Report T I G A R D .0 I V I C C E N T E R E X E C U T I V E C 0 M M I T T E E R E P O R T HONORARY CO-CHAIRMEN: Floyd Bergmann Wilbur Bishop Daniel Larsen Alan Mickelson Elton Phillips CHAIRMAN: VICE-CHAIRMAN: Dr. Chuck Samuel Gary Leon Fox, Sr. MEMBERS; Dr. Steven Alexander Yvonne Burgess Betsy� Chick Allan Popp Basil` Dmytryshyn Cliff. Speaker Gerry Edwards Tom Taylor Robert Gray Madalyn Utz David Hughes J. Allan Paterson Joan Barker Steve Slaybaugh C. Vern Christensen Sharon Takahashi Howard (Gerry) Duffy Frank Tepedino Mary Payne Carol Weaver Phil Hirl STAFF. Dennis Brun, Architect Bob Moore, Financial Consultant Linda Sargent., Administrative Assistant Robert W Jean, City Administrator 1. CIVIC CENTER COMMITTEE Summary of Meetings 5/18/81 Civic Center Executive Committee/Committee-at-Large established by City Council. Need for Library space explored. 6/18/81 Council meets with City staff on space needs and concerns regarding a new Civic Center. 7/20/81 Council sets goals and guidelines for Committee per resolution of City Council: 1. To review and study the Fanno Creek Park Master Plan by ORB Organization that was approved by the Park Board and the City Council in the spring of 1980 as the future site for the Civic Center-Library complex. (To review this in light of today's needs and economic realities. ) 2. To review and study the possibility of the Crow Engineering Building for a Civic Center-Library complex. (Work with City negotiators on this. ) 3. Compare this proposed site and building with others that might be available within the City. 4. To work with City staff and each of the department heads to determine the space needs of the City during the next 5, 10, and 20 years. 5 To seek out professional help, with the authorization of the City Council, to determine: a) space needs; b) appraisal costs; c) remodel- ing costs of a Civic Center-Library complex by stages; d) full cost. 6. Review and give Council a composite cost of present City office costs: a) City Hall; b) Library; c) Police Department; d) Muni- cipal Court; e) other. 7• Develop and submit to the City Council a campaign strategy for voter approval of a new City Center: a) total amount needed; b) expanded Citizens Committee of several hundred; c) time schedule; and d) date of proposed election. 8/13/81 Introductions/Background; review of ORB study; purchase of Crow Building discussed. 8/27/81 On-site visit of Crow Building; discussion of scope of project. 9/17/81 Staff reports to Committee on space needs and development of alternatives. .Expand/remodel existing City Hall .Remodel leased space .New building/Public Works site .New building/alternative site .Remodel alternative structure .Purchase decentralized office space .Lease decentralized office space .Lease with option to purchase centralized office space .Build big/look to future 2. Staff presents space needs/manpower plan. Committee discusses special needs for now/future; remodeling costs now/future; com- parisons of alternatives; advantages/disadvantages of new construc- tion. 10/1/81 Committee discusses community image and goals, centralized vs. decentralized options, site alternatives. Alternatives limited to downtown sites. Appoints sub-committee to select professional consultant and to review site proposals. Letters of interest and brochures received from 11 architectural/ planning firms. Executive Committee solicits site proposals from interested parties. 10/8/81 Sub-committee members/scope of work selected. 10/12/81 Alternatives discussed; 9/17 presented to Library Board. 10/22/81 Staff reviews slides/materials from other communities on Civic Center complexes with Executive Committee. Reconsider all alternatives. Authorize sub-committee to select architect. Revise timetable. 11/3/81 Sub-committee meets to discuss criteria for evaluating architects .Brochure/Summary letter .Availability .Itemized hourly costs/fee schedule/manpower allocation Sub-committee directed to select three architects to interview. 11/5/81 Deadline for submission of site proposals. 11/17/81 Sub-committee reviews submittals from architects. 11/18/81 Library Board develops Library building criteria. 11/19/81 Sub-committee selects four firms out of 11 as finalists: 1. Brun/Moreland/Christopher 2. Fletcher/Finch/Farr 3. Koch/Sachs/Whittaker 4. SRG Partnership Each firm gives a brief oral presentation. Committee moves to select Brun group. List of sites offered to the City announced. 11/24/81 Architectural firm of Brun/Moreland/Christopher (BMC) introduced._ Scope of work discussed: I. Architects are to review and make recommendations on space needs, both present and future, for City services as well as potential allocation of other space. (Basic information to be provided by City staff, reviewed by architects, and referred to Committee. ) 2. Architects are to consider options of total building program with possible lease-back of currently unneeded space as opposed to a building plan accomplished in stages over a period of time. 3. Architects are to review a full range of costs and/or policy options. 3. 4. Architects will review physical sites as proposed, consider merits of central as opposed to decentralized locations, and make their recommendations to the sub-committee. 5. _ A detailed footprint of selected alternatives is to be provided. 6. Architects will provide information on financing alternatives and make a recommendation on what they see as the optimum time frame for obtaining funding. 7. Recommendations will be provided to assist the Committee in promoting a community image via this Civic Center. 8. The contract will specify a dollar amount to be spent on this footprint work. Since the scope of work to be provided is somewhat more extensive than originally planned, it may be necessary to approach City Council for additional authorization and funds. 12/3/81 Staff meets with architect regarding Phase I contract. 12/3/81 Committee tours Lamb-Weston facility. Downtown Revitalization Plan/Urban Renewal Plan presented to Council. Phase I agreement approved. 