Loading...
Report (57) COM check Software Version 4.1.1.0 Interior Lighting Compliance Certificate RECEIVED Section 1: Project Information MAR 202019 Energy Code:2014 Oregon Energy Efficiency Specialty Code Project Title:Twality Middle School CITY OF TIGARD Project Type:Addition BUILDING DIVISION Construction Site: Owner/Agent: Designer/Contractor: Tualitin,OR Section 2: Interior Lighting and Power Calculation A B C D Floor Area Allowed Allowed Watts Watts/ft2 Remodeled Middle School(School/University) 142000 1.01 143420 Total Allowed Watts= 143420 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Remodeled Middle School(School/University 142000 sq.ft.) LED 1:L1-12:LINEAR:Other: 1 120 96 11520 LED 2:L1-14:LINEAR:Other: 1 3 112 336 LED 3:L1-20:LINEAR:Other: 1 15 160 2400 LED 4:L1-24:LINEAR:Other: 1 13 192 2496 LED 5:L1-26:LINEAR:Other: 1 1 208 208 LED 6:L1-27:LINEAR:Other: 1 2 216 432 LED 7:L1-28:LINEAR:Other: 1 40 224 8960 LED 8:L1-32:LINEAR:Other: 1 4 256 1024 LED 9:L2-2:LINEAR:Other: 1 9 14 126 LED 10:L2-4:LINEAR:Other: 1 276 28 7728 LED 11:L2A:LINEAR:Other: 1 33 112 3696 LED 12:L2B:LINEAR:Other: 1 10 28 280 LED 13:L2C:LINEAR:Other: 1 61 28 1708 LED 14:L3-1:LINEAR:Other: 1 4 7 28 LED 15:L3-8:LINEAR:Other: 1 4 56 224 LED 16:L4:REC 2X2:Other: 1 42 49 2058 LED 16:L5:PENDANT:Other: 1 75 25 1875 LED 17:L6:REC 2X2:Other: 1 34 35 1190 LED 18:L6A:REC 2X2:Other: 1 132 18 2376 LED 19:L7:STRIP:Other: 1 90 30 2700 I LED 20:L8:HIGHBAY:Other: 1 16 158 2528 LED 21:L9:DOWNLIGHT:Other: 1 116 15 1740 LED 22:L10-4:LINEAR:Other: 1 2 20 40 LED 23:L10-8:LINEAR:Other: 1 4 40 160 LED 24:L10-12:LINEAR:Other: 1 2 60 120 LED 25:L10-16:LINEAR:Other: 1 10 80 800 LED 26:L11:LINEAR:Other: 1 4 40 160 LED 27:L12-6:LINEAR:Other: 1 8 30 240 LED 28:L12-8:LINEAR:Other: 1 1 40 40 LED 29:L12-12:LINEAR:Other: 1 2 60 120 Project Title:Twality Middle School Report date: 02/06/19 Data filename:P:\2017\17-1321 -TTSD Twality Middle School\12 Codes and Stnds\Compliance Forms\TTSD TMS Lighting Compliance annrmc nn4 Popo I of • LED 30:L13:PENDANT:Other: 1 17 63 1071 LED 31:L14:LINEAR:Other: 1 2 30 60 LED 32:L15:PENDANT:Other: 1 6 10 60 LED 33:L16:LINEAR WALLWASH:Other: 1 3 170 510 LED 34:T1:TRACK HEAD:Other: 1 6 23 138 LED 35:T2:TRACK HEAD:Other: 1 6 23 138 Total Proposed Watts= 59290 Section 4: Requirements Checklist In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Lighting Wattage: • 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Wattage:143420 Proposed Wattage:59290 Complies:YES Mandatory Requirements: • 2. Exit signs.Internally illuminated exit signs shall not exceed 5 watts per side. Plans reference page/section: E3.XX Sheets • 3. Daylight zone control.All daylight zones are provided with individual controls that control the lights independent of general area lighting in the non-daylight zone. In all individual daylight zones larger than 350 sq.ft.,automatic daylight controls is provided.Automatic daylight sensing controls reduce the light output of the controlled luminaires at least 50 percent,and provide an automatic OFF control, while maintaining a uniform level of illumination.Contiguous daylight zones adjacent to vertical fenestration may be controlled by a single controlling device provided that they do not include zones facing more than two adjacent cardinal orientations(i.e.,north,east, south,west).Daylight zones under skylights shall be controlled separately from daylight zones adjacent to vertical fenestration. Plans reference page/section: E3.XX Sheets 4. Interior lighting controls.At least one local shutoff lighting control has been provided for every 2,000 square feet of lit floor area and each area enclosed by walls or floor-to-ceiling partitions.The required controls are located within the area served by the controls or are a remote switch that identifies the lights served and indicates their status. Plans reference page/section: E3.XX Sheets ✓ 5. Sleeping unit controls.Master switch at entry to hotel/motel guest room. Plans reference page/section: Not Applicable • 6. Egress lighting. Egress illumination is controlled by a combination of listed emergency relay and occupancy sensors to shut off during periods that the building space served by the means of egress is unoccupied. Plans reference page/section: E3.XX Sheets • 7. Additional controls.Each area that is required to have a manual control shall have additional controls that meet the requirements of Sections 505.2.2.1 and 505.2.2.2. Plans reference page/section: E3.XX Sheets • 8. Light reduction controls. