Permit (54) CITY OF TIGARD REROOF PERMIT
COMMUNITY DEVELOPMENT Permit#: RER2019-00009
Date Issued: 07/03/2019
T i t_;i R p 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S104AA90281
Jurisdiction: Tigard
Site address: 12646 SW KAREN ST 28
Project: Bellwoodk Terrace Subdivision: BELLWOOD TERRACE CONDO Lot: 28
Project Description: Reroof-remove and replace for carport.
Contractor: RELIABLE HOME IMPROVEMENT INC Owner: BELLWOOD TERRACE LLC
PO BOX 230815 PO BOX 189
TIGARD, OR 97281 YAMHILL, OR 97148
PHONE: 503-481-0240 PHONE:
FAX:
FEES
Description Date Amount
Permit Fee 07/03/2019 $119.33
Specifics: 12%State Surcharge-Building 07/03/2019 $14.32
Type of Use: MF
Class of Work: ALT Type of Const:
Occupancy Load:
Stories: Height: 0 ft
Project Valuation: $2,500.00
General Information
Building Area: 0
Re-Roof Area: 0
Roof Class:
Tear Off:
Overlay:
Existing Roof Layers:
Parapets:
Total $133.65
Required Items and Reports(Conditions)
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 throughOAR 52-001-0090. Yo ay obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.8 332.2344.
Issued By: 7 / Permittee Signature: � � �
2;____.E!
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completio of the proje
Approved plans are required on the job site at the time of each inspection.
, Building Permit
f �/�
Application
C /[E- �f 1 oR 0111(11 IASL 0yl.1
City of Tigard (�('� Date/BReceived
:
mi 13125 SW Hall Blvd.,Tigard,OR 9722��./�'� Plan Review `=t
Phone: 503-718-2439 Fax: 503-598-1960 Date/B : Related Permit:
T I G A R D Inspection Line: 503-639-4175 JUL 3 2019 Date Ready/By: Jug ® See Page 2 for
Internet: www.tigard-or.gov Notified/Method: Supplemental Information
CITY OF TIGARD
TYPE OF Wt ti3LDING ti!VIStON REQUIRED DATA:1-AND 2-FAMILY DWELLING
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
M'Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
0 1-and 2-family dwelling p.Commercial/industrial Valuation: $
ElAccessory building El Multi-family Number of bedrooms:
El Master builder El Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
I
Job site address: /26 ` .c re 4 57- New dwelling area: square feet
City/State/ZIP: 'i'' Q.I`4 O K. R?ZZ3 Garage/carport area: square feet
Suite/bldg./apt.#: Project name:/ r f f jL Trim e.,... Covered porch area: square feet
Cross street/directions to job site: �,a r 1 Z-aA-v.e Deck area: square feet
/ Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot#: Permit fees*are based on the value of the work performed.
Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION jOF/WORK J) work indicated on this application.
plc C i.
S (t'{ 1 t 1 / ✓t bcc l` S-de Valuation: $ Z,S 00
1 J� Existing building area: square feet
t�'r r.
New building area: square feet
0 PROPERTY OWNER 0 TENANT Number of stories:
Name: Type of construction:
Address: Occupancy groups:
City/State/ZIP: Existing:
Phone:( ) Fax:( ) New:
0 APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES*
} (Please refer to fee schedule)
Business name: n
P l L�to , lfpt--t t Structural plan review fee(or deposit):
Contact name: TpM Pc.h+
Boo FLS plan review fee(if applicable):
Address: 1 77 S c) 5 CJ Boo ne-s F.erry Ad
p / ( Amount received:
Total fees due upon application:
City/State/ZIP: T or't _ O _-7Zz
Phone:(spa ) 2 if q Z 30 Fax::( )
E-mail: PHOTOVOLTAICSOLAR PANEL SYSTEM FEES*
CONTRACTOR Commercial and residential prescriptive installation of
roof-top mounted PhotoVoltaic Solar Panel System.
Business name: b l� /1„,e, �VSubmit two(2)sets of roof plan with connection details
Q1_')II G ;�'� �''"'�`�T and fire department access,along with the 2010 Oregon
Address: I .0 ick i 3 7 Solar Installation Specialty Code checklist.
City/State/ZIP: '-4 r of., 9'21" Permit fee(includes plan review $180.00
and administrative fees):
Phone:(503 ) t' g. (4-311,- Fax:( )
State surcharge(12%of permit fee): $21.60
CCB Lic.: v! (03 Total fee due upon application: $201.60
Authorized signature: / This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: ( D ate: q * Fee methodology set by Tri-County Building Industry
dl,� C 24'K P 7- / Service Board.
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB)
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Accessibility: Barrier Removal Improvement Plan
■
Commercial & Multi-Family - Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019
4
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
__ ' Plan Submittal Requirements
Commercial & Multi-Family - New, Additions or Alterations
A D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 •www.tigard-or.gov
1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with:
A. ❑ map&tax lot# El project name ❑ site address ❑ suite number
❑ zoning El applicant name El phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit-based on valuation of project.
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
__ Plan Submittal Requirements Matrix
commercial &_Multi-Family - New, Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
Type of Submittal # of Plans
(Includes new,additions and alterations.) Required at
Submittal
Demolition Permit 2
(site plan is required showing location and square footage
of all buildings to be demolished,erosion control plan and
tree protection,if applicable)
Site Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing(building fixtures) 2
Electrical 2
Solar Photovoltaic 2
(Requires check list for prescriptive installation. If not
prescriptive installation,engineering is required.)
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County, and Tualatin Valley Fire&Rescue),if applicable.
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019
City of Tigard
Tel: 503.718.2439
Location: Inspection Date:
12646 SW KAREN ST 28, TIGARD, OR, 97223
Record Type: Record ID:
Cornmericial - Reroof RER2019-00009
Inspection Type: Inspector:
299 Final inspection Jeff Grove
Result:
PASS - NoCofO
Comments:
Violation Summary:
Inspector Contractor