Loading...
Specifications C/S- (L.," C63 C-ZIRik-k-Als- SA • GREEN MOUNT-11111N structural engineering N.g 1 STRUCTURAL CALCULATIOia Plan 2885 Elderberry Ridge, Lot 38 Tigard, Oregon Contractor: Riverside Homes P R O °pen NE.4.A j 49 SPE r- OREGON o Oft • Mtral- [EXPIRES Project Number: 17485 November 8, 2018 Index Structural Information Lateral Analysis L-1 thru L-15 greenmountainse com-infoggreenmountainse com-4857 NW Lake Rd..Suite 260.Camas,WA 98607 GREEN MOUNTIIIN structural engineering STRUCTURAL DESIGN INFORMATION GOVERNING CODE: 2015 International Residential Code(IRC) 2015 International Building Code(IBC) This engineering pertains to the design of the Lateral Force Resisting System and a review of the home designer's framing and foundation plans. The home designer is responsible for making any necessary changes as required by these calculations to their framing and foundation plans. 1. Dead Load: A. Roof 15 psf B. Floor 10 psf C. Exterior walls 10 psf D. Exterior walls with veneer 50 psf E. Interior walls with gypboard each side 5 psf 2. Live load: A. Floor 40 psf B. Decks&Balconies 60 psf 3. Snow load: A. Uniformly distributed snow load on roof 25 psf 4. Wind load-based on ASCE 7-10 CH 27 MWFRS Directional Procedure: A. 3 Second Gust Wind Speed V=126 mph B. Exposure B C. Importance factor I=1.0 D. Topographical Factor Kzt=1.0 E. Wind Directional Factor Kd=0.85 F. Structure classified as enclosed 5. Seismic load-based on ASCE 7-10 Section 12.14: A. Mapped Spectral Acceleration for short periods Ss=1.0 B. Mapped Spectral Acceleration for 1 second period S1A.34 C. Soil Site Class ...D D. Ductility coefficient R=6.5 E. Seismic Design Category D 6. Foundation Soil Properties: A. Undisturbed sandy silt per IBC 2015 Table 1806.2 Soil Class#5 B. Maximum vertical bearing pressure 1500 psf 7. Retaining wall lateral loads: A. Walls free to displace laterally at top 40 pcf B. Walls restrained against lateral displacement at top 45 pcf 8. Concrete: A. 28 day design strength F'c 3000 psi B. Reinforcing bars ASTM A615,Grade 60 greenmountainse.com-info@greenmountainse.com-4857 NW Lake Rd.,Suite 260,Camas,WA 98607 GREEN MOUNTVIIN PROJECT: Riverside - 2885 ilif structural engineering DATE: 12/4/2017 BY: CM JOB NO: 17485 SHEET: L-1 LATERAL SEISMIC DESIGN BASED ON ASCE-7-10 16175 Simplified analysis procedure for seismic design of buildings 1.2•SDs SEISMIC BASE SHEAR V:= R W (EQ.12.14-11 with F=12) SS mapped spectral acceleration for SS:= 1.00 short periods(Sec.11.4.1) from USGS web site SS mapped