ON� �0:Maxinlitm Bending Stress Ratio '
^ --=----- — - 8.T79,1 Maximum Shear Stress Ratio = 0.550: 1
Scctton Used h this span 8x8' Section for onuveu �iaopon 8x6(FLAT)
m:Actual = 1�,65' \ Iv:Actual = 00.89pS|
PB:Allowable = 862.60ps1 Fv:Allowable = 109.26 psi
Lou Combination — Load Combination u
Location�~° dmaximum oospan = '— b*u(|onu[maximum uospan = i�8 k
SpanSpan#1
8pon0nhmamax|mum�omo = �p�#> #wheremux)mommmu� ~
Maximum Deflection
Max Downward Transient Deflection 0.025 in Ratio= .1856
Max Upward Transient Deflection 0.00DioRatio= O<sGQ
Max Downward Total Deflection 0.042 In Ratio= 1118
Max Upward Total Deflection -0.001 in Ratio= 6p48
^ ` S notation --__ Yuhoh�PS
SupportLoad Combination 1 SupportSupportvuopmh4
vviw.p° .m.. _
------ --_—_-
^'^`' 233-1—
Overall MiNtmunt
~`'OvemKh8Nbmnt 1,000 1.008
+04H 1,008 1.008
~04-Sil{ 2,531 2.531
1)Only 1.008 1.008
8 Only 1,523 1.623
.
.
. .
/ |
I
.i
!
i1
9
7!,, "1 J- SHEETNo....... 1) or ' 1)?v1_..:. �a
LUit.C71NG SYSTEMS �,• _ _._:
9493 Porter Road SE PO Box 110 CALCULATED BY1 m.� : Via . �A• . 1 , k ., .__....
AUMSVILLE, OREGON 97325 C tEa<ro fYr,.. „,„� Di TE ..
503-749-4949 6 Fax 503749-4950 scAt.O�
l
! a1 tl t .
f
?1 :21.y.t r.. . ) 1 1 1'f
1trel:
f
t
1 t
I
J00 � J16. 6« 1
,
._BUILDING SYSTEMS
9493 Porker Road SE • PO Box 110 CALCUTATEDBY 1,',!f, ._._ _ �n1E: __(_i r/1 tl-- .
AUMSVILLE, OREGON 97325 CPiE-.CK[aD[;Y _«._....«_.__ .:. ;D,,rE ..........._ ..«,.
503-749-4949 o Fax 503-749-4950 SCALE._ _ —. ... .
_
1
il 54 I 1.;\ 1 1(11 I 1 ' ' \ )1(or 7 7'6 7 1, ,- )46 I/ -i F -
, .1_,' _ __ , 7, „..) 1 _ _ _
1«..._� « «:.._ Vim _
1 1
1
,,
)/ ( 07t. '1-74 'r
`---
.v.)�,lr) « \O)')-1,A Vii 1. i k/ 0
w.._ _, e _..,
1.-01' ,.. i,»i(..j _... ....«We..m... .. . ...._ _.___. . ..
i 3.
f, ) ( '1 4? ' _.. /1 .., .x ,�.. __(t IA(1J. . �. j ! �: �I.?�11 t�:1 ll.
_.- i6 #S, -L. is
_._ ..
2.01.'3-03
1
JOB it
._...
2 [ :SHEET NO ..
L-1 Of S
_CALCULATED
AflD 13Y.,L . MCL...... 0A1EL. .r�. . �.
