Loading...
Permit (224) CITY OF TIGARD MECHANICAL PERMIT 114 , COMMUNITY DEVELOPMENT Permit#: MEC2019-00565 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 08/08/2019 T t i ;i R C 9 Parcel: 1S136DCO2504 Jurisdiction: Tigard Site address: 7301 SW DARTMOUTH ST Project: Lumber Liquidators Subdivision: None Lot: None Project Description: Replace rooftop HVAC unit. Contractor: ARJAE SHEET METAL CO, INC. Owner: AMERICAN INDUSTRIES INC 8545 SE MCLOUGHLIN BLVD. 1750 NW FRONT AVE STE#106 PORTLAND, OR 97222 PORTLAND, OR 97209 PHONE: 503-231-7717 PHONE: FAX: 503-230-4888 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 08/08/2019 $474.71 Class of Work: ALT Type of Const: VB Plan Review 08/08/2019 $118.68 Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 08/08/2019 $56.97 Stories: Info Process/Archiving-Sm$0.50(up to 08/08/2019 $1.50 $15,000.00 11x17) Project Valuation: Fuel Air Handlers Fuel Types: Units<10000 cfm: Gas Pressure: Units>10000 cfm: Furnaces Boilers&Compressors Furnaces<100K BTU: 0-3 HP: Furnaces>=100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: Vent Systems: Total $651.86 Hoods: Comm Incinerators: Required Items and Reports(Conditions) Woodstoves: Gas Fireplaces: Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions t NC by calling 503.232.1987 or 1.800.332.2344. Issued By: , Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit Application FOR OFFICE USE ONLY t 13125 SW hall Blvd, Rat wed ,J City of Tigard e- Permit DECEIVED Date,By(Y/`�i, C �9 - 5"6� Tigard,OR 9 3 I 1 m Revietiv �f) Other Permit. Phone: X03.7152439 Fax: 503.III 5)8.1960 Date By TIGARII Inspection Line. 503.639 4175 AUG 1 2019 Date Ready,By: furk Fa See Page 2 for Internet www.tigard-or.gov Notified,Ndethod:g -7 /..,-, Information CITY OF TIGARD �? TYPE OF $. ING DIUIS{(JN 2"' t1V/ (OtMMMERCI L EEE* SC EIEDt LE - 1ISE CIIE(1KLIST Mechanical permit fees*are based on the value of the work ❑New construction Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all 0 Demolition 0 Other: mechanical materials,equipment,labor.overhead,and profit. Value $ )bp00 CATEGORY OE (ONS Ilt1 E I ION RESIDENTIAL EQIIPAIE1NT/SYSTEMS FEES' 0 1-and 2-family dwelling Commercial/industrial 0 Accessory building For special information use checklist. ❑Multi-family 0 Master builder 0 Other: Description Qty. Ea. Total JOB SITE INFORMATION AND LOCATION Heating/cooling: Air conditioning 46.75 , Job site address:?3O I '' %'/'•/, 3 W Dar-i-51,41004 3 T. Furnace 100.000 BID(ducts/vents) 46.75 City/State/ZIP: 1 )*-4.(a)--ci i o gFurnace 100.000+BTU(ducts/vents) 54.91 Suite/bldg apt.no.: Project name: Heat pump 61.06 '� (fWl l"Q_(Jlj"S Duct work 23.32 Cross street/directions to job site: r I lydronic hot water system 23.32 Residential boiler(radiator or hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: 1 Lot no.: Other: 23.32 Other fuel appliances: 'fax map/parcel no.: Water heater 23.32 DESCRIPTION OF WORK Gas fireplace/insert 33.39 , 7^ Flue vent for water heater or gas / /OWE ,51`4.6 Ckovv,yep au•4" - �7-( fireplace 23.32 I� "��J1 Log lighter(gas) 23.32 Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 Other: 23.32 0 P1tOPERT1=OWNER ( i TENAN1` �� �'�" Environmental exhaust and ventilation: Name: ( V ) U D oh Range hood/other kitchen equipment 33.39 Address: Clothes dryer exhaust 33.39 City/State/ZIP: Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:( ) Fax:( ) Attic/crawlspace fans 23.32 A PPI,C C A NT ❑ CONTACT PERSON Other: 23.32 Fuel piping: Business name: 1 f-, oe ��eefiin ,� $14.15 for first four;S4.03 for each additional Contact name: ��-`-0----„,."4" �Ir' :• fitt. / s- ,/¢ etti l Furnace.etc. .Address: �! �0: 4. 