12/8/81 Phase I contract presented to Committee. Guidelines for judging sites developed by sub-committee: 1. Minimum size (2.5 acres) 2. Within the Urban Growth Boundary 3. On or near major arterial 4. Accessibility to public transportation - current or future modifi- cations 5. Complementary environment Of the 18 sites submitted, all but the following five were eliminated: 1. Crow site - 5 acres - $1,250,000 2. Public Works site - 3.2 acres - City-owned (85% out of floodplain) 3. Christ King Lutheran Church - 2.5 acres — $525,000 4. Air-King - 5.16 acres - $850,000 5. Hall Blvd. at Hwy. 217 - 2.47 acres - $485,000 -(possible additional acreage) Executive Committee agreed upon the Crow site, Public Works site, and the Air-King site to be considered in the site analysis by the architect. The Crow site will be considered in combination with the Public Works site, and the Public Works site will also be studied as a single site. 12/15/81 Tour of Salem Civic Center. 12/17/81 Committee explores program/policy options. Debriefing on Civic Center complexes. 4. 12/28/81 Committee explores site relationship to transportation corridors. Recommends June 29, 1982, special election and tying up option on Crow Building. Architect directed to complete site analysis on split site and partial site with and without expansion. . 1/8/82 Report from sub-committee on professional services contract; site selection; architect presents space needs, manpower projections. 1/26/82 Sub-committee reviews space needs with department head comments; architect discusses site analysis; City Administrator discusses campaign/financing strategy. 1/28/82 Architect presents policy options to Committee and timetable. 2/25/82 Site studies to Committee. 3/2/82 Schemes A and B presented by architect. Cost for real estate acquisi- tion, roadway improvements, new construction, demolition and site improvements explored for each scheme. 3/9/82 Site analysis, policy options, interdepartmental relationships, cost presented. Review Phase I work. Recommend Phase II contract. Cost - of City Administrator's recommendation for Scheme B and BMC's adjust- ments to costs presented. 3/23/82 Phase I architect's services, alternative schemes completed. Site analysis/cost estimates, policy options discussed. Possibility of Teasing extra space explored. 4/6/82 Discussion of presentation of site program to Committee-at-Large; campaign strategy. 4/13/82 Presentation of revised Scheme B by architect; campaign strategy and presentation of program to Committee-at-Large for 4/20/82 meeting. • 5. CIVIC CENTER CONCEPTS The Committee considered the overall concept of a centralized Civic Center, as well as decentralized options. The Committee reviewed the 1980 ORB proposal for Tigard and received materials about other Civic Centers in Medford, Oregon; Brea, Califor- nia; Lake Oswego, Oregon; Beaverton, Oregon; and Pendleton, Oregon. Resource mater- ials from the American Institute of Architects, American Planning Association, International City Management Association, and other sources were used by the Com- mittee in its work. The Committee had fairly solid concepts in mind by the time the project architect was retained. The Committee's concepts were then further developed by the architect. The Committee and architect determined that a centralized Civic Center site was preferred and should: • Be a community focal point or image; • Be a people place for more than just the transaction of government business; a Preferably be in the downtown area to enhance economic development (although a City-wide site study was conducted) . SUMMARY OF ALTERNATIVES FOR CONSIDERATION Alternative 1. Expand or Remodel City Hall The existing structure housing City Hall could be remodeled or expanded by purchasing or leasing the space on either side of the existing structure and/or building an addition in the rear parking lot of the structure. City Hall contains 3450 gross square feet of space. The projected space needs for City Hall offices (Administra- tion/Finance/Engineering/Planning/Bui.lding and Public Works Administration) at this time are approximately 5000 gross square feet with space needs accelerating to 7330 gross square feet for the same departments in the year 2000. Remodeling costs are estimated at $25 per square foot. To create an additionall550 square feet of space (5000 projected need-3450 present space) , cost is estimated at $38,750. To accommodate the maximum space needed of 7830 square feet in 1990, cost is projected at $109,500 to create 4380 square feet in additional space. The purchase or lease of additional space and property may be incurred as a result of remodeling City Hall. Alternative 2. Remodel Leased Space (Crow Bldg. ) The Crow Building contains 6840 square feet of available office space. The space -would accommodate City Hall offices (Administration/Finance/Engineering/Planning/ Building/Public Works Administration) until 1985. At such point, the Crow Building could be remodeled at $25 a square foot to create 440 (7280 projected 1985 need-6840 present space) additional square feet at a cost of $11,000. To accommodate the maximum space of 7830 square feet required for 1990, cost would be $24,750 to create an additional 990 square feet of space. Also, cost for leasing the space would be incurred at approximately $7.25 per square foot dur- ing remodeling. , 6. Alternative 3. New Building at Public Works Site A 35,663 square foot structure could be built at the Public Works site on the land already owned by the City. This building would house all City offices, Police and Library. At a projected cost of $75 per square foot, the building could be constructed for $2,674,725. Alternative 4. New Building at Alternate Site (A-Boy Site) A 35,663 square foot Civic Center complex could be constructed at an alternative site in the City. The structure would house all City offices, Police and Library. At a projected cost of $75 per square foot, the building could be constructed for $2,674,725, plus the cost of the land acquisition. Alternative 5. Remodel Existing Structure at Alternate Site (Air-King) Owner plans to upgrade existing structure to accommodate municipal offices. Site is 2Z acres. Leasing cost would be $6.50 per square foot. Alternative 6. Remodel Alternative Structures (Lease/Option to Purchase) A leased structure could be remodeled to accommodate City Hall's present and future needs. Given that a structure with 5000 square feet of space is located, remodeling costs to create 1330 square feet of space for 1982 needs (6330-5000) would cost $33,250. To accommodate the maximum space required for City Hall offices by 1990, remodeling costs would be $70,750 in addition to the cost of leasing the space. Alternative 7. Purchasing Decentralized Office Space To accommodate present and future space needs for City offices, decentralized