Loading...
Plans (108) OFFICE COPY LIABILITY The City of Tigard and its employees shall not be responsible for discrepancies which may appear herein. VALIDITY OF PERMIT THE ISSUANCE OF A PERMIT BASED ON CONSTRUCTION DOCUMENTS AND OTHER DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM REQUIRING THE CORRECTION OF ERRORS.ORSC 105.4 CITY OP TIGA.RD Approved plans REVIEWED FOR CODE COMP shall be on job site. Approved: [vi' COMPLIANCE OTC: 1 Pcrrnit#: IM.S t� �' �♦ tc6 Address: Suite#: Date: 411.2. ) k,N)WC Stir% /11/5 7.2-c i c- OciX-6"-• DCatAt 1 I of- ti- ll - arai oe qie-2-11 is•-" c,,-/ cc,' Srg,z- AP. b s - 1 fag LEGEND: `'.'''''-'---"'*•-;,-._,,,,..' 2 1 , pacific —ss--- SANITARY SEWER ; • (I/ —s0— STORM DRAIN t C0111M1u 11. 1 ; Desiun 1 —w— WATER UNE iiii.:4 sw TALI.sho.t ' A /111112.11111111hhh, o • MANHOLE 110.M.OR 97723 CI]503-941-9484 _ iktu a I", /At,. bi 64.3* - - II CATCH BASIN DATE: 21,13 — ____ :r lir& 449.5 Nic I - 414 _ _ N-447.3 0-• STREET LIGHT REVISIONS Pilli 450 STRAW WATTLE PERIMETER NO. CATE DESCRIPTION Pt0 e05e-CA Cle-C-14 .C-v=p=rD I 10 I IZ 2.11 I EROSION CONTROL 1001....., 411 J ' .._ I r-.% tr-D liameas I 39.21' r4111111111\ 9. N,..,,„....,.. 1 . REC;7-1Vt' r I li frri....1. 1.....__ 6.00 f--1--6-- ill 4s2A41 ; I \PUE I --,---___. I •I_i FEB 2 9 2016 --- SETBACK SUMMARY i I 119/ liggell 461 I FRONT SETBACK: 20* mt 0 rw. .: r1.1/•,.. i :‘411 Pr AIII , i r ---- 1 . , i it......... , PLANT(4)STREET ":" lit i',,z -) 1 I STREET SIDE SETBACK: 1 5' i -I REAR SETBACK: 15 TREE:2"CAL - 4 , :11 RAYWOODASH) .4....4111, i ,..1 55 I I FRAXINUS OXYCARPA\ 56 RAYWOOL7 1141 Ilk 1 7,039 SF I F2. 'aro 1 20.(nr h! I BUILDING:5AR-DL I 1 -, FF=459.61 1 I 00,PM, 1,...emarg.:9Nks ',..--,.•...„; ...4 i GARAGE I; L ----I iril 5 /1-11N I i trilla MUMMER 11-------1E2- , ' I OtMr;E=MIIIIIIIMIIIMaijlililr LOT COVERAGE: LOT AREA: 7,039 SF POLYGON AT 1 . < D I _ OK 11_2CIRC IMMire Enimer--------.— BUILDING FOOTPRINT: 1,814 SF BULL , latil-- ,- 1 70.9m- 1 6.00' PUE COVERED PORCH: 52 SF MOUNTAIN C; CANTILEVER LIVING SPACE: 257 SF 1----1 , 4 --1,,Are:iiiiiM.--, ;_____ _E__ SIDEWALK_ ;j 1 DECK AREA: 276 SF i - 61 457.8 Wirl;'4110/ VI''`'4''six diidir-Afamiss,w, - .. ,, / TOTAL COVERAGE: 2,399 SF / 4 ss., I, I k A&AMMTIWAR - LOT 56 0 NIT — WATER METER\ 34.1 % PLOT PLAN /4- tit I M tot M , , V IMPERVIOUS AREA: 2,705 SF .„4, r„.......... STORM LATERAL_so ,di PLANT(2)STREET SD TREE:2"CAL. SD SANITARYLATERAL SDI SW SEINE DRIVE GOLDENRAIN TREE/ Approved by Plannino KoaftEuTERIA „),. . _,d+ sc ss PANICULATA - / ('c) '-1°1 rl OFby TpliGaAnRiDng Liii, _ l• _ss _ —.--, ______w -.-- DAapInitials:tperC:o11:ed POLYGON NORTHWEST (503) 221-1920 ei 'ROAM'NO.: 39S-031 2S1W8 / REVIEWED We. PAC LOT 56 (R-4.5, LARGE) POLYGON AT BULL MOUNTAIN ./536 -1384rit6 SW SEINE DR 1 INCH.ZO FEET , ( . , V•ick r r..-r-) 6 e-c-k ip vi ) Orm,,tamik 2- Ct it i 3 f ri(f 7 ri Tivarel/ OR q 7 27-1 MAY 0 7 2019 . , ,t, /,......" •2_1,10 Lt die r"yr t LAISD07.- I I II Y CVF 4a.1194 0'"C 1 • brkt e.- 4 0 iraets ..2.y.to. ...Itisi- ib" O.C. te.....— .z)4(r L oi 4-fe,f a I bv-Ac.e, ' 4 3c boi-i-o 0 cif.eart-tjei,%i• 7 'So ...k I trs, 1 i ... .... I /0 et z//' i Ity-19-. )(le ckdc 1 20;1 -2-0° •$,, 2-4-II Con cre_le, pier 6-0 4' / Z 1.— ' ....1 r-i r---1 //En 1.--1 L.11.1 12....i L.L....1 ., I---J .,..4 C•1 / 1t,21-4" .e• (°' -.-..„ 1", *) -• 35'-4'' tt % 5C.