Permit CITY OF TIGARD MASTER PERMIT
.H. COMMUNITY DEVELOPMENT Permit#: MST2019 00235
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/16/2019
Parcel: 1 S 136AA00900
Jurisdiction:
Site address: 7015 SW OAK ST
Subdivision: None Lot: None
Project: Johnson
Project Description: Constructing a 16x32 pole building for storage. Per CWS, erosion control is not required.
BUILDING
Floor Areas Required Setbacks Required
Stories: 0 Bedrooms: 0 First: 0 sf Basement: 0 sf Left: 5 Parking Spaces: 0
Height: 15 Bathrooms: 0 Second: 0 sf Garage: 0 sf Front: Smoke
Dwelling Units: 0 Third: 0 sf Right: 5
Detectors: No
Total: 0 sf Value: $10,000.00 Rear: 5
PLUMBING
Sinks: 0 Water Closets: 0 Washing Mach: 0 Laundry Trays: 0 Rain Drain: 0 Urinals: 0
Lavatories: 0 Dishwashers: 0 Floor Drains: 0 Sewer Lines: 0 SF Rain Storm Sewer: 0
Drains: 0
Tubs/Showers: 0 Garbage Disp: 0 Water Heaters: 0 Water Lines: 0 Catch Basins: 0
Bckflw Prevntr: 0
Footing Drain: 0 Ice Maker: 0 Hose Bib: 0 Backwater Value: 0
Other Fixtures: 0
Drywell-Trench Drain: 0
Other Fixture Units:
MECHANICAL
Fuel Types Air Conditioning: N Vent Fans: 0 Clothes Dryers: 0
Heat Pump: N Hoods: 0 Other Units: 0
Furn<100K: 0 Vents: 0 Woodstoves: 0 Gas Outlets: 0
Furn>=100K: 0
ELECTRICAL
Residential Unit Service Feeder Temp Srvc/Feeders Branch Circuits
1000 sf or less: 0 0-200 amp: 0 0-200 amp: 0 W/Svc or Fdr: 0
Ea add]500 sf: 0 201-400 amp: 0 201-400 amp: 0 W/O Svc/Fdr: 0
Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0
601-1000 amp: 0 601+amp-1000v: 0
1000+amp/volt: 0
ELECTRICAL-RESTRICTED ENERGY
SF Residential
Audio&Stereo: N HVAC: N Security Alarm: N Vaccuum System: N Garage Opener: N All
Other: N Other Description: Ecompasing: N
BUILDING INFO
Class of Work: Type of Use: Type of Constr: Occupancy Group: Square Feet:
ACS SF VB R-3 0
Owner: Contractor:
HUBBARD G STREET PROPERTY LLC J&H HOME IMPROVEMENTS Required Items and Reports(Conditions)
1275 HIDE AWAY LN 34730 NW HORNECKER RD
LAKE OSWEGO,OR 97034 HILLSBORO,OR 97124
PHONE: 503-636-1279 PHONE: 971-409-9156
FAX:
Total Fees: $509.67
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if wor • suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification .Center. Th,se ' les are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 50 . .1987 or 1.8t o 2. -,�.
Issued By: �_=J Permittee Signature: z - ,��
-
=9.4175 by 7:00 a.m.for the next available inspection da e.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application Checklist
One- and Two-Family Dwelling FOR OFFICE USE ONLI
City of Tigard
Received
• Date/By: Permit No.:
13125 SW Hall Blvd.,Tigard,OR 97223 Associated permits:
Phone: 503.718.2439 Fax: 503.598.1960
24-Hour Inspection Line: 503.639.4175 0 Electrical 0 Plumbing 0 Mechanical
r I c.AR l) Internet: www.tigard-or.gov 0 Other:
THE FOLLOWING ITEMS ARE REQUIRED FOR PLAN REVIEW 1 e No N/:k
1 Land use actions completed. See jurisdiction criteria for concurrent reviews. 0 0 0
2 Zoning. Flood plain,solar balance points,seismic soils designation,historic district,etc. 0 ❑ 0
3 Verification of approved plat/lot. ❑ 0 0
4 Fire district approval required. Name of district: ❑ 0 0
5 Septic system permit or authorization for remodel. Existing system capacity ❑ 0 CI
6 Sewer permit. 0 ❑ ❑
7 Water district approval. 0 ❑ ❑
8 Soils report. Must carry original applicable stamp and signature on file or with application. ❑ ❑ 0
9 Erosion control 0 plan 0 permit required. Include drainage-way protection,silt fence design and location of catch- ❑ ❑ 0
basin protection,etc.
10 3 Complete sets of legible plans. Must be drawn to scale,showing conformance to applicable local and state 0 0 ❑
building codes. Lateral design details and connections must be incorporated into the plans or on a separate full-size
sheet attached to the plans with cross references between plan location and details. Plan review cannot be completed if
copyright violations exist.
