Loading...
Permit Support Document 7rP)RE9 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT /` it11 Request for Permit Action TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503-718-2439 • www.tigard-or.gov TO: CITY OF TIGARD Building Division 13125 SW Hall Blvd.,Tigard,OR 97223 Phone: 503-718-2439 Fax: 503-598-1960 TigardBuildingPermits@tigard-or.gov FROM: ❑ Owner ❑ Applicant ❑ Contractor [ -C taff Check(1)one REFUND OR Name: INVOICE TO: (Business or Individual) Mailing Address: City/State/Zip: A Phone No. PLEASE TAKE ACTION FOR THE ITEM(S) CHECKED (1): Er-CANCEL/VOID PERMIT APPLICATION. ❑ REFUND PERMIT FEES (attach copy of original receipt and provide explanation below). D INVOICE FOR FEES DUE (attach casefee schedule and provide explanation below). Permit#: et4/ Cil/r"_ ()0 .- "Prz_,a Site Address or Parcel#: /z 3 py IS/...,,,) s-,1„)/ c i -v , /4p Project Name: 7r)G6l.14/ Subdivision Name: Lot#: '. EXPLANATION: S Ai ide,:s i 1D e-rr, +r-c,. 4,-,h/4 ,.-.ejJ -i 771- U ne_ old,,4 4.2/0,r-)i r--,0_... .„, r ivr-.." apo 4r—cid Signature: 7 . _- Date: L`/JS et Print Name: ,Q,..,,, ^, �-�. Refund Policy _ ��� - 1. The city's Community Development Director,Building Official or City Engineer may authorize the refund of: • Any fee which was erroneously paid or collected. • Not more than 80%of the application or plan review fee when an application is withdrawn or canceled before review effort has been expended. • Not more than 80%of the application or permit fee for issued permits prior to any inspection requests. 2. All refunds will be returned to the original payer in the form of a check via US postal service. 3. Please allow 3-4 weeks for processing refund requests. FOR OFFICE USE ONLY Route to Sys Admin: Date /6ct By Route to Records: Date / /9 By lei , yif�— Refund Processed: Date '7By I Invoice Processed: Date By Permit i io P ate N// ', By R 470. '.rcel Tag Added: Date By I:\Building\Forms\RegPermitAction_11t(0518. oc City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT a Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: 5 TOTAL (shall equal line [2] of Valuation Computation): $ ***An accessibility study has been done on site,our architectural set details plans to make this location is 100% accessibility compliant.*** I:\Building\Pemuts\BUP_COM_PermitApp.doc Rev.12/18/2014 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 1111 a Plan Submittal Requirements IN Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with: A. ❑ map &tax lot# El project name El site address El suite number ❑ zoning ❑ applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations, plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit- based on valuation of project. 4. ADDITIONAL INFORMATION AS FOLLOWS: A. Fire Department Building Survey with (1) additional full set of architecture drawings. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014 I 4 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Plan Submittal Requirements Matrix Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov Type of Submittal # of Plans (Includes new, additions and alterations.) Required at Submittal Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing(building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County, and Tualatin Valley Fire & Rescue),if applicable. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014