Loading...
Report (66) p a0/ 2 - O O '-/O Bend Office (541)330-9155 Geotechnical Office (503)601-8250 Carlson Testing, Inc. Eugene Office (541)345-0289 Salem Office (503)589-1252 Tigard Office (503)684-3460 April 23,2019 11906419 Permit No. MST2018-00240 FIELD INSPECTION REPORT DATES COVERED: April 19,2019 PROJECT: LANGE RESIDENCE—ADDITION ADDRESS: 16264 SW 104TH AVENUE--TIGARD,OR INSPECTOR: Timothy Suess 04/19/19 - Anchor Load Test As requested by the client, CTI representative was on site to conduct a load test on anchors that were installed without inspection. Engineer's letter dated 03/27/19,written by Robert McClung, indicates a load value of 2,400 lbs to be applied to (2) holdown anchors installed on back garage wall. Load was applied with a hydraulic ram assembly (CTI N2 4590) and a gauge (CTI N2 4594)to specified load. The anchors held the required load without cracking,spalling or excessive movement. The results of CTI's testing were discussed with Nixon Lange prior to leaving site. ***CHECK ONE BOX ONLY*** YES NO 1. This is a preliminary inspection only. —OR— 0 2. The work inspected conforms to acceptance criteria listed above. If"No,"the portions of the work that are non-conforming items are clearly stated above and will be added to the NCL. Remaining portions of the work,which are not preliminary in nature,are to be ® 0 considered as conforming. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, IN . im Suess Project Manager Thick cc: Nixon Lange NGLANGE3@GMAIL.COM City of Tigard Building Division—Walter'Chip'Barnett WALTER@TIGARD-OR.GOV BKE Inc—Robert McClung ROBERT@BKENGINEERS.COM 8430 SW Hunziker St.,Tigard,OR 97223 PQ BOX 230997_Tigard_OR 97281 04-19-19 fr 610(ts)