W...�yy/://,
___ .� BUILDING SYSTEMS
PO Box 110•9493 Porter lid.Aumsvllie,On 97325By '
800.682,1422 Modernoulldingsystems.com SCALE
WIND ANALYSIS FOR ENCLOSED SIMPLE DIAPHRAGM LOW'RISE
BUILDINGS - BASED ON IBC 2012 / ASCE 7-10 CHAPTER 28, PART 2
INPUT DATA
-i
Risk Category = RC 14 .. :i (Table 1.54)
Basic Wind Speed -- Vult A41,4YqVasd -3:08;. mph (3 sec gust)(Fig 26.5-1)
Exposure Category = EC 8 (Sec. 26.7)
'topographic Factor= Kit Pima (Sec. 26.8 & 26. 3-1)
Adjustment Factor = Lambda 1.00 (Sec 28.6-1)
Building Length = L 1 35.00 ' ft
Building width = B 127.67,° ft 1 1.41:51 PM
Building Height to Eave = he ' 16.00 'ft
Building Height to Ridge = hr l13,00�,:ft
Eave Overhang oh l : 0.00-. ft
Building End Zone = a 3.00 ft
Roof Pitch = RP :,:•:3:741p.,70:1
Approx, Roof Angle = RA 10 degrees (Ref. Fig. 28.6-1)
OUTPUT
Wind Pressure, ps30(Fig. 28.6-1)
Horizontal A-ps30 351.0 psf
Horizontal B-ps30 -14.50 psf
Horizontal C-ps30 23.30 psf
Horizontal D-ps30 -8.50 psf
Vertical E-ps30 -37.30 psf
Vertical F-ps30 -22.80 psf
Vertical G-ps30 -26.00 psf
Vertical H-ps30 -17.50 psf
O.H. Eoh-ps30 -52.30 psf
0.H. Goh-ps30 -40.90 psf
JOB it 2016-0Z,
,/ SHEET NO i z OF 1..-!_,
/'` / ' _ ( _ .L-2 _ _ _ _
K._ .�%�....� (3U ILD NG SYSTEMS CALCULATED BY MCI.. DATE 11,/`19/2015
Po Box 110•0493 Porter Rd.Aumsvllic,OR 97325 CHECKED Q BYDATE _. _.._,...._...._.__..n
800.682.1422 Moder,tii3uildingSysterns.com SCALE
Wind Pressure, ps
ps= Lambda * Kzt* ps30 Min Loading
Horizontal A-ps 35.10 psf 16,00
Horizontal B-ps -1.4.50 psf 8.00
Horizontal C-ps 23,30 psf 16.00
Horizontal D-ps -8.50 psf 8.00
Vertical E-ps -37.30 psf 0.00
Vertical F-ps -22.80 psf 0,00
Vertical G-ps -26.00 psf 0.00
Vertical H-ps -17.50 psf 0.00
O.H, Eoh-ps -52.30 psf
O.H. Gob-ps -40.90 psf
CASE A-Transverse Wind Mini Loading
A-tw 2106 lbs 960 lbs
Set to 0 B-tw -261, lbs 144 his
C-tw 6757 lbs 4640 lbs
Set to 0 D-tw -740 lbs 696 lbs
Total 8863 lbs(SD) 6440 lbs
Convert to ASO x 0.5 0.6
Total Force on building side L= 5318 lbs(ASD) _ 3864. lbs
CASE B-Longitudinal Wind
A-lw 1106 lbs 504 lbs
C-lw 6715 lbs 4611 lbs
Total 7821 lbs(SD) 5115 lbs
Convert to ASD x 0,6 0.6
Total Force on building end 13= 4692 lbs(ASD) 3069 lbs
CASE A-Transverse Uplift
w/gable end OH uplift F-up -3096 lbs
w/gable end OH uplift F-up -1893 lbs
w/gable end OH uplift G-up -10432 lbs
w/gable end OH uplift H-up -7021 lbs
sidewall eaves OH uplift Fob-up 0 ibs
sidewall eaves OH uplift Gob-up - 0 lbs
Total -22442 lbs(SD)
_
Convert to ASD x 0,6
Total Uplift Force = -13465 lbs(ASD)
�.,, JOB 6`2016.O .._ . _ ... .w
Li li
SHEET NO h3 (lt" L-5
`_ _iI 1ilI...I.)IN(a sYs'I�' :Ms ,ckicut,A1t.C 't3Y'NI I DATE 111/19/2015
F'D Flax 110.9493 Pot for lid.Aumsvtno,OR 97375
CHECKED ECKED 13Y DA r(
800.687.142?. Modernhutldtngsystems.coni ."w, ."_ - -- -• - -."
SCALE .. __."_... _.
I r: 8 x ' OCULAR
SEISMIC per IBC 2012/ ASCE 7-10
Risk Categoryi t ' "`
ASCE 7-10 Table 1.5-1
ASCE 7-10 Table 1.5 2Seismic Importance Factor To= 1...
