Permit (34) CITY OF TIGARD BUILDING PERMIT
-11 COMMUNITY DEVELOPMENT Permit#: BUP2019-00146
Date Issued: 06/18/2019
T f 6 A Iz,n 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439
Parcel: 2S112BA05900
Jurisdiction: Tigard
Site address: 14050 SW MILTON CT
Project: SHB Power Point Engineering Subdivision: BONITA INDUSTRIAL PARK Lot: 7
Project Description: New partition walls for new offices.
Contractor: OWNER Owner: LWTE DEVELOPMENT LLC
SHB POWER PLANT ENGINEERING, LLC 7180 SW SANDBURG RD#400
15930 SW 72ND AVENUE TIGARD, OR 97224
PORTLAND, OR 97224
PHONE: 503-620-6506
PHONE: 503-620-6506
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: IIB DC Provision Review,COM TI-Ping 06/18/2019 $98.00
Occupancy Grp: B Occupancy Load: 27 Permit Fee-Additions,Alterations, 06/18/2019 $195.38
Demolition
Dwelling Units: 0 12%State Surcharge-Building 06/18/2019 $23.45
Stories: 0 Height: 0 ft Plan Review 06/18/2019 $127.00
Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 06/18/2019 $78.15
Value: $7,730 Info Process/Archiving-Lg$2.00(over 06/18/2019 $6.00
11x17)
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $527.98
Required: Required Items and Reports(Conditions)
Fire Sprinkler: No Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set in OAR
952-001-0010 through OAR 952-001-0090. You ma obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: ` 7</Z4/)1
��ri�� Permittee Signature:
Call 503.639.4175 by 7:00 a.m.for the next available inspection te.
This permit card shall be kept in a conspicuous place on the job site until completion of the project
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Commercial EC;EI rtl►R OFFI(1: 1 S1:cO\l '
Cl of Tigard Received a��/l��/���
`J g JUNDate/B : / I1[ i
1,11 . 13125 SW Hall Blvd.,Tigard,OR 97223 �a 8 a w
g Plan Review
Phone: 503-718-2439 Fax: 503-598-19�Q Date/B : Related Permit:
Inspection Line: 503-639-4175 l i��Y O it(�AHD Date Ready/By: Juris: ® See Page 2 for
1 1 G n I l) Internet: www.tigard-or.gov BUILDING DIV!S 10 Notified/Method: Supplemental Information
TYPE OF WORK
❑New constructionPrint name:
0 Demolition
ElAddition/alteration/replacement REQUIRED DATA:1-AND 2-FAMILY DWELLING
❑Other:
Permit fees*are based on the value of the work performed.
CATEGORY OF CONSTRUCTION Indicate the value(rounded to the nearest dollar)of all
❑ 1 and 2-family dwelling ❑Commercial/industrial equipment,materials,labor,overhead,and the profit for the
work indicated on this application.
❑Accessory building 0 Multi-family Valuation: $
❑Master builder ❑Other:
Number of bedrooms:
JOB SITE INFORMATION AND LOCATION
Number of bathrooms:
Job site address: ` LIO S-O AI i„iv,,,t c.T: Total number of floors:
City/State/ZIP: raj q Q
� G/�//� / �Q �'2Z 7 New dwelling area: square feet
Suite/bldg./apt.#: Project name: 5)18 M 01/e -////
Garage/carport area: square feet
Cross street/directions to job site:
Covered porch area: square feet
Deck area: square feet
Subdivision: Lot#: Other structure area: square feet
Tax map/parcel#: REQUIRED DATA:COMMERCIAL-USE CHECKLIST
. � .I l I4 - ,ai, Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
o.4.c L6 ,4NJ* ?A945/r,On/ W,9L.L Ai/Li)-(, ; equipment,materials,labor,overhead,and the profit for the
work indicated on this application.
