Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Specifications
/141-2-0161- b005 w Corin ++ GREEN MOUNThIN structural engineering Memorandum July 2, 2019 To: Amilian Avgi, Riverside Homes From: Corina Muntean, P.E Re: Plan 2626 at Elderberry Lot 29 Based on our conversation and photographs that were send from the job site,the stab bolts for the garage pier were not placed in the correct location per detail 11 on S2.We recommend that new 5/8"dia. anchor bolts be drilled and epoxied using Simpson Set Xp, in a 10 inch hole. Special inspection may be required at the discretion of the inspector. If you have any questions, don't hesitate to ask. 00 PR©pe GNE sr ,Z,7 `49 78PE 9 ©y tr r- 0:4 ;:,1114.6.944 Cs IA+ r NN {EXPIRES t2• 51 .Z07 greenmountainse.com-infoga greenmountainse.com-4857 NW Lake Rd.,Suite 260,Camas,WA 98607