ASCE 7-10 Table 12.2-1 Response Modification Factor R = rc �
USGS Data Spectral Response Accel. Ss = • 1.500`'
ASCE 7-10 11,4.2 Site Class D
ASCE 7-10 Table 11.4-1 Site Coefficient Fa= I 1.000,
ASCE 7-10 Eqn, 11.4-1 Stns =Ss * Fa Sins - 150
ASCE 7-10 Eqn 11.4-3 Sds = 2/3 * Sms Sds.- 1.000
ASCE 7-10 12,14.8.1 F=1.0 for one story Bldgs F= 1.000
ASCE 7-10 Table 11.6-1 Seismic Design Cat. D
ASCE 7-10 Eqn 12.8-1 V=(F*Sds/(R/Ie) * W)* 0.7 V 0.108 W
1BC 2012 1605.3.1 Note: 0.7 converts to ASD
ASCE 7-10 Eqn 12.8-5 Vmin = 0.010 W
Building Weight
Roof(psf) Exterior Wall (psf)
s "• 1.7
'P;- a 2.5 ?
r yf 1.7
f 1.5 4�
0 O "n1.9 -#40„.„ftif1474-1 ,,1, 1.3
,osl: `l- 1.8 r
2.8
,'
ktg
0 1.8 0
0
4 0
x 0
0
Total 9.5 7.5
Interior Wall (psf) Floor(psf)
17141e f71iblM)5 1.0
r�j' 2.8
' e ,g 1.1
2,5
< . 2,8 2.2
� . 1.6
v '`; 0 0
Total 6.77.3
f^_. l JOB#2016-03
/ ,,i/, ,"" SHEET NO L-4 OF17-5
a' c.,' .. BUILDING SYSTEMS CALCULATED BY MCLDATE 11/19/2015
Po Box 110.9493 Porter Rd•Avnisvllle,OR 97325 CHECKED 1W DATE__. .... „
.. ._
$00.682,1422 ModerntlufldingSystems.com
SCALE
Building Weight (can't)
o 27:67:' f 35.00!- 0.0 psf 0 lbs
Roof ;.' 27.67:' 35.00' 9,5 psf --- 92001 lbs
Ext.Wall 1 ,00.1 A`12 34 7.5 psf = 7520 lbs
Int.Waif w 4 ' 1.4s-4-0A� z, 6.7 psf - 3216 lbs
Floor 27.67' f 35 00,' 7.3 psf 7070 lbs
�..
Chassis . 0 lbs
0 lbs
Total 27006 lbs
Wr= Total DL tributary to roof 14568 lbs
W1= Total DL tributary to floor 12438 Ibs
Fx Story(Shearwall) Force Table
Story Force-k Fx Coot=
Story Height Weight *wxthx/( V*hx/( Story Shear
wx*hx} V wx*hx)
(hx) (vex) (wx*hx) . (Vx)
R 19,00:" "';' 14.57 k 146 k-ft 2.68 k 0.184 2.68 k
1 1.00'' 12.44 k 12 k-ft 0.23 k 0.018 2.91 k
Grade 0.00'
Sum (Z) 27.01k 158k-ft V=2.91k
Shear Value OK
Comparison
1
i
.
11
j
i.
Desi g n Ma s Summar Re ox t rage 1 cf 2
p Y p
F, , ° Design MapsSummary Report t� �►_ '..�
User—Specified Input
Report Title 2016-03, Tigard
Tu l, November 19,2015 19:30:09 UTC
Building Code Reference Document 2012 International Building Code
(which utilizes USGS hazard data available In 2008)
Site Coordinates 45.431°N, 122.771°W
Site Soil Classification Site Class D "Stiff Sall"
Risk Category I/II/III
tl ;)i' ,%13f aye r on, ` I `
li In {71i4
NL
) 149« : V11l .tlrI{• . ft_ , t' , ..'1 t3ttlt€£>pt � _�J r i' It i + f '
',,
�£�titait,
if s. flirt{3 :,1#t . thtant: i,`
P v �*� Cir' p ( /- t'
r t r I . i, is 11 ' i«r '.