11 Site/plot plan drawn to scale. The plan must show lot and building setback dimensions;property corner elevations(if El ❑ 0
there is more than a 4-ft.elevation differential,plan must show contour lines at 2-ft.intervals);location of easements
and driveway;footprint of structure(including decks);location of wells/septic systems;utility locations;direction
indicator;lot area;building coverage area;percentage of coverage;impervious area;existing structures on site;and
surface drainage.
12 Foundation plan. Show dimensions,anchor bolts,any hold-downs and reinforcing pads,connection details,vent size 0 0 ❑
and location.
13 Floor plans. Show all dimensions,room identification,window size,location of smoke detectors,water heater, 0 ❑ 0
furnace,ventilation fans,plumbing fixtures,balconies and decks 30 inches above grade,etc.
14 Cross section(s)and details. Show all framing-member sizes and spacing such as floor beams,headers,joists,sub- ❑ ❑ ❑
floor,wall construction,roof construction. More than one cross section may be required to clearly portray
construction. Show details of all wall and roof sheathing,roofing,roof slope,ceiling height,siding material,footings
and foundation,stairs,fireplace construction,thermal insulation,etc.
15 Elevation views. Provide elevations for new construction;minimum of two elevations for additions and remodels. ❑ ❑ 0
Exterior elevations must reflect the actual grade if the change in grade is greater than four foot at building envelope.
Full-size sheet addendums showing foundation elevations with cross references are acceptable.
16 Wall bracing(prescriptive path)and/or lateral analysis plans. Must indicate details and locations;for non- 0 ❑ ❑
prescriptive path analysis provide specifications and calculations to engineering standards.
17 Floor/roof framing. Provide plans for all floors/roof assemblies,indicating member sizing,spacing,and bearing ❑ 0 0
locations. Show attic ventilation.
18 Basement and retaining walls. Provide cross sections and details showing placement of rebar. For engineered ❑ ❑ 0
systems,see item 22,"Engineer's calculations."
19 Beam calculations. Provide two sets of calculations using current code design values for all beams and multiple joists ❑ ❑ ❑
over 10 feet long and/or any beam/joist carrying a non-uniform load.
20 Manuc-ured floor/roof truss design details. 0 ❑ ❑
21 Energy Code compliance. Identify the prescriptive path or provide calculations. A gas-piping schematic is required 0 ❑ 0
for four or more appliances.
22 Engineer's calculations. When required or provided,(i.e.,shear wall,roof truss)shall be stamped by an engineer or ❑ 0 ❑
architect licensed in Oreton and shall be shown to be a..licable to the Iro'ect under review.
JURISDICTIONAL SPECIFICS
23 Three(3)site plans are required for Item 11 above. Site plans must be 8-1/2"x 11"or 11"x 17". ❑ ❑ ❑
24 Two(2)sets each are required for Items 16, 19,20 and 22 above. ❑ ❑ ❑
25 Building plans shall not contain red lines or tape-ons. "Mirrored"building plans will not be accepted. 0 0 ❑
26 "Reversed"building plans must meet criteria outlined in the Permit&System Development Fees document. ❑ ❑ ❑
27 "Drawn to scale"indicates standard architect or engineer scale. 0 ❑ 0
28 Site plan to include tree size,type and location per approved project street tree plan(if applicable),and City of Tigard 0 0 ❑
Street Tree List.
29 Site plan to include trees and tree protection measures as required by conditions of approval. Tree locations,driplines, ❑ ❑ ❑
and protection measures must be drawn to scale and must include the project arborist's signature of approval.
30 A Clean Water Services'Sensitive Area Pre-Screening Site Assessment form is required for all building additions, 0 ❑ ❑
including decks,patio covers(over non-impervious surface)and accessory structures to existing residential dwellings
on a lot of record approved prior to September 9, 1995.
I:\Building\Permits\BUP-RESPermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB)
Julie Drinkwater
From: margie johnson <margieanddave@yahoo.com>
Sent: Monday,July 15, 2019 7:31 PM
To: Julie Drinkwater
Subject: Re: MST2019-00235, 7015 SW Oak,Johnson
Follow Up Flag: Follow up
Flag Status: Flagged
Caution! This message was sent from outside your organization. Allow sender I Block sender
Hi Julie,
We have decided on our contractor, it will be J&H Homes LLC, OR CCB 196906. Please let me know when
this goes through and I will go online and pay for the permit.
Thank you for all your help,
Margie
On Jun 24, 2019, at 8:58 AM,margie johnson<margieanddave@yahoo.com>wrote:
Thanks Julie,
Sorry,just want to clarify. Do I have up to 180 days to actually issue the permit and then another
180 days for the permit to stay active? Or is the 180 days the entirety of the permit process?
Thanks!
Margie
On Jun 24, 2019, at 8:50 AM, Julie Drinkwater< JulieD@a tigard-or.gov> wrote:
Good morning Margie
The permit was made ready to issue on June 13, 2019. We will be able to issue
the permit for you up to 180 days from that date, without the permit expiring.
Thank you and please let us know if you have any questions.
