Plans (111) REVISIONa ,.) p 3-.0 1 9 - ‹: (-3 ) ) aTh
OFFICE COPv
, , , , ,
MAY 2 2019 snCITY OF 1R.Mte;„:„f1;00'
I LSA,
BUILDING DIVISION a,r>A MA
City of ._. �gard ' of e t-
Approved Plans
Y--- ---- Date\'-
EXISTING WOOD #10 SCREW TOP AND
STRUCTURE ABOVE .,,, BOTTOM TO TRACK AT
TO REMAINEACH METAL STUD,TYP.
,
2 1/2"x 20 ga metal 2-€.- -rtr
studs @ 16"O.C.
#10 SCREW TOP AND 1 ,.-,r 2 1/2"x 20 x 2"deepcont.
BOTTOM TO TRACK AT ; g a.
EACH METAL STUD,TYP. 0 track with#8 x 1 1/2"screws
I .
I �,
'� @10"O.C.
I ."';•,.,,,,H- .. -...„....-w.-0 rte.„,,,r•. ;. .� _ EXISTING CEILING ,
2 1/2"x 20 ga.x 2"deep cont. .,--`" `._. HEIGHT TO REMAIN
,
track with#8 x 1 1/2"screws '`ti,.
@ 10"O.C. #10 SCREW TOP AND
!0[ 101 BOTTOM TO TRACK AT
l EACH METAL STUD,TYP.
/ i
EXISTING 5/8"GYP. BD. ////, j mac'~—EXISTING 5/8"GYP. BD.
(BOTH SIDES)OVER % ` 5/8"GYP. BD.OVER (BOTH SIDES)OVER
EXISTING 6"METAL r` r" METAL STUD EXISTING 6"METAL
STUDS, FULL HEIGHT /' FRAMING, REFER TO STUDS, FULL HEIGHT
WALL TO REMAIN. t ICC REPORT ON WALL TO REMAIN.
SHEET A206
2GYP. BD. CEILING SCALE: 1"=1'-0"
River Ridge Renovations,LIC : D O U B L E T R E E BY HILTON DATE: '05.01.2019
,fl 1900 N 18th Street,Suite 300 "" °'
kijolitil Monroe,LA 71201 SCALE: 1"= 1'-0"
www,rverriagerenos.com 9575 SW LOCUST STREET
TIGARD,OREGON .PLAN: I DETAIL
FOR OFFICE USE ONLY-SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
71
Transmittal Letter
16A.D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigar r.gov
TO: Tom Hochstatter DATE ' EIVED:
DEPT: BUILDING DIVISION CEIVED
FROM: Keith Mayo MAY 2019
OF TIGARD
COMPANY: River Ridge Renovations, LLC CITY
BUILDINGD1VISIn�"
PHONE: 318 . 372 . 6671 By:,
RE: 9575 SW Locust St. BUP2019-00112
(Site Address) (Permit Number)
Double Tree HoNl\
(Project name or subdivision n. - 0, umb-
ATTACHED ARE THE FOLLOWI IT
Copies: Description: ' Copies: Description;
Additional set(s) of pl. s. 1 Revisions: Revised Detail
Cross section(s) and .etails. Wall bracing and/or lateral analysis.
Floor/roof framin: Basement and retaining walls.
Beam calculatio's. Engineer's calculations.
Other(explai :
REMARKS: Plea - see the attached revised detail #2 on sheet A201 .
FOR OFFICE USE ONLY
Routed to Permit Technician: Date: (-- C— 5 cA Initials:
Fees Due: ❑ Yes Fee Description: Amount Due:
$ r�
Special
Instructions:
Reprint Permit(per PE): Yes No ❑ Done
Applicant Notified: p� -Date: _c7'ij Initials:
I_\BuddiDgworms\TransnaittatLetter-Revicions doc 05/25/2012