spectral acceleration for Si := 0.34 1 second period(Sec.11.4.1) Fa Site coefficient(Table 11.4-1) Fa' 1.1 Based on Soil FV 1 b Site Class D F, Site coefficient(Table 11.42) SMs:= Fa•Ss SMs= 1.1 (Eq.11.4-1) SM1:= FvSi SM1= 0.61 (Eq.11.4-2) 11.4.43 Design spectrum response acceleration parameters 2 SDs:= 3 SMS SDs= 0.73 > 0.50g SEISMIC 2 CATEGORY SDi:= 3•SM1 SDS= 0.41 > 0.20g D per Table 11.6-1 WOOD SHEAR PANELS 1.2•SDs R:= 6.5 Table 9.52.2 V:_ •W R 1.2.0.73 V:_ •W V:= 0.135•W 6.5 12.4 Seismic La act COMbtllattons E:= 1.3•V (Eq.12.4-3 with redundancy factor=13 per 12.3.42) WSD:= 0.7•E 0.7.1.3.0.135•W 0.123•W WOOD SHEAR PANELS PI GREEN MOUNTMIN PROJECT: Riverside - 2885 Ile structural engineering DATE: 12/4/2017 BY: CM JOB NO: 17485 SHEET: L-2 LATERAL SIMPLIFIED WIND AND SEISMIC COMPARISON WIND 7.4 111111 psf psf Wind ease 1111 Shear Length L:= 52-ft Height Ht:= 24•ft WIND:= L•Ht.(11•psf + 7.4•psf) SEISMIC WIND= 22963.2 lb Fr + Wroof F2 Wfloor Seismic Wwal I Sase Shear Aroof:= 52 ft 40 ft Aro = 2080ft2 p" = 43ft40ft door= 1720ft2 ' noor• Wwal�s:= 4 52 ft 20 ft Wwalls= 4160ft2 SEISMIC:_ (Aroof•15•psf + Afhr•15•psf + Wwa ls•10•psf)•0.123 SEISMIC= 12127.8 lb WIND GOVERNS DESIGN GREEN MOUNThIN PROJECT: Riverside - 2885 11111, structural engineering DATE: 12/4/2017 BY: CM JOB NO: 17485 SHEET: L-3 LATERAL WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE VELOCITY PRESSURE qZ:= .00256•KZ•KZt•Kd•V2•I (Eq.6-15) EXPOSURE B WIND SPEED(3 second gust) Vas:= 126 mph IMPORTANCE FACTOR I:= 1.0 TOPOGRAPHICAL FACTOR KZt:= 1.0 WIND DIRECTIONAL FACTOR Kd:= 0.85 (Table 6-4) EXPOSURE COEFFICIENT 0'-15' KZ:= 0.57 qz:= .00256•lc.Ice.•Kd•V3s2•I qZ= 19.69 (varies/height) 15'-20' KZ:= 0.62 qz:= .00256•KZ•KZt•Kd-V3,2•I qZ= 21.42 20'-25' KZ:= 0.66 qz:= .00256•KZ•KZt•Kd•V3s2•I qZ= 22.8 25-30' KZ:= 0.70 qZ:= .00256•KZ•Krt.•Kd V3s2•I qZ= 24.18 GREEN MOUNTIIIN PROJECT: Riverside - 2885 structural engineering DATE: 12/4/2017 BY: CM JOB NO: 17485 SHEET: L-4 LATE RAL WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont. WIND PRESSURE P:= gz•G•Cp G:= 0.85 Gust factor CP coefficient coecient AT WALLS For Working Stress Design Multiply WIND PRESSURE by 0.6 per IBC 1605.3.1 0'15' WINDWARD PW:= 12.4•psf•0.85.0.8 Ps.,= 8.43 psf LEEWARD PL := 12.4•psf•0.85.0.5 PL = 5.27 psf 15-20' WINDWARD PW:= 13.49•psf•0.85.0.8 PW= 9.17 psf LEEWARD PL:= 13.49•psf•0.85.0.5 PL = 5.73 psf 20'-25' WINDWARD PW:= 14.36•psf•0.85.0.8 PW= 9.76 psf LEEWARD PL := 14.36•psf•0.85.0.5 PL = 6.1 psf AT ROOF 01 WINDWARD PW:= 12.4.psf•0.85.0.3 PH,= 3.16 psf LEEWARD PL:= 12.4•psf•0.85.0.6 Pt = 6.32 psf 15-20' WINDWARD PW:= 13.49.psf•0.85.0.3 PN,= 3.44 psf A-- - . - - - WARD— PL r- 13.49•psf•0.85.0.6 PL.