Loading...
Specifications (3) EC LI PS E Abercrombie& Fitch #11972 5/20/2019 ENGINEERING Portland, Oregon NSB PIPP MOBILE STORAGE SYSTEMS INC. STEEL STORAGE SHELVING-LIGHT RETAIL CODES: Current Editions of the: IBC& CBC&ASCE 7& RMI Design Inputs: Steel Storage Shelving: RR9 UNITS Shelving Geometry- Height of Shelving Unit= 10.0 ft Steel Yield Stress= 33 ksi Width of Shelving Unit= 4.0 ft Modulus of Elast. = 29000 ksi Depth of Shelving Unit= 2.5 ft Eff. Lx Factor= 1.7 Number of Shelves/Unit= 10 Unbraced Length,x= 13.0 in Vertical Shelf Spacing= 13.0 in Unbraced Length,y= 13.0 in Back to Back Units? NO Type of Post? 14ga Upright Posts Included Units, Fixed? Moblie? NO YES Type of Beam? DRL Low Profile Number of Units per Track? 2 Top Shelf Loaded? YES • Anchor Spacing? 22.50 in Intermediate Anchor: Double Shelving Loading- Live Load per Shelf= 9.50 psf Display On Plaque Near Shelving Units Maximum Weight per Shelf= 95 lbs Per 48 in.x 30 in. Shelf Dead Load per Shelf= 1.5 psf Wire Grid Shelf Material Weight of Each Post= 7.4 lbs Shelving is NOT accessible to public Weight of Mobile Carriage= 50 lbs Floor Load Calculations: Total Load on Each Post= 282 lbs Ground Fir Conc Slab Total Load On Each Unit= 1180 lbs 2500 psi NWC Concrete Floor Area Load = 12.0 ft2 3/8"43. KB-TZ w/2.313" Embedment Allowable Floor Loading= 100 psf Floor Load Under Shelf= 98 psf OK FOR 100psf RETAIL FLOOR LOADING Seismic Information- Risk Category= II Not Open to the Public SDC: D Seismic Importance Factor(IE) = 1.0 Site Class= D Worst Case Assumed Mapped Accel. Parameters: Ss= 0.977 Fa = 1.109 Sms= 1.084 Sds= 0.722 51 = 0.425 Fv= 1.575 Sm1 = 0.669 Sd1= 0.446 Structural System: ASCE 7 Section 15.5.3 Steel Storage Shelving: R= 4 ap = 2.5 Ip= 1.0 Average Roof Height= 20 ft 0'-0" For Ground Floor Location Height of Base Attachment= 0 ft Ground Floor Shear Coeff Boundaries= Vmin = 0.032 Vmax= 0.181 Design Base Shear Coeff= Vt= 0.126 Adjusted For ASD 1/11 EC LI PS E Abercrombie& Fitch#11972 5/20/2019 ENGINEERING Portland, Oregon NSB Lateral Force Distribution: per ASCE 7 Section 15.5.3.3 Total Dead Load per Level = 18.0 lbs Total Live Load per Level = 95 lbs Lateral DL Force per Level = 2.3 lbs Lateral LL Force per Level = 12.0 lbs 67%of LL Force per Level = 8.0 lbs Total DL Base Shear= 22.7 lbs Total LL Base Shear= 120.1 lbs LC1: Each Level is Loaded to 67%of its Live Weight Cumulative Moment: 50186 in-lbs Total Base Shear= 103.2 lbs Controlling Load Case By Inspection Height: Load: % Per Shelf: Lateral Force/Shelf: h1 = 3 in 82 lbs 0.5% Fl = 0.5 lbs h2 = 16 in 82 lbs 2.6% F2 = 2.7 lbs h3 = 29 in 82 lbs 4.7% F3 = 4.9 lbs h4= 42 in 82 lbs 6.8% F4= 7.0 lbs h5 = 55 in 82 lbs 8.9% F5 = 9.2 lbs h6 = 68 in 82 lbs 11.1% F6 = 11.4 lbs h7= 81 in 82 lbs 13.2% F7 = 13.6 lbs h8= 94 in 82 lbs 15.3% F8= 15.8 lbs h9= 107 in 82 lbs 17.4% F9= 18.0 lbs h10= 120 in 82 lbs 19.5% F10= 20.1 lbs h11 = 0 in 0 lbs 0.0% F11 = 0.0 lbs h12 = 0 in 0 lbs 0.0% F12 = 0.0 lbs h13 = 0 in 0 lbs 0.0% F13 = 0.0 lbs h14= 0 in 0 lbs 0.0% F14= 0.0 lbs h15 = 0 in 0 lbs 0.0% F15 = 0.0 lbs h16= 0 in 0 lbs 0.0% F16= 0.0 lbs h17= 0 in 0 lbs 0.0% F17= 0.0 lbs h18= 0 in 0 lbs 0.0% F18= 0.0 lbs h19= 0 in 0 lbs 0.0% F19= 0.0 lbs h20= 0 in 0 lbs 0.0% F20= 0.0 lbs Sum = 100% Total = 103.2 lbs LC 2:Top Level Only is Loaded to 100%of its Live Weight Total Base Shear= 34.7 lbs Does Not Control By inspection,the force distribution for intermediate level without live load (case 2) is negligible. Calculate the moment for each column based on the total seismic base shear for each shelf being loaded to 67%of it's allowable live weight. The column at the center of the shelving system is the worst case for this condition. 