-c1 c;:04v►rte i)rc iin6 3 of 4"t404. A l R(4-11Pro Con+)nuocts --9 iveActul hatdrai I I, +►s+em_ Posh 60i I58 posl- ''ns 6106(1 ns pet' mania-0.c Fur s �I p,cars xto Come ol2ck. board 2 Zc to •)ois i Iv )k.j Q 5 e-i n c en Fbean Com) E.PG lP Z — -enas (�) \NICI f WC) auk 153(,q 7;?, ard/ o c1 7 ZZ-ti- '.co Post' AD_i(QleZ Ut CCCkA.1.d ! s+ ass z ► iv�1 81 1\ 11 S1Ye, IZh k 20 k 2214 Cone re 'Q pier (4) SCAM(/ • 3, = I De3c 61 IDra 1 of `1 \i\la r ter. d,e:.c k 1534,4' 5t Sei,it- der. f arcii og .772-`2 ' Del-a'i 1 14 1 a Led.ger arti-achineanf D2kc 1 '42--0 Tension T tLs 2,1 ,l r 1 „...i.12- Ledetei t 2" V ® af,' 7 r ° ' z.x 10 Jotsr I t- Ledier tele.. li' • I 'IC .2..), i o i-tdg e4r R ` ,D-triz. +ensior, +t2 CAI) 2. q 1' tach tild of deck !tea‘ t 1 1 # 2 Sccile, : f = I Brian W. Doyle,P.E. .--- '—� Residential&Light Commercial `✓'"�y l �% Structures and Foundations <3*" +$+ `yy 17,427 Doyle Engineering Inc. ,; PO Box 193 A Newberg,OR 97132 a' .t OREGON Tel 503.538.2380 1r+"pt 2e, ®� doyleb@asme.org n`E SIE 't t Brian W. Doyle Oregon PE#17,427 1 May 2019 Stan Moore Moore Construction 6107 SW Murray Blvd. #263 Beaverton,OR 97008 <stan(a,mooredecks.com> 503-522-0047 re: Warren deck 15364 SW Seine Dr Tigard, OR 97224 You designed a new 16'x 35'-6"deck attached to the house..Your drawings are acceptable with the following notes and adjustments.My attached notes show the basis for the adjusted specs. 1. On page 2 add a second diagonal brace on the right side of the deck. Show the long dimension—35'-6". 2.On page 3 increase the beam size to 6x10.With cantilevered beams,all the post caps will be PC6Z—no end caps. The joist size can be either 2x12 or 2x10 at 16" o.c., or 2x8 at 12" o.c. Check with the manufacturer for maximum joist spacing—with 1x6 composite decking, I think that you would be better off with 12"joist spacing. 3.The railing posts need to screw into solid blocking that is screwed to the joists.You will likely have some short pieces of 6x8 that would be appropriate for this blocking. -end offile S'6 ,fit 'v?9 25 2, life e(P''�l 4'C/ h j j 4 2/ egg ; Yirrat (eI ') d7d416449 7 Vr3P«a pofaxg!,r 11 -41117M0'. Z 71 ,('J 0 * ofSda705/7/6..cb• ; `fit ne,g vcrt1A4j 011 bz rEeIg 0;5'6'0' z4.asof ev /b. /, tengife yZzb( ,1ay 'v�'947L ( (tot.ft? 1a -z fp 0( - r rd f ,,Z;�'`. -$4.cry3a (97 42E4 . ,rs (v/ si y/ �/5s ‹=' 7-0 xrlC N .ICO rt ;iv/35€2'r 4.9CP �I F 0 R T E MEMBER REPORT Deck,Floor:Joist PASSED J 1 piece(s) 2 x 10 Douglas Fir-Larch No. 2 @ 16"OC Overall Length:16' 0 0 lf 13 6" X 2 6" 0 All locations are measured from the outside face of left support(or left cantilever end).All dimensions are horizontal. Design Results Actual Location Allowed Result LDF Load:Combination(Pattern) System:Floor Member Reaction(lbs) 407 @ 3 1/2" 1406(1.50") Passed(29%) -- 1.0 D+1.0 L(Alt Spans) Member Type:Joist Shear(lbs) 369 @ 12'5 1/4" 1665 Passed(22%) 1.00 1.0 D+1.0 L(All Spans) Building Use:Residential Moment(Ft-lbs) 1320 @ 6'9 3/8" 2029 Passed(65%) 1.00 1.0 D+1.0 L(Alt Spans) Building Code:IBC 2015 Live Load Defl.