Loading...
Report (12) RFI 01 Project: Pierce Residence / /D 7� ) ivL From: Joe Rotta Pro.com /711—0291?-COI 8.3 To: MFA I Architecture and Planning 107 SE Washington St.-Suite 227 Portland, OR 97214 RFI: 01 Date: 07/19/19 Subject: Revised sill detail REQUEST: The new stem wall was poured to align with the existing stem wall. Please provide a revised sill detail. RESPONSE: The following response has been reviewed by Greg Munsell, Structural Engineer,WDY Inc: See attached revised detail 1/A4.1. Seth Moran Architect 07/22/19 .c*D *� ,N, 4936 � MICHAEL P.FLOWERS C-2 7/11---"--------- -3 PORTLAND,OR , 1/) O�.# OF NOTES FOR"SILL BOX" 1. RIP VERTICALS AS REQ'D TO ALIGN WITH (E) FLOOR. 2. ATTACH VERTICALS TO SILL PLATE WITH SDWS22300 SCREWS AT 16"O.C. PRIOR TO SETTING SILL(U-SHAPED SET). 3. ATTACH CAP PLATE WITH SDWS22300 SCREWS OR 16D NAILS AT 16"O.C. I, + r1 SOLE PLATE TO SILL BOX; 16d @ 6"OC OUT-TO-IN i CLADDING; I� / 2x"SILL BOX"-SEE NOTES PVC OR METAL STARTER STRIP t W/INSECT SCREEN; li ! 5/8"ANCHOR BOLT WEATHER BARRIER; ___ W/3x3x1/4 PLATE WASHER @ 48"OC SELF-ADHERED PRE-STRIP; q �_ . 3/4"DECKING SHEATHING PT 2x8 DF-L SILL PLATE(2x6 AT SIM) 1 1, W/SILL SEAL N � 'I_ LB212AZ HANGER TO FULL WIDTH PT PLATE; a �> p•� " �e1 W/SELF-ADHERED VAPOR BARRIER -a I- II ` -1i -,er Imo <'' #4 VERTICAL @ 48"OC MAX; I ° - ALTERNATE HOOK DIRECTION AT FOOTING DAMP : "i CO PROOFING 1J• 4 e GRADE - - " #4@18"OC _ _ = I ° - .'9 • #4 TOP&BOTTOM OF STEMWALL 1=III-III=III—II ` -, io — -IIIIIH — — ,. I1111 •" _ -- II 11=1 I 1—I 11=1 I I .. z -III—III—III—III ` ;'N'' =1 I I=1 I I=I (2)#4 W/3"COVER z 1=III=III=1 I I -11 I - .a_;- -I„1=11 6E I I—I I I—III a - , .2---:-7.-- 11— • FOOTING DRAIN 4” 8" 4" 16" OFOUNDATION - RFI #1 1"= 1'-0" MFA PIERCE RESIDENCE ADDITION REF: 1 I A4.1 PROJECT 19009 107 SE WASHINGTON 11075 SW ERROL ST DATE 07/22119 SUITE 227 PORTLAND,OR 97214 ASK-RFI#1