02/17/2000 - Minutes Library Construction Committee Meeting Minutes Thursday, February 17, 2000 The Library Construction Committee met on Thursday, February 17, 2000, at 6 p.m. in the Red Rock Creek Conference Room. Members Present: Curtis Tigard, George Burgess, David Chapman, Tony Greiner, Gus Duenas, and Bill Monahan-. Also present were representatives of BML Architects: Richard Brooks and Gary Larson. Opening discussion centered on the need to develop a scope of initial activities for BML to assist the Committee. At the outset, BML and the Committee will focus on the programming phase and needs analysis for the Library as well as site selection. At the request of the City Council, initial site selection will focus on the downtown area. BML will meet with the Community Development Department staff to obtain information from the GIS system on available sites and to gain information on the development standards that will be applied to a new library. In addition, Tony Greiner distributed to BML a copy of the draft minimum library standards developed by the Oregon Library Association. During the discussion, it was determined that the initial efforts will help to first define the library that is needed by the community before selecting a site. The Committee is open to the consideration of collocation of library functions with commercial uses. Such collocation could be temporary or long term in nature. BML distributed a revised project schedule dated February 15, 2000. Gary Larson noted that Cynthia Ripley will start the initial-needs analysis. Then the sites identification will take place. After that, the needs analysis will be plugged into the site information. Gary Larson will work with City staff to gather demographic information. Then, focus group discussions, led by Cynthia, will be held with a number of groups throughout the community to get a flavor of what the community identifies as the need. Tony Greiner noted that he has demographic information that he can share with BML. Tony will also provide information to BML on the WCCLS formula and governance. It was noted that our service area is approximately 49,000 people. Library Construction Committee Meeting Minutes - 2/17/00 - Page 1 The schedule will be as follows: • From the end of February to the end of April, the programming phase will take place including the meetings with focus groups. The programming and site selection phases will coincide during March through May. The scheduling indicates up to four months will be needed to secure asite, however, it could take less time. Once the site deal is in place, design could proceed and then design review could be initiated. BML will need about three weeks to do the analysis of demographics and then begin to look at sites in mid-March. Rich distributed a potential budget for a 25,000 square foot-building with a $750,000 real estate acquisition fee. The project costs exceeds $7 million. This was based on $135 per square foot with 1-1/2 acres of land. Rich noted that this is a draft merely to give everyone an idea of all the costs associated with construction. As specific information is gained, he will regularly update the potential budget. Rich provided a draft contract that BML proposes for this project. It is based upon the City's standard agreement and includes suggested changes, which BML included in their original proposal. Gus Duenas will review the suggested changes and discuss them with our City Attorney's office. BML has also provided information on the insurance coverage that they have for this project. Over the next two weeks, Gus will work with the Attorney's office on the contract and submit a revised draft to BML. After two weeks, BML will provide us with a revised scheduled. Focus groups will likely take place at the end of March. The next meeting of the Committee will be held on Thursday, March 16, at 7 p.m. in the Red Rock Creek Conference Room. Submitted by: Bill Monahan, City Manager Date: �2_ /-7 i /ori I:\ADM\BILL\LIBRARY CONSTRUCTION COMMITTEE MINUTES 2-17-OO.DOC Library Construction Committee Meeting Minutes - 2/17/00 - Page 2 zj/5-) Owner costs �Rif T Real Estate/Acquisition $ 750,000 Direct Construction Costs Sitework $ 300,000 Demolition $ 35,000 General Construction $ 3,750,000 General conditions $ 612,750 GC Fee@ 5% $ 234,888 Const. Contingency @ 10%w/o GCFee $ 469,775 Other $ - Subtotal: $ 5,402,413 Permit/Agency/Development Fees Pre-application Conference $ 240 Community Development Code Review $ 252 Planning & Development Fee $ 3,780 Traffic Impact Fee $ 26,394 ODOT Inspection Fee $ 500 Water Resources Review-Type 2 -add to P&D Fee $ 30 Sesitive Lands Review-Type 2 -for storm outfall $ 149 Water Quality Fee $ - Water Quantity fee $ 5,603 Sewer Connection Fee $ 9,200 System Development Fee $ - Facility Development Fee $ - Erosion Control Review Fee $ 673 Erosion Control Fee $ 1,036 Site Fire Life Safety Review Fee $ 566 Site Permit Review Fee $ 368 Site Permit $ 1,414 Building Permit $ 11,814 Building Permit Review Fee $ 7,679 Building Fire Life Safety Review Fee $ 4,726 Demolition Permit- Included in General conditions $ - Plumbing Permit - Included in General Conditions $ - Mechanical Permit - Included in General Conditions $ - Electrical Permit- Included in General Conditions $ - State Surcharge 8%combined permit fees $ 1,058 Other $ - Subtotal: $ 75,482 Design Fees Entitlement Services $ 15,000 Programming Services $ 37,500 Site Selection Fees $ 22,000 Design Fees $ 400,000 Reimbursable Expenses $ 18,000 FF&E Selection $ - ALTA survey $ 11,000 Soils Enginering $ 7,700 Level 1 Haz Mat Survey $ 2,200 Topo Survey $ 6,600 Subtotal: $ 520,000 Off-Site Improvement Costs Included above Street Improvements $ - Others $ Subtotal $ ' Legal Fees Agreements -Arch, CM/GC $ - Insurance $ Other $ ' Subtotal $ ' Owner's Representation Services estimate Services $ 60,000 Reimbursibles $ 3,000 Subtotal $ 63,000 Testing/Inspection Materials - UBC Required $ 12,_000 Other $ - Subtotal $ 12,000 Moving Expenses Move-in $ - Other $ - Subtotal $ - Owner Construction, Furn. & Equip. estimate Furniture $ 50,000 Shelving $ 60,000 Appliances _$ - Other $ - Subtotal $ 110,000 Project Sub-Total $ 6,932,894 Project Contingency @ 2.5% $ 173,322 TOTAL: OWNER COSTS $ 7,106,216 i CITY OF TIGARD LIBRARY PROJECT December Janus FebruaryMarch it Ma June Jul A ust Se tember October iD Name Duration 11121 1128 12/5 12/12 12119 12126 12 119 1/16 123 1130 2/6 2113 220 227 3/5. 3/12 3/19 3126 42 4/9 4/16 4/23 4/30 W/ 5/14 521 5/26 &4 &11 6118 625 712 7/9 7/16 723 7/30 &6 &13 820 827 9/3 9/10 9/17 924 10/1 10/8 1 2nd release of Request for Proposal 0 days 1123 2 2nd Pre-proposal conference and Tour 0 days 12n ' -- -3 Wetland Setback Determination 0 days 12119 ' 4 ..ys � 12121 1 Deadline for Proposals 0 days 5 Library Expansion Committee Review 28 days 128 ( ' 6 Consultant Interviews 0 days �112 - - --- 7 Selection of BML Architects 0 days en2 8 Proof of Insurance and Contract Award 7 days 2121 - -. ......_._-- ; 9 Programming Phase 60ays Pr 1 _- dogramming Phase i - — -- 5115 , c 10 Needs Assessment 30 days : 413 Diagrams 20 days 5/1 12 City Review Period 10 days ® 5/15 13 Site Selection 95 days Site selection 724 - - 14 Site Prototype Analysis 5 days 3120 . 15 Site Location Criteria 5 days : ® 3120 ; 16 Identify Candidate Sites 10 days ® 413 17 Preliminary Negotiations with Property Owners 30 days : 5/15 18 Recommendations to City Council 0 days sns 19 Final Negotion with Selected Property Owner 30 days : 61i6 20 Geotechnical Investigation 15 days ® 615 ; 21 level 1 Hazardous Materials Survey 15 days &s 22 Flood Plain Delineation 15 days ?i%?7�'7� . G &5 L'C� 23 Wetland Delineation 15 days615 24 Final Approval from City Council 0 days : 626 25 Purchase Site 20 days Ina 26 Schematic Design 30 days ; Sctxrratic Design 8t7 ; 35 Design Development 20 days Design Development 914 43 Site Development Review 105 days Site Development Review 10 53 Contract Documents 95 days Contract Documents 62 Building and Site Construction Permit Review 50 days ee Bidding 40 days 71 Building and Site Construction 180 days C l �I I Proieot:schedule Task ® Progress Summary Rolled Up Split Rolled Up Progress Project Summary Date:Tue 2/15/00 Split Milestone O Rolled Up Task Rolled Up Milestone O haemal Tasks ,,w*.•�'• Forge 1