office space could be purchased. An additional 1550 square feet of office space would need to be purchased to meet 1981 needs for City Hall. Additional space for Police and Library departments would need to be negotiated. The cost of acquiring 1550 square feet would total $116,250. An additional 4380 square feet (7840-3450) would be needed by 1990 at a cost of $328,500 ($75 per square foot) . Alternative 8. Leased Decentralized Office Space To accommodate present and future space needs for City offices, decentralized office space could be leased at approximately $7.25 per square foot. An addi- tional 1550 square feet of office space to meet 1981 needs for City Hall would cost $11,238 per year. By 1990, the cost would accelerate to $28,130 (3880 square feet) . Additional space would still need to be negotiated for the Police and Library departments. Alternative 9. Build Small with Land/Expand Later on Site Alternative 10. "Build Big" With Vision to Future 7. SPACE NEEDS AND MANPOWER PLAN City Hall offices, Library, Police and Public Works Shops are the basic functional space needs to be provided in the Civic Center. The additional concerns of "Tigard's image" and "community facilities" were to be integrated into the design. To deter- mine what was needed, the Committee reviewed: the existing space; a projected 20-year City staff manpower plan; the special department needs in general, and Library and Police needs in particular. . A phased project was considered to coincide with staffing and community growth. The project architect later reviewed and modified the space needs with the Committee. 8. EXISTING SPACE - 1981-82 expressed in square feet _CITY HALL Administration 250 Finance 1,750 Planning 300 Building 230 Engineering 200 Public Works 200 Computer Room 100 Vault 70 Xerox, storage, halls, r/r 350 Gross Total 3,450 (29 employees) LIBRARY Librarians Office 70 Circulation Desk 300 Staff Work Area 380 Shelving, Files, Patron Work Areas 3,750 Storage, Halls, r/r 500 Gross Total 5,000 (5.5 employees) POLICE Chief's Office 100 Lieutenant's Office 100 Detective's Office 300 Booking/Interviewing Room 75 Briefing Room 150 Locker/Shower 100 Dispatch Center 540 RecordsSupervisor's Office 75 Storage, Files, r/r 160 Gross Total 1,600 (28 employees) PUBLIC WORKS SHOP Superintendent's Office 50 Map/Tool Room 100 Staff Room 150 Storage, File, r/r 75 Garage Office 100 Shop 700 Storage, Files r/r 200 Gross Total 1,375 (14.5 employees) TOTAL EMPLOYEES - 77 a 9. MANPOWER PLAN 1981-82 1982-83 1985 1990 1995 2000 Staff Estimate Estimate Estimate Estimate Estin (14,500- (18,000 (24,000) (28,000) (30,000) (32,C 16,500) 20,000) EXECUTIVE City Administrator 1 I I I I I Admin. Secretary 0.50 1 1 1 1 1 Admin.Aide/Asst. 1 1 2 2 2 2 Totals 2.50 3 4 4 4 4 Staff/Population Ratio 1:5862 1:6000 1:6000 1:7000 1:7500 1: FINANCE/RECORDS Finance Director .50 1 1 1 1 1 Admin'. Secretary 0.25 0.50 1 1 1 1 Accountant Sr. 1 I I I I 1 Accountant I I 1 I I 1 1 Billing Typist 0.75 0.75 1 2 2 2 City Recorder 0.50 1 1 1 1 1 Admin. Secretary 0.25 0.50 l 1 I 1 Clerk II 1 1 1 1 l 1 Clerk II 1 1 1 1 1 1 Clerk II (Bldg. ) 0.25 0.25 0.50 1 1 1 Billing Typist 0.25 0.25 0.50 0.50 1 1 Totals 6.75 8.25 10 11.50 12 12 Staff/Population Ratio 1:2171 1:2182 1 :2400 1:24.35 1:2500 1 NON-DEPARTMENTAL Cashier 0 1 1.50 1.50 1.50 1. Receptionist/Switchboard 1 1 1.50 1.50 1.50 1, Information Specialist 0 1 1 1 1 1 Computer Programmer 0 1 1 1 1 1 Data Entry Operator 0 1 2 2 2 2 Totals 1 -S- 7 7 7 7 Staff/Population Ratio 1:14,655 1 :3600 1:3428 1:4000 1:4285 LIBRARY Librarian 1 1 1 1 1 1 Asst. Lib.-Reference 0.50 1 1 1 1' 1 Lib. Asst.-Childrens 0.50 1 2 2 2 2 Lib. Asst.-Technical 1 2 2 3 3 3 Lib. Asst.-Circulation 1 2 3 4 4 4 Library Clerk 1 2 2 3 3 3 Library Aide 0.50 1 2 3 3 3 Totals 5.50 10 13 17 17 17 Staff/Population Ratio 1 :2665 1 :1800 1:1846 1 :1647 1 :1765 1:1 ?LANNING Planning Director 1 I I 1 1 0 Asst. Planner 1 2 Z 2 1 1 Clerk II 1 1 I 1 1 Code Enforcement Off. 0.50 10.5 1 1 1 1 Totals 3.50 5 55___,__ 4 2.5 Staff/Population Ratio 1 :4187 1 :3600 1:4800 1:5600 1 :7500 1: 1281 • 1lH:yry�YL' it rL:�;v (CONTINUED) 10• 1981-82 1982-83 1985 1990 1995 2000 Staff Estimate Estimate Estimate Estimate Estima (14,500- (18,000 (24,000) (28,000) (30,000) (32,00 16,500) 20,000) POLICE Chief 1 1 1 1 1 1 Lieutenant 1 1 1 1 1 1 Police Officer 1 1 1 I 1 I Admin. Secretary 0 1 1 1 1 1 Records Supervisor 1 1 1 1 1 1 Comm. Services Off. 0 0 0 1 2 3 Clerk/Dispatcher 6 6 8 9 9 11 Sergeant/Detective 1 1 1 1 2 2 Corporal/Investigator 1 1 2 2 2 2 Police Officer/Invest. 1 1.50 2 4 4 4 Sergeant 3 3 3 4 5 5 Corporal 2 3 4 5 5 5 Police Officer 10 13 20 22 25 28 Totals 21 + 7 25.5 + 8 35 + 10 41 + 12 46 + 13 49 + 11 Staff/Population Ratio 1:697 1:705 1:685 1:682 1:652 1:1 (sworn) (sworn) (sworn) (sworn) (sworn) (swc 1:523 1:537 1:533 1:528 1:508 1:� (total force) (total force) (total force) (total force)(total force) (tai fol. BUILDING Building 'Official 1 1 1 1 1 1 Chief Plans Ex. 1 1 1 1 1 1 Building Insp. 1 2 2 2 2 2 Clerk II 0.75 1 1 1 1 1 Code EnforcementOff. 0.50 0 0 0 0 0" Totals 4.25 5 5 5 5 5 Staff/Population Ratio 1 :3448 1:3600 1:4800 1:5600 1:6000 1 PUBLIC WORKS Public Works Director I 1 1 1 1 1 Clerk II 1 1 1 1 1 1 *Clerk III 1 1 1 1 1 1 Public Works Supt. 1 1 1 1 1 1 Utility Worker III 1 1 1 1 1 1 Utility Worker II 1 3 3 3 3 3 Utility Worker I 1 1 2 3 4 6 Part-time Summer 0.50 1 2 3 4 6 Utility Worker III 1 1 1 1. 1 1 Utility Worker II 1 1 2 2 2 3 Utility Worker I 2 3 4 5 6 6 Utility Worker III 1 1 1 1 1 1 Utility Worker II 1 1 2 2 2 2 Utility Worker I 2 2 2 3 4 4 Mechanic 1 1 1 1 1 1 Utility Worker 1 1 2 2 3 3 Engineering Supt. 1 1 1 1 1 1 Engineering Tech I 1 1 1 1 1 0 Engineering Tech II 1 1 1 1 1 1 Engineering Tech III I 1 1 1 1 1 *Engineering Tech IT 1 Is 1 1 1 0 0 Engineering Tech II 1 1 1 0 0 0 Engineering Tech I 1 1 1 0 0 0 Engineering Tech I 1 1 1 0 0 0 Totals 25.50 29 35 36 40 44 Staff/Population Ratio 1 :574 1 :620 1 :685 1 :777 1:750 1 : Currently vacant 11. MANP01,'ER PLAN 1981-82 1982-83 1985 1990 1995 2000 Staff Estimate Estimate Estimate Estimate Estima (14,500- (18,000- (24,000) (28,000) (30,000) (32,OC 16,500) 20,000) TOTAL. City Hall 29 37.25 41 40.50 37 36.5 Library 5.50 10 13 17 17 17 Police 28 33.50 45 53 58 65 t Public Works 14.50 18 25 28 33 38 Totals 77 98.75 124 138.50 145 156.5 Staff/Population Ratio 1:190 1:182 1 :193 1:202 1:207 1:2 + Excluding Engineering Staff, Public Works Director, and Clerks { 12. f R., D. L -1 Y PUS11. � s C Phone 639-9511 12568 SW Main-Tigard, Or. 97223 MEMORANDUM November 18, 1981 TO: Civic Center Development Committee FROM: Tigard Library Board SUBJECT: Library Building Criteria After careful consideration and discussion, and following consultation with representatives of other library districts, the Tigard Library Board respectfully submits the following , criteria for a new library for the City of Tigard: 1. Siting a. The library should be located in order to reflect that most library activities and pursuits are literary, cultural, and esthetic and the environment should foster and encourage these pursuits. b. The building must be efficient and flexible, to meet changes in needs and technology. C. The site should be within an area commonly traversed by patrons and away from noisy locations such as a fire station. 