(in) 0.221 @ 6'9 7/8" 0.435 Passed([/710) -- 1.0 D+1.0 L(Alt Spans) Design Methodology:ASD Total Load Deft(in) 0.256 @ 6'9 11/16" 0.653 Passed([/613) -- 1.0 D+1.0 L(Alt Spans) TJ-Pro'''Rating N/A N/A -- -- -- •Deflection criteria:LL(L/360)and TL(L/240). •Overhang deflection criteria:LL(21/360)and TL(2L/240). •Top Edge Bracing(Lu):Top compression edge must be braced at 10'4"o/c unless detailed otherwise. •Bottom Edge Bracing(Lu):Bottom compression edge must be braced at 15'9"o/c unless detailed otherwise. •A 15%increase in the moment capacity has been added to account for repetitive member usage. •Applicable calculations are based on NDS. • No composite action between deck and joist was considered in analysis. Bearing Length Loads to Supports(lbs) SUpport5Total Available Required Dead Fie Total Accessories 1-Hanger on 9 1/4"DF beam 3.50" Hangers 1.50" 61 364 425 See note s 2-Beam-OF 3.50" 3.50" 1.50" 88 504 592 Blocking •Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. •At hanger supports,the Total Bearing dimension is equal to the width of the material that is supporting the hanger • s See Connector grid below for additional information and/or requirements. Connector:Simpson Strong-Tie Connectors Support Model Seat Length Top Nails Face Nails Member Nails Accessories -Face Mount Hanger LU28 1.50" N/A 8-10d 6-10dx1.5 None Dead Floor Live Loads Location(Side) sparing (0.90) (1.00) Comments 1-Uniform(PSF) 0 to 16' 16" 7.0 40.0 Residential-Living Areas /� Weyerhaeuser Notes SUSTAINABLE FORESTRY INITIATIVE Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. T Weyerhaeuser expressly disclaims any other warranties related to the software.Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction.The designer of record,builder or framer is responsible to assure that this calculation is compatible with the overall project.Accessories(Rim Board,Blocking Panels and Squash Blocks)are not designed by this software.Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards.Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards.For current code evaluation reports,Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application,input design loads,dimensions and support information have been provided by Forte Software Operator Forte Software Operator Job Notes 5/1/2019 3:06:32 PM Brian Doyle Forte v5.4,Design Engine:V7.1.1.3 Doyle Engineering Inc (503)538-2380 doyleb@asme.org Page 1 of 1 • ` MEMBER REPORT Deck,Floor:Joist2 PASSED I fF1 GORTE 1 piece(s) 2 x 8 Douglas Fir-Larch No. 2 @ 12rr OC •• Overall Length:16' 0 0 I la 13 6• t� 2 6" a 0 All locations are measured from the outside face of left support(or left cantilever end).AII dimensions are horizontal. Design Results Actual!Location Allowed Result LOF Loads Combination(Pattern) System:Floor Member Reaction(lbs) 305 @ 3 1/2" 1406(1.50") Passed(22%) -- 1.0 D+1.0 L(Alt Spans) Member Type:Joist Shear(lbs) 284 @ 12'7 1/4" 1305 Passed(22%) 1.00 1.0 D+1.0 L(All Spans) Building Use:Residential Moment(Ft-lbs) 990 @ 6'9 3/8" 1360 Passed{73%) 1.00 1.0 D+1.0 L(Alt Spans) Building Code:IBC 2015 Live Load Defl.(in) 0.344 @ 6'9 7/8" 0.435 Passed(L/456) -- 1.0 D+1.0 L(Alt Spans) Design Methodology:ASD Total Load Defl.(in) 0.398 @ 6'9 11/16" 0.653 Passed(L/394) -- 1.0 D+1.0 L(Alt Spans) TJ-Pro'"Rating N/A N/A -- -- -- •Deflection criteria:LL(L/360)and TL(L/240). •Overhang deflection criteria:LL(21/360)and TL(2L/240). •Top Edge Bracing(Lu):Top compression edge must be braced at 11'5"o/c unless detailed otherwise. •Bottom Edge Bracing(Lu):Bottom compression edge must be braced at 15'9"o/c unless detailed otherwise. •A 15%increase in the moment capacity has been added to account for repetitive member usage. •Upward deflection on right cantilever exceeds overhang deflection criteria. •Applicable calculations are based on NDS. •No composite action between deck and joist was considered in analysis. Bearing Length