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either 1)controlling(dimming or multi-level switching)all luminaires;or 2)dual switching of alternate rows of luminaires,alternate luminaires,or alternate lamps;or 3)switching the middle lamp luminaires independently of other lamps;or 4)switching each luminaire or each lamp. t/ Exception applies:An occupant-sensing device controls the area. Plans reference page/section: E3.XX Sheets ✓ 9. Buildings larger than 2,000 square feet are equipped with an automatic control device to shut off lighting in those areas.This automatic control device shall function on either: 1)a scheduled basis,using time-of-day,with an independent program schedule that controls the interior lighting in areas that do not exceed 10,000 square feet and are not more than one floor;or 2)an occupant sensor that shall turn lighting off within 30 minutes of an occupant leaving a space;or 3)a signal from another control or alarm system that indicates the area is unoccupied. Plans reference page/section: E3.XX Sheets • 10.Occupancy sensors in rooms that include daylight zones are required to have Manual ON activation. Project Title: Twality Middle School Report date:02/06/19 Data filename:P:\2017\17-1321 -TTSD Twality Middle School\12 Codes and Stnds\Compliance Forms\TTSD TMS Lighting Compliance Fnnrmc'snit D,nn 9 of r. Plans reference page/section: E3.XX Sheets • 11.An occupant sensor control device is installed that automatically turns lighting off within 30 minutes of all occupants leaving a space. Plans reference page/section: E3.XX Sheets • 12.Additional controls.An occupant sensor control device that automatically turns lighting off within 30 minutes of all occupants leaving a space or a locally activated switch that automatically turns lighting off within 30 minutes of being activated is installed in all storage and supply rooms up to 1000 square feet. Plans reference page/section: E3.XX Sheets • 13.Occupant override.Automatic lighting shutoff operating on a time-of-day scheduled basis incorporates an override switching device that:1)is readily accessible,2)is located so that a person using the device can see the lights or the area controlled by that switch,or so that the area being lit is annunciated,3)is manually operated,4)allows the lighting to remain on for no more than 2 hours when an override is initiated,and 5)controls an area not exceeding 2,000 square feet. Plans reference page/section: E3.XX Sheets 14.Holiday scheduling.Automatic lighting shutoff operating on a time-of-day scheduled basis has an automatic holiday scheduling feature that turns off all loads for at least 24 hours,then resumes the normally scheduled operation. Plans reference page/section: E3.XX Sheets 15.Exterior lighting controls. Lighting not designated for dusk-to-dawn operation shall be controlled by either a combination of a photosensor and a time switch,or an astronomical time switch.Lighting designated for dusk-to-dawn operation shall be controlled by an astronomical time switch or photosensor. Plans reference page/section: E3.XX Sheets • 16.Tandem wiring.The following luminaires located within the same area shall be tandem wired: 1.Fluorescent luminaires equipped with one,three or odd-numbered lamp configurations,that are recess-mounted within 10 feet center-to-center of each other. 2.Fluorescent luminaires equipped with one,three or any odd-numbered lamp configuration,that are pendant-or surface-mounted within 1 foot edge-to-edge of each other. Plans reference page/section: Not Applicable • 17.Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. Plans reference page/section: Not Applicable • 18.Each dwelling unit in a building is metered separately. Plans reference page/section: Not Applicable tetior'Lighting PASSES:Design 59%better thar> Section 5: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2014 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 4.1.1.0 and to comply with the mandatory requirements in the Requirements Checklist. t i MICHAEL LOPEZ, LEAD ELEC. ENGINEER. 