2/11 i EC LI PS E Abercrombie & Fitch#11972 5/20/2019 ENGINEERING Portland, Oregon NSB " Column Calculations - Combined Bending and Axial Post Type: Double Rivet"L" or"T" Post Width = 1.5 in rx= 0.470 in Depth = 1.5 in Sx= 0.044 in3 Thickness = 0.075 in lx= 0.049 in4 Ap= 0.217 in2 Column Bending Calculations- Max Column Moment= .13.9 ft-lbs Allowable Bending Stress= 19.8 ksi Bending Stress on Column = 3.8 ksi Bending Stress OK Column Deflection Calculations- Max Deflection = 0.084 in At Top of Unit Deflection Ratio = 1437 L/A Allowable Deflection = 6 in Max Deflection = 5%of Height Deflection OK Shelf Rivet Connection- Diameter of Rivet= 0.25 in Shear on Each Rivet= 111.2 lbs Bearing Capacity of Rivet= 519.8 lbs Bearing Stress OK Allowable Shear Stress = 13.5 ksi Shear Stress on Rivet= 2.3 ksi Shear Stress OK Column Axial Calculations- Per"L" Post DL+ PL= 282 lbs RMI Load Combination#1 DL+ PL+ EQ= 268 lbs RMI Load Combination#6 Column Capacity Calculations- Controlling Buckling Stress= 20.2 ksi Allowable Comp. Stress= 19.5 ksi Factor of Safety for Comp. = 1.80 Nominal Column Capacity= 3825 lbs Allowable Column Capacity= 2125 lbs Static Axial Load on Column = 282 lbs Axial Load OK Combined Bending And Axial Forces- Critical Buckling Load = 28539 lbs Axial Stress Unity= 0.126 Magnification Factor= 0.982 Bending Stress Unity= 0.165 Cm = 0.85 Combined Stress Unity= 0.291 Column is Adequate 3/11 EC LI PS E Abercrombie & Fitch#11972 5/20/2019 ENGINEERING Portland, Oregon NSB Overturning and Anti-Tip Calculations Overturning Forces- Total Weight= 816 lbs Load Case 1: Dead Load +67% Live Load Total Lateral Force= 103 lbs Overturning Force= 724 ft*lbs Controlling Overturning Force Total Weight= 275 lbs Load Case 2: Dead Load + 100%Top Shelf Total Lateral Force= 35 lbs Overturning Force= 258 ft*lbs Does Not Control Tension Force per Anchor= 43 lbs Per Side of Unit Shear Force per Anchor= 26 lbs USE: POST INSTALLED ANCHOR BOLTS/LAG SCREWS AS REQUIRED FOR FLOOR NOTED BELOW Allowable Tension Force= 753 lbs 2500 psi NWC Concrete Allowable Shear Force = 718 lbs 3/8"43, KB-TZ w/2.313" Embedment • Vertical Seismic Force= 41.3 lbs Overstrength Factor= 2 For Anchoring to Concrete Combined Loading= 0.114 Floor anchors are adequate Anti-Tip Track Design- Type of Anti-Tip Device= Arm and Track Tension per Unit= 172 lbs Capacity of Screws to Carriage= 600 lbs (2) 1/4-in screws are adequate Anti-Tip Peg Yield Stress= 27 ksi Steel Fy= 36 ksi F„=58 ksi Thickness Anti-Tip Peg Head = 0.09 in Width of Anti-Tip Peg Head = 0.43 in Section Modulus of Peg Head = 0.0006 in3 Allowable Stress on Leg= 27 ksi Bending Stress on Leg= 6.38 ksi Anti-Tip Stress Unity= 0.236 Bending Stress OK Section Modulus of Track= 0.093 in3 Spacing of Track A.B's= 22.50 in Allowable Alumn. Stress= 21 ksi 6061-T6 Ftv=35 ksi Ft„ =38 ksi Bending Stress on Track= 5.20 ksi Track Stress Unity= 0.247 Bending Stress OK 4/11 • i EC LI PS E Abercrombie & Fitch#11972 5/20/2019 ENGINEERING Portland, Oregon NSB Shelf Beam Calculations Shelf Beam Calculations: DRL Low Profile Steel Yield Stress = 33 ksi Shelf DL= 1.5 psf Modulus of Elast. = 29000 ksi Shelf LL= 9.50 psf Beam Type: DRL Low Profile Area of Beam = 0.264 in2 Section Modulus of Beam = 0.098 in3 Moment of Inertia of Beam = 0.072 in4 Shelf Width = 4.0 ft Allowable Bending Stress= 19.8 ksi Shelf Depth = 2.5 ft Allowable Shear Stress= 13.2 ksi Total Load/Shelf= 110 lbs Distributed Load = 13.75 plf Maximum Design Moment= 27.5 ft-lbs Maximum Design Shear= 27.5 lbs Beam Bending Stress = 3.4 ksi Bending Stress Unity= 0.171 Bending Stress OK Beam Shear Stress= 0.10 ksi Shear Stress Unity= 0.008 Shear Stress OK Max Allowable Deflection = 0.267 in L/180 Maximum Beam Deflection = 0.038 in Deflection OK Shelf Beam Rivet Check: Diameter of Rivet= 0.25 in Post Moment Shear on Rivet= 111.2 lbs Beam Shear on Rivet= 13.8 lbs Resultant Shear= 112.1 lbs Bearing Capacity of Rivet= 519.8 lbs Bearing Stress OK Allowable Shear Stress= 9.6 ksi Shear Stress on Rivet= 2.3 ksi Shear Stress OK 5/11 ti EC LI PS E Abercrombie& Fitch#11972 5/20/2019 • ENGINEERING Portland, Oregon NSB Wall Supported Unit Calculations Seismic Force at Top of Units- Average Roof Height= 20.0 ft Height of Attachment= 10.0 ft Shear Coeff Boundaries = Vann= 0.217 Vmax= 1.156 Design Base Shear Coeff= Vt= 0.258 Adjusted For ASD Total Weight per Unit= 757 lbs Lateral Force at Top/Bottom = 98 lbs Standard Stud Spacing= 16 in Wall Connections per Unit= 3 Tek Screw Capacity= 84 lbs Tension Cap.for#10 Screw in 20ga Stud Force Per Connection = 33 lbs Screw Capacity OK Seismic Uplift Force on Each Shelf Seismic Uplift on Shelves- Vertical Seismic Component= 15.9 lbs Vertical Dead Load per Shelf= 110.0 lbs Connection Points per Shelf= 4.0 Each Corner Net Uplift Load per Shelf= -50.1 lbs Uplift Forcer per Connection = -12.5 lbs Rivet Connection OK 6/11 • .. i EC LI PS E Abercrombie & Fitch#11972 5/20/2019 ENGINEERING Portland, Oregon NSB Light Gage Steel Stud Wall Framing Stud Design Data- Height of Wall Studs= 16.0 ft Int. Non-Brg-Worst Case Ht Assumed Location of Point Load = 10.0 ft Design Lateral Load = 32.5 lbs From Shelving Unit Additional Lateral Load = 5.0 psf Interior Seismic Force Design Axial Load = 85.3 lbs Dead Load of Wall Framing Spacing of Studs = 16.0 in TRY: 3-5/8" x 1-5/8" x 20ga Studs @ 16" o.c. (Worst Case Assumed) Width = 3.625 in rx= 1.450 in Depth = 1.625 in ry= 0.616 in Thickness = 0.035 in Sx= 0.268 in3 Fy= 33 ksi lx= 0.551 in4 E= 29000 ksi Ap= 0.262 in2 K= 1.0 Unbraced Length X= 16 ft Unbraced Length Y= 4 ft Stud Capacity- Buckling Stress,X= 16.32 ksi Buckling Stress,Y= 47.14 ksi Allowable Buckling Stress = 16.32 ksi Nominal Axial Strength = 4277 lbs Factor of Safety= 1.92 Allowable Axial Load = 2228 lbs Maximum Design Moment= 335.4 ft-lbs Maximum Design Shear= 73.7 lbs Allowable Bending Stress= 21.78 ksi Actual Bending Stress= 15.02 ksi Bending Stress OK Allowable Shear Stress = 13.20 ksi Actual Shear Stress= 0.28 ksi Shear Stress OK Allowable Axial Stress = 8.50 ksi Actual Axial Stress = 0.33 ksi Axial Stress OK Combined Stress Unity= 0.73 Combined Stress OK 7/11 EC LI PS E Abercrombie & Fitch #11972 5/20/2019 • ENGINEERING Portland, Oregon NSB Slab Bearing & Uplift Calculations Slab Design Properties- Minimum Concrete Strength = 2500 psi Assumed Thickness of Concrete Slab= 4 in Assumed Weight of Concrete Slab= 50 psf Allowable Bearing Pressure= 500 psf Assumed Bearing Loads On Post= 82 lbs Dead Load 475 lbs Live Load 289 lbs EQ Load Uplift Loads on Post= 86 lbs Resultant Uplift Slab Bearing Capacity- Depth of Post on Slab= 1.5 in Factored Bearing Load = 1272 lbs Required Bearing Area = 243.89 in2 15.62 inches per side Critical Section = 5.06 in For Bending Soil Pressure on Crit. Section = 751.2 plf Along Critical Length Section Modulus= 32.0 in3 Plain Concrete per Foot Shear Area = 22 