Loading...
Report (19) giepZ16— Ovz 6 1 .CIVIL•PLANNING•SURVEY•LANDSCAPE 'o ��.`1 l r L P503.643898Ei 'nptigrp.corn 9020 SW Washington Square Rd Suite 170 PIONEER DESIGN GROUP, INC. Porland.Oregrrn97223 July 30, 2019 Mr. Scott McLain The William Warren Group, Inc. 959 South Coast Drive, Suite 350 Costa Mesa, CA 92626 RE: Storquest Self Storage—Tigard, Oregon Engineer's Construction Completion Certification Dear Scott: I do hereby certify that the public improvements associated with the above referenced project have been inspected under my supervision. In these inspections, I, or people under my supervision, have determined that the improvements have been constructed in accordance with the plans and specifications as approved by the City of Tigard and have been accomplished in accordance with the provisions of the effective Community Development Code and the Conditions of Approval. Furthermore, I certify that the private site improvements relative to the civil engineering elements and systems have been constructed in accordance with the final construction plans. Sincerely, Pioneer Design Group,Inc. c.-"C? .8; Luke R. Lappin, P.E. Senior Project Manager Cc: File Pare 11