Permit IL CITY OF TIGARD BUILDING PERMIT
11 . COMMUNITY DEVELOPMENT Permit#: BUP2019-00060
Date Issued: 06/18/2019
Tf GARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439
Parcel: 2S111 ACO2700
Jurisdiction: Tigard
Site address: 14650 SW 97TH AVE
Project: Twality Middle School Subdivision: None Lot: None
Project Description: Foundation and ADA ramping for(5)relocated portable buildings.
Contractor: PACIFIC MOBILE Owner: UNION HIGH SCHOOL DISTRICT
PO BOX 1404 NO. 3 JT
CHEHALIS,WA 98532 00000
PHONE: 360-748-0121 PHONE:
FAX:
FEES
Specifics:
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 04/18/2019 $1,090.89
Demolition
Occupancy Grp: E Occupancy Load: 250 12%State Surcharge-Building 04/18/2019 $130.91
Dwelling Units: Plan Review 03/20/2019 $709.08
Stories: Height: ft DC Provision Review, COM TI-Ping 04/18/2019 $243.00
Bedrooms: Bathrooms: Plan Review-Fire Life Safety 04/18/2019 $436.36
Value: $98,000 Info Process/Archiving-Lg$2.00(over 04/18/2019 $42.00
11x17)
Info Process/Archiving-Sm$0.50(up to 04/18/2019 $7.50
Floor Areas: 11x17)
Total Area:
Accessory Struct:
Basement:
Carport:
Covered Porch:
Deck:
Garage:
Mezzanine:
Total $2,659.74
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires yo to fo ow - les adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You ma. •.tain a copy of the .-s or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: Permittee Signature:
503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the Job ails at the time of-each inspection. —- -- - --
r
Building Permit Application
Commercial RECEIVE1) FOR OFFICE FSE O\E\
ill Received 4
City of Tigard DateB : } � PermitNo.:Alp i _
13125 SW Hall Blvd.,Tigard,OR 9722"1'1=`1 11 2019 Plan Review
• Phone: 503.718.2439 Fax: 503.59 ,, Date/B : - Other Permit: )
T 1 C .ARD Inspection Line: 503.639.4175 OF riCiHHD Date Ready/By: /� MII d See Page 2 for
Internet: www.tigard-or.gov BUILDING DIVISION Notified/Method: 0, tq jr Supplemental Information
TYPE OP NVORit REQUTIt DATA:1-/NB 3-FA;MILV D%VLLING
®New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
❑Addition/alteration/replacement ®Other:Manufactured equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1-and 2-family dwelling 0 Commercial/industrial Valuation: $
12Accessory building 0 Multi-family Number of bedrooms:
1:1Master builder ®Other:Manufactured Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address:14650 SW 97th Street New dwelling area: square feet
City/State/ZIP:Tigard,OR 97224 Garage/carport area: square feet
Suite/bldg./apt.no.: Project name:Twality Mid Sch-Portables Covered porch area: square feet
Cross street/directions to job site:97th and Murdock street Deck area: square feet
Other structure area: square feet
REQUIRED DATA;COMMERCIAL-USE CH CKLIST
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
Tax map/parcel no.:2S111ACO2700 Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
All work associated with moving(5)existing portables on to the school track Valuation: $ 9 CS/ 000
out of the way of construction of the new building for use 2019-2020 school Existing building area: square feet
year. New building area: square feet
►:® PROPERTY OWNER l ❑ TENANT Number of stories:
Name:Tigard-Tualatin School District Type of construction:
Address:6960 SW Sandburg Street Occupancy groups:
City/State/ZIP:Tigard,OR 97223 Existing:
Phone:(503)431-4000 Fax:( ) New:
APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES*
Business name:Day CPM (Please refer to fee schedule)
Structural plan review fee(or deposit):
Contact name:Shawn Christensen
FLS plan review fee(if applicable):
Address:6960 SW Sandburg Street
Total fees due upon application:
City/State/ZIP:Tigard,OR 97223
Phone:(971)727-4168 Fax::( ) Amount received:
E-mail:shawn.christensen@otak.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
CONTRACTOR Commercial and residential prescriptive installation of
- roof-top mounted Photo Voltaic Solar Panel System.
Business name:� f- c,k -... ---iv oc-;-i �z`J Submit two(2)sets of roof plan with connection details
�L `'\ and fire department access,along with the 2010 Oregon
Address: ?0 y t"4 d4 I 1 j'4 -c))\-,\„,,,-, Z_ &� Solar Installation Specialty Code checklist.