f i` et
: } rt.l tt.l$1
l ` i 1 r } , it j
i,,,,,, CIUc s .Q Q#t'PfAitt uc a�liic 410. r20,?:6,i ,it i ' hfalt(ltt,
USGS—Provided Output
Ss = 0,972 g SHs c 1.0!30 g Sus = 0.720 g G' , •Ul)U qo CJ
Si = 0.423 g 5,,,. = 0,667 g S"1 = 0,445 g
'' For information on how the SS and S1 values above have been calculated from probabilistic(risk-targeted) and
deterministic ground motions in the direction of maximum horizontal response, please return to the application and
select the"2009 NEHRP"building code reference document,
MCEA Response Spectrum Design Response Spectrum
'o fro
a.10 V.tiO
0.95
0.72
U•, 8,64
COW
077° 0.56
6,Gc ., Ili =5.48
0 0,ti'i 0.10
0,73 .'....a.. 0.24
6,22. 1.1Q
0,11 +.,,00,
0 00 #.740,141) 0.50 —0,4J0 LOS .1.1;0L40 1,50 1.05 ,O0 0.4{+ 0.20 0 10 41:60 000 1 {'{1 i.i'O 'I (0 1 SO 4,O .so
Period,T(sec) lieriod, T{sets
http://ehp 1-ear thquake.cl•.usgs.gov/designtnaps/us/summary,php?template... 11 'I 9/2015
I
i
I
i
it
Il
ii
4
11
Design Maps Summary Report Pdge ! of 2
1,6
Design Maps Summary ep rl. f . Of: -t
User-Specified Input
Report Title 2016-03, IHITgsboro
Thu November 19, 2015 19:39;58 UTC
r3uiiding Code Reference Document 2012 International Building Code
(which utilizes USGS hazard data available In 2008)
Site Coordinates 45,523°N, 122,99°W
Site Soil Classification Site Class D - "Stiff Soli"
Risk Category I/II/III
tz
4.1 1,1
._
;� �iili•ioro .�
� c1rn:11 C�rov�,• • ! i I �� *-
0
l's1 J 1, 'E if
,
Il. 1 • i., ASM EM (`1 1 (.
t., l
I'„vII _f
i :111111PCI rWit 02815 tltailtiuest 5041,0 ilatat>2p1S'13ii"� t ' +sem 11Iallttlret,t'
USGS--Provided Output
Ss = 0,991 g Stis = 1.093 g Sus = 0,729 g 1 ,006
Si = 0.448 g SKI = 0.695 g SD{ = 0,463 g
For Information on how the SS and S1 values above have been calculated from probabilistic. (risk-targeted) and
deterministic ground motions in the direction of maximum horizontal response, please return to the,application and
select the"2009 NEHRP”building code reference document.
MCE8 Response Spectrum Design Response Spectrum
,),P0
1,14 0.00
n:G9 0.72.
0,10> Ii.GI
0,7T 0.94-
Cr,G6 t 0,4P
0.55 ig 0.40
0,4j 0 32 ,
0,33 6.21
41.27 0.14
41.11 0.011
O.OG. 1 f 1 f t 4 - i --t- 1 I oc,o } 4 t ;_ 3. y.. ._y-._.. .{.._ I
0 oil 0.}9 010 9,49 0.99 1.99 1.70 1.49 1,(9 1.09 190 0 GCI 0.29 9.11 0 1 0:60 1.19 1.2V I.t0 i.GQ 1,90 1,99
Period, T(sec) Period, T(sec)
http://ehp2-earthquake.wr.usgs.gov/designmaps/us/summary.php?template... 11/19/2015
li
{
II
II
iI
I,l
9
Exit Index Search
ULTIMATE FRICTION FACTORS AND
ADH Ii,SJON FOR DISSIMILAR MA`.[ ,RT:A,LS
(NAAC!AC DM 7 2,Table 1, n72-63)
Friction 1lrtctlr
Interface Materials factor a#1(ties
degrees
Mass concrete on-the following foundation materials:
Clean sound rock 0,70 35
Clean gravel,gravel-sand mixtures,coarse sand 0.55 to 0.60 29 to 31
Clean fine to medium sand,silty medium to coarse sand,silty or clayey gravel 0.45 to 0,55 24 to 29
Clean fine sand,silty or clayey fine to medium sand 0.35 to.045 19 to 24
Fine sandy silt,non-plastic silt 0.30 to 0.35 17 to 19
Very stiff and hard residual or pre-consolidated clay 0.40 to 0.50 22 to 26
Medium stiff and.stiff clay and silty clay 030 to 0.35 17 to 19
(Masonry on foundation materials has same friction factors.)