in Conc. Shear Stress = 14.5 psi Allowable Shear Stress= 73.2 psi Shear Stress OK Conc. Bending Stress = 25.0 psi Allowable Bending Stress= 137.5 psi Bending Stress OK Slab Uplift Capacity- Required Area to Resist Uplift= 2.86 ft2 Length of Slab Req'd = 0.36 ft Assume Required Area/ Full Shelf Width Worst Case Length of Slab= 1.25 ft Maximum Lenght Required Distance to Anchor Bolt= 0.63 ft Length of 1ft Strip= 1.25 ft Length Safety Factor: 2.00 Shear Force on 1ft Strip= 87.5 lbs Allowable Shear Force= 1760.0 lbs Shear OK Bending Moment on 1ft Strip= 54.7 ft-lbs Allowable Bending Moment= 366.7 ft-lbs Bending OK 8/11 MI Lair. vww.hlld.us Profis Anchor 2.7.6 www.hi tl.us Profis Anchor 2.; :ompany: ECLIPSE ENGINEERING,INC. Page: 1 Company: ECLIPSE ENGINEERING,INC. Page: 2 specifier. Project Specifier. Project: tddress: 376 SW Bluff Dr.,Suite 8 Sub-Project I Pos.No.: Address: 376 SW Bluff Dr..Suite 8 Sub-Project I Pos.No.: 'hone I Fax: 541-389-96591 Date: 5/14/2018 Phone I Fax: 541-389-96591 Date: 5/14/2018 _Mail: E-Mail: Specifiers•• manta: 2 Proof I Utilization(Governing Cases) Design values(ib) Utilization 1 Input data Loading Proof Load Capacity fie 1pv(%] Status `` .t= Tension Pullout Strength --- 500 1,107 46/- OK Anchor type and diameter: Kwik Bolt TZ-CS 3/8(2) 5.. _.. . Shear Steel Strength 300 1,468 -/21 OK Effective embedment depth: he,, =2.000 In.,h,„,,,=2.313 in. Material: Carbon Steel LoadingUtilization [%] Status SAFE-2-ET .4 Pv c Pkv..-__..-...._ Evaluation Service Report: ESR-1917 _...-.— P Combinedtensionandshearloads . 0.452 0.205 5/3 34 OK Issued I Valid: 5/1/201715!1/2019 Proof: Design method ACI 318-14/Mech. Stand-off ins'ilalion: -(Recommended plate thickness:not calculated) 3 Warnings ` Profile: no profile •Please consider all details and hints/warnings given in the detailed report! Base mater'. cracked concrete,2500,f =2,500 psi;h=4.000 in. Fastening meets the design criteria! Installation: hammer drilled hole,Installation condkion:Dry Reinforceme : tension:condition B.shear:condition B:no supplemental splitting reinforcement present 4 Remarks;Your Cooperation Duties edge reinforcement:none or<No.4 bar •Any and all information and data contained in the Software concern solely the use of Hila products and are based on the principles,formulas an Seismic load (cat.C,D,E,or F) Tension bad:yes(17.2.3.4.3(d)) security regulations in accordance with Hilti's technical directions and operating,mounting and assembly instructions,etc.,that must be strictly Shear bad:yes(17.2.3.5.3(c)) complied with by the user.At figures contained therein are average figures,and therefore use-specific tests are to be conducted prior to using the relevant Hilti product.The results of the calculations carried out by means of the Software are based essentially on the data you put in. Geometry(1 ]S Loading[Ib,in.lb] Therefore,you bear the sole responsibility for the absence of errors,the completeness and the relevance of the data to be put in by you. Moreover,you bear sole responsibility for having the results of the calculation checked and cleared by an expert,particularly with regard to compliance with applicable norms and permits,prior to using them for your specific facility.The Software serves only as an aid to interpret porn Z and permits without any guarantee as to the absence of errors,the correctness and the relevance of the results or suitability for a specific application. •You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular,you must arrange for the