City/State/ZIP: L.�c .L�5 1 k 6-1 " Permit fee(includes plan review $180.00
and administrative fees):
Phone:( ,2.1-. 3ci Fax:( ) State surcharge(12%of permit fee): $21.60
CCB lic.: * So Eh 2-).2i Total fee due upon application: $201.60
Authorized signature: C- / This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name:Shawn Christensen Date:03/15/2019 * Fee methodology set by Tri-County Building Industry
-Luisa-Beard.
I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB)
1,1 Building Division
Plan Submittal Requirements
TI G A R D Commercial&Multi-Family-New,Additions or Alterations
1. SITE PLAN (fully dimensional, drawn to scale) labeled with:
A. ❑ map&tax lot# ❑ project name ❑ site address ❑ suite number
❑ zoning ❑ applicant name ❑ phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit-based on valuation of project.
4. EXTRA SET OF THE FOLLOWING:
A. Two (2) copies of site plan to include vicinity map.
B. One (1) copy of erosion control plan with details.
C. Fire Department Building Survey,and full set of architecture drawings.
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
~`M
III Building Division
Plan Submittal Requirement Matrix
TI G A R D Commercial&Multi-Family-New,Additions or Alterations
Type of Submittal # of Plans
(Includes new,additions and alterations) Required at
Submittal
Demolition Permit 2
(site plan required showing location and square
footage of all buildings to be demolished)
Site Work 3
(must include location of all accessible parking)
Plumbing(site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing(building fixtures) 2
Electrical 2
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor,City of Tigard,Washington
County,and Tualatin Valley Fire&Rescue),if applicable.
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
City of Tigard
IIId COMMUNITY DEVELOPMENT DEPARTMENT
I
TIGARD Building Permit Review — Commercial - With Land Use
Building Permit #: / zlei-Ooa,Q
Site Address: I L tO s\A; ont4 s-tieist Suite/Bldg#:
Project Name: 1vvJ I M V i lt, (cs, 1 VL pp 1/l IA"
(Name of commtrcial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: t AN t fi j QX,Vit 3 05) pl itik1 i 'The 1121 t.,
'Verify site address/suite# exists and active in permit system.
'River Terrace Neighborhood: ❑ Yes l NorLand Use Case#: PDRf 11Cf:G62— jcu p- ie-G )1
.'Plans Match Approved Land Use:
Site Plan Nick,Landscape Plan ❑ Other:
NIS Urban Forestry Plan 1\i `Elevation Plan
'`r Building Height: Maximum Height ,-n�-tuual Height
(V
Conditions Met Prior to Submittal �.E nor to Permit Issuance
Business License:
Exists: ❑ Yes ❑ No,applicant notified to obtain business license
Public Facilities Improvement(PFI) Permit:
Required: , Yes,applicant was notified ❑ No Applied For: ❑ Yes ❑ No,stop intake
Notes: tok1j. meek t jl,w .0 ,; pYjllY tt 1 trtl;t,t1Lt .
Approved by Planning: , i^,r " Date: 3/11 1 lel
Revisions (after Building Submitta only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: 3/11M
Site Plans: #
Building Plans: #
Building Permit#: Winter building permit#above.
Workflow Routing: Fanning -gineering D..erfFi't Coordinator ung
Workflow Sign-off: ❑ Sign-off for Planning(include notes from planning review)
Route Application Documents: ❑ Building: original permit application,site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes: '"��
By Permit Technician: Ao.......7,,,i_e____ / Date: 3/9,
I:\Building\Forms\BldgPernritRvw_COM_WithLandUse 060116.docx
Engineering Review
Slope at building pad:
❑ PFI Permit#:
❑ Conditions "Met"prior to issuance of building permit
❑ Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP)
Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: ❑ Yes 'f No
Assess Water Quantity Fee in-lieu: ❑ Yes No
LIDA Facility on lot: An Yes ❑ No
❑ NOT Approved by Engineering: Date
Notes:
Approved by Engineering: �— -- Date: 4 1 19
Revisions (after Building Submittal only) Reviewer Date
Revision 1: 0 Approved ❑ Not Approved
Revision 2: 0 Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant: �/
DC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes Id /A
Tigard Trans SDC:
CI
A
Parks SDC: ❑ Yes EXA
OK to Issue Permit
Approved by Permit Coordinator: Date: A// /A
I:\Building\Fonns\BldgPernutRvw_COM_WithLandUse 070915.docx