Julie Drinkwater
Permit Technician
City of Tigard Building Department
13125 SW Hall Blvd
Tigard, OR 97223
503-718-2804
1
City of Tigard
COMMUNITY DEVELOPMENT DEPARTMENT
III 111
T 1 c A R)J Building Permit Review — Residential
IP
Building Permit #: S l c7 CU, S
Site Address: 0/S-' ?/Q Cak 2•727-4,4-
Project
Project Name: 1.711.ceptncesdue ,-e Lot #:
(New dwelling=subdivision name;Ad i' n or Alteration=last name of owner)
Planning Review
Pro sal: itic/2 th .7C' ssb ` a21('
17 Verify address/suite#active in Accela. ON River Tei? NJ No
El Yes,River Terrace Review Addendum
Si. I.
t Plan Elements: IPI ,-sion Control
0�,33'copies of site plan on 8-1/2"x 11"or 11 x 17"paper i1J • ained trees with drip line and tree protection measures
[ISD awn to scale(standard architect or engineer scale) 0..tprint of new structure(including decks)and FFE
IV orth arrow Iii t', -ty locations&easements(required for new and additions)
IS}te address,project or subdivision name and lot number AA Sidewalk/driveway approach
I )plicant information(name and phone number) 1C .cation of wells/septic systems
X . dimensions and building setback dimensions00'4,eet tree size,type and location
•�,uare footage of buildings to be demolished 7 Street names
J Existing structures on site r orner elevations(2'contours if more than 4'differential)
F! '.,t area,building coverage area,percentage of coverage and >1,000 sf of impervious area created or replace.? ❑Yes
- ..ervious area(applicable if R-7,R-12,R-25&R-40) If yes,is a storm water quality facility shown? l•Yes o
►► Clean Wate,r..,�rvices—Service Provider Letter(lot platted prior to 9/10/1995): (,ff , .-�///,,,
1Required: LJ Yes,applicant was notified ❑ No Received: Yes {U No
ublic Facilities Improvement(PFI) Permit:
Required: ❑ Yes,applicant was notified 4: No Applied For: ❑ Yes ❑ No,stop intake
1 and Use Case#: _ ❑ Zoning:
wquired Setbacks: Front �II7i� Rear: Side: S--: - Street Side: ' Garage: 1
ilding Height: Max. Height: Actual Height: /
Landscape Area: % of Coverage Max: /
Entrance ;- back no more than 8'from street-facing wall ❑ Parallel to street or of - • degrees or less
Windows ❑ Minim 00 of area of all street-facing facades
Garage CI Garage door is be . ;4 est street-facing wall V ❑ ❑ No,one of the following is met:
❑ Door extends no more . _' rom wall and .- - is a covered porch extending beyond garage:
❑ Door extends no more than 5'fro,. .. . d there is a 12 sq ft.window above garage on 2nd floor.
❑ Garage door width is ❑ ' . ess ❑ 50%or e : facade ❑ 60%or less and includes 7 of following:
❑ Covered .. ■ Recessed entrance ❑ Wall offset ■ 1'Roof eave ❑ Roof offset
-_`R ::. ,; . .ir' Nio pt c ■ a. e, p, : brel roof ❑ Dormer
❑ Accent siding ! Window trim El Window recess El Window pro` ,'.n ❑ Balcony
��� isual Clearance 41 rban Forestrryy an
�' -nsitive Lands: El Yes
C1G o Type:
I onditions met prior to issuance of building permit
Approved By Planning: -a ' Date: ____,,,4441_
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
I:\Building\Forms\BldgPermitRvw RES 022819.docx
Building Permit Submittal
Original Submittal Date: 6
Site Plans: #
Building Plans: #
Building Permit#: Enter building permit#above.
Workflow Routing: Planningngineering L�rl9trmit Coordinator Building
Workflow Sign-off: ign-off for Ifnning(include notes``from planning review)
Route Application Documents: [""Engineering: (1) copy of permit application, (1) site plan, (1) building plan and
original plan review routing form.
Building: original permit application,site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes: 0 '7
_ /
By Permit Technician: ,<IaI /,4 ,e;�j�;L/ Date: 6'
Engineering Review
Ei Slope at building pad: 3
a
4 Conditions "Met"prior to nuance of building permit
LJ Easements (encroachments)per engineering conditions of approval and plat
Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: ❑ Yes 1/No
Assess Water Quantity Fee in-lieu: ❑ Yes Z/N o
Facility on lot: 111 Yes l No
z Final PlLIDAat.Recorded:
❑ NOT Approved by Engineering: Date:
Notes:
r1 Approved by Engineering: / Date: ca p z/2d/ 9
Revisions (after Building Submittal only) ' Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Permit Coordinator Review
❑ Conditions"Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
inion Notice 3: Date Sent to Applicant:
SDC Fees Entered: Wash Co Trans Dev.Tax: es /A
Tigard rd Trans SDC: ❑ Yes l�'N/A
Parks SDC: ❑ Yes 11(>10
LIDA ❑ Yes N/A
OK to Issue Permit
Approved by Permit Coordinator: igH7-Date:
(-'1'/
I:\Building\Forms\BldgPennitRvw_RES 022819.docx