Valuation: $ 7/ 730.Qp
Existing building area: square feet
0 PROPERTY OWNER INANT
5)46 /AL2 AA�f ,� /�G UC
New building area: square feet
Name:
Address: / 0 5,4, I L ,ye. Number of stories: /
City/State/ZIP: Q�fin/j� 6 2 Z Z y Type of construction:/ t 4j of Nook
Phone:(9 3) (p Zo-- (0$'040 ' Fax:(5D3) G Zo —6,619 3 Occupancy groups: 2.
LICANT '. ❑ CONTACT PERSON Existing: I
Business name: . el�u et_ ,.�i„f i New:
BUILDING PERMIT FEES*
Contact name:
Address: Structural plan review fee(or deposit):
City/State/ZIP: FLS plan review fee(if applicable):
Phone:( ) I Fax::( ) Total fees due upon application:
E-mail: c l >' 4tP S/f 6 i4,2_. 7rJ� Amount received:
{ CONTRACTOR
PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
Business name: 5�0 ,( W� AlN, 64,,,�GI�.4,a6, Commercial and residential prescriptive installation of
Address: /S9;OP /5'-' 22 IV �.vr. roof-top mounted PhotoVoltaic Solar Panel System.
7 Submit two(2)sets of roof plan with connection details
City/State/ZIP: f7dnJ�pfa#J, CL 97 i2 y and fire department access,along with the 2010 Oregon
Phone:(4 19) r (�`- I Fax:(�9$ &Zp ,5-G 3 Solar Installation Specialty Code checklist.
3 d Permit fee(includes plan review
CCB Lic.: ` and administrative fees): $180.00
'V
vi
Ergo ifillip. til Aviv: 6A6w1 5 State surcharge(12%of permit fee): $21.60
I:\Building\Permits\BUP_COM P: 'tApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB)
Total fee due upon application: $201.60 * Fee methodology set by Tri-County Building Industry
Service Board.
This permit application expires if a permit is not obtained within 180 days after it has been
accepted as complete.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Ilie Accessibility: Barrier Removal Improvement Plan
C
Commercial & Multi-Family - Additions or Alterations
T I GARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Permits\BUP_COM_PemutApp.doc Rev.03/05/2019
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
" Plan Submittal Requirements
Commercial & Multi-Family - New, Additions or Alterations
I ►G n RD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with:
A. ❑ map&tax lot# ❑ project name ❑ site address 0 suite number
❑ zoning ❑ applicant name 0 phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit-based on valuation of project.
.
I: Bailamg Pemvr BUP COivf_PermnApp.doc Rev.03/05/2019 — —
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Plan Submittal Requirements Matrix
Commercial & Multi-Family - New, Additions or Alterations
T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
Type of Submittal # of Plans
(Includes new,additions and alterations) Required at
Submittal
Demolition Permit 2
(site plan is required showing location and square footage
of all buildings to be demolished,erosion control plan and
tree protection,if applicable)
Site Work 3
(must include location of all accessible parking)
Plumbing(site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Solar Photovoltaic 2
(Requires check list for prescriptive installation. If not
prescriptive installation,engineering is required.)
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval,the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County, and Tualatin Valley Fire&Rescue),if applicable.
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019
City of Tigard • BUILDING DIVISION
11 ' Over-The-Counter (OTC) Building & Fire Protection System Permit
r i c n i.r) Appointment Checklist
Permit Record#: 6uPi•ofq--0/cf
Contact Name: -, sr, Phone#• ` T.'G r - dr,
usmess 'lame: ,.' .r£2i, Gam'- 'VvYor Ir�,iS Appt. Date/Time: .I - O ) C3/?).
Site Address: /4/ i (V4 /Y), (- iv G�, Bldg/Suite #: '---
Project Name: New Tenant? es 0 No
Project Description: Atc4 j,o ✓ 7)CXR (.,,,,v ,1 /i i �� of/C242-s.
Existing Use: ,f New Use: e
MMD Required: 0 Yes No Related Record#:
APPLICATION SPECIFICINFORMATION- ` isr.
GENERAL INFORMATION •l# ,.
