Specifications yn 5 r 2 °' - 00116 X 6 9 `/ sW G v TT S T
GREEN MOUNTMIN
structural engineering
Memorandum
May 29, 2019
To: Amilian Avgi, Riverside Homes
From: Corina Muntean, F.E
Re: Plan 2885 at Lot 40, Lot 3 Lot 31, Lot 30 and Lot 12
I understand that theara9e shear wall does not meet the 3.5:1 ratio that is noted on
9
detail 11 on S2 or permit drawings.We recommend that the inside of the pier be sheathed
and nailed as shear wall type D.
If you have any questions, don't hesitate to ask.
44 PRQ�r�
t4G NE.
<r�s��
49 78PE
rr r-
ORECaOM
C1024°.
d 1 , 1.q
pp 9��A �
tEXPIRES �Z' CJI 'f►V fi1.f
greenmountainse.com-infoQa greenmountainse.com-4857 NW Lake Rd.,Suite 260,Camas,WA 98607