Loading...
Report (26) / L7 /°/ - ?s® /8/v? 5tdc,, 9 t et___ GREEN MOUNTAIN structural engineering STRUCTURAL MEMO Date: June 6, 2019 To: Luke Parker Job: Dumont Plan No. Pages: 1 RE: Framing Inspection Contractor: Pacific Lifestyle Homes Address: Willow Brook Lot 27, Tigard, OR Job Number: 18116 Dear Luke: The front garage walls were framed at 10' high with the garage door header up at ceiling height which increased the height to width ratio of the portal frame. There is an approximate 24"high cripple wall framed down from the header to the top of the garage door opening. I recommend that you add blocking in alignment with the double plate at the top of the garage door and then add a horizontal MSTC40 strap going across the shearwall to the double plate,nailing it to the multiple studs of the shearwall,blocking and plates. Please give me a call if you have any questions. Sincerely, 0 PROP 4764% GINE % 619 t9 OREGO in; ANDS Expires: Dec. 31,2019 Anne M.Anderson, S.E. , ,,,, li greenmountainse.com - Info c,?greenmountalnse.com-4857 rwW Lake Rd., u'te 260,Camas,WA 98607