regular backup of programs and data and,if applicable,carry out the updates of the Software offered by Hilti on a regular basis.If you do not us the AutoUpdate function of the Software,you must ensure that you are using the current and thus up-to-date version of the Software in each ca G by carrying out manual updates via the Hilts Website. Hilti will not be liable for consequences,such as the recovery of lost or damaged data or y programs,arising from a culpable breath of duty by you. yy�� 1 2f i p •1 0 C 6 1 ; P. a X. a-. a, o 3 to X soul deb and„ -must be checked for agreement with the existing conditions and for pbudbitty, Input data end results must be checked for agreement wish the existing conditions and for plausibility! !ROFIS Anchor(•)2003.2009 HIM AG,FL-9494 Schoen HIS Is a registered Trademark of HMI AG.Sri,. PROFIS Anchor(c)2003.2009 HIM AG,FL-9494 Schoen Hix is a registered Trademark of Hit!AG,Schean Nw.hihl.us Profis Anchor 2.7.6 www.hilti.us Profis Anchor 2.7 3mpany: ECLIPSE ENGINEERING,INC. Page: 1 Company: ECLIPSE ENGINEERING,INC. Page: 2 ratifier. Project: Specifier: Project: /dress: 376 SW Bluff Dr.,Suite 8 Sub-Project I Pos.No.: Address: 376 SW Bluff Dr.,Suite 8 Sub-Project I Pos.No.: tone I Fax: 541-389-9659 j Date: 5/14/2018 Phone I Fax: 541-389-9659 j Date: 5/14,2018 Mail: E-Mail: ipecifier•s comments: 2 Proof I Utilization(Governing Cases) Design values[Ib] Utilization Input data , Loading Proof Load Capacity Dsitiv[i] Status I. ,nchor type and diameter: Kwik Boll TZ•CS 3/6(2) I. ""' Tension Concrete Breakout Strength 1,000 2,149 47/- OK r Shear Concrete edge failure in direction x+ 700 2,055 -/35 OK ' ffective embedment depth: h,r,,n=2.000 in.,h„a,=2.313 in. !aterial. Carbon Steel Loading Bx 9v S Utilization valuation Service Report: ESR-1917 SAFE-` T Lodin _._ x.vl"'Ai Status Combined tension and shear bads 0.465 0.341 5/3 45 OK sued I Valid: 5/1/2017 I 5/1/2019 'roof: Design method ACI 318-14/Mech. land-off installation: eb=0.000 in.(no stand-off);I=0.074 in. 3 Warnings .nchor plate: I,x I,x t=3.000 in.x 7.000 in.x 0.074 in.;(Recommended plate thickness:not calculated •Please consider all details and hints/warnings given In the deleted report! rofile: no profile ase material: cracked concrete,2500,f:=2,500 psi;h=4.000 in. Fastening meets the design criteria! rstallation: hammer drilled hole,Installation condition:Dry 4 Remarks;Your Cooperation Duties :einforcement: tension:condition B,shear:condition B;no supplemental s itting reinforcement present •Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles,formulas am edge reinforcement none or<No.4 bar security regulations in accordance with Hitti's technical directions and operating,mounting and assembly instructions,etc.,that must be strictly eismic bads(cat.C,D,E,or F) Tension load:yes(172.3.4.3(d)) complied with by the user.All figures contained therein are average figures,end therefore use-specific tests are to be conducted prior to using the relevant Hilti product.The results of the calculations carried out by means of the Software are based essentially on the data you put in. Shear load:yes(17.2.3.5.3(c)) Therefore,you bear the sole responsibility for the absence of errors,the completeness and the relevance of the data to be put in by you. Moreover,you bear sole responsibility for having the results of the calculation checked and cleared by an expert,particularly with regard to ieometry[in.]