2/6/2019 Name-Title Signature (7' Date Project Title:Twality Middle School Report date:02/06/19 Data filename:P:\2017\17-1321 -TTSD Twality Middle School\12 Codes and Stnds\Compliance Forms\TTSD TMS Lighting Compliance Cnnrmc nn4 Pone Z of irlit1/1COMcheck Software Version 4.1.1 .0 Exterior Lighting Compliance Certificate Section 1: Project Information Energy Code:2014 Oregon Energy Efficiency Specialty Code Project Title:Twality Middle School Project Type:Addition Exterior Lighting Zone: 2(Residential mixed use area) Construction Site: Owner/Agent: Designer/Contractor: Tualitin,OR Section 2: Exterior Lighting Area/Surface Power Calculation A B C D E F Exterior Area/Surface Quantity Allowed Tradable Allowed Proposed Watts Wattage Watts Watts /Unit (B x C) Entry canopy 1644 ft2 0.25 Yes 411 1100 Illuminated length of facade wall/surface or roof path 100 ft 2.5 No 250 120 Parking area 50269 ft2 0.06 Yes 3016 3608 Other door(not main entry) 320 ft of door width 20 Yes 6400 720 Driveway 42469 ft2 0.06 Yes 2548 350 Total Tradable Watts*= 12375 5778 Total Allowed Watts= 12625 Total Allowed Supplemental Watts"`= 600 Wattage tradeoffs are only allowed between tradable areas/surfaces. **A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Section 3: Exterior Lighting Fixture Schedule A B C D E Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Entry canopy(1644 ft2):Tradable Wattage LED 1:S4-4:LED TAPE:Other: 1 4 20 80 LED 2:S4-5:LED TAPE:Other: 1 10 25 250 LED 3:S4-8:LED TAPE:Other: 1 2 40 80 LED 4:S4-23:LED TAPE:Other: 1 6 115 690 Illuminated length of facade wall/surface or roof path(100 ft):Non-tradable Wattage LED 5:S3:WALL SCONCE:Other: 1 5 24 120 Parking area(50269 ft2):Tradable Wattage LED 6:S1:PARKING LIGHT:Other: 1 42 70 2940 LED 7:S2:PEDESTRIAN LIGHT:Other: 1 10 50 500 LED 8:S6:Other: 1 1 168 168 Other door(not main entry)(320 ft of door width):Tradable Wattage LED 9:S5:WALL SCONCE:Other: 1 20 36 720 Driveway(42469 ft2):Tradable Wattage LED 10:S1:PARKING LIGHT:Other: 1 5 70 350 Total Tradable Proposed Watts= 5778 Section 4: Requirements Checklist Project Title:Twality Middle School Report date: 02/06/19 Data filename:P:\2017\17-1321 -TTSD Twality Middle School\12 Codes and Stnds\Compliance Forms\TTSD TMS Lighting Compliance Gnnrmc nn4 Dano A of G ., In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Controls, Switching,and Wiring: • 1. Lighting designated to operate more than 2000 hours per year for Uncovered Parking Areas shall be equipped with motion sensors that will reduce the luminaire power by thirty-three percent or turn off one-third the luminaires when no activity is detected. Plans reference page/section: E3.XX Sheets Exterior Lighting Restrictions and Exceptions: • 2. Mercury vapor and incandescent lighting is not permitted for use as exterior lighting. • 3. Exempt lighting fixtures are equipped with a control device independent of the control of the nonexempt lighting and are identified in Section 3 table above. Plans reference page/section: E3.XX Sheets :V Ma VMttl:ienkitt?Vna:tgtatnZigg Section 5: Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2014 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 4.1.1.0 and to comply with the mandatory requirements in the Requirements Checklist. r MICHAEL LOPEZ, LEAD ELEC. ENGINEER. 2/6/2019 Name-Title Signature Date Project Title: Twality Middle School Report date: 02/06/19 Data filename:P:\2017\17-1321 -TTSD Twality Middle School\12 Codes and Stnds\Compliance Forms\TTSD TMS Lighting Compliance Cnnrmc nnL Dana G of F COMcheck Software Version 4.1.1.0 Envelope Compliance Certificate RECEIVED Section 1: Project Information MAR 202019 Energy Code:2014 Oregon Energy Efficiency Specialty Code Project Title: TAflD Project Type:New Construction f3Ul ="ION Envelope Compliance Method:Simplified Trade-Off David Moore Rebecca Grant Twality Middle School Tigard-Tualatin School District DOWA-IBI Group Architects Construction Site: 14650 SW 97th Ave Owner/Agent:6960 