2. Size and configuration a. The library should have at least 12,000 square feet of usable area, preferably on one floor. b. The space should be essentially rectangular and approach a square in proportions. C. Provision should be made for future expansion to a minimum of 20,000 square feet. 3. Access a. Adequate and safe foot passage should be provided. b. Public transportation should be readily available. C. Easy auto entry and exit should be provided along with adequate parking. d. Handicapped persons should be adequately provided for. 4. Liveability a. Adequate heating, air conditioning, and ventilation should be provided. b. All areas should be properly illuminated for their intended uses with some provision for natural light. C. Sanitary, maintenance, rest, and conference space should be separate and adequate. d. Alternate energy systems should be incorporated. 5. Esthetics a. The exterior of the building should be esthetically pleasing. b. The library should look like a "library". C. Landscaping should be attractive and relatively care free. d. Interior decoration and furnishings should be tastefully chosen and arranged. 6. Security a. Adequate fire and access alarms should be provided. b. Emergency access and exit should be considered. C. Passage to employees parking should be exposed and illuminated. d. The book drop should be incorporated in the building so that returns will go into the building. e. Patrons and staff should be visible when approaching and entering or leaving the building. Y 13. 1 � Phone 639-9511 12568 SW Main•Tigard, Or. 97223 Library Building Criteria November 1981 I . General Statement a . Location: Much information is contained in library literature regarding the criteria for location of the library building. "The basic criterion for location is : is this location one where people cannot miss the library? . . . The library has to be more than con- venient to users ; it has to be in a location where potential patrons will stumble over it . . .To allow the library to function as an active community institution the library must be where the action is . . . . It will have to be on expensive property - property very desirable to commercial interests . It does not have to be at the busiest intersection, but it should be very close to it , and it must be in a natural center of pedestrian traffic as well as near parking facilities for automobiles . With competition for time , the library is going to lose if it is inaccessible . A beautiful building isolated from natural traffic patterns will be a dead facility unless there are potent reasonslwhich force its use . . . .The site should be such as would be selected by a keen business man locating a book store ." Libraries : Building for the Future . Chicago , ALA. 1967 , p . 27 . "The site should be where the largest possible percentage of the people to be served will pass the site frequently in the daily pursuit of their normal activities . The site ' s surrounding land use should be compatible with a library, and the size of the site should allow parking and future expansion of the building . " Rochell , Carlton C . Wheeler and Goldhor ' s Practi-<al Administration of Public Libraries ; rev. ed . New York, Harper & Row, 1981 . p . 407 . "The purpose of the building ( library) is to attract and serve the greatest possible clientele at the least cost . " Wheeler , Joseph L . The Small Library Building, No . 13 in a series of pamphlets , Small Libraries Project , ALA. The literature also refers to specific areas as being unacceptable , i .e . , parks and civic complexes are unacceptable , while shopping areas are ideal . It is possible that none of these specific locations is better or worse so long as the primary criteria is satisfied . Tigard Public Library - Building Criteria - page 2 lit. t Each community is different . The library must satisfy tscommunity 's expectations and needs . The library will also be subject to the resources available in the community . Careful planning with the basic criteria in sight at all times can develope the best library for this community in the best location . b . Space Requirements : These criteria describe each functional area of the library. Floor areas are approximations based on the function, furniture and number of occupants anticipated for each area. Two figures are given — immediate need and year 2000. It is not intended that the specifications on space be final but that they be used as guides only. Floor space is expressed in square feet . AREA NAME NOW 2000 Reference 650 1150 Quiet area 175 500 Adult Reading/Stacks 3790 6000 Audio-Visual/Periodicals 200 1000 Youn4 Adult 500 1000 Children' s Library 1550 2000 Entry & Exhibit 270 500 Service Desk 500 1000 Work Room 740 1200 Librarians ' Offices/ Small Conference Room 275 475 Staff Room 120 170 Rest Rooms 350 700 Janitor ' s Space 180 200 Meeting Room 1800 2000 City Archives 100 200 Dead Storage/Utility Room 200 1000 11 ,400 19 ,095 The public service areas of the library are : Reference Quiet Area - 17,Reading /Stack Audio-Visual/Periodicals Young Adult Children 's Library Entry & Exhibit Service Desk Rest Rooms Tigard Public Library Building Criteria - page 3 15. The support service area are : Workroom Librarians ' Offices/Small Conference Room Staff Room 3anitor '.s Space Dead Storage & Utility Room The auxiliary function areas are : Meeting Room City Archives II . Interior Arrangement a. Flexibility and the Modular Concept : The Public Services areas , except for the Rest Rooms , must be incorporated into what is essentially one large room. The dimensions of this