Loading...
Permit CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2019-00027 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 05/20/2019 Parcel: 1 S125DC00600 Jurisdiction: Tigard Site address: 9777 SW 74TH AVE Project: Red Cedar Estates Subdivision: BOULEVARD HEIGHTS Lot: 30 Project Description: Demolition of(1)1,600 sq.ft.house and(1)808 sq.ft.detached garage. UPON FINAL INSPECTION,CREDITS FOR TRANSPORATION, PARKS AND SEWER SDCS MAY BE APPLIED TOWARDS NEW CONSTRUCTION. Contractor: JTSC LLC Owner: LFII 74 LLC 5285 MEADOWS RD, SUITE 171 5285 MEADOWS RD STE 171 LAKE OSWEGO, OR 97035 LAKE OSWEGO, OR 97035 PHONE: 503-308-7324 PHONE: FAX: 503-684-0102 Specifics: FEES Description Date Amount Type of Use: SF Class of Work: DEM Type of Const: Permit Fee-Additions,Alterations, 05/20/2019 $210.59 Demolition Occupancy Grp: Occupancy Load: Info Process/Archiving-Sm$0.50(up to 05/20/2019 $0.50 Dwelling Units: 0 11x17) Stories: 0 Height: 0 ft Erosion Control w/Development 05/20/2019 $80.70 Bedrooms: 0 Bathrooms: 0 Value: $9,000 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $291.79 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialt •.es and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 day • issuance or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility otification C: ter. Those rules are set forth in OAR 952-001-0010 through OAR•52-001-0090. You may obtain a copy of the rules or direct questions to OUNC • calling 503.23 .1987 or 1.800.332.2344. Issued By: �-- Permittee Signature: ',3.639.4175 by 7:00 a.m.for the next available in. ion date. This permit card shall be kept in a conspicuous place on the job site it completion of the project. Approved plans are required on the job site at the time of each inspection. PietBuilding Permit Application ResidentialFOR OFFICE USE ONLY City of Tigard Received 11111 11 13125 S W Hall Blvd.,Tigard,OR 97223 r r Date/By: /S i /377-.. i Permit No.: zi /baa G f ,cw 7 g. j ' ; 3) ! j"-. Plan Review /[ 4. �G ,� /. Phone: 503.718.2439 Fax: 503.598:1964 Date/By: Other Permit: 7 1 G R U Inspection Line: 503.639.4175 ,- r Date Ready/By: A��'� Inns: ® See Page 2 for Internet: www.tigard-or.gov (ATY r:� �, Notified/Method: ,) d-6 it, 077 7..6 Supplemental Informalion BtiILD N(; r rik#i ii":; /-u I(44J il " .Jl//^ efe,-�C� TYPE—OF WORK REQUIRED DATA:1- 2-FAMILY DWELLING O New construction ®Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ® 1-and 2-familY dwellin Valuation: $9,000 g ❑Commercial/industrial 12Accessory building ElMulti-familyNumber of bedrooms: 3 O Master builder ❑Other: Number of bathrooms: 2.5 JOB SITE INFORMATION AND LOCATION Total number of floors: 2 Job site address:9777 SW 74th Ave New dwelling area: 0 square feet City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.: Project name:Red Cedar Estates Covered porch area: square feet Cross street/directions to job site:SW 74th&Red Cedar St Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision:Red Cedar Estates I Lot no.:EX Permit fees*are based on the value of the work performed. Tax map/parcel no.: 1S125DC00600 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Demolition of Existing home and detached garage to prepare for subdivision Valuation: $ Existing building area: 2408 square feet New building area: 0 square feet ® PROPERTY OWNER 0 TENANT Number of stories: Name:LF II 74,LLC Type of construction: demolition Address:5285 Meadows Rd,Suite 171 Occupancy groups: City/State/ZIP:Lake Oswego,OR 97035 Existing: Residential Phone:(503)730-8620 Fax:( ) New: ►P APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* Business name:JT Smith Companies (Please refer tofesschedule) Structural plan review fee(or deposit): Contact name:Jesse Nemec Address:5285 Meadows Rd,Suite 171 FLS plan review fee(if applicable): City/State/ZIP:Lake Oswego,OR 97035 Total fees due upon application: Phone:(503)730-8620 Fax::( ) Amount received: E-mail:jnemec@jtsmithco.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted Photo Voltaic Solar Panel System. Business name:JTSC,LLC Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:5285 Meadows Rd,Suite 171 Solar Installation Specialty Code checklist. City/State/ZIP:Lake Oswego,OR 97035 Permit Fee(includes plan review $180.00 and administrative fees): Phone:(503)730-86 I Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.:200237 Total fee due upon application: $201.60 Authorized signature: This permit application expires if a permit is not obtained _� within 180 days after it has been accepted as complete. Print name:Jesse mec Date:1/31/2019 *Fee methodology set by TriCounty Building Industry Service Board: I:\Building\Penmts\BUP-RESPennitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) Jesse Nemec From: Monica Bilodeau Sent: Tuesday, February 5, 2019 8:56 AM To: Jesse Nemec Subject: RE: Red Cedar Estates Demo is included in the site work so typically we require it. But we can allow you to pay later if needed.Will the tree protection fencing be up prior to demo? I am more concerned the tree protection fencing is up around the demo site. Thanks, Monica Original Message