S.W.Sandburg St. Designer/Contractor:907 SW Stark Street Tigard,Oregon 97224 Tigard,OR 97223 Portland,Oregon 97205 Building Location(for weather data): Portland,Oregon Nick Wellman Climate Zone: 4c Vertical Glazing/Wall Area Pct.: 23% Triplett Wellman P.O. Box 160 Building Use:Area Type Floor Area Woodburn,Oregon 97071 1-School/University:Nonresidential 101123 Section 2: Envelope Assemblies and Requirements Checklist ,,y e..PSsF.,S Desi•n,0.1./ better than code. Envelope Assemblies: Component Name/Description Gross Cavity Cont. Proposed Budget Area or R-Value R-Value U-Factor U-Factor(a) Perimeter Exterior Wall 1:Wood-Framed, 16"o.c.,[Bldg.Use 1 - 45850 13.0 3.8 0.064 0.064 School/University] Window 1:Metal Frame with Thermal Break,Pert.Specs.:Product 10644 --- --- 0.450 0.460 ID N/A,SHGC 0.40,[Bldg.Use 1 -School/University](b) Roof 1:Insulation Entirely Above Deck,[Bldg.Use 1 - 78786 --- 20.0 0.048 0.048 School/University] Basement Wall 1:Solid Concrete:8"Thickness,Light Density, 12259 --- 7.5 0.102 0.108 Furring:None,Wall Ht 14.0,Depth B.G. 14.0,[Bldg.Use 1 - School/University] (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Fenestration Product Rating: x0 1. U-factors of fenestration products(windows,doors and skylights)are determined in accordance with NFRC 100 by an accredited, independent laboratory,and labeled and certified by the manufacturer or are determined using the commercial size category values listed in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.4 and shall include the effects of the window frame. The temporary label afixed to the fenestration products must not be removed prior to inspection. Exception(s): 0 Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills, center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be maintained on the jobsite and made available to the inspector. Plans reference page/section: Specification Section 08 80 00 Glazing 0 2. Solar heat gain coefficient(SHGC)of glazed fenestration products(windows,glazed doors and skylights)shall be determined in accordance with NFRC 200 by an accredited,independent laboratory,and labeled and certified by the manufacturer or be determined using the Solar Heat Gain Coefficients(SHGC)in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.10.The overall values must consider type of frame material and operator for the SHGC at normal incidence. Project Title: Report date: 02/15/19 Data filename:C:\Users\andrew.comstock\OneDrive-PAE Engineers\Desktop\TTSD TMS Mechanical Compliance Forms 7 nn4 Dona 1 of Exception(s): Li Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills, center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be maintained on the jobsite and made available to the inspector. Plans reference page/section: Specification Section 08 43 13 Aluminum-Framed Storefronts Air Leakage, Insulation, and Component Certification: O 3. Sealing of the building envelope.Openings and penetrations in the building envelope are sealed with caulking materials or closed with gasketing systems compatible with the construction materials and location.Joints and seams are sealed in the same manner or taped or covered with a moisture vapor-permeable wrapping material.Sealing materials spanning joints between construction materials allow for expansion and contraction of the construction materials. Plans reference page/section: Specification Section 07 25 00 Weather Barriers O 4. Window and door assemblies.The air leakage of window and sliding or swinging door assemblies that are part of the building envelope are determined in accordance with AAMA/WDMA/CSA 101/I.S.2/A440,or NFRC 400 by an accredited,independent laboratory,and labeled and certified by the manufacturer. Exception(s): LI Site-constructed windows and doors that are weatherstripped or sealed in accordance with Section 502.4.3. Plans reference page/section: Specification Section 08 43 13 Aluminum-Framed Storefronts O 5. Curtain wall,storefront glazing and commercial entrance doors.Curtain wall,storefront glazing and commercial-glazed swinging entrance doors and revolving doors are tested for air leakage in accordance with ASTM E 283.For curtain walls and storefront