room must be based on the concept of a 3ft . module--the length of a standard shelf . Length of walls and spacing of support columns in the whole building should coincide with the modular concept to minimize wasted space and lend flexibility to the floor plan. Flexibility will also be served by minimal use of fixed obstructions Any walls contemplated for the Public Service areas should be movable without a major remodeling effort and should not block visual access from the Service Desk. Support Service areas should be clustered and convenient to the Service Desk. Flexibility is paramount in the evenfthat the library is built in increments . As shown already, the floor space needed by year 2000 will be double today 's minimum. if the library is built in increments, the building design must anticipate this future expansion . The site will determine whether this expansion is vertical or horizontal . b . Floor Level Options : Ideally, the entire building would be on one level but the site will largely determine whether the building will have one or two levels . The library may have to operate with minimum staffing at times . It is therefore essential that all the Public Service areas (see above) be on the same level . Of the Support Service areas , the Librarians ! Offices and Workroom should be on the same floor as the Public Service area . The remaining Support Service 'areas , listed according to priority for inclusion on the main floor are ; iigara F'uolic Library Building Criteria page 4 16. a . Janitor ' s Space b . Staff Room c . Dead Storage & Utility Room Both Auxiliary Function areas can be on a separate level from the Public Service areas . It must be noted that a two-floor building will necessitate ( 1 ) two sets of rest rooms , (2) an elevator , and (3) stairs and additional exit( s) . C . Visual Control. All the Public Service areas should be under visual control from the Service Desk. Visual control is the design prin- ciple most effective in forestalling minor disturbances , theft of materials and vandalism in the completed building . The heights of furniture and shelving units in these" criteria should be selected with this principle in mind : Theit arrangement in the "one large room" of Public Service areas , and the appropriate positioning and composition of any partitions in this room, should also lend themselves Ito visual control from the Ser- vice Desk . The entrance and emergency exits) should be in sight of the Service Desk. d . Sound: Interior finishing materials and carpeting should help deaden noise in all Public Service areas . Furniture , 'stack, and partition arrangements should also help block .sound from noisy to quiet areas . Noise level relationships must be considered in locating the various use areas . A list of Public Service areas from noisiest to quietest is as follows : a. Children ' s Library g. Audio-Visual/Periodical b. Service Desk h. Quiet area C . Entry and Exhibit d . Young Adult e . Reference f . Adult Reading/Stack e . Windows : There should 'be few windows : every interior wall is a potential shelving space but it cannot be used if the wall is glass ; windows create hot spots and leak heated air ; installation, maintenance Tigard Public Library - Building Criteria - page 5 17. and repair costs are high; sunlight damages books and furniture; glare and uneven light makes reading difficult . Windows may be used to : provide readers with a pleasant view; invite people inside the library (windows in the Children ' s Library or the informal reading part of the Adult Reading/Stack Area would be inviting) ; windows would allow some recourse if the ventilating system. f. Lighting: Careful consideration must be given to glare , contrast and shadow control througIDut thelibrary. * Some areas , e .g . , stairs , storage , staff room, corridors , rest rooms , utility rooms , will need only 25-40 foot candles of illumination while reading surfaces will require 75-85 , reduced only where architectural or psychological reasons require it . Equal lighting over a general area is preferable to specialized lighting for specific functions where such specialized lighting would reduce flexibility in the floor plan. There should be a master light control behind or near the Service Desk; switches here should control all lights in the building . (except those in the Meeting Room) ; a delay switch should allow library staff to get to their cars in the parking area before lights in the area are ex- tinguished . Some interior lights and lighting over some exterior doors should remain on through the night . g . Reating and cooling: The building should be heavily insulated . Perimeter heating will not be practical because all wall space will or could be used for shelving . The meeting room chould be controlled as a zone separate from the rest of the library. Zoned heating/cooling should also be used in parts of the building that , because of exposure, are anti- cipated to be heating/cooling problems . The building must be air conditioned . Noise from heating/cooling systems must noc interfere with the operation of the library or intrude on uses of the meeting room. Selection of the heating/cooling system will be be a major decision. For the comfort of patrons and the preservation of library materials , some sort of .5y.5tem-wide humidity control system should be considered . a Tigard Public Library - Building Criteria - page 6 18. h . Car etin : Wall-to-wall carpeting should be included in all Public Service areas and the Librarians ' Offices . Carpeting should be durable , easily cleaned , and be a color that does not show dirt . This is a general statement outling some of the primary criteria in planning for a building . A more detailed criteria will be developed treating each functional area of the library. This will include: a. Area name b . Type and number of occupants C . Required area in square feet d . Functions e . Relationships to other area f Special problems g . Built-in and movable equipment 19. TIGARD CIVIC CENTER - SPACE NEEDS COMMUNITY CENTER SQUARE FEET Community Hall 2,500 Judge's Office 200 Jury Room 250 Kitchen/Service Area 1,020 TOTAL: 3,970 LIBRARY Reference 1,150 Quiet Area 500 Adult Reading/Stacks 6,000 Audio-Visual/Periodicals 1,000 Young Adult 1,000 Children's Library 2,000 Entry & Exhibit 500 Service Desk 800 Work Room 1,400 Librarians' Offices/Small Conference Room 475 Staff Room 170 Rest Rooms 500 i Janitor's Space 