= 6.88 psf 2O'-25' WINDWARD PN,:= 14.36•psf•0.85.0.3 PH,= 3.66 psf LEEWARD PL:= 14.36•psf•0.85.0.6 PL = 7.32 psf 25-30' WINDWARD PW:= 15.23.psf•0.85.0.3 P,,= 3.88 psf LEEWARD PL := 15.23•psf•0.85.0.6 PL = 7.77 psf ft GREEN MOUNTIAIN PROJECT: Riverside - 2885 structural engineering DATE: 12/4/2017 BY: CM JOB NO: 17485 SHEET: L-5 LATE RAL WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont. Assume 3-44 6.88 Cp-0.3 psf psf A := 35 r Cp--0.6 8ft 9.17 6.1 Psf psf 9 ft Mean Roof Height 18+ 22 = 20 2 Loads at Roof roof-ave Windward 3.44•psf•5.5•ft= 18.92 plf Leeward 6.88•psf•5.5•ft= 37.84 pIf Wall loads at upper level at main level Windward 8.43psf•4•ft= 33.72p1f 8.43•psf•8.5•ft= 71.66pIf Leeward 5.73•psf.4•ft= 22.92pIf 5.73•psf•8.5•ft= 48.71pIf 1 A 9 Roof A Otv11sv) el YWr rT -I- n L-6 I r + iI I II III I I II i tl {11 / I I Ii 1''II I1 I i II II I I II • I PRE. MFG. - -,8 0 24" O.9. Ln IS _ ❑ d ' TRUSS i'ir-�n++►�!♦!l�1'•♦♦•: -i." i'• +�+l+!''+"ilitvp, r li/� i�liliiii♦i l.o_�l+==+j ii ilk.40/i!li//•!!! !.. ,•.. ♦ ••• ••••••;'•'i l4•+P•--Jlili• l4.4 Ill, /14►ii+�► • ►•:►!+lilies/f/A . 41,e...**************!+!!, •lv/ili '". . ••►+ li�•i•i•••., d 11 ♦ !lliilii4/ ►l11�1lllillliilili4i►l aIt--. a 14 !iliiii!l/i•l414l4I••••liii ,. i • l e 1. •i+l....44.II••/l+!!ill•41 ,� .'�l+i +... .." !►ii!,i!l/i+i/ic' ' 0 i121E1 i lili•l+iliii! .3' 4+ili•iii►+.,s...,_ � dr... j 4, •• +- ❑ 40' �i�: ❑ ❑❑ ❑ i ❑ •ii r ■ lei - Root .• lii . il•i4ili, ilii/il , ri4 !i!� i�ii•►il4►/l•i4 t*!• •!t►!•l•ill�, a illi+ 4;1, !4!!.'!il••i, rill•►lUi4R►l•ll•!!ii i ••••••4 • /!!/l•!••4'. i +ll!•►l1►it4i1liliili l►. /4••l+•••••ilk►i!�t•.4N.I:i/liilll+llil++ii:'!•lig, �fililllil�:►.i 1;1�'a, lili*"4PPiliiii/l4li.*• /1lt••••!•"-'1'247'4. •••l ►l ll•4."4".P•••••••••ii i�!llililli•-•lll�& 4�tlil�llit.i.••-•-•24P!lV PV4lilllil�, m ❑ —— 0_�- - I SES 0 24 G.C. J► __ � -� �. - ;+rio �1! ..L.F �� ❑ . . . • M� ,_. gent Po1E A F® 1� ROOF Tei: 101.110 . Y7 ESTE T,E AT • 0245O.C. ® pCMPRE. MFG. W/ 7'-E' RAI- iTRUSSES4 O 24' 0,0. :Li!'-6 RAISED C I1otit1 401 h 17 'I 10 459 F Old 00:19 OCOL OX$O9 'N016 COX Cf O9 E,1 .I 4 I 7 - . --, ---3 WOOaa38 33>slNl Ilr i 19Q021Q38 1341 • 7 i S�Pd _ �� n i I- � , 0 c r I -3�sr�ti ; 0 Z t 1 5�9d 1. J1> y �� swPd 'F- �J r--,r, ' I i ..) E c .,/argNnvl� ' 11 _ I '- a 1E1 (-1Q � i II. I .."