Permit (76) CITY OF TIGARD BUILDING PERMIT
Ili ' • COMMUNITY DEVELOPMENT Permit#: BUP2019-00038
T f(-1 A f:f) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 05/30/2019
Parcel: 2S101 DD00500
Jurisdiction: Tigard
Site address: 6755 SW SANDBURG ST
Project: Reece Security Subdivision: SALEM FREEWAY SUBDIVISION Lot: 2
Project Description: TI for existing tenant:Remodel and second story addition.
Contractor: YORKE&CURTIS Owner: REECE HOLDINGS LLC
4480 SW 101ST AVE 25977 SW CANYON CREEK RD, STE E
BEAVERTON, OR 97005 WILSONVILLE, OR 97070
PHONE: 646-2123 PHONE: 503-803-7673
FAX: FAX 643-5531
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: VBPermit Fee-Additions,Alterations, 05/29/2019 $7,100.90
Demolition
Occupancy Grp: B Occupancy Load: 246 12%State Surcharge-Building 05/29/2019 $852.11
Dwelling Units: Plan Review 02/21/2019 $4,615.59
Stories: 2 Height: 36 ft Plan Review-Fire Life Safety 05/29/2019 $2,840.36
Bedrooms: Bathrooms: Info Process/Archiving-Lg$2.00(over 05/29/2019 $102.00
Value: $1,304,548 11x17)
Info Process/Archiving-Sm$0.50(up to 05/29/2019 $200.50
11x17)
Floor Areas: Tig-Tual School CET-Non Residential 05/29/2019 $6,718.40
Metro Const.Excise Tax 05/29/2019 $1,565.46
Total Area: 10336 Wash Co Trans Dev Tax 05/29/2019 $97,366.00
Accessory Struct: Tigard Trans SDC Improvement 05/29/2019 $44,286.00
Basement: Tigard Trans SDC Reimbursement 05/29/2019 $2,540.00
Carport: Parks SDC Improvement 05/29/2019 $12,907.00
Covered Porch: Parks SDC Reimbursement 05/29/2019 $2,344.00
Deck: DC Provision Review,COM TI-Ping 05/29/2019 $388.00
Garage:
Mezzanine:
Total $183,826.32
Required: Required Items and Reports(Conditions)
1 Special Inspection(see plans)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: Adij Permittee Signature:i ,
'
�ti
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Commercial FOR OFFICE USE ONLY
Cityof Tigard Received
g
'
� 7 ,,�.,
Date/By: C i / 's —AIPermit No.:
C
13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review
Phone: 503.718.2439 Fax: 503.598.1960 RECEIVE II'ate/By: 3—aS"-JC) Other Permit: 'eu /47 /
ty
Inspection Line: 503.639.4175 ate Ready/By: to s: Se Page 2 foreTIGARDInternet: www.tigard-or.gov .'fed/Method: i (l . ��JrSupplemental Information
FEB2019 ''Ii�
_F_ I
WPE t3F'WOItKµf`ITY C3TlGq iC? tYIRE 1 ATA.`T-"Army-FAMILY DWELTING"
❑New construction 0 De8WilditflING DIVISION Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
®Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
0 1-and 2-family dwelling ®Commercial/industrial Valuation: $
❑Accessory building 0 Multi-family Number of bedrooms:
❑Master builder 0 Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address:6755 SW Sandburg st. New dwelling area: square feet
City/State/ZIP:Tigard,Oregon 97224 Garage/carport area: square feet
Suite/bldg./apt.no.: Project name:Reece Security Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
End of Sandburg St cul de sac off SW 72"a Ave. Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot no.:500 Permit fees*are based on the value of the work performed.
Tax map/parcel no.:2S101DD 00500 Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
This Building permit is for a remodel and addition for Reece Security.The Valuation: $1,304,548
addition will include approx.216 sf infill on the 1st fir,10,600 sf 2"a fir Existing building area: 10512 square feet
addition and a 11'-4"x 21'-4"cmu trash enclosure. New building area: 21336 square feet
CI PROPERTY OWNER 0 TENANT Number of stories: 2
Name:Reece Holdings Type of construction: VB
Address:25977 NE Butteville Road Occupancy groups: ati 6 o CLVp,,ti�s
City/State/ZIP:Aurora,Oregon 97002 Existing: B V
Phone:(503)803-7673 Fax:( ) New: B
0 APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES*
Business name:Cida,Inc.
(Please refer to fee schedule)
Structural plan review fee(or deposit):
Contact name:Leslie Jones
"a FLS plan review fee(if applicable): •
Address:15895 SW 72 Ave
City/State/ZIP:Portland Oregon 97224 Total fees due upon application �l /S: ,I
Phone:(503)226-1285 Fax: :( ) Amount received:
E-mail:Leslie)@cidainc.com -PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
CONTRACTOR Commercial and residential prescriptive installation of
roof-top mounted PhotoVoltaic Solar Panel System.
Business name:Yorke&Curtis Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address:4480 SW 1015'Ave Solar Installation Specialty Code checklist.