200 Meeting Rooms (2) 500 1,500 City Archives 200 Dead Storage/Utility Room 1,000 TOTAL: 18,895 CITY HALL Executive City Administrator 300 Administrative Secretary 200 Administrative Assistant (2) 250 *Attorney 200 *Secretary/Reception 200 Finance/Records Finance Director 250 Administrative Secretary 200 Accountant Sr. 200 Accountant I 150 Billing Typist (2) 200 City Recorder 125 Administrative Secretary 125 Clerk II 80 Clerk II 80 Clerk II (Bldg. ) 80 Billing Typist 80 *Added to department's estimate of need $Changed from department's estimate t 20. Finance/Records (Cont. ) SQUARE FEET Vault 80 *Conference Room 225 Computer 300 *Reception 300 *Court Administration 200 Non-Departmental Cashier 150 Information Specialist 125 Computer Programmer 80 Data Entry Operator (2) 150 *Conference 300 *Copy Center 200 0 Reception 250 Mail Room 200 Planning, Building, Public Works Planning Director 250 Assistant Planner 150 Clerk II ( .5) 100 Code Enforcement Officer 100 Building Official 150 Chief Plans Examiner 150 Building Inspector (2) 200 Clerk II 100 Code Enforcement Officer 100 Public Works Director 150 Clerk II 100 Clerk II 100 Engineering Superintendent 150 Engineering Tech. I (3) 300 Engineering Tech. II (3) 300 Engineering Tech. III (1) 100 Conference Room 225 *Conference Room II 150 *Conference Alcoves (2) 100 *Vault 150 Drafting Area 300 Storage 600 *Paper Storage 100 *Reception 300 Urban Renewal Agency *Staff (3) 450 *Secretary 150 Circulation/Mechanical/Janitorial/Restrooms 1,340 TOTAL: 11,645 *Added to department's estimate of need •Changed from department's estimate 21.._ POLICE DEPARTMENT SQUARE FEET *Police Officer 100 *Administrative Secretary 150 . *Community Service Officer 150 *Clerk/Dispatcher (4) 400 Chief's Office 200 Lieutenant's Office 200 Conference/Prisoner Lineup/Multi-Purpose 600 Crime Analysis 420 Detective's Office 300 Division Commander's Office 375 Equipment Storage 200 S.I. Room 400 • Squad Room Male 650 Female 300 Shower Room Male 160 Female 80 Physical Fitness Room 500 Briefing Room 240 Patrol Division Commander's Office 200 Records Room 500 Supervisor's Office 150 Communications Center 300 Police Library 200 Report Writing Room 225 • Records (Microfilm) 350 Supplies 430 Evidence/Property 430 Armory 200 Firearms Range 1,440 Recommended not on premises Equipment Room 250 Holding Cells 480 Prisoner Booking Room 180 Interview Rooms 300 Prisoner Dock 575 Exterior space Reception Area 380 *Conference Room 400 Circulation/Mechanical/Janitorial/Restrooms 1,241 TOTAL: 13,656 GRAND TOTAL: 48,166 *Added to department's estimate of need •Changed from department's estimate 22. SITE ALTERNATIVES AND FOOTPRINTS After determining what we wanted and what we needed as a Civic Center, the Committee appointed a sub-committee to evaluate a series of site alternatives from all over the City. Three preliminary sites were selected: the Air-King site at Burnham and Hall; the Crow site on Burnham and Ash; and the Police/Public Works site opposite the Crow site on Burnham and Ash. Site characteristics for these preliminary sites were developed by the architect and reviewed with the Executive Committee. The combination of the Crow and Police/Public Works sites were selected as the most appropriate. The architect was directed to prepare two site lay-outs or "footprints" showing how the space needs and community uses could be arranged. One footprint was to use the full site and relocate the shops; the other was to leave the shops on site. Plans "A" (relocating shops) and "B" (with shops on site) were developed. 23. v t,e r. meet mow! y N I - LU p w Al I chamber to P c � r 1. Lace -- 41 ..tea_ ? it LI L' 1', Ck Tower Lake - e f Futgq Creak � �%' bridge Tigard civic center Bryn Moreland Christopher An Ntmtsa frF{ ( Scheme A >o %v A,— March 2.1982 R;,!,,q on 97205 E 503!222-5757 SCHEME A 24. sv J Burnham Street '� 8 1 (ice { •�: t FU Expansion IU, re L-btdr j ;:•'\ taC Shops i•ky , - ha�mbaer f xe6'i �. ..•. '' I F uel JAW .�: Covered r•,.-Y� Storage top i • . i t iX,% f Lake SA?- femo Outdoor Storage i •�+�' "S3 s x J t i SCHEME B 24a.. T I G A R D C I V I C C E' N T E R Bru--%',caelana Cra:stopner Architects pr, 20 Aord 1982 ►NOMM 1:40 S.a:.,.,,..cv..,, INS smi LK p 4 /L. I `Bur At Ocw n_:�ar•rir van �'�/• .RowtiW .��.�� � `{ rr - Y 1 REVISED SCHEME B 25. COST AND FINANCE Although cost was a continuing point of concern throughout the study, it wasn't until Plans A and B were developed and revised by the Committee that a null range of policy options could be developed. It was determined that the City's options as far as space needs were: • Rent space as needed. . .$12.5 million total needed over the next 20 years and have nothing to show for it after 20 years. . . • Purchase and remodel the Crow site for $3 million now, with the second phase to be developed at a cost of another $3 million in 10 years when needed. . .$9.3 million total needed over the next 20 years for principal and interest on $6 million project. . . • Building Plan B now for $4.7 million and rent out excess space. . .$9.1 million total needed for principal and interest over 20 years. . . • Build Plan A now for $4.9 million and relocate shops. . .$10 million total needed for principal and interest over 20 years. . . The Committee recommended building Plan B with the Public Works shops remaining adjacent to the site. The architect had originally recommended demolition of the existing offices on the Crow site for overall design and building efficiency rea- sons, but the Committee directed that the offices be retained and leased out so as to,lower the tax levy and total cost over time. TIGARD CIVIC CENTER Projected costs based on building Schemes A and B and Scheme B/Revised as presented to Tigard Civic Center Committee, March, 1982. Recommended Scheme A Scheme B Scheme B/Revised REAL ESTATE ACQUISITION Crow Building and Lot #100 $1,250,000* $1,250,000* $1,250,000* Frame House and Lot #2900 501000* 50,000* 50,000* Land swap 7,200 s.f. of DWD access Lot #2400 for 4,000 s.f. of Shops N/C N/C N/C ROW purchase east of Fanno Creek 20,000* N/C N/C TOTAL $1,320,000* $1,3009000* $1,300,000* ROADWAY IMPROVEMENTS Fanno Creek crossing $ 100,000* Extend Ash to Burnham LF 32' paving with 54' ROW 210,000* $ 170,000* $ 170,000* Burnham 1/2 street improvement LF 1/2 street, with no storm 50,000* 50,000* 50,000* TOTAL $ 360,000* $ 220,000* $ 220,000* CROW ITE Demolish office portion of Crow Building, Police office and House** $ 101000* $ 109000* $ 5,000* Crow Building office remodel 27,000 s.f. 733,700* 733,700* 733,700* Police office improvements 70,000* 70,000* 70,000* Furnishings 85,000* 851000* 85,000* Community Center 4,300 s.f./2,150 s.f. 2369500* 160,000* 236,500* Furnishings 37,000* 37,000* 37,000* Library Building 18,000 s.f. 9991000* 9991000* Furnishings 160,000* 160,000* Library Phase 1 only 12,000 s.f. 760,000* Furnishings 105,000* Building Subtotal $2,331,200* $1,960,700* $2,326,200* Site Improvements Parking, paving and lighting $ 71,200* $ 100,800* $ 100,800* Landscape-Option One 100,000* 100,000* 100,000* Landscape-Option Two 178,000? 