From:Jesse Nemec<jnemec@jtsmithco.com> Sent:Tuesday, February 5,2019 8:38 AM To: Monica Bilodeau<MonicaB@tigard-or.gov> Subject: Red Cedar Estates Good morning Monica, I am trying to obtain a demolition permit for the existing home in order to be prepared for site work in the spring. I wanted to clarify something that Lina brought up at the counter yesterday. Per the conditions of approval,we need to pay a Urban Forestry Data Collection Fee and provide a Tree Establishment bond. My question is,does this apply to demolition of the existing home only? I'm not proposing to cut any trees at this time,just wanting to get my demolition permit to remove the structures. I appreciate any input you have on this topic. Jesse Nemec Sr Development Manager 503-730-8620 Original Message From: scanner@jtsmithco.com <scanner@jtsmithco.com> Sent:Tuesday, February 5,2019 8:54 AM To:jnemec@jtsmithco.com Subject: TASKaIfa 3050ci [00:c0:ee:86:89:b0] DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested,e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule." 11111111 City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT TIGAD R z Building Permit Review — Residential Building Permit #: ,% / ` 030,-4.7�da � 3, 'x ' Site Address: 97k - 2-/-1, -e Project Name: p�j ( Cddr c Lot #: (New dwelling=subdivision name;Addition or Alteration=last name of owner) Planning Review Proposal: 21t C,1i s - 1d Verify site address suite / #exists and activyth permit system. ever Terrace Neighborhood: kai No ❑ Yes,See River Terrace ReviewAddendum Attached Sit lan Elements: ' ee(3)copies of site plan Existing structures on site late plan must be on 8-1/2"x 11"or 11 x 17"paper rptprint of new structure(includingdecks)with finished wn to scale(standard architect or engineer scale) floo elevations E •rth arrow 67' j'ty locations&easements(required for new and additions) Ri S' address,project or subdivision name and lot number IPalk/diiveway approach A•plicant information(name and phone number) to e. ation of wells/septic systems IT o, dimensions and building setback dimensions V 'xisting trees to be retained with drip line,and tree e quare footage of buildings to be demolished protection measures t area,building coverage area,percentage of coverage and 4/ �,. eet tree size,type and location pervious area(applicable if R-7,R-12,R-25&R-40) Street names ►P 'roperty corner elevations(2 foot contour lines if more than >1,000 sf of impervious area created or replaced? ❑Yes lZ 4 foot differential) If es,is a storm water .uali ' facili , shown? ❑Yes 10 *Clean Water Services—Service Provider Lett- (lot platted prior to 9/10/1995): equired: ElYes,applicant was notified a No Received: 0 Yes 0 No Public Facilitie provement(PFI)Permit: 2 0 o —OC-, equired: Yes,applicant was notified ❑ No Applied For. '�1 Yes L No,stop intake d Use Case#: �'4( Z.ning. —21- C--" O'equired Setbacks: Front Rear Side Street Side Garage andscape Requirement: of Coverage Maximum: I'Puilding Height Maximum Height Actual Height IC ° isual Clearance . ensitive Lands: LTJ Yes 0 No Type �Ql ,e 4 �j ,�j Urban Forestry Plan ❑ Conditions "Met" rior to issuance of building permit i,/,Notes: SC:e A7rgc e 04-4, P-;J (,'lawr ‘1 c 7%,,,iON put7ffni {tir #2 4 3 L-kr- /Approved By Planning: J141t1k GlIA&L- Date: 2-"--I 1 Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved I:\BuildineForms\BldgPermitRvw RES 061417.docx Building Permit Submittal - . { Original Submittal Date: prf l`1 Site Plans: # `R Building Plans: # T Building Permit#: ter building permit# bove. �, __// Workflow Routing: ning ngineering L1-I--Permit Coordinator 0 Building Workflow Sign-off: 2..E,!.. Route for Planning(include notes from planning review) Route Application Documents: [ 'Engineering: (1) copy of permit application, (1)site plan, (1) building plan and original plan review routing form. ding: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: > f) dA)/7" By Permit Technician: �� Date: Engineering Review Clope at building pad: ..5% 12-Conditions"Met"prior to issuance of building permit (',o#.4 D mot.* s4o T w.tT ❑ Easements (encroachments)per engineering conditions of approval and plat Cater Quality/Quantity Facility: Assess Water Quality Fee in-lieu: 0 Yes E No Assess Water Quantity Fee in-lieu: 0 Yes ErNo LIDA Facility on lot 0 Yes I2'No Et-Final Plat Recorded: 14 0 ❑ NOT Approved Engineering: Date: PP d b Y � �� Notes: P J r.t0.15 1.4.441.1T17 1 ' FAL>'Mt t-1 reva t..4) AL{4.2 C t_wA.0 Imo'Approved by Engineering: V t1.4 #4154t12._ Date: a- 0„ - 1 i Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved Permit Coordinator Review 0 Con ' 'ons"Met"prior to issuance of building permit 4( Approved,NOT Released: /21.-e `�2 •Y-eA6rte-- ate: -2 /1, i'li Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant Revision ► .tice 2: Date Sent to Applicant R ,...'on Notice 3: Date Sent to Applicant: ,ir. SDC Fees Entered: Wash Co Trans Dev Tax: 0 Yes 04V/A Tigard Trans SDC: 0 Yes ID/N/A Parks SDC: 0 Yes LIDA 0 Yes /A OK to Issue Permit �G�7��� `�l�t�,� ti Approved by Permit Coordinator: rf/ Date: 2 L\Building\Forms\BldgPermitRwv_RES 010118.docx