City/State/ZIP:Beaverton Oregon 97005 Permit fee(includes plan review $180.00
and administrative fees):
Phone:(503)646-2123 Fax:( ) State surcharge(12%of permit fee):
Total fee due upon application:
This $21.60
CCB lie.:55644 z
( si& .s
$201.60
Authorized signature: ruin if a pe
../ withinper180it daysapplication after it exhas been acceptedermit is asnot complete.obtaind
Print name: Les I i t J•,i S Date: tit, /24211 * Fee methodology set by Tri-County Building Industry
Service Rnarrt. _ _.... _...
I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-46131(11/02/COM/WEB)
, n Building Division
Accessibility: Barrier Removal Improvement Plan
TIGARD
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per-cent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $ 1,885,236
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 471,309
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $ 250,326
(b) An accessible entrance: $ 53,455
(c) An accessible route to the altered area: $ 91,600
(d) At least one accessible restroom for each sex or a single unisex
restroom: $ 75,928
(e) Accessible telephones: $ 0
(f) Accessible drinking fountains:and, $ 0
(g) When possible,additional accessible elements such as storage and
alarms: $ 0
TOTAL(shall equal line [2] of Valuation Computation): $ 471,309
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
mi Building Division
Plan Submittal Requirements
T I GARD Commercial& Multi-Family-New,Additions or Alterations
1. SITE PLAN (fully dimensional, drawn to scale) labeled with:
A. ❑ map&tax lot# ❑ project name ❑ site address ❑ suite number
❑ zoning ❑ applicant name ❑ phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit-based on valuation of project.
4. EXTRA SET OF THE FOLLOWING:
A. Two (2) copies of site plan to include vicinity map.
B. One (1) copy of erosion control plan with details.
C. Fire Department Building Survey, and full set of architecture drawings.
. :ui.uig i_ -
1111 Building Division
Plan Submittal Requirement Matrix
TI GARD Commercial& Multi-Family-New,Additions or Alterations
Type of Submittal. #of Plans
(Includes new,additions and alterations) Required at
Submittal
Demolition Permit 2
(site plan required showing location and square
footage of all buildings to be demolished)
Site Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 3 .
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County, and Tualatin Valley Fire &Rescue),if applicable.
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
i "
■ City of Tigard
71 COMMUNITY DEVELOPMENT DEPARTMENT
T 1 c n R D Building Permit Review — Commercial - With Land Use
Building Permit #: -get /),20/F.-672003,
Site Address: 10-155 Stn/ Sa►�•tbuA Stree,t Suite/Bldg#:
Project Name: Reece i,y-
(Name of commercial business occu} tg the space. If vacant,enter Spec Space.)
Planning Review
•Proposal: eV4 't
shym eacteit� !n-A.
Verify site address/suite# exists and active in permit system.
River Terrace Neighborhood: ❑ Yes X No
IX Land Use Case#: SD(2.0t,1Z.- V)i t
Plans Match Approved Land Use:
'XISite Plan NA'Landscape Plan ❑ Other:
Urban Forestry Plan .["Elevation Plan t
" Building Height: Maximum Height y 5 tual Height G.S
4160 onditions Met: X Prior to Submittal 0 rior to Permit Issuance
Business License:
Exists: Yes ❑ No,applicant notified to obtain business license
. -Public Facilities Improvement (PFI) Permit:
Required: At Yes, applicant was notified ❑ No Applied For: X Yes ❑ No, stop intake
Notes: Mo 31 rnf�' CGvI((tfil WI( '[ n Or 10 Ccuzwi C..
Approved by Planning: Date: 2421 1 19
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: a�o2i//9 •w
Site Plans: # 3
Building Plans: # ,_3
Building Permit#: -2 Enter building permit#above.
Workflow Routing: -Planning likriigineering 22"1sermit Coordinator Building
Workflow Sign-off: \I:1 Sign-off for Planning(include notes from planning review)
Route Application Documents: - Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable, etc.
Notes:
By Permit Technician: 4 ,; - Date: c9/;24P/2
I:\Building\Forms\BldgPennitRvw_COM_WithlandUse 07091 5.docx
Engineering Review
Q.-Slope at building pad: S70
G
Er-PFI Permit#: e F 12O11j - 000 5G0
❑ Conditions "Met"prior to issuance of building permit
.../A E Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP)
[ Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: ❑ Yes Ef No
Assess Water Quantity Fee in-lieu: ❑ Yes C'/No
LIDA Facility on lot: E Yes Q' No
❑ NOT Approved by Engineering: Date
Notes:
Approved by Engineering: ,,,( • Date: rzyzver
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
2 SDC Fees Entered: Wash Co Trans Dev Tax: W/Yes ❑ N/A
Tigard Trans SDC: R'Y s ❑ N/A
Parks SDC: LJ'Yes CI N/A
OK to Issue Permit
Approved by Permit Coordi atorP�1 F�vr Date: 4/z - iq
C9 K 'x. 1 5)23 2
% 7�11.cr
I:\Building\Fonns\B ldgPe7nitRvw_CO M_W ithLandU se_0709 15.docx