178,000? Paved walkways 150,000* 80,000* 80,000* Covered walkways 22,000* 50,000* 50,000* Public activity promenade 60,000* 60,000* Performance Center 35,000* Fountain 10,000* Public art 65,000* Sitework Subtotal $ 478,200* $ 365,800* $ 390,800* TOTAL $2,809,400* $2,326,500* $2,7171000* *Items included in totals ?Optional - not added in totals **Changed in recommended Scheme B/Revised N d\ Recommended Scheme A Scheme B Scheme B/Revised PUBLIC WORKS SITE IMPROVEMENTS Scheme A Demolish existing structures $ 12,000* - ---------- 4 acre land acquisition 400,000* ---------- New Public Works facility 9,020 s.f. 270,000* ---------- Covered storage 4,600 s.f. 46,000* ---------- New ------""New fuel station 42,000* ------ Security fence 8,000* --------- ------ Paved area for Public Works 107,000* ------ ---------- Impound lot: 20 cars 25,200* Subtotal Scheme A $ 910,200* ------ ---------- Scheme B Demolish sewage tanks -------- $ 2,500* $ 2,500* Remodel shop 9,020 s.f. -------- 80,400* 48,000* New pump station -------- 12,000* 12,000* Covered storage 4,600 s.f. ------ 46,000* 46,000* Impound lot: 20 cars Land acquisition ------ 10,000* Paving, fence, lights -------- 15,200* Paved area for Public Works -------- 107,000* 107,000* Subtotal Scheme B $ 273,100* $ 215,500* Schemes A and B Site Improvements Parking/paving $ 80,000* Landscaping Option one same as Option Two 58,000* $ 58,000* 58,000* Screen wall ------ 13,500* 13,500* Subtotal $ 138,000 $ 71,500* , TOTAL $1,048,200* $ 344,600* $ 287. 000* Architectural/Engineering Services @ 6% $ 222,000* $ 156,000* 180,240` GRAND TOTAL $5,759,600 $4,347,100 . $4,632,740 *Items included in totals N v 27a. TIGARD CIVIC CENTER Projected Budget for Full Construction March 23 , 1982 Page One Scheme B REAL ESTATE ACQUISITION Grow Building and Lot #100 $1 , 250 , 000 Frame House and Lot #2900 50, 000 Land Swap 7, 200 s . f . of• DIVD access Lot #2400 for 4 , 000 s. f. of Shops N/C Row Purchase East of Fanno Creek N/C TOTAL $1 .300.00-0- ROADWAY 1 ,300, UOROADWAY IMPROVEMENTS Fanho Creek Crossing $ N/C x Extent Ash to Burnham -LF 32 ' Paving with 54 ' Rol! 170,000 Burnham 1/2 Street Improvement LF 1/2 .Street, with no storm 50,000 TOTAL S 220, U CROW SITE Demolish Police Office and House $ 5,000 Crow Building Office Remodel 27, 000 s. f. 733, 700 Police Office Improvements 70,000 Furnishings 85 ,000 City Council Chamber 4, 300 s. f. 236 , 500 Furnishings 37 , 000 Library Building 18 ,000 s. f. 999 ,000 Furnishings 160,000 Library Phase 1 only 12, 000 s. f. -0- Furnishings -0- Building Subtotal $2 326 200 Site Improvements Parking, Paving, and Lighting $ 100, 800 Landscape Option One 100, 000 Landscape Option Two _0_ Paved Walkways 80,000 Covered Walkways 50,000 Public Activity Promenade 60,000 Performance Center Fountain -U- Public Art Sitework Subtotal $ 390, 800 ' TOTAL271 ,000 Systems Development Charge r 27b. ` Tigard Civic Center Projected Budget for Full Construction Page L March 23, 1982 Scheme B PUBLIC WORKS SITE IMPROVEMENTS Demolish Sewage Tanks $ 2, 500 Remodel Shop 9020 s . f . 48,000 New Pump Station 12, 000 Covered Storage 4, 600 s. f. 46,000 Impound Lot ; 20 Cars Land Acquisition _0_ x Paving, Fence, Lights _0_ ,� Paved Area for Public Works 107,000 Sub Total Scheme B _ Site Improvements Parking/Paving -0- Landscaping Option One _a_ Screen Wall -0- Sub Total $ -0 TOTAL ARDT�fiAL`� � , 6% A & E Fee 180,240 $4,632, 740 Phase work using Utility funds ** Keep auto impound lot on- site until later date; investigate legislation that would allow a towing company to keep autos on their own lot which have not beenn involved in criminal com- mission. ** Work by the Parks Department 28. (1) Real Estate Acquisition These cost estimates were provided by the City of Tigard. (2) Roadway Improvements These cost estimates were provided by the City of Tigard, Frank Currie. Currie projected a cost of $250/LF, although recent bids in a depressed market have been approximately $175/LF. This should cover all roadway costs. (3) Crow Site Crow Building office remodel includes normal office improvement - lighting, minimum partition, HVAC and exterior work. Police office improvement is an allowance for special equipment such as lockers, special glazing and locks associated with security. Crow Building furnishings include open landscape partitions and 90% of existing furniture. Library furnishings assume no re-use of existing shelving. (4) Site Improvements Landscape Option One includes grading, 3-4" caliper trees, minimum shrubs and seeding with automatic irrigation around the building and manual irriga- tion in large grassy areas. Landscape Option Two includes heavily planted areas around building and high impact area with trees, shrubs, groundcover and sod. In open areas, trees, shrubs and seeded grass will be provided. All sprinkling will be automatic. Paved walkway with Promenade in Scheme A is larger than Scheme B as a result of Promenade Concept. Public Promenade and Performance Center concepts are interchangeable between schemes. (5) Public Works Site Required square footage for all buildings was provided by Public Works. Public Works requests 80,000 s.f. of paved area. Brun, Moreland Christopher Associates provided 58,000 s.f. on Scheme A and Scheme B, allowing for multi-use of the maintenance vehicle parking for maneuvering. The lot for impounded cars would be located on the acquired land for Public Works in Scheme A. In Scheme B, the lot must be located off-site, requiring additional land acquisition. CITY OF TIGARD, OREGON CIVIC CENTER POLICY OPTIONS Fiscal OPTION "A" OPTION "B" OPTION "B-1" OPTION "L" Year Expense Tax Expense Tax Expense Tax Expense Tax ` 1982-83 * -0- -0- -0 $ 71,000 -0- 1983-84 $557,388 $500,000 $495,456 $450,000 $371,592 $370,000 $286,000* $186,000 1984-85 557,388 500,000 495,456 450,000 