Loading...
Permit (24) CITY OF TIGARD BUILDING PERMIT 2±:. COMMUNITY DEVELOPMENT a , i Permit#: BUP2019-00047 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 TIGARD •��� Date Issued: 05/23/2019Parcel: 151260000300 Jurisdiction: Tigard Site address: 9753 SW WASHINGTON SQUARE RD D02 Project: 85C Bakery Subdivision: None Lot: None Project Description: Tenant improvement for new bakery. 9/17/19: REPRINTED permit to reduce scope of work to interior only. Contractor: PHILCO Owner: PPR WASHINGTON SQUARE LLC 16037 SW KELLY ST PO BOX 847 PORTLAND, OR 97236 CARLSBAD, CA 92018 PHONE: 503-427-2988 PHONE: FAX: FEES Specifics: Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIA Permit Fee-Additions,Alterations, 05/21/2019 $2,615.95 Demolition Occupancy Grp: M Occupancy Load: 117 12%State Surcharge-Building 05/21/2019 $313.91 Dwelling Units: Plan Review 03/01/2019 $1,700.37 Stories: Height: ft DC Provision Review, COM TI-Ping 05/21/2019 $388.00 Bedrooms: Bathrooms: Plan Review-Fire Life Safety 05/21/2019 $1,046.38 Value: $350,000 Info Process/Archiving-Lg$2.00(over 05/21/2019 $100.00 11x17) Info Process/Archiving-Sm$0.50(up to 05/21/2019 $100.50 Floor Areas: 11x17) Metro Const. Excise Tax 05/21/2019 $420.00 Total Area: Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $6,685.11 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained TigardMunicipal the Munici al Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR/ 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. 11111. Issued By: Permittee Signature: • 7.4.44."(----("?/4-1 f„„,, all 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Branden Taggart From: ksmith@smithco.org Sent: Tuesday, September 17, 2019 1:32 PM To: Branden Taggart Cc: Tom McGuire;#Building Permit Technicians; Samuel Copelan Subject: RE: 85c bakery WASHINGTON square - 9753 SW Washington Square Rd. Caution! This message was sent from outside your organization. Brandon, per our conversation, we are removing the patio and landscaping out of the scope for the permit BUP2019- 00047, 9753 SW Washington Square, 85C Bakery We will put the existing landscaping back in its original condition. I will have the GC go in with approved site permit drawings for you to mark-up. Thanks for your help keith 1. smith principal aii .. 603 stewart street suite 610 wattle, washingtort 98101 206.713, 076 m k'tnith etssrni hco.car e WWW:$,M0419-rZ w 1 hh tomer ortgmatea from smith co,Ile tt contacts intaracn ttknn that ntay be czaralldented end is eatcnded only for the individual or entaty named above Unless you are the sddro.ee.(or autheoa`zed to receive leer the addreasc4 you may not duclose copy,use,or thstrthute this hriarmattota A0 p€rsors.al moss?excess v:ewe solely of the sender,wtheh are net to be attr but ta,I ith,tcr,,ft,and may not bcr.corer,or distr(bee ed without this t mit a.inacr. It you rook-mod this vmt.t att in error,l trate notary us insrttrdieeeIy et 1,intttlattimtttoestrz or call t2061 713..5076, 76, ti and-or. From:. Branden Taggart<brandent@ ov>g g Sent: Monday, September 16, 2019 5:32 PM To: ksmith@smithco.org Cc:Tom McGuire<TomM@tigard-or.gov>; #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>; Samuel Copelan <samuelc@tigard-or.gov> Subject: RE: 85c bakery WASHINGTON square -9753 SW Washington Square Rd. 1 CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2019-00047 T[GARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 05/23/2019 Parcel: 1S1260000300 Jurisdiction: Tigard Site address: 9753 SW WASHINGTON SQUARE RD D02 Project: 85C Bakery Subdivision: None Lot: None Project Description: Tenant improvement for new bakery. Contractor: PHILCO Owner: PPR WASHINGTON SQUARE LLC 16037 SW KELLY ST PO BOX 847 PORTLAND, OR 97236 CARLSBAD, CA 92018 PHONE: 503-427-2988 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIA Permit Fee-Additions,Alterations, 05/21/2019 $2,615.95 Demolition Occupancy Grp: M Occupancy Load: 117 12%State Surcharge-Building 05/21/2019 $313.91 Dwelling Units: Plan Review 03/01/2019 $1,700.37 Stories: Height: ft DC Provision Review,COM TI-Ping 05/21/2019 $388.00 Bedrooms: Bathrooms: Plan Review-Fire Life Safety 05/21/2019 $1,046.38 Value: $350,000 Info Process/Archiving-Lg$2.00(over 05/21/2019 $100.00 11x17) Info Process/Archiving-Sm$0.50(up to 05/21/2019 $100.50 Floor Areas: 11x17) Metro Const.Excise Tax 05/21/2019 $420.00 Total Area: Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $6,685.11 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 2-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the Job site at the time of each inspection. City of Tigard ■ 11 COMMUNITY DEVELOPMENT DEPARTMENT T 1 G A R D Building Permit Review — Commercial - With Land Use Building Permit #: /3 Z1/0,2.6/9 -- 90i91 7 Site Address: 9-75:sSid L/t3f1� /c•/5.5 62. Suite/Bldg#: Project Name: .3.5 e d;-- --X--X (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: '� t : 1.. r in&Jvvi 1p4,elrlri js,Verify site address/suite# exists and active in permit system. j:SOZ.iver Terrace Neighborhood: ❑ Yes X No ,Land Use Case#: /7/- 2D/9 eo o O:j g-Plans Match Approved Land Use: Site Plan ❑ Landscape Plan ❑ Other: ❑ Urban Forestry Plan ❑ Elevation Plan Building Height: Maximum Height Actual Height Conditions Met: ❑ Prior to Submittal ❑ Prior to Permit Issuance ,Business License: Exists: ❑ Yes No,applicant notified to obtain business license Public Facilities Improvement (PFI) Permit: Required: ❑ Yes,applicant was notified No Applied For: ❑ Yes ❑ No,stop intake Notes: Approved by Planning: ro ,. „ Date: 311i 11� Revisions (after Building Submitta only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: o?,a2,��/y Site Plans: # 3 Building Plans: # -=5 Building Permit#: D--Enter building permit#above. Workflow Routing: Planning Q.igineering I ermit Coordinator ®wilding Workflow Sign-off: Si -off for Planning(include notes from planning review) Route Application Documents: Wig: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable, etc. Notes: -1 By Permit Technician: .., /Z�t{, Date: �/�, I:\Building\Forms\BldgPermitRvw_COM_W ithLandUse_070915.docx Engineering Review ❑ Slope at building pad: ❑ PFI Permit#: ❑ Conditions "Met"prior to issuance of building permit ❑ Easements (encroachments) per engineering conditions of approval and plat (not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: ✓� Date: 3ls-7i� Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: q C Fees Entered: Wash Co Trans Dev Tax: ❑ Yes 42 (1/A Tigard Trans SDC: ❑ Yes Parks SDC: CI Yes VeA A OK to Issue Permit Approved by Permit Coordinator: Al;ate: J 2 ler 1:\Building\Fonns\BldgPennitRvw_COM_W ithLandUse_0709 1 5.docx