Loading...
Report (45) m sr V. e //ggy Sw sumrk, c 3rooic �N la3MULHERN+KULP RESIDENTIAL 300 Brookside Avenue,Building 4,Ambler,PA 19002 p 215-646-8001 inulhernkulp.com August 13,2019 Jeremy Hammon DAVID WEEKLEY HOMES 1905 NW 169th Place Suite 210 Beaverton,OR 97006 SUMMERBROOK - LOT 13 7894 Model JOIST BEARING M+K Projed#: 211-18020 Reference Structural plans,prepared by Mu/hem d Kulp As-Built Photos,prowded by David Weekley Homes Jeremy, Pursuant to your request,we have prepared this letter to address the 1 nfloor T1I floor joist bearing at the above referenced lot in the Summerbrook Community.It has been reported to our office that the 9 'h"T11110 series floor joists @ 32"o.c.were pocketed into the foundation walls and have 2"-2.25"of bearing. Per PRSC R502.6 and the provided structural plans, 3"of bearing is required. Please note that a representative from our office has not visited the site to confirm these conditions,but photos were provided. Based on our evaluation.the as-built floor joists with 2"(min.)of bearing are adequate to support the code required loads tributary to each joist.No further action is required. Please feel free to call if you have any questions. Respectfully, ��RED PRQPe`Sd' ,NGINEF /0 MULHERN &KULP STRUCTURAL ENGINEERING,INC. `, 3 9 93737PE � Nicholas J.Dastalfo Project Engineer 'Y 'WI r . Nicholas J.Martignetti,P.E. Project Manager itk„ OREGON RAF 48 J. MARS Stratum Sethi Date EXPIRES: i z (z.0 P.ICI'ent Flles1211-David Weekay-POR12018118020-7894 ModelCA12019-08-13-68020013 Joist Beaiing120i9.08-13-Lot 88020013-Joist Bearing.doac