Loading...
Permit (69) , CITY OF TIGARDBUILDING PERMIT ! ' COMMUNITY DEVELOPMENT Permit#: BUP2019-00130 T[to x k.O 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 e ~M Date Issued: 06/24/2019 Parcel: 2S101 DD00101 Jurisdiction: Tigard Site address: 6975 SW SANDBURG ST Project: AT&T Subdivision: None Lot: None Project Description: Replacing(6)antennas and associated equipment,power plant and batteries,and making structural upgrade to existing mounting structures. 8/9/2019: REPRINT to change contractor. Contractor: LEGACY WIRELESS SERVICES INC Owner: WESTON INVESTMENT CO LLC 15580 SE FOR MOR CT 2154 NE BROADWAY, STE 200 CLACKAMAS, OR 97015 PORTLAND, OR 97232 PHONE: 503-656-5300 PHONE: 503-691-5008 FAX: 503-656-5305 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: Other Permit Fee-Additions,Alterations, 06/24/2019 $453.95 Occupancy Grp: U Occupancy Load: Demolition 12%State Surcharge-Building 06/24/2019 $54.47 Dwelling Units: 0 Plan Review 06/04/2019 Stories: 0 Height: 0 ft $295.07 DC Provision Review,COM TI-Ping 06/24/2019 $98.00 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Sm$0.50(up to 06/24/2019 $100.50 Value: $25,000 11x17) Misc Administration Fee 08/09/2019 $45.00 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $1,046.99 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: _ Protected Corridors:_ Smoke Detectors:r Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: <:::C3,� ,,"tc_---- Permittee Signature: ‘,47 '/---/ L/C' Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. 1/1/° 2-0/2'—a9/3 Dianna Howse 7-75' St From: Teather Bailey <tbailey@legacy-wireless.com> Sent: Friday, August 9, 2019 4:06 PM To: Dianna Howse Cc: 'Sen Galindo';#Building Permit Technicians;tbailey@legacy-wireless.com Subject: RE: BP#BUP2019-00130 @ 6975 SW Sandburg St (PR35 Tigard) Request for Contractor Change 8-8-19 Attachments: PR35 $45 Admin Fee for Contractor Change on City of Tigard BP#BUP2019-00130 8-9-19 Teather's Visa Receipt.pdf Warning!This message was sent from outside your organization and we are unable to verify the sender. Good afternoon Dianna, Please see the attached receipt showing the$45 fee paid for the contractor change. As noted below, please send us the revised permit once it's been updated. Thank you! Teather Bailey Project Coordinator Legacy Wireless Services, Inc. 15580 SE For Mor Ct Clackamas, OR 97015 (503) 656-5300 (o) (503)656-5305 (f) www.leoacy-wireless.com From: Dianna Howse [mailto:Dianna@tigard-or.gov] Sent: Thursday, August 8, 2019 1:20 PM To: Teather Bailey Cc: Sen Galindo; #Building Permit Technicians Subject: RE: BP#BUP2019-00130 @ 6975 SW Sandburg St(PR35 Tigard) Request for Contractor Change 8-8-19 Hello Teather, There is a$45.00 fee to change contractor and reprint permits to update our public records. The fee can be paid online at https://aca.accela.com/TIGARD/Welcome.asox by searching for the permit record number BUP2019-00130 under the Building tab. Please let us know once the fee has been paid and we will change the contractor and email a copy of the revised permit. Thank you. Dianna L. Howse Building Division Services Supervisor City of Tigard I Community Development 1 13125 SW Hall Blvd I Tigard, OR 97223 503-718-2430 Direct 1503-718-2439 Permits From:Teather Bailey<tbailey@legacy-wireless.com> Sent:Thursday,August 8, 2019 10:52 AM To:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Cc:tbailey@legacy-wireless.com; Sen Galindo<sgalindo@legacy-wireless.com> Subject: BP#BUP2019-00130 @ 6975 SW Sandburg St(PR35 Tigard) Request for Contractor Change 8-8-19 Good morning, Legacy Wireless Services, Inc. has been awarded the job for the subject site building permit. We would like to change the contractor to us, Legacy Wireless Services, Inc, in place of Ericsson, Inc. Our CCB#is 150432 and our Metro#is 8365. Is this something we can do via email? Please advise. Thank you! Teather Bailey Project Coordinator Legacy Wireless Services, Inc. 15580 SE For Mor Ct Clackamas, OR 97015 (503) 656-5300 (o) (503) 656-5305 (f) www.legacy-wireless.com From: Timothy Trotter [mailto:timothy.trotter@ ericsson.com] Sent: Thursday,July 25, 2019 12:33 PM To: Teather Bailey Cc: Sen Galindo; Mark Rainey; Sanjeev Tirunagaram; Ronald Guggenheim Subject: PR35 6C BP and NTP Legacy, This site was listed as high priority for review and NTP submittal after our call Wednesday. I just received the RE020,and the BP is attached. Can you please have it transferred to Legacy. Also please see below for the access request information. Please reach out to Kathi to set up the potential site walk and let me know if you would like me to provide any assistance. **IMPORTANT** Please contact Kathi Pearce prior to beginning construction or visiting the site: 503-624-8240 kpearce@apmportland.com • Advanced notice prior to construction commencing is requested. A pre-construction walk through may need to be conducted if there are any questions to address. • All project permits must be current. 