-r)" S-414,.. ;- rr01"3 1 I / II C•••••-. IT 1.1a G i s t I ((MM t OMl T woolac 3fa i wo0ao3 EII —1a�svw , 11 m 5VPI I I III I I III I I In I I a El a %`�f ; Slfd 1 • ��— 4 I /— I 41 LiAl -Itqt,Crd'ti L-1 'off C►of el d►rVA • j3/41.4 Ve4CoLd L-8 of LO ... 14016 2eit� 3 _ - r 1 11 sm i DINING + I IROOM GREAT �s@I ROOM I c OFFICE ' U \,._II ■ ff v I 1 I TYPIAL ST R r-}I OETAA I'l II I1 1 I II L= GREEN MOUNThIN PROJECT: Riverside - 2885 structural engineering DATE: 12/4/2017 BY: CM JOB NO: 17485 SHEET: L-9 LATE RAL SHEAR WALL DESIGN PdI PdI Wdl 4, L Y I p (0 P:= wind V:= seismic h R=Holdown Force Based on 2012 IBC Basic Load Combinations 1605.31 0.6D+ W (Equation 16-11) 0.6•D+ 0.7•E (Equation 16-12) Overturning Moment: Mot:= P•h L2 Resisting Moment: Mr:= 0.6•(Wdi + Wwafl)•(2 + 0.6•Pdi•L Mot— Mr Holdown Force R L GREEN MOUNTAIN PROJECT: Riverside - 2885 structural engineering DATE: 12/4/2017 BY: CM JOB NO: 17485 SHEET: L-10 LATE RAL Left Elevation Exterior Walls Second Level Wind Force P:= 2260•Ib P= 22601b Length of wall L:= 5•ft+ 4•ft+ 19•ft L= 28ft P Shear v:= - v= 80.71 plf A 5 Overturning Mot:= P•8•ft 28 Mot= 3228.57Ib.ft Moment (5•ft)2 Resisting Mr:= 0.6•(15-psf•2•ft+ 10•psf•8•ft)• + 0.6.600•Ib•5•ft 2 Moment Mr= 2625Ib•ft Mot- Mr Holdown = 120.71 lb Force 5ft Main Level Wind Force P:= 4660•Ib P= 4660 lb Length of wall L:= 14•ft + 10-ft+ 8-ft L= 32ft P Shear v:= - v= 145.63 plf 5 8 Overturning Mot:= P•9-ft 32 Mot= 10485lb•ft Moment 2 Resisting Mr:= 0.6•(15•psf•2•ft+ 10•psf•17•ft) (840 + 0.6.800•Ib•8•ft 2 Moment Mr= 7680Ib•ft Mot- Mr Holdown 8-ft = 350.63 lb Force GREEN MOUNThIN PROJECT: Riverside - 2885 structural engineering DATE: 12/4/2017 BY: CM JOB NO: 17485 SHEET: L-1 LATE RAL Front Elevation Exterior Walls Second Level Wind Force P:= 2373-lb P= 2373 lb Length of wall L:= 3.5-ft+ 3-ft+ 3.5-ft+ 3.5•ft L= 13.5ft P Shear v:= L v= 175.78 plf 3.5 Mot= 4921.78 lb•ft Moment Overturning Mot:= P•e•ft•— 13.5 (3.5•ft)2 Resisting Mr:= 0.6•(15•psf•4•ft+ 10•psf•8•ft)• + 0.6.600•Ib•3.5•ft 2 Moment Mr= 1774.5 lb•ft Mot- Mr Holdown = 899.22lb Force 3.5 ft MSTC48B3 Main Level Wind Force P:= 2988•lb P= 2988lb Length of wall L:= 2.25•ft+ 2.25•ft+ 1.5•ft+1.5•ft L= 7.5ft 2.25.3.5= 7.88 P v= 398.4 plf D Shear Ndnd V:= — p 2.25 Overturning Mot:= P•7.88•ft• 75 Mot= 7063.63lb•ft (2.25•ft)2 Resisting Mr:= 0.6•(15•psf•4•ft+ 10•psf•8•ft)• + 0.6.800•Ib•2.25•ft 2 Moment Mot Mr Mr= 1292.631b•ft Holdown = 2564.89 lb Force 2.25•ft HITS GREEN MOUNTIIIN PROJECT: Riverside - 2885 structural engineering DATE: 12/4/2017 BY: CM JOB NO: 17485 SHEET: L-12 LATERAL Right Elevation Exterior Wal