Class of Work: A Occupancy Group: ja Type of Construction: 2 t
Type of Use: Occupancy Load: 2:-/ _ Oregon Specialty Code: Q.00 ) /
SPECIFICS
Number of Stories: Building Height: Mixed Use:
Number of Dw Units: Number of Bathrooms: Number of Bedrooms:
BUILDING SQ FT-SCHOOL CET OTHER SQUARE FOOTAGES
Story Square Footage: Accessory Structure: Covered Porch:
Basement: Garage: Deck:
Total Square Footage: Carport: Mezzanine:
SETBACKS
Sideyard Setback—Left Sideyard Setback—Front
Sideyard Setback—Right Sideyard Setback—Back _
CONSTRUCTION .... ,,
Exterior Walls: Openings Protected: Firewall Separation:
N: S: N: S: Occupancy Separation:
E: W: E: _ W: Access.Parking Spaces:
REQUIRED ITEMS
Fire Sprinklers: no Fire Alarms: Smoke Detectors:
Sprinkler Type: Alarm Type: Protected Corridors:
Standpipe Required: Pull Stations Required: Parapet:
Hazard Group: Battery Calcs Provided:
Density: Cut Sheets Provided:
Design Area:
K Factor:
Total Project Valuation: $ 7 7 '0,
;',
$ F , DC Prov Rvw,COM TI—Ping
$ j 9r Permit Fee—Add,Alt,Demo
Project Valuation _ e iG�.zi ' an 'eview,Structural
Upto$4 999 �"I��.D �__.. _
$0.00 y $ 7 rr , _ flan Review,Fire Life Safety
$5,000-$74,999 $98.00 7v'I S $ GL Info Proc/Arch,Lg(over 11x17$2.00)
$75,000-$149,999 $243.00 $ Info Proc/Arch,Sm(up to 11x17$0.50)
$150,000 and over $388.00 $ Metro Construction Excise Tax
$ School Construction Excise Tax
$ Hourly Rate Fee
$ Hourly Rate State Surcharge
$ Misc.Admin Fee
$ Other:
Building Staff: $ Other:
011IIIIMMEMBEG4.-..., -44
rtl50ctt++ormAcrfc suF yrs o701rs:ac .
City of Tigard
14 " COMMUNITY DEVELOPMENT DEPARTMENT
T1cARD Building Permit Review — Commercial - No Land Use
Building Permit #: / ,- , 76/ c-- -
Site Address: 14 0 SO SWM i I h) r) Ct. - Suite/Bldg#:
Project Name: S Fl 13 M 0 r1 - tr-I
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: (r) 1i1 (0 . ci h 4 p ci rh t-1 0-tel V✓ti 1 t to vita ` 0 v }-
Existing Business Activity: C, 9" I V1 c u ( r z✓`. le —
Proposed Business Activity: Li To i- 14 div c}- .„Z.A._
/Verify site address/suite#exists and active in permit system.
Al River Terrace Neighborhood: Cl Yes /`i No
AZoning: I -t--
APermitted Use: jZi Yes ❑ No ❑ Spec Space
AConfirm no land use required.
Business License:
Exists: El Yes 4 No,applicant notified to obtain business license
Notes:
Approved by Planning: k" �`�'— Date: 0/I 9 / I cl
Revisions (after Building Submittal only) Reviewer Date
Revision 1: El Approved El Not Approved
Revision 2: El Approved ❑ Not Approved
Revision 3: El Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: / /
Site Plans: #
Building Plans: #
Building Permit#: nter building permit#above.
Workflow Routing: .3.Planning ❑ oordinatording
Workflow Sign-off: ign-off for Planning(include notes from planning review)
Route Application Documents: Building: original permit application,site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: 1 Date: /./ --1?/ '
I:\Building\Forms\BldgPemiitRvw_COM_NoLandUse 060116.docx
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
❑ SDC Fees Entered: Wash Co Trans D Tax: 0 Yes 0 N/A
Tigard Trans •C: 0 Yes 0 N/A
Parks S R`: 0 Yes 0 N/A
❑ OK to Issue Permit
Approved by Permit Coo inator: Date:
I:\Building\Forms\BldgPermitRvw_COM_NoLandUse 070915.docx