2 • Roof protection must be in place throughout the project to prevent roof damage. • A construction schedule must be provided to American Property Management before work commences. • All cell site equipment shall be painted to blend in with the surrounding building background material. Any new equipment shall be painted to blend in after installation. • A final inspection walk through with American Property Management must be conducted to finalize the project after all work is completed. • This approved work must be performed within six(6) months of the date of this letter. If not performed by that date,these requested cell site modifications will be required to be resubmitted with a new approval package and fee for Lessor review and approval. Thank you, 2.1c Timothy Trotter Construction Coordinator Contractor on behalf of Ericsson NBO-West Region CMO- ROW Ericsson 8100 SW Nyberg Rd Suite 290 97062, Tualatin, OR, U.S.A. Phone (971)235-8146 timothy.trotter(a�ericsson.corn www.ericsson.com 1-Minute QuickCheck 00 Click ler '. r--,- on your customer experience` Our commitment to Technology for Good and Diversity and Inclusion contributes to positive change in the Networked Society. Follow us on:Facebook Linkedln Twitter Legal entity:Ericsson Inc., registered office in Plano TX, USA. This communication is confidential.Our email terms:www.ericsson.com/en/legal/privacv/email-disclaimer DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may_be disclose __another from- sure_u ire ---_ gon-F -Rect''rdstavrr.€--meds are reftinect by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." 3 CITY OF TIGARD BUILDING PERMIT `' - COMMUNITY DEVELOPMENT Permit#: BUP2019-00130 - IAD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 06/24/2019 Parcel: 2S101 DD00101 Jurisdiction: Tigard Site address: 6975 SW SANDBURG ST Project: AT&T Subdivision: None Lot: None Project Description: Replacing(6)antennas and associated equipment,power plant and batteries,and making structural upgrade to existing mounting structures. Contractor: ERICSSON INC Owner: WESTON INVESTMENT CO LLC 6300 LEGACY DR 2154 NE BROADWAY, STE 200 PLANO, TX 45024 PORTLAND, OR 97232 PHONE: 972-583-0000 PHONE: 503-691-5008 FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: Other Permit Fee-Additions,Alterations, 06/24/2019 $453.95 Demolition Occupancy Grp: U Occupancy Load: 12%State Surcharge-Building 06/24/2019 $54.47 Dwelling Units: 0 Plan Review 06/04/2019 $295.07 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 06/24/2019 $98.00 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Sm$0.50(up to 06/24/2019 $100.50 Value: $25,000 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $1,001.99 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.22332..19,$L• .800.332.2344. Issued By: Permittee Signature: 639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. r Building Permit Application „,.r— } 5 r....,..:, Commercial tit:,t r „r` FOR OFFICE USF,ONLY Cl of Tigard Received • • 13125 SW Hall Blvd.,Tigard,OR 97223 MAY 2 2 2Q19DateBy: �� i .. '' � �����d Plan Review 114 ■ Phone: 503-718-2439 Fax: 503-598-1960 o n.teB Related Permit: CITY OF TIGA y _ ��) 7 1" t 1 K l) Inspection Line: 503-639-4175 �. ReadyBy: _ /�'i Tuns: El See Page 2 for Internet: www.tigard-or.gov BU ILAING U IVI t'/: ed/Method �/7 4 Supplemental Information ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. hvalue( ed arar)of all 1J Addition/alteration/replacement ❑Other: eIndiquipcatementt ,e materials,laborround ,overheadtothene ,est anddollthe profit for the l gl e e + , ® TR▪Ut[T!13 molt,„x -Itt work indicated on this application. 1=11-and 2-family dwelling Commercial/industrialValuation: $ ❑Accessory building ❑Multi-family Number of bedrooms: ❑Master builder 1=1 Other: Number of bathrooms: i ;.: , . " . ® , / -. Total number of floors: ,lit Job site address: rn 975 ss)..I CJdra�trei --- `� New dwelling area: square feet City/State/ZIP: `li Q OR 2z er-/ /1Garage/carport area: square feet Suite/bldg./apt.#: Project name: • �� Covered porch area: square feet Cross street/directions to job site: d,,,,,....1,phs Oh S1_e i �� Deck area: square feet /] Other structure area: square feet , . ;. 