Loading...
Report ,/, ��i1-cif 11• MILLER CONSULTING July 19,2019 ENGINEERS Mr. Aaron Worthen IBI Construction 15420 SE 82nd Dr Clackamas, Oregon 97015 Subject: Cuffel Foundation Condition Assessment Report 11770 SW 90th Avenue,Tigard, Oregon MCE Project Number: 190872 Dear Mr. Worthen: As you have requested, Kevin M McCormick, PE SE of Miller Consulting Engineers, Inc. (MCE)has been asked to review the infill of an abandoned water cistern below the foundation of the new residential addition.Based on the supplied information,this is a bearing wall supporting a one-story wood framed structure. The roof and a portion of the floor bear on this foundation. The design load(DL+SL+FLR LL)from the structure is about 850 plf. The vault can be infilled with a lean concrete mix as long as the existing water is pumped out first. The concrete can be about 2000 psi and is to cure a minimum of 3 days before placing the new concrete foundation. The concrete is to completely fill the existing vault. It is also recommended that(2)#4 x 14'-0"long reinforcing steel be added to the footer (3"clear of bottom)and(1)#4 x 14'-0"long reinforcing steel be added at the top of the stem wall(3"clear of top)for the new foundation for the addition. Center this reinforcing steel on the vault. This area will be the hard spot in the foundation and the reinforcing steel will help redistribute forces. If you have any questions or concerns in this matter,please feel free to contact me. Respectfully, R U T R MiNer �� iac. \ .G11 < \n E 16655PE Kevin M. McCormick, S.E. `y OREGON ooh 0 ?0�'RY 15 2'�0� Managing Principal rl,° �,s• EXPIRES: 12-317- 1 J Engineering Practical, Diverse, Structural Solutions Since 1978 9570 SW Barbur Blvd Suite 100 Portland, Oregon 97219-5412 Phone 15031 246-1250 fax (5031 246-1395 www miller se corn