&Loading[lb,in.lb] compliance with applicable norms and permits,prior to using them for your specific facility.The Software serves only as an aid to interpret norm and permits without any guarantee as to the absence of errors,the correctness and the relevance of the results or suitability for a specific Z application. •You must take all necessary and reasonable steps to prevent or limit damage caused by the Software.In particular,you must arrange for the regular backup of programs and data and,if applicable,carry out the updates of the Software offered by Hilti on a regular basis.If you do not us the AutoUpdate function of the Software,you must ensure that you are using the current and thus up-to-date version of the Software in each ca: by carrying out manual updates via the HiN Website. Hilt!will not be liable for consequences,such as the recovery of lost or damaged data or programs,arising from a culpable breach of duty by you. 0 6 5 2875w lt p .%'� �,I``' 4 ,,....„e..,..z,,7.4" "' 000. i< Z r ad data and results trust ba checked for agreement With the existing conditions and for plausibility, Input data and results must be checked for agreement with the existing condilons and for plausibility! :OFIS Anchor(c)2003.2009 Mai AG,FL.9494 Schon Hilt,is a registered Trademark of Huai AG,Schwan PROFIS Anchor(c)2003.2009 Hiki AG,FL-9494 Schoen 0,1ti is a registered Trademark of Rh AG,Schwan / // „0- ,01 ,q 7' A IIO-I9 Cr)c‹....., , • • • • • • • • m Q V . = = O7 ° ' • • • • • • • • • 1 "...,_- ___,7k- _ w}- � / c r CCv V z � 7r iiz/( lf uz�i 21 le uz� qlf iizf 21 iiz/( GI l' H5( l � uz�l 2liiz�l qlf - LIwT H Ia c a a a c.naa o-aa a anno-ao-aa a an sa as a s canna aaa a o-anna4.a aaaa c.C.aa a aPa a nC.a a aaa a ac.c.a ad a s as na I V/ 1.5 Y = NNNNNN'N.NN41h1/4 0 0 • U . 0 1)C =I < a cc z 2 N ..._ J 1 .., m ccncl I F!,,C,C.0C.P P PPP P POPP PPPP P G,0,0*(>PPPPPP PC+P P PP P PPC.O.PSP PPPP PPPP P PPPP OPP P PPPP PC.nP C,.• C,c C,,C.p ' J/ pE-'01 / �cc F-- y 0 • • . • . • N C/) r1 ie/ CITY OF PORTLAND, OREGON - BUREAU OF DEVELOPMENT SERVICES 1.4 fir -;,' Special Inspections • 1900 SW Fourth Avenue, Suite 5000• Portland, Oregon 97201 •www.portlandonline.com/bds Structural Special Inspection and Observation Program Checksheet The registered design professional in responsible charge shall prepare and submit a special inspection and structural observation program in accordance with IBC Sections 1704.1.1, 1705.2, and 106.3.4.1, and confirm that the special inspection and structural observations noted below,are indicated on the drawings. -Please Note that separate Soils and Life Safety Inspection Checksheets may also be required- Instructions - Parts D and E of this Checksheet must be fully completed by the Owner (or Architect or Engineer acting as the owner's agent) in order to obtain your permit. When complete, return this form to BDS Permitting Services. You may return it in person at 1900 SW 4th Ave, by fax to (503) 823-4172, or by email to specialinspectionsforms@portlandoregon.gov Application # Date: 05/20/2019 Project Name: Abercrombie R Fitch #11972 Site Address: 9573 SW Washington Square Road - Space B06 Architect of Record (Firm) Phone# Engineer ofRecord (Firm) ECLIPSE ENGINEERING Phone# 541-389-9659 The following special inspections and structural observations shall be performed according to the State Building Code and City of Portland Special Inspection Program Administrative Rules unless a program of inspections is submitted by the Engineer of Record and approved by Bureau of Development Services. A. REQUIRED SPECIAL INSPECTIONS FOR ALL BUILDING