Loading...
Specifications (2) T20 - 00116 7094/ ski/ 4v2i•'L., 77- s7— GREEN MOUNTRIN structural engineering Memorandum July 2, 2019 To: Amilian Avgi, Riverside Homes From: Corina Muntean, P.E Re: Plan 2885 at Elderberry Lot 31 eased on our conversation and photographs that were send from the job site,the knock out for the furnace was incorrectly located in the shear wall at the back of garage. Rebar was drilled and epoxied into the concrete foundation on both sides. I have reviewed it and take no exception. If you have any questions, don't hesitate to ask. 4oPRare 41., 49 78PE Cc r ,OREGON °'11tia MIPP- tExPInEs 12 '5140/0 greenmountainse.com-infoggreenmountainse.com-4857 NW Lake Rd.,Suite 260,Camas,WA 98607