Is second Level Wind Force P:= 2260.lb P= 2260 lb Length of wall L:= 8•ft+ 5•ft+ 4•ft L= 17ft P Shear v L v=132.94 plf A := 4 Mot= 4254.12lb•ft Overturning Mot:= P'8.ft'.17 Moment (4,ft)2 Resisting Mr:= 0.6•(15•psf•2•ft+ 10•psf•8•ft)• + 0.6.600•Ib•4•ft 2 Moment Mr= 1968Ib•ft Mot- Mr Holdown 4 ft = 571.53 lb Force Main Level Wind Force P:= 4660•Ib P= 4660 lb Length of wall L:= 15-ft+ 8-ft+ 3-ft L= 26ft P v= 179.23 If B Shear v:_ — p 8 Overturning Mot:= P•9•ft•26 Mot= 12904.62lb-ft Moment (84'02 Resisting Mr:= 0.6•(15•psf•2•ft+ 10•psf•17•ft) + 0.6.800•Ib•8•ft 2 Moment Mr= 7680lb-Ft Mot- Mr Holdown 8•ft = 653.08 lb Force GREEN MOUNThIN PROJECT: Riverside - 2885 structural engineering DATE: 12/4/2017 BY: CM JOB HO: 17485 SHEET: L-13 LATERAL Rear Elevation Exterior Walls Second Level Wind Force P:= 2373•Ib P= 2373lb Length of wall L:= 7.5•ft + 11•ft+ 4•ft L= 22.5ft P Shear v:= - v= 105.47 plf A 7.5 Mot= 63281b•ft Moment Overturning Mot:= Pb —• •ft• 22'5 (7.5•ft)2 Resisting Mr:= 0.6•(15•psf•2•ft+ 10•psf•12•ft)• 2 + 0.6.600•Ib•7.5•ft Moment Mr= 5231.25lb•ft Mot- Mr Holdown = 146.23 lb Force 7.5•ft Main Level Wind Force P:= 3813•Ib P= 3813 lb Length of wall L:= 6•ft+ 7•ft+ 4•ft L= 17ft P S Shear Wind v:_ — v= 224.29plf 4 Overturning Mot:= P•9•ft 17 Mot= 8074.59 lb-ft - (4•ft)2 •8 Resisting Mr:= 0.6•(15•psf•4•ft+ 10•psf •ft) + 0.6.800•Ib 4•ft 2 Moment Mot Mr Mr= 2592 Ib•ft Holdown 4 ft = 1370.65 lb Force HTT5 GREEN MOUNTVIIN PROJECT: Riverside - 2885 structural engineering DATE: 12/4/2017 BY: CM JOB NO: 17485 SHEET: L-14 LATERAL Interior Shear Walls at back of Garage Main Level Wind Force P:= 4069.1b P=40691b Length of wall L:= 18•ft L= 18ft P S Shear Wind v:= - v= 226.06pif Overturning Mot:= P•9•ft Ma= 36621 Ib•ft Moment (18•ft)2 Resisting Mr:= 0.6•(10•psf•12•ft+ 10•psf•9•ft)• + 0.6.1200•lb•18•ft 2 Moment Mot- Mr = 33372Ib•ft Holdown = 180.51b Force 18•ft L. GREEN MOUNTMIIN PROJECT: Riverside - 2885 *OP structural engineering DATE: 12/4/2017 BY: CM JOB NO: 17485 SHEET: L-15 LATE RAL WIND ON PORCH ROOF 126 MPH,EXP 6 w:= 6•ft•(4.43•psf + 8.86•psf) w= 79.7 plf t a ` \ II II / II II II / ii w iI M II IIT ` IIII II 11 id .,....,,-- v I) i I.,________,... / I DESIGN ROOF TO CANTILEVER FROM HOUSE L:= 10•ft D:= 11-ft w•L2 M:= - M= 3987lbft 2 support beam on post in wall at house with M Simpson HUCQ-SDS C:= L T:= C C= 398.7 lb 12 SDS 1/4x21/4 screws(min)x 172 lbs=2064 in combined withdraw w•L Nail top and bottom chord of first truss to wall with v:= — v= 72.49 plf (2)16d nails at 16"o.c.(web to studs) D ei