glazing, the maximum air leakage rate is 0.3 cubic foot per minute per square foot of fenestration area.For commercial glazed swinging entrance doors and revolving doors,the maximum air leakage rate is 1.00 cfm/ft2 of door area. Exception(s): LI Requirement is not applicable. Plans reference page/section: Specification Section 08 43 13 Aluminum-Framed Storefronts O 6. Building thermal envelope insulation.An R-value identification mark is applied(by manufacturer)to each piece of insulation 12 inches or greater in width.Alternately,the insulation installers have provided a signed,dated and posted certification listing the type, manufacturer and R-value of insulation installed.Refer to code section for blown or sprayed insulation installation/settling depths and marker requirements. O 7. Insulation mark installation.Insulating materials are installed such that the manufacturer's R-value mark is readily observable upon inspection. A 8. Insulation product rating.The thermal resistance(R-value)of insulation has been determined in accordance with the U.S.FTC R-value rule. O 9. Installation.All material,systems and equipment are installed in accordance with the manufacturer's installation instructions and the International Building Code. 10.Outdoor air intakes and exhaust openings.Stair and elevator shaft vents and other outdoor air intakes and exhaust openings integral to the building envelope shall be equipped with not less than a Class I motorized,leakage-rated damper with a maximum leakage rate of 4 cfm per square foot at 1.0 inch water gauge when tested in accordance with AMCA 500D.Stair and shaft vent dampers shall be capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection systems. Plans reference page/section: Spec 23 33 00 • 11.Loading dock weatherseals.Cargo doors and loading dock doors are equipped with weather seals to restrict infiltration when vehicles are parked in the doorway. Exception(s): 0 Requirement is not applicable. Plans reference page/section: N/A • 12.Recessed lighting.Recessed luminaires installed in the building thermal envelope are sealed to limit air leakage between conditioned and unconditioned spaces.All recessed luminaires are IC-rated and labeled as meeting ASTM E 283.All recessed luminaires are sealed with a gasket or caulk between the housing and interior wall or ceiling covering. Exception(s): LI Requirement is not applicable. Plans reference page/section: N/A ▪ 13.Vestibules.Doors that separate conditioned space from the exterior are protected with an enclosed vestibule,with all doors of the vestibule equipped with self-closing devices.Vestibules are designed so interior and exterior doors to not operate simultaneously. Exception(s): x0 Doors not intended to be used as a building entrance door,such as doors to mechanical or electrical equipment rooms. Project Title: Report date: 02/15/19 Data filename:C:\Users\andrew.comstock\OneDrive-PAE Engineers\Desktop\TTSD TMS Mechanical Compliance Forms 7 nnli Dono ') of 0 Doors opening directly from a sleeping unit or dwelling unit. LI Doors that open directly from a space less than 3000 sq.ft.in area. LI Revolving doors. 0 Doors used primarily to facilitate vehicular movement or material handling and adjacent personnel doors. Li Requirement is not applicable. Plans reference page/section: 14.'Other'components have supporting documentation for proposed U-Factors. Exception(s): Li Requirement is not applicable. Plans reference page/section: Section 3: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed envelope system has been designed to meet the 2014 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 4.1.1.0 and to comply with the mandatory requirements in the Requirements Checklist. Rebecca Grant, Principal,Project Manager 02.15.19 Name-Title Signature Date Project Title: Report date: 02/15/19 Data filename:C:\Users\andrew.comstock\OneDrive-PAE Engineers\Desktop\TTSD TMS Mechanical Compliance Forms 2.cck Page 3 of 3 COM check Software Version 4.1.1.0;6 Envelope Compliance Certificate Section 1: Project Information Energy Code:2014 Oregon Energy Efficiency Specialty Code Project Title: Project Type: New Construction Envelope Compliance