151s 5E �IClaE fiii Bl Gas heatpump r I►e �f�_...._-�/.� Will/suspended/unit heater .._..City/Statv(7IP• -- ' I ` • ..� f L/ 7 R T .2-Z Water-hefltef Phone:(SC'3) 23(- 33- i 7 / Fast :( ) Fireplace Range F-mail (iiittly i4-6 r7Llr3ot =.Co Wt. Barbecue ('ON"I t.1("1 ORClothes dryer(gas) Other Business name: 5 � ...5 �,v3/IE('F1.1N1C3L PERMIT FEE'S* Address: Subtotal City/State/ZIP: Minimum permit fee($90.00) . Plan review(25`5o of permit fee) Phone:( ) Fax:( ) State surcharge(12°of permit fee) CCB lie.: °1 35T(YIU, LFERMIfIEE` /, 4, This permit application evinces if a permit is not obta ed rsithin ISO days after it has been accepted is complete Authorized signature: ��..e, ''/ Fee methodology set by tri-County Building Industry Service Board Print name: P01tf1`i 4,etrec&LAI?Y2 Date: Oct) ( 2,7t? I Building Permits.MFC Pel 11111,1pp_010113 doe 440-46171'1 1 111 ("(1st 15L13i Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial & Multi-Family Fee Schedule: Total Valuation: Permit Fee: $0.00 to $500.00 Minimum fee$69.06 $500.01 to$5,000.00 $69.06 for the first$500.00 and $3.07 for each additional$100.00 or fraction thereof,to and including $5,000.00. $5,000.01 to $10,000.00 $207.21 for the first$5,000.00 and $2.81 for each additional$100.00 or fraction thereof, to and including $10,000.00. $10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and $2.54 for each additional$100.00 or fraction thereof, to and including $50,000.00. $50.000.01 to$100.000.00 $1,363.71 for the first$50,000.00 and $2.49 for each additional$100.00 or fraction thereof, to and including $100,000.00. $100,000.01 and up $2,608.71 for the first$100,000.00 and $2.92 for each additional $100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. 1:v,Building\Permits\MEC_PermitApp_040113.doe 2 City of Tigard Ill a COMMUNITY DEVELOPMENT DEPARTMENT I Building Permit Review — Commercial - No Land Use TIGARD Building Permit #: /1-1 --C,,,,20/9 00-5C-S- Site Address: 13O( SW DaY.F►Y10-14- -. Suite/Bldg#: Project Name: Int {yv r I-101u.tG rs- (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: R.-e p a.c& roof-N p ht-VAC, uvt IA" Existing Business Activity: 0Pc ao. , I Proposed Business Activity: N/ Verify site address/suite# exists and active in permit system. River Terrace Neighborhood: El Yes KNo X Zoning: I I-/�°l"',,(( Permitted Use: IK.Yes El No ❑ Spec Space X.Confirm no land use required. Business License: Exists: `I Yes �❑,,`No,applicant notified to obtain business license Notes: eXeMI7± -I (vm SEMII IA41 t 8.1o(O.070 . C-fL Approved by Planning: ( Date: e3/1 I Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: j Site Plans: # - Building Plans: # -2 Building Permit#: Enter building permit#above. Workflow Routing: i-e-Planning ❑ Permit Coordinator [wilding Workflow Sign-off: a-Sign-off for Planning(include notes from planning review) Route Application Documents: —Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: A,,,..j.p. . . _, Date: 1)1/4/(, I:\Building\Forms\BldgPennitRvw_COM_NoLandUse_060116.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal onl` Revision Notice 1: Date Sent t Appli nt: Revision Notice 2: Date Sent to A cant: Revision Notice 3: Date Sent to pplicant: ❑ SDC Fees Entered: Wash • Trans Dev Tax: ❑ Yes ❑ N/A Ti. d Trans SDC: ❑ Yes ❑ N/A 'arks SDC: ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved by Pe Coordinator: Date: I:\Building\Forms\B1dgPermitRvw_COM_NoLandUse_070915.docx