Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Correspondence (6)
v ■ ARCHITECTURAL DESIGN GUILD RECEIVED Building Department Comment Response Revision APR 2 5 2019 April 24, 2019 CITY OF TIGARD BUILDING DIVISION RE: Office Depot Store 921 15060 SW Sequoia Pkwy Tigard, OR 97224 Response to Building Department Comments BUILDING 1. The structural drawings are missing. Response: The structural drawing is enclosed. 2. In regard to egress door 101, per section 1014.2 of the 2014 Oregon Structural Specialty Code, there must be full or partial-height fixed walls or similar construction that will maintain the required width and lead directly from the retail area to the exit without obstructions. Response: A 42" tall wall has been added to the plans to maintain the required egress width from the rear Workonomy Hub door to exit door 101. See sheet A102 for the location and A401 for the new partition type. 2710 Sutton Boulevard ■ Saint Louis,Missouri 63143 ■ P::314.644.1234 F::314.644.4373 • www.adg-stl.com FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT III111 Transmittal Letter ,,„\R n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: f) DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED FROM: abicreAi4- Plin,,Q,i 1 APR 2 5 2019 CITY OF TIGARD COMPANY: P0�( j/tilSi" BUILDING DMS ON PHONE: 3. (0 24 . C300 By: .6.% RE: 1 0l0G Svi S-ecikkbia 19kwcui $ue-2o1C1 - 0009 (Site Address) (Permit Number) © '1 G€ De r (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: X Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. 0.. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. X Other(explain): CWYD ' REMARKS: Routed to Permit Technician: ' Date: 'n —oZ ' Initials: Fees Due: ❑ Yes [ No Fee Description: Amount Due: $ $ Special Instructions: Reprint Permit(per PE): ❑ Yes AI No ❑ Done Applicant Notified: Date: Initials: I:\Building\Forms\TransmittalL.etter-Revisions 061316.doc