371,592 370,000 301,000* 201,000 1985-86 557,388 500,000 495,456 450,000 471,592 370,000 316,500* 216,500 1986-87 557,388 500,000 495,456 450,000 471,592 370,000 235,300 235,300 1987-88 557,388 500,000 495,456 450,000 471,592 370,000 338,500 338,500 1988-89 557,388 500,000 495,456 500,000 471,592 370,000 371,500 371,500 1989-90 557,388 500,000 495,456 500,000 471,592 370,000 395,500 395,500 1990-91 557,388 -500,000 495,456 500,000 471,592 370,000 424,500 424,500 1991-92 557,388 500,000 495,456 500,000 571,592 370,000 461,000 461,000 Sub-total: $5,016,492 $4,500,000 $4,459,104 $4,250,000 $4,144,328 0,330,000 $3,200,800 $2,900,800 1992-93 $557,388 $500,000 $495,456 $500,000 $371,592** $370,000 $642,000 $642,000 1993-94 557,388 550,000 495,456 500,000 619,548 620,000 694,800 694,800 1994-95 557,388 550,000 495,456 500,000 619,548 620,000 746,250 746,250 1995-96 557,388 550,000 495,456 500,000 619,548 620,000 808,500 808,500 1996-97 557,388 550,000 495,456 500,000 619,548 620,000 875,500 875,500 1997-98 557,388 550,000 495,456 500,000 619,548 620,000 990,000 990,000 1998-99 557,388 550,000 495,456 500,000 619,548 620,000 1,078,200 1,078,200 1999-00 557,388 550,000 495,456 500,000 619,548 620,000 1,156,500 1,156,500 2000-01 557,388 550,000 495,456 500,000 619,548 620,000 1,255,500 1,255,500 2001-02 557,388 550,000 495,456 400,000 619,548 600,000 1,354,500 1,354,400 Sub-total: $5,573,880 $5,500,000 $4,954,560 $4,900,000 $5,947,524 $5,930,000 $9,901,750 $9,901,750 20 Year Total: $10,590,372 $10,000,000 $9,413,664 $9,100,000 $10,091,852 $9,260,000 $12,802,550$12,502,550 *$4.5M bond sale 20 years *$4M bond sale 20 years *3M bond sale 20 years *Leased space plus $100,000 @ 11% less $500,000 from @ 111/o less $250,000 from @ 11%. . .PW, parks & per year streets, parks streets, parks and PW. . . streets, parks & PW. . . streets pay-as-you-go and PW. . . in 1984-92. . . 21st year-no C.O. $. . . 21st year=no C.O. $. . . **Phase II bond sale NOTE: Lease payments $3M. . . ($1.5M @ 8% continue in this option NOTE: $8.6 million total NOTE: $7.7 million total inflation) 10 years beyond 20 years. . . tax cost if rentals used. . . tax cost if rentals used. . . @ 11%. . $247,956 + $371,592= $619,549. . . PRELIMINARY ESTIMATES 21st year=no C.O. $. N MARCH, 1982 NOTE: $8.9 million total tax cost if rentals used. . . 30. FINANCIAL OUTLINE - PLAN B A financial outline for Plan B as amended was prepared by staff and reviewed by the financial consultant working with the architect and Committee on the project. A 20-year financial projection was prepared, along with an estimate of the tax impact for the next few years. It was determined that even with anticipated increases in the City's operating tax levy, the Civic Center could be built for about $.40/$1,000 of assessed value, and City property taxes could remain under the $2.00/$1,000 ceiling. SCHEME "B" TOTAL PROJECT ►+ REVENUES: 1982-83 1983-84 1984-85 1985-86 1986-87 1987-88 1988-89 1989-90 1990-91 1991-92 Beginning Balance -0- 2,710,000 300,000 75,000 40,000 41,000 111,000 198,000 293,000 412,000 Bond Sale 4,600,000(*) -0- -0- -0- -0- -0- -0- -0- -0- -0- Interest Earn. 300,000(1) 270,000(5) 35,000 5,000 3,000 3,000 10,000 18,000" 27,000 36,000 Rental Income 100,000(2) -0- 50,000(7) 75,000(8) 75,000 75,000 85,000 85,000 90,000 90,000 Tax Levy(**) -0- 335,000 405,000 550,000 588,000 612,000 612,000 612,000 612,000 612,000 Total Revenues $5,000,000 $39315,UUU $790,000 $705,000 $706,000 $731,000 $618,OUO $913,000 $1,022,000 $1,150,000 EXPENDITURES: Debt Service 276,000(3) 615,000(6) 615,000 615,000 615,000 615,000 615,000 615,000 615,000 615,000 Project Costs 2,014,000(4) 2,400,000 100,000 50,000 50,000 5,000(9) 5,000 5,000 5,000 5,000 Total Expend. $2,290,000 $3,015,000 $715,000 $665,000 $665,000 $6209000 $620,000 $620,000 $620,000 $620,000 REVENUES: 1992-93 1993-94 1994-95 1995-96 1996-97 1997-98 1998-99 1999-00 2000-01 2001-02 2002-03 Beginning Balance 530,000 620,000 605,000 600,000 600,000 600,000 600,000 610,000 615,000 620,000 625,000 Interest Earn. 30,000 50,000 60,000 60,000 60,000 60,000 60,000 60,000 60,000 30,000 10,000 Rental Income(10) 60,000 60,000 60,000 65,000 65,000 65,000 70,000 70,000 70,000 80,000 80,000 Tax Levy 612,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 -0- Total Revenues $1,232,000 $1,230,000 $1,225,000 $1,225,000 $1,225,000 $1,225,000 $1,235,000 $1,240,000 $1,245,000 $1,230,000 $715,000 EXPENDITURES: Debt Service 615,000 615,000 615,000 615,000 615,000 615,000 615,000 615,000 615,000 615,000 615,000 Oper. & Maint. 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 -0- Total Expend. $ 625,000 $ 625,000 $ 625,000 $ 625,000 $ 625,000 $ 625,000 $ 625,000 $ 625,000 $ 625,000 259000 15,000(11) (*)If approved 6/82 and proceeds on 11/82...12% for 20 years... (7)TEK or offices... (1)13% on available balance...land purchase on 1/83... (8)Offices and 6,000 sq. ft. of Library... (2)$60,000 from TEK and $40,000 City... (9)Building repair and major maintenance... (3)Interest only on $4.6M at 12%/20 years... (10)Offices only, Library fully used... (4)$1.3M land and buildings, architectural services and start-up...bond sale costs at $15,000... (11)$100,000 Building Maintenance Fund; close-out from (5)Available balance at 12% interest••• Bond Fund... (6)Level principal and interest @ 12%/20 years... (**)$375,000 @ 90% = $335,000... $425,000 @ 95% = $405,000... $475.000 @ 98% = $465,000... $560,000 @ 98% = $550,000... $6009000 @ 98% = $5889000... $625,000 @ 98% = $612,000... w N OPTION "B" TOTAL PROJECT 81-82 82-83 83-84 84-85 85-86 TOTAL ASSESSED VALUE: $ 628,800,000 $ 740,600,000 $ 852,800,000 $ 980,000,000 $ 1,130,000,000 TOTAL TAXES: Tax Base 566,000 664,200 1,2.00,000 1,400,000 117.00,000 Debt Service -0- -0- 375. nnn_ 425.000 _ 475.000 City Levy 566,000 664,200 1,550,000 1,800,000 2,200,000 Loaves & Fishes 10,000 12,500 15,000 20,000 25,000 T.C.Y.S. 66,383 73,300 85,000 90,000 100,000 Bikepath 100,000 100,000 -0- -0- -0- -TOTAL TAX LEVY $ 742,383 $ 850,000 1,675,000 1,935,000 2,300,000 Tax Base $ .90 $ .867 $ 1.40 $ 1.43 $ 1.50 Debt Service -0- -0- .41 .41 .44 City Levy .90 .867 1.91 1.84 1.94 Loaves & Fishes .016 .0.16 .02 .02 .0222 T.C.Y.S. .104 .103 .10 .09 .088 Bikepath .159 .134 -0- -0- -0- TOTAL TAX RATE 1.18 1.12 2.03 1.95 2.05 1700 Sg, Ft. Average Home $ 75,000= 78,000= 82,000= 86,000= 90,000= Civic Center Share: --0-- --0-- $ 33.62 $ 35.26 $ 39.60 Total City Tax: $88.50 $87.36 166.46 167.70 184.50 w iv