1 ' : i l l '' ik s l(' ST Subdivision: Lot#: Permit fees*are based on the value of the work performed. Tax map/parcel#: '�� 0 p Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the t -4*f. 1 1r 4411- work indicated on this application. Valuation: $2.5 000 C���lls��-e, vc�o��o� r-,nod - place (� oar,}C�nnns E Citi 1 s1C;„�„ \ e. (�>P. ;Pp. �gGL � p1Qy�� 1'Ley- ,SExisting building areaZ15 square feet Ie% e,5r. 64 sc,s a rT , New building area: QsquarefeetT YO.� 11 , 1 3 � � i 6 v ` '� �. �`' Number of stories: Name: AJ e Li_ !`A obi 1.,, l A' 15011�( aat� Type of construction: Address: 1 $ SW �\ 5 t 20 Occupancy groups: Ci /State/ZIp�-� 1 1 ��`),,Q T1 y� R 910�!!.1., Existing: u Phone:(5i %� W 9) Fax ( ) New: 7. �: E S=� f 4 P� d ,1 9� € Business name: Pte'oG iG l LC 29 Structural plan review fee(or deposit). ;220. Contact name: llay.l `vi the — `` / FLS plan review fee(if applicable): Address:L,I OOy I< ue. W 0 P1 OCL t^S 22 � Total fees due upon application: City/State/ZIP: Lake, O5�� �R�i^ e ''^`�" //__ W Amount received Phone:503) 9 Col-1-141 W% Fax::( ) E-mail: CWle�nS �r�i1QGlG' co zra s e +� + f Commercial and residential prescriptive mstallahon of ;, t 9 G ,, „ , ,,,„, . �. .,-. ` _ - .,.,. roof-top mounted Photovoltaic Solar Panel System. Business name. , c Submit two(2)sets of roof plan with connection details tC VI r't C, and fire department access,along with the 2010 Oregon Address: 6-3-P1 r _ , J Solar Installation Specialty Code checklist. City/State/ZIP: IJ '�' L��w�//' L Permit fee(includes plan review $180.00 14441 1 G S and administrative fees): Phone:(C2 _ �f,1.k'� Fax:( ) State surcharge(12%of permit fee): $21.60 ii3 CCB Lic.: ao G�1 Total fee due upon application: $201.60 Authorized signature: di . ' This permit application expires if a permit is not obtained '►`` 1 Li- within 180 days after it has been accepted as complete. Print name: O� .I e� 1 en e� Date: * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Pennits\BUP COM Permit pp.doc Rev.04/21/2014 440 4613T(11/02/COM/WEB] City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 41 Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (fj Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 A r • City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT ._ Plan Submittal Requirements • Commercial & Multi-Family - New, Additions or Alterations TIGAKD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional,drawn to scale and labeled with: A. ' map&tax lot# project name site address suite number ®' zoning kT, applicant name ® phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans,details and specifications. J. Accessibility barrier removal worksheet. K. Deposit-based on valuation of project. I:\Building\Permits\BUP_COb1_PermitApp.doc Rev.03/05/2019 • ti City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT _ " Plan Submittal Requirements Matrix Commercial& Multi-Family - New, Additions or Alterations 1 1GAKll 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov +n ® s te z� JtI zwgfiAt$elld a # i a a o 1TS ® i -atte S }.K:.. . . , v .. Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County,and Tualatin Valley Fire &Rescue),if applicable. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard n COMMUNITY DEVELOPMENT DEPARTMENT ■ TIGARD Building Permit Review — Commercial - No Land Use Building Permit #: ���/J�G� I (/O/so Site Address: 6T3S S\J Sco.Auri Suite/Bldg#: Project Name: AT C. T (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: ca iNhuci et4v & c ascoc,c,4 eit,iqprw-)—) t 1o.0 a,.nr �'L� ` L.14(0s) i ,r m-1 UfrA e..÷;11-111 T.NA , Existing Business Activity: \t I`, k.0 LNA✓n t Proposed Business Activity: `^ Verify site address/suite# exists and active in permit system/ L�1 t:ver Terrace N hborhood: ❑ Yes LP'No ,�//Zoning: LX PPermitted Use: Lid" Yes ❑ No ❑ Spec Space It/Confirm no land use required. ❑ Business License: Exists: 0 Yes ❑ No,applicant notified to obtain business license Notes: 1MM� J t l i' iNggi,� (1.5I JZ•� LPL gO 1SO,( 3o-R Approved by Planning: 4Q( Date: 122-) 19 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: Site Plans: Building Plans: # Building Permit#: ► ter building permit#above. Workflow Routing: ■ho Tanning Permit Coordinator :uilding Workflow Sign-off: jgn-off for lanning(include notes from r anning review) Route Application Documents: 1...Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: � Date: c72-2_4, I:\Building\Forms\BldgPermitRvw COM_NoLandUse_060116.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: IK;DC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes /A Tigard Trans SDC: ❑ Yes N/A Parks SDC: ❑ Yes N/A ❑ OK to Issue Permit 4/I'D—ate: JJ17 Approved by Permit Coordinator: 1' I:\Building\Forms\B1dgPermitRvw_COM NoLandUse 070915.docx