Steal sheet piles against the following soils:
Clean gravel,gravel-sand mixtures,well-graded.rock fill with spalls 0.40 22
Clean sand,silty sand-gravel mixture,single size hard rook fill 030 17
Silty sand,gravel or sand mixed with silt or clay 0.25 14
Fine sandy silt,non-plastic silt 0.20 11
Formed concrete or concrete sheet piling against the following soils:
Clean gravel,gravel-sand mixtures,well-graded rook fill with spalls 0.40 to 0.50 19 to 26
Clean sand,silty sand-gravel mixture,single size hard rock fill 0.30 to 0.40 .17 to 22
Silty sand,gravel or sand mixed with silt or clay 0.30 17
Fine sandy silt,non-plastic silt 0,25 14
Various structural materials; `
Masonry on masonry,igneous and metamorphic rocks:
Dressed soft rock on dressed soft rook 0.70 35
Dressed hard rock on dressed soft rock 0.65 33
Dressed hard rock on dressed hard rook 0.55 29
Masonry on wood.(cross grain) 0.50 26
Steel on steel at sheet pito interlocks 0.30 17
Interface Materials(cohesion} Adhesion C„(psf),
Very soft cohesive soil(0-250 psf) 0-250
oft cohesive soil(250..500 psf) 250-500
I odium stiff cohesive soil(500—1000 psf) 500-750
tiff cohesive soil(1000-2000 psf) 750-950
c stiff cohesive soil(2000-4000.psf) 950-1,300
C-11
i
r.e."M"-Mr...V-:-.4.s- „riar-..,71-‘,X1r=r7,=_Y=A.ne r"Z:7=',:::7.',....C.X:1L4M47,..":1-1,,,,t72,.. r".. ,,,V7:::TZts-sx.f-A,r,,,`-:•",4,.=,...Z.'r.70,1Zik...,,, ,,,,,,?...,,%,..1
ti
INSTRUCTIONS FOR USING H
PRS
are
anchor sip. firm MTh /±E HOME
•t----- 1
The manufactured home shall be Installed and
A
'
.
,.
t
\
I
At '%',
i
I leveled by qualified contracting personnel who
are acceptable and licensed by the governing
authority, Minute Man piers are designed to
SUPPORT mobile homes and are not to be
used for raising or lowering the home,
Minute Man piers should be placed directly
under the main support frames on both sides
of the home spaced In accordance with the
...,.tIllazWEZMItolosiiN atInaterm.avagsw= home manufacturer's instructions,
.W1UTE MAN ANCHORS 28726
HO 8524
KATED 4000 015370 1 SAFETY FACTQl
RA7E0 8000 LBS 2.2570 1 SAE ETf FACTOR OR E-q u p,1-
2'WAX EXTENSION
WARMING)DO NOT USE ID.T/ I<HOME
MINUTE MAN *IER SET-UP PROCEDURES
1 Designed and manufactured for use under mobile and manufactured homes and commercial structures,
the support pier is best suited to a dry environment Minute Man piers are not recommended for use
within 1500 foot of a coastline or in an application where the base of the pier would be immersed in
water, All support piers must be attached to the I-beams With an appropriate pier head, to prevent
horizontal movement,
2 Use hydraulic jacks or other suitable devices to level the chassis beam of the home. Be sure to use
sufficient jacks and safety blocking to safely support the home before installing support piers, Level the
chassis using a water level or other leveling device for accuracy, After the chassis Is leveled using
hydraulic Jacks and levels,you may begin to install the support piers.
s Using the appropriate pier for the Installation,determine the pier height that will be best for each Individual
pier location and insure that the height to the bottom of the chassis beam is no greater than 36 Inches,
Insure that the pier caps ate appropriate for the type of chassis beam or for the marriage line,
4 Prepare a level surface at the location of each pier, Use coarse sand or gravel,If necessary to prepare
the surface so as to have full contact for the footing pad. The surface of the footing pad needs to be
high enough to Insure that the base of the support pier does not come into contact with any drainage
water that may be present under the home, Do not set a footing pad on organic material, Use the
appropriate type and size of fooling pad for the load required, Refer to the home manufacturer's
Installation manual for specific loads and footing sizes;and to the governing authority in the locale in
which you are Installing,
5 Locate the support pier on the footing pad,making certain to center the support pier on the pier pad.
Where required by local code,secure the support pier to the footing pad with appropriate fasteners, In no
case are you to extend the threaded rod adjuster more than 2 inches, When more height is needed, use
the next taller size support pier. Carefully align the support pier under the chassis beam or marriage line
and install the pier head, lighten and snug plus one-halt turn,
6. Repeat this installation process with each pier. After all support piers are installed,you may then remove
the safety blocking and hydraulic jacks used to Initially level the chassis,
8,
,-....-"'aZt:'.:17P4VItiT=1:4,404-o,,X,Pr.r..,;,,,T4...,ZTiarir4tFri,..-ii,s-i.U.. .."%1E171.1111Wt1717;ailITEr-'11,7,11MATZWZ":2.."-M,.134 :1,1W-,C,M,'s 4.112W-TYCI=,.
r 4 -