Loads to Supports(lbs) Supports Total Available Required Dead Filve Total Accessories 1-Hanger on 7 1/4"OF beam 3.50" Hangers 1.50" 46 273 319 See note s 2-Beam-DF 3.50" 3.50" 1.50" 66 378 444 Blocking •Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. •At hanger supports,the Total Bearing dimension is equal to the width of the material that is supporting the hanger • s See Connector grid below for additional information and/or requirements. Connector Simpson Stron -Tie Connectors Support Model Seat Length Top Nails Face Nails Member Malls Accessories 1-Face Mount Hanger LU26 1.50" N/A 6-10d 4-lOdx1.5 None Dead Floor Live Loads Location(Side) Spacing (0.90) (1.00) Comments -Uniform(PSF) 0 to 16' 12" 7.0 40.0 Residential-Living Areas /� Weyerhaeuser Notes 0 SUSTAINABLE FORESTRY INITIATIVE Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software.Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction.The designer of record,builder or framer is responsible to assure that this calculation is compatible with the overall project.Accessories(Rim Board,Blocking Panels and Squash Blocks)are not designed by this software.Products manufactured at Weyerhaeuser facilities are third-party certified in sustainable forestry standards.Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards.For current code evaluation reports,Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproduds/document-library. The product application,input design loads,dimensions and support information have been provided by Forte Software Operator Forte Software Operator Job Notes 5/1/2019 3:11:32 PM Brian Doyle Forte v5.4,Design Engine:V7.1.1.3 Doyle Engineering Inc (503)538-2380 doyleh@asme.org Page 1 of 1 F 0 R T E' MEMBER REPORT Deck,End Beams PASSED • 1 piece(s) 6 x 10 Douglas Fir-Larch No. 2 •, Overall Length:12'8" 0 0 It rr Ir 10'2" u 2,6• All locations are measured from the outside face of left support(or left cantilever end).All dimensions are horizontal. Design Results Actual p Location Allowed Result LDF Load:Combination(Pattern) System:Floor Member Reaction(lbs) 2266 @ 1 1/4" 9453(2.75") Passed(24%) -- 1.0 D+1.0 L(Alt Spans) Member Type:Drop Beam Shear(lbs) 1954 @ 8'11" 5922 Passed(33%) 1.00 1.0 D+1.0 L(All Spans) Building Use:Residential Moment(Ft-lbs) 5380 @ 4'11 7/16" 6032 Passed(89%) 1.00 1.0 D+1.0 L(Alt Spans) Building Code:IBC 2015 Live Load Defl.(in) 0.156 @ 5'1/4" 0.328 Passed(L/758) -- 1.0 D+1.0 L(Alt Spans) Design Methodology:ASD Total Load Defl.(in) 0.182 @ 5' 0.492 Passed(1/647) — 1.0 D+1.0 L(Alt Spans) •Deflection criteria:LL(L/360)and TL(1/240). •Overhang deflection criteria:LL(21/360)and TL(21/240). •Top Edge Bracing(Lu):Top compression edge must be braced at 12'8"o/c unless detailed otherwise. •Bottom Edge Bracing(Lu):Bottom compression edge must be braced at 12'8"o/c unless detailed otherwise. •Applicable calculations are based on NDS. Bearing Length Loads to Supports(lbs) SupportsTotal Available Required Dead Live Total Accessories 1-Column-OF 2.75" 2.75" 1.50" 368 1898/-143 2266/-143 Blocking 2-Column-DF 5.50" 5.50" 1.50" 636 3033 3669 Blocking •Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. Tributary Dead Floor Live Loads Location(Side) Width (0.90) (1.00) Comments 0-Self Weight(PLF) 0 to 12'8" N/A 13.2 1-Uniform(PLF) 0 to 12'8"(Front) N/A 66.0 378.0 Linked from:Floor: Joist,Support 2 Weyerhaeuser Notes SUSTAINABLE FORESTRY INITIATIVE Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software.Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction.The designer of record,builder or framer is responsible to assure that this calculation is compatible with the overall project.Accessories(Rim Board,Blocking Panels and Squash Blocks)are not designed by this software.Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards.Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards.For current code evaluation reports,Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.tom/woodproducts/document-library. The product application,input design loads,dimensions and support information have been provided by Forte Software Operator Forte Software Operator Job Notes 5/1/2019 3:36:05 PM Brian Doyle Forte v5.4,Design Engine:V7.1.1.3 Doyle Engineering Inc (503)538-2380 doyleb@asme.org Page 1 of 1 l a R MEMBER REPORT Deck,Floor.-Drop Beam PASSED 1 ■` 1 piece(s)6 x 10 Douglas Fir-Larch No. 2 °verell Length:10 7 r , ds 10'2" a All locations are measured from the outside face of left support(or left cantilever end).All dimensions are horizontal. Design Results Actual p Location Allowed Result LDF Load:Combination(Pattern) System:Floor Member Reaction(lbs) 2324 @ 1 1/4" 9453(2.75") Passed(25%) -- 1.0 D+1.0 L(All Spans) Member Type:Drop Beam Shear(lbs) 1858 @ 1'1/4" 5922 Passed(31%) 1.00 1.0 D+1.0 L(All Spans) Building Use:Residential Moment(Ft-lbs) 5668 @ 5'1" 6032 Passed(94%) 1.00 1.0 D+1.0 L(All Spans) Building Code:IBC 2015 Live Load Defl.(in) 0.164 @ 5'1" 0.332 Passed(1/730) -- 1.0 D+1.0 L(All Spans) Design Methodology:ASO I Total Load Defl.(in) 0.198 @ 5'1" 0.498 Passed(L/603) -- 1.0 D+1.0 L(All Spans) •Deflection criteria:LL(L/360)and TL(1/240). •Top Edge Bracing(Lu):Top compression edge must be braced at 10'2"o/c unless detailed otherwise. •Bottom Edge Bracing(Lu):Bottom compression edge must be braced at 10'2"o/c unless detailed otherwise. •Applicable calculations are based on NDS. Bearing Length Loads to Supports(lbs) Supports Total Available Required Dead Live Total Accessories 1-Column-DF 2.75" 2.75" 1.50" 403 1922 2325 Blocking 2-Column-DF 2.75" 2.75" 1.50" 403 1922 2325 Blocking •Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. Tributary Dead Floor Live Loads Location(Side) Width (0.90), (1.00) Comments 0-Self Weight(PLF) 0 to 10'2" N/A 13.2 1-Uniform(PLF) 0 to 10'2"(Front) N/A 66.0 378.0 Linked from:Floor: Joist Support 2 Weyerhaeuser Notes : (Z$)SUSTAINABLE FORESTRY INITIATIVE Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. '' Weyerhaeuser expressly disclaims any other warranties related to the software.Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction.The designer of record,builder or framer is responsible to assure that this calculation is compatible with the overall project.Accessories(Rim Board,Blocking Panels and Squash Blocks)are not designed by this software.Products manufactured at Weyerhaeuser facilities are third-party certified to sustainable forestry standards.Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards.For current code evaluation reports, Weyerhaeuser product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library. The product application,input design loads,dimensions and support information have been provided by Forte Software Operator Forte Software Operator Job Notes 5/1/2019 3:27:00 PM Brian Doyle Forte v5.4,Design Engine:V7.1.1.3 Doyle Engineering Inc (503)538-2380 doyleb@asme.org Page 1 of 1