Loading...
Permit (166) Building Permit Application Residential ` FOR OFFICE USE ONLI Cityilh of Tigard Da /By: 7 l � ; G� i�7 "tel n tlr r 13125 SW Hall Blvd.,Tigard,OR 97223 72019 Plan Review ` �/ Phone: 503.718.2439 Fax: 503.598.1960 el Date/By: Other Permit: T I GARD Inspection Line: 503.639.4175 " �� r r��, Date Ready/By: 0 Juris: la See Page 2 for Internet: www.tigard-or.gov Bt: .iMe.+" �� / Supplemental Information TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING 0 New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CO_ STRUCTION work indicated on this application. 1 Valuation: $ 0 1-and 2-family dwelling M, ommercial/industrial ❑Accessory building 0 Multi-family Number of bedrooms: 0 Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: '7 7 y 3 342- i0l/�4 f j,,, New dwelling area: square feet City/State/ZIP: "� i/�r ) Garage/carport area: square feet Suite/bldg./apt.no.: 1 Project name: 1/5 Aid n r ,e Covered porch area: square feet Cross street/directions to job site: Y c Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Valuation: $ / / Existing building area: square feet New building area: square feet 1'ROPERTY OWNER ❑ TENANT Number of stories: Name: /4t . If Type of construction: .Address: Occupancy groups: City/State/ZIP: Existing: Phone:('u? ) 6,t 631,0 Fax:( ) New: J APPLICANT 04 CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name: , ✓ n P P_/-�(�/L✓ 4l-01,„ II.; Structural plan review fee(or deposit): t , Contact name: �, j C1 fc�, G 4 Address: FLS plan review fee(if applicable): .Gs City/State/ZIP: Total fees due upon application: (q 7/' '7 / //, ( ) Amount received: Phone: 3 b Fax:: E-mail: PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System. Business name: F,M!/-)'P Ket,1 " 0 ✓r Submit two(2)sets of roof plan with connection details (1° 7 J ! .j and fire department access,along with the 2010 Oregon Address: l 0 Un S '7 U to Solar Installation Specialty Code checklist. City/State/ZIP: Permit Fee(includes plan review $180.00 �9 and administrative fees): Phone:( C F / ,1-21 b/ 3 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.: / t/ Total fee due upon application: $201.60 Authorized signature: / (/ This permit application expires if a permit is not obtained �7� ff within 180 days after it has been accepted as complete. Print name: r / *Fee methodology set by Tri-County Building Industry �' I Gil S �� ` 4, Date: �(/ Service Board. I:\Building\Permits\BUP-RESPermitApp.doc 02/24/2011 440 4613T(11/02/COM/WEB) Building Permit Application Checklist One- and Two-Family Dwelling FoR oFFic F l I. ON 1 City of Tigard Received Permit No.: Date/By: 13125 SW Hall Blvd.,Tigard,OR 97223 Associated permits: Phone: 503.718.2439 Fax: 503.598.1960 24-Hour Inspection Line: 503.639.4175 0 Electrical 0 Plumbing 0 Mechanical TIGARD Internet: www.tigard-or.gov ❑ Other. THE FOLLOWING ITEMS ARE REQUIRED FOR PLAN REVIEW Yes No N/A 1 Land use actions completed. See jurisdiction criteria for concurrent reviews. 0 0 0 2 Zoning. Flood plain,solar balance points,seismic soils designation,historic district,etc. 0 ❑ ❑ 3 Verification of approved plat/lot. ❑ 0 0 4 Fire district approval required. Name of district: • 0 0 ❑ 5 Septic system permit or authorization for remodel. Existing system capacity . ❑ 0 ❑ 6 Sewer permit. 0 ❑ ❑ 7 Water district approval. 0 ❑ ❑ 8 Soils report. Must carry original applicable stamp and signature on file or with application. ❑ 0 0 9 Erosion control 0 plan 0 permit required. Include drainage-way protection,silt fence design and location of catch- 0 ❑ 0 basin protection,etc. 10 3 Complete sets of legible plans. Must be drawn to scale,showing conformance to applicable local and state 0 0 ❑ building codes. Lateral design details and connections must be incorporated into the plans or on a separate full-size sheet attached to the plans with cross references between plan location and details. Plan review cannot be completed if copyright violations exist. 