Loading...
Report (25) 5 T��1q•0132 � L6 °1 n` trV� � 5 CT ENGINEERING C/v INC 180 Nickerson St. Suite 302 Seattle,WA 98109 (206)285-4512(V) (206)285-0618(F) asolomon®ctengineering.com BULLETIN Date: September 18,2018 Number:CT-03 Project#: 17155 Project Name: Sunset Ridge SF Attached: None Subject: All Lots—Shearwall Nailinlg at Main Floor Level Drawings Affected: Description/Action: This bulletin provides response to RFI's, design clarifications and/or variation requests for the 'Sunset Ridae SF' project located in North Plains, Oregon. The exterior shearwall nailing at the main floor/foundation level can be accomplished as shown on either detail 1/S1.1 or detail 6/S1.1 (it is not required to satisfy both conditions). * Constructing per detail 1/S1.1 provides a load path that bypasses the bottom plate nailing requirements for the first floor shearwalls provided the wall sheathing extends down to and is attached to the sill plate. The wall sheathing shall also be attached to the bottom plate of the first floor shearwall and, if applicable, the top and bottom plate of the pony/cripple wall between the main floor framing and concrete stem wall as shown on detail 1/S1.1. * Constructing per detail 6/S1.1 would require the bottom plate of the first floor shearwall be attached to the rim (and, if required, an additional 1-1/2"minimum blocking) below because the wall sheathing is not continuous to the sill plate. Please note that this additional blocking is only required when there is more than one row of bottom plate nails. ‘..‘G I N �)r. 11 Nes' 09/18/2018 • CALL WITH ANY OUESTIONS Issued by: Arnold R. Solomon Date: Sept. 18.2018 Distribution: Contact Information: Paul McColm Polygon Northwest Company Tom Dicianno Polvpon Northwest Company Frank Sandoval Polvaon Northwest Company David Burnett Milbrandt Architects T:117155 Sunset Ridge II(North Plains,OR)12017 ORSC Code Updates\Builetins117155_2018.09.18 CT03_All Lots-Shearwall Nailing at Main Floor Level.doc Structural Engineers