Method:Simplified Trade-Off David Moore Rebecca Grant Twality Middle School Tigard-Tualatin School District DOWA-IBI Group Architects Construction Site: 14650 SW 97th Ave Owner/Agent:6960 S.W.Sandburg St. Designer/Contractor:907 SW Stark Street Tigard,Oregon 97224 Tigard,OR 97223 Portland,Oregon 97205 Building Location(for weather data): Portland,Oregon Nick Wellman Climate Zone: 4co Triplett Wellman Vertical Glazing/Wall Area Pct.: 23% P.O.Box 160 Building Use:Area Type Floor Area Woodburn,Oregon 97071 1-School/University:Nonresidential 101123 Section 2: Envelope Assemblies and Requirements Checklist R'ash xf ,w ma'^ �'* xaz''' p4:-4:-aora , f oe` z ary ; 't' �' . f, t-'K;,-rfoe Envelope Assemblies: Component Name/Description Gross Cavity Cont. Proposed Budget Area or R-Value R-Value U-Factor U-Factor(a) Perimeter Exterior Wall 1:Wood-Framed,16"o.c.,[Bldg.Use 1 - 45850 13.0 3.8 0.064 0.064 School/University] Window 1:Metal Frame with Thermal Break,Pert.Specs.:Product 10644 --- --- 0.450 0.460 ID N/A,SHGC 0.40,[Bldg.Use 1 -School/University](b) Roof 1: Insulation Entirely Above Deck,[Bldg. Use 1 - 78786 --- 20.0 0.048 0.048 School/University] Basement Wall 1:Solid Concrete:8"Thickness,Light Density, 12259 --- 7.5 0.102 0.108 Furring:None,Wall Ht 14.0,Depth B.G.14.0,[Bldg.Use 1 - School/University] (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Fenestration Product Rating: Li 1. U-factors of fenestration products(windows,doors and skylights)are determined in accordance with NFRC 100 by an accredited, independent laboratory,and labeled and certified by the manufacturer or are determined using the commercial size category values listed in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.4 and shall include the effects of the window frame. The temporary label afixed to the fenestration products must not be removed prior to inspection. Exception(s): x0 Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills, center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be maintained on the jobsite and made available to the inspector. Plans reference page/section: Specification Section 08 80 00 Glazing 0 2. Solar heat gain coefficient(SHGC)of glazed fenestration products(windows,glazed doors and skylights)shall be determined in accordance with NFRC 200 by an accredited,independent laboratory,and labeled and certified by the manufacturer or be determined using the Solar Heat Gain Coefficients(SHGC)in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.10.The overall values must consider type of frame material and operator for the SHGC at normal incidence. Project Title: Report date: 02/15/19 Data filename:C:\Users\andrew.comstock\OneDrive-PAE Engineers\Desktop\TTSD TMS Mechanical Compliance Forms 0 nn4 Donn 1 of"2 Exception(s): 0 Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills, center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be maintained on the jobsite and made available to the inspector. Plans reference page/section: Specification Section 08 43 13 Aluminum-Framed Storefronts Air Leakage, Insulation,and Component Certification: x❑ 3. Sealing of the building envelope.Openings and penetrations in the building envelope are sealed with caulking materials or closed with gasketing systems compatible with the construction materials and location.Joints and seams are sealed in the same manner or taped or covered with a moisture vapor-permeable wrapping material.Sealing materials spanning joints between construction materials allow for expansion and contraction of the construction materials. Plans reference page/section: Specification Section 07 25 00 Weather Barriers x❑ 4. Window and door assemblies.The air leakage of window and sliding or swinging door assemblies that are part of the building envelope are determined in accordance with AAMA/WDMA/CSA 101/I.S.2/A440,or NFRC 400 by an accredited,independent laboratory,and labeled and certified by the manufacturer. Exception(s): ❑ Site-constructed windows and doors that are weatherstripped or sealed in accordance with Section 502.4.3. Plans reference page/section: Specification Section 08 43 13 Aluminum-Framed Storefronts O 5. Curtain wall,storefront