TYPES nSteel Construction Concrete Construction Anchors—Adhesive Wood Construction Curtainwall Prestressed Concrete Anchors—Cast-in-place Masonry Structural Silicone Glazing Shotcrete I'�l Anchors—Expansion/Screw Cold Formed Steel Framing Special Cases: B. REQUIRED SPECIAL INSPECTIONS FOR CATEGORY III AND IV BUILDINGS (In addition to those noted above.) Seismic Force Resist. System Storage Racks Access Floors Suspended Ceilings Mechanical Components Electrical Components Cladding Veneer Nonbearing Walls n Seismic Isolation System Special Cases: EI VED W C. STRUCTURAL OBSERVATION "SAY 21 2019 o25 Required (The stages of construction at which structural observation is to occur shall be indicated on the drawings.) r )F, Ir1lJ D. APPROVED SPECIAL INSPECTOR OR INSPECTION AGENCY(To be completed bythe licant: D1 t.ISlory p pp � �_< �/ Indicate the City approved special inspector or special inspection agency to perform the required special Et ins ections noted in parts A. and B. above: a ACS(503)443-3799 KE&Associates(503)853-9033 PSI (503)289-1778 W Carlson Testing (503)684-3460 I I KPFF SIG(503)227-3251 Other: Clair Company(541)758-1302 Materials Testing/Insp(208)376-4748 J Columbia West Eng (360)823-2900 Mayes Testing, Inc. (503)281-7515 0_ 2 FEI Testing(541)757-4698 Northwest Geotech(503)682-1880 O U E. To be completed by the applicant. By completing Part E the project owner(or the Architect or Engineer acting as the Owner's Agent) hereby agrees to I- employ the special inspector or inspection agency and/or engineer of record for the above noted special inspections and/or structural observations. (Contractors are NOT authorized to agree for the Owner.) The project owner shall provide a copy of this checksheet to the special inspection agency and engineer of record. a Print Name Date a. (Project Owner or the Architect or Engineer acting as the Owner's Agent) Firm Phone 1 - ECL' • SL ECLIPSE - ENGINEERING . COM ENGINEERING Letter of Transmittal To: City of Tigard Community Development From: Nick Burnam, PE Attn: Braden Taggart 376 SW Bluff Drive,Suite 8 13125 SW Hall Blvd Bend, OR 97702 Tigard, OR 97223 (541)389-9659 Phone: Via: UPS Next Day Air Fax: Date: 5/20/19 Re: A&F#11972 CC: PO 42906—SO 100197 Portland, OR(19-05-111) PIPP MOBILE STORAGE SYSTEMS, INC. Qty: Date: Description: 1 5/20/19 Special Inspection Form 4 5/20/19 Wet Stamped Calculations 4 5/20/19 Wet Stamped Storage Rack Detail Sheet • Comments: Best regards, Nick MTSSOULA WHTTEnt: FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT N . Ii Transmittal Letter T I G A R n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: C li DATReetiNED DEPT: BUILDING DIVISION MAY 21 2019 /� UI t-Y Ot- ("1 RD FROM: /j4 '`ir/l/ vV) UILD!NG ► SI®N COMPANY: (,:i-1/// f ,, ,' r,�� PHONE: i) 317-- /65"5" By:e/, RE: q S-?36a / h A )w St, %P211-(r- (Site Address) / (Permit Number) i t7f-f V►b iY_ Y" . (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: 'opies: . Description: Additional set(s) of plans. 3 Revisions: L) v j c ,-adovI Cross section(s) and details. O' Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. D\ ) Engineer's calculations. Other(explain): }2= \',,... r REMARKS: l i {l 6t FOR OFFICE USE ONLY Routed to Permit Techrf n: Date: ) 3- ) 9 Initials: 11 Fees Duel No Fee Description: Amount Due: 0 • h r p -n ✓—v:ems—' $ c� - $ 1 $ Special Instructions: / Reprint Permit(per PE): ❑ Yes Nor/ 11 Done Applicant Notified: ra,___-- Date: <1,4g Initials, I:\Building\Forms\TransmittalLetter-Revisions_061316.doc