Loading...
Permit (142) 1111 .�: CITY OF TIGARD BUILDING PERMIT '' COMMUNITY DEVELOPMENT Permit#: BUP2019 00124 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 05/16/2019 Parcel: 1 S 136DA02300 Jurisdiction: Tigard Site address: 6900 SW ATLANTA ST 120 Project: Spec Space Subdivision: None Lot: None Project Description: New partition wall to divide(1)large room into(2)rooms. Contractor: COMMERCIAL BUILDING MAINTENANCE Owner: OREGON EDUCATION ASSN PO BOX 3728 6900 SW ATLANTA ST TUALATIN, OR 97062 TIGARD, OR 97223 PHONE: 503-691-2723 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VBPermit Fee-Additions,Alterations, 05/16/2019 $119.33 Demolition Occupancy Grp: B Occupancy Load: 20 12%State Surcharge-Building 05/16/2019 $14.32 Dwelling Units: 0 Plan Review 05/14/2019 $77.56 Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 05/16/2019 $47.73 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Sm$0.50(up to 05/16/2019 $1.00 Value: $2,500 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $259.94 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a •'- • e rules or.1 rct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. P Issued By: 'ermittee Sign-� � ��L-i0 2----(--,-4-2---' i''Z ea/�iy— '03.639.4175 by 7:00 a.m.for the next available inspection da This permit card shall be kept in a conspicuous place on the job site until corn• •tion of the project. Approvea plans are requ re on the job site at the time of each i pection. City of Tigard ' COMMUNITY DEVELOPMENT DEPARTMENT IIIII ■ T 1 c a R o Building Permit Review — Commercial - No Land U s e Building Permit #: , €/ )/cy- C Oil Site Address: 6q OO SW 4414.11,, ,c4. Suite/Bldg#: 12,0 Project Name: V J —. CPkoz. (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review 11 Proposal: 6464 � b� j n�� 4411,\I idd� ir3 L .C-,a(Ltr— re a„,) ,All,,.,„7. Existing Business Activity: Proposed Business Activity: (Olt LI Verify site address/suite# exists and active in permit system. V--"ver Terrace Neighborhood: ❑ Yes ai' o L4't oning: -11% riVy&mitted Use: ❑ Yes ❑ No l Spec Space BCo firm no land use required. 02 Business License: Exists: ❑ Yes lIX No,applicant notified to obtain business license Notes: Approved by Planning: JLAI C )L Date: c-1611 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: s// A Site Plans: # Building Plans: # .� Building Permit#: nter building— permit#above. Workflow Routing: [ming 'Permit Coordinatoren ding Workflow Sign-off: E sign-off for Planning(include notes from planning review) Route Application Documents: wilding: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: , -., Dater� ' I:\Building\Forms\BldgPen iitRvwCOM NoLandUse 060116.docx Permit Coordinator Review 14Conditions "Met"prior to issuance of building permit 0 Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: 0 Yes N/A Tigard Trans SDC: 0 Yes N/A Parks SDC: 0 Yes N/A 1K to Issue Permit Approved by Permit Coordinator: ArAA6O "` Date: s)15/119 I:\Building\Forms\BldgPermitRvw_COM_NoLandUse_070915.docx