glazing and commercial entrance doors.Curtain wall,storefront glazing and commercial-glazed swinging entrance doors and revolving doors are tested for air leakage in accordance with ASTM E 283. For curtain walls and storefront glazing, the maximum air leakage rate is 0.3 cubic foot per minute per square foot of fenestration area.For commercial glazed swinging entrance doors and revolving doors,the maximum air leakage rate is 1.00 cfm/ft2 of door area. Exception(s): ❑ Requirement is not applicable. Plans reference page/section: Specification Section 08 43 13 Aluminum-Framed Storefronts x❑ 6. Building thermal envelope insulation.An R-value identification mark is applied(by manufacturer)to each piece of insulation 12 inches or greater in width.Alternately,the insulation installers have provided a signed,dated and posted certification listing the type, manufacturer and R-value of insulation installed.Refer to code section for blown or sprayed insulation installation/settling depths and marker requirements. x0 7. Insulation mark installation.Insulating materials are installed such that the manufacturer's R-value mark is readily observable upon inspection. x❑ 8. Insulation product rating.The thermal resistance(R-value)of insulation has been determined in accordance with the U.S.FTC R-value rule. O 9. Installation.All material,systems and equipment are installed in accordance with the manufacturer's installation instructions and the International Building Code. • 10.Outdoor air intakes and exhaust openings.Stair and elevator shaft vents and other outdoor air intakes and exhaust openings integral to the building envelope shall be equipped with not less than a Class I motorized,leakage-rated damper with a maximum leakage rate of 4 cfm per square foot at 1.0 inch water gauge when tested in accordance with AMCA 500D.Stair and shaft vent dampers shall be capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection systems. Plans reference page/section: Spec 23 33 00 ❑ 11.Loading dock weatherseals.Cargo doors and loading dock doors are equipped with weather seals to restrict infiltration when vehicles are parked in the doorway. Exception(s): 0 Requirement is not applicable. Plans reference page/section: N/A ❑ 12.Recessed lighting.Recessed luminaires installed in the building thermal envelope are sealed to limit air leakage between conditioned and unconditioned spaces.All recessed luminaires are IC-rated and labeled as meeting ASTM E 283.All recessed luminaires are sealed with a gasket or caulk between the housing and interior wall or ceiling covering. Exception(s): ❑x Requirement is not applicable. Plans reference page/section: N/A • 13.Vestibules_Doors that separate conditioned space from the exterior are protected with an enclosed vestibule,with all doors of the vestibule equipped with self-closing devices.Vestibules are designed so interior and exterior doors to not operate simultaneously. Exception(s): 0 Doors not intended to be used as a building entrance door,such as doors to mechanical or electrical equipment rooms. Project Title: Report date: 02/15/19 Data filename:C:\Users\andrew.comstock\OneDrive-PAE Engineers\Desktop\TTSD TMS Mechanical Compliance Forms 0 nnL Done 7 of 0 Doors opening directly from a sleeping unit or dwelling unit. 0 Doors that open directly from a space less than 3000 sq.ft.in area. fJ Revolving doors. Li Doors used primarily to facilitate vehicular movement or material handling and adjacent personnel doors. LI Requirement is not applicable. Plans reference page/section: 14.'Other'components have supporting documentation for proposed U-Factors. Exception(s): x0 Requirement is not applicable. Plans reference page/section: Section 3: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed envelope system has been designed to meet the 2014 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 4.1.1.0 and to comply with the mandatory requirements in the Requirements Checklist. Rebecca Grant,Principal,Project Manager 02.15.19 Name-Title Signature Date Project Title: Report date: 02/15/19 Data filename:C:\Users\andrew.comstock\OneDrive-PAE Engineers\Desktop\TTSD TMS Mechanical Compliance Forms 2.cck Page 3 of 3