Loading...
Plans (88) RECEIVED APR 16 2019 Building Plans for City of Tigard Building Permit Application CITY OFTIGARD BUILDING DIVISION Customer: The Fountains at Summerfield condominiums HOA 15685 SW 116th Ave., #105 Tigard, OR 97224 Contact - Paul Brock, 858-212-9105, pbrock987Pgmail.com Contractor: Jon Erickson, 503-730-9220 OFFICE COPY ion.eveniobsPemail.com CCB 162397 CITY OF T 4r, REVIEWED POR CODE COMPLIANCE Scope of Work— Repair Decks Approved:NNNJl • Replace perimeter joists with PT O i C: ( l • Repair joist and soffit dry rot Permit th i. O J 9_ O in 0 99, • Re-coat deck surface with Gaco Address: • Replace 42" guardrail and infill to comply with `��7 z\ �� ' Suite #: I O IBC multi-family code By: 11 Date: (4-a 0- tSUBJeCt File Location: Fountains Deck Permit Plans REVISED.pptx j `y REVIE VALIDITY OF Wood structural members that ar, THE ISSUANCE OF A p ,kr,7 T exposed to thQ weather to be BASED ON CONSTRUCTiO-. Pressure Treated or decay reslshnt DOCUMENTS AND OTHER per 317.1.3 DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM 4/16/19 Fountains at Summerfield - Deck Building Plans REQUIRING THE CORRECTION 1 OF ERRORS. OSSC 105.4 Typical Deck Construction and Size — 102 SF < Brick Col. 114.5" > 11'x15 1.------- Imbedded 6x6 PT {_- ; n e.--- 4x4 PT Posts AP - 2 x 8 PT blocking between joists attached with Three 16D 3-1/2"n HDG )( ; >< > Ref: 2014 Oregon Structural 43" .5" 56.5" Specialty Code—Table I 2304.9.1-29 2"x8"Joists 16" OC Blocking supports Simpson Rim joist attached to Tension Ties DTT2Z. Two lateral joists with El ' DTT2Z brackets required for Three 16D 3-1/2"n HDG ------4' posts in this position. See Beam^' 6"x10" Simpson Wood Connection Ref: 2014 Oregon Connectors 2018-18 Deck Structural Specialty L Tension Ties— page 337 Code—Table N 2304.9.1-29 House—Brick exterior El 43" ' 7 Scale— 12"/increment 4/16/19 Fountains at Summerfield - Deck Building Plans 2 Water Penetration Remediation — Cross Section 1111111111111IimilmillimilluilPosts—4x4 PT Flashing 2" x 3" Y Resurfacing material 3/4" exterior plywood decking 0 E F2 co x N 1C----.__— _____j Hardi-plank Fascia 9.25" x .25". Applied with exterior adhesive and secured with post bolts. Wicking protection for soffit provided by%" extension. Pre-paint before adding flashing %" plywood soffit 1/7 Scale— 1" increment 4/16/19 Fountains at Summerfield - Deck Building Plans 3 1 iiiiiiminiiimminsii Guard Rail Post — Simpson Tension Ties Posts—4x4 PT �:% :- Vt,‘,, *: " 1 '(;*4.**::.,, ; � Simpson DDT2Z *�, '� Attach to lateral joist with k,\\\ \\\\�\ ' 8 SDS 1.5" screws I %" x 6" Machine Bolt HDG with nuts and ..`. , . DTT2Z supports 1800 Ib. ° " tension load. Meets IBC washers Code for multi-family deck v) c 'o guardrails. N ERefer catalog to attached Sp- Deck ionimTiesson Lateral Joist page 337 Tens Also refer to Simpson code- compliant Guardrail Post Connection bulletin T-C-GRDRLPST17 Scale— 1" increment 4/16/19 Fountains at Summerfield - Deck Building Plans 4 a Typical Guardrail and Infill Section — 50" max. between posts Simpson Strong Drive k , to r: = 1 Wide Screw SDWS 4", Railing 2 x 4 TKC O 2 3/8"TL. Two per Cap Rail –Trex etoii end,three in mid span 1" x 5.5" attached to Railing with ,ate , �m va P, " exterior , "#e ' . :� a �", adhesive. / i, i z in N Railing Support ieM v 2x4TKC . ao f;' f o Attached to 1-- f;' rNi Installation of Railing and v X }Y Posts with Tr balasters and rails adhesive and per mfg installation Simpson instructions. Strong Drive Wide Screw SDWS 4", Railing 2 x 4 TKC Railing Infill - 2 3/8"TL. DecKorator aluminum 2.75 space balaster%" x 32". — 1 0 tA Spacing 3.75" DecKorator Scale 1" increments 0 0CodeCompliance Research Report 1roiliu ltiii CCRR-0161 4/16/19 Fountains at Summerfield -Deck Building Plans 5 of 5