11 Site/plot plan drawn to scale. The plan must show lot and building setback dimensions;property corner elevations(if 0 ❑ 0 there is more than a 4-ft.elevation differential,plan must show contour lines at 2-ft.intervals);location of easements and driveway;footprint of structure(including decks);location of wells/septic systems;utility locations;direction indicator;lot area;building coverage area;percentage of coverage;impervious area;existing structures on site;and surface drainage. 12 Foundation plan. Show dimensions,anchor bolts,any hold-downs and reinforcing pads,connection details,vent size ❑ ❑ 0 and location. 13 Floor plans. Show all dimensions,room identification,window size,location of smoke detectors,water heater, ❑ ❑ ❑ furnace,ventilation fans,plumbing fixtures,balconies and decks 30 inches above grade,etc. 14 Cross section(s)and details. Show all framing-member sizes and spacing such as floor beams,headers,joists,sub- 0 ❑ ❑ floor,wall construction,roof construction. More than one cross section may be required to clearly portray construction. Show details of all wall and roof sheathing,roofing,roof slope,ceiling height,siding material,footings and foundation,stairs,fireplace construction,thermal insulation,etc. 15 Elevation views. Provide elevations for new construction;minimum of two elevations for additions and remodels. 0 ❑ ❑ Exterior elevations must reflect the actual grade if the change in grade is greater than four foot at building envelope. Full-size sheet addendums showing foundation elevations with cross references are acceptable. 16 Wall bracing(prescriptive path)and/or lateral analysis plans. Must indicate details and locations;for non- 0 ❑ ❑ prescriptive path analysis provide specifications and calculations to engineering standards. 17 Floor/roof framing. Provide plans for all floors/roof assemblies,indicating member sizing,spacing,and bearing 0 0 ❑ locations. Show attic ventilation. 18 Basement and retaining walls. Provide cross sections and details showing placement of rebar. For engineered 0 0 ❑ systems,see item 22,"Engineer's calculations." 19 Beam calculations. Provide two sets of calculations using current code design values for all beams and multiple joists 0 ❑ ❑ over 10 feet long and/or any beam/joist carrying a non-uniform load. 20 Manufactured floor/roof truss design details. 0 0 ❑ 21 Energy Code compliance. Identify the prescriptive path or provide calculations. A gas-piping schematic is required 0 0 ❑ for four or more appliances. 22 Engineer's calculations. When required or provided,(i.e.,shear wall,roof truss)shall be stamped by an engineer or 0 ❑ 0 architect licensed in Ore•on and shall be shown to be a••licable to the ,ro'ect under review. JURISDICTIONAL SPECIFICS 23 Three(3)site plans are required for Item 11 above. Site plans must be 8-1/2"x 11"or 11"x 17". 0 0 24 Two(2)sets each are required for Items 16,19,20 and 22 above. 0 ❑ 25 Building plans shall not contain red lines or tape-ons. "Mirrored"building plans will not be accepted. 0 ❑ 1 26 "Reversed"building plans must meet criteria outlined in the Permit&System Development Fees document. ❑ , ❑ 27 "Drawn to scale"indicates standard architect or engineer scale. 0 ❑ 0 28 Site plan to include tree size,type and location per approved project street tree plan(if applicable),and City of Tigard 0 0 ❑ Street Tree List. 29 Site plan to include trees and tree protection measures as required by conditions of approval. Tree locations,driplines, 0 0 ❑ and protection measures must be drawn to scale and must include the project arborist's signature of approval. 30 A Clean Water Services'Sensitive Area Pre-Screening Site Assessment form is required for all building additions, 0 ❑ 0 including decks,patio covers(over non-impervious surface)and accessory structures to existing residential dwellings on a lot of record approved prior to September 9,1995. I:\Building\Permits\BUP-RESPermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) City of Tigard Tel: 503.718.2439 Location: Inspection Date: 7236 SW DURHAM RD 500, TIGARD, OR, 97224 August 30, 2019 at 10:13:54 AM Record Type: Record ID: Commercial - Building BUP2019-00196 Inspection Type: Inspector: 299 Final inspection Chip Barnett Result: PASS - NoCofO Comments: Violation Summary: Inspector Contractor