Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans (89)
Trash Enclosure Doubletree Tigard 9575 SW Locust Street,Tigard,OR 97223 REAPOR F2 12\/790 SPEC HEQUIRED State of Oreg ,s.-,:fuctural Specialty Code Pi Concrete and ReiriJoac4ig Steel • - 111111 Bolts Installed in Concrete O Special Moment-Resisting Concrete Frame o Reinforcing Steel&Prestressing Steel Tendons • az Structural Welding VALIDITY OF PERMIT 0 High-Strnght Bolting THE ISSUANCE OF A PERMIT BASED ON CONSTRUCTION Structural Masonry DOCUMENTS AND OTHER O Reinforced Gypsum Concrete • DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM Insulating Concrete Fill REQUIRING THE CORRECTION 0 Spray Applied Fre-Resistive Materials OF ERRORS. OSSC 105.4 • 0 Pilings,Drilieci Piers and Caissons Shotcrete 0 Special Grarlinu Excavation and Filling 8.00 0 •smoke-co,q,- immoommiimmiminomm 125 ft. 1;3 Other;ikrx,i.),1(1,. 1.25 In. 300.00 per 35 00 pa. • • • • _ 255 pg. OFFICE COPY 537 PO. 2.67 ft. CITY OF TIGARD REVIEW • FOR CODE COMPLIANCE Approved: PROpe OTC: I I c;cvx4GItsle4, permit#: jA ur AO )9 00Ic 4, • Wean Cc,,.\•J r 1924.4P I Address: —Suite#:L--eS( By: Date: • O is,144,5k 49 tit. C. pAp 7 EXPIRES://, tlt) DIMENSIONS: Heel Length = 1.25 ft. Stem Height = 7.00 ft Toe Length = 0.75 ft. Stern Thick @ Top = 8.00 in Total Ftg.Width, B = 2.67 ft. Stem Thick @ Base = 8.00 in. Key Depth = 0.00 ft. Footing Thickness = 12.00 in Key Width = 0.00 ft. STABILITY ANALYSIS: Max. Bearing Press: at Toe = 537 psf. v/ Sliding Force, F = 31 Lb IIat Heel = 255 psf. V Resisting Force, RF = 828 Lb Allowable Bearing Pressure = 1,500 psf. F.O.S. = 26.76 1( Resultant Location from C.L. = 0.16 ft. Overturning Moment = 14 ft-lb Kern Point Location, B/6 = 0.44 ft. Resisting Moment = 1,256 ft-lb Limit Resultant to Mid 1/3? = No F.O.S. = 91.49 V DESIGN Mu/Ms Vs OVn/V Shear As Req'd. As Furn. Astl. Devel. RESULTS: ( ft-k) (,kip) (Chk.) ( inA2) (_inA2) (Chk.) (Lgth.) . Stern : 000 0.00 5.11 ✓ 0.173 0.300 J v' Toe : 0.13 0.02 9.68 ✓ 0.259 0.600 ✓ v Heel : -0.14 -0.25 10.81 ✓ 0.259 0.400 1. 7 V Key : 0.00 0.00 0.00 0.000 0.000 w QuickWall 8.0 - RETAINING WALL ANALYSIS AND DESIGN Job Description: 9575 SW Locust Street, Tigard, OR 97223 Designed By: Mia Mahedy, PE GE FOOTING DESIGN METHOD: Ultimate Strength ACI 318-11 STEM DESIGN METHOD Working Stress IBC 2012 (Masonry) WALL TYPE Cantilever Retaining Wall RETAINING WALL DIMENSIONS: Wall Stem Height = 7.00 ft. Stem Thickness @ Top = 8.00 in. Stem Thickness @ Bottom = 8.00 in. Footing Thickness = 12.00 in. Heel Width = 1.25 ft. Toe Width = 0 .75 ft. Stem Bar Size = # 4 at 8 .00 in. o.c. Heel Bar Size = # 4 at 6.00 in. o.c. Toe Bar Size = # 4 at 4 .00 in. o.c. Footing Key Depth = 0.00 ft. Footing Key Width = 0.00 ft. BackFill Slope (Vert/Horiz) = 0.00 :12 RETAINING WALL LOADS: Horizontal Equivalent Fluid Pressure = 35.00 pcf. (Load Case = Soil) Backfill Height = 0.33 ft. 1 Equivalent Fluid Pressure Angle = 0.00 deg. Vertical Surcharge on Backfill = 0 psf. (Load Case = Soil) Horizontal Surcharge = 0 psf. (Load Case = Wind) Vertical Surcharge on Toe = 0 psf. (Load Case = Soil) Wind Load on Fence = 0 psf. (Load Case = Wind) Fence Height = 0.00 ft. ULTIMATE STRENGTH LOAD COMBINATIONS (Concrete Design) : 1 .4D + 1.4H 1.2D + 1.6L + 1.6H + 0.5R 1.2D + 1. 6R + 1. 6H + 1.0L 1.2D + 1.6R + 1. 6H + 0.5W 1 .2D + 1.0W + 1.0L + 0.5R 1 .2D + 1.0E + 1.0L + 1. 6H + 0.2R 0.9D + 1.0W + 1. 6H 0. 9D + 1.0E + 1.6H WORKING STRESS LOAD COMBINATIONS (Stability Checks and Masonry Design) : D + L + R + H D + L + 0. 6W + H D + L + 0. 6W + 0.5R + H D + L + R + 0 .3W + H D + L + R + E/1 .4 + H D + E/1 .4 + H RETAINING WALL RESISTING FORCES: Allowable Soil Pressure = 1, 500 psf. Passive Equivalent Fluid Press. = 300.00 pcf. Passive Soil Height = 0.50 ft. Coefficient of Friction = 0.50 Cohesion = 0 psf. Use Vertical Surcharge as Resisting Wt. ? = No Overturning Safety Factor = 2.00 Sliding Safety Factor = 1.50 Limit Reaction to Mid 1/3? = No MATERIAL DATA: Concrete Strength, f'c = 4.00 ksi. Steel Yield Strength, Fy = 60.00 ksi. Concrete Unit Weight = 145.00 pcf. Soil Unit Weight = 110.00 pcf. Fence Weight = 10.00 psf. REINFORCING STEEL DATA: Concrete cover to center of steel: Wall Inside Face = 2.50 in. Footing Heel (Top Face) = 2.50 in. Footing Toe (Bottom Face) = 3.50 in. Minimum Ratios for Shrinkage and Temperature Reinf: Vertical Stem Reinf. = 0.0018 Horizontal Stem Reinf. = 0.0020 Footing Reinforcement = 0.0018 MASONRY STEM DATA: Height To New Thick. (y) = 0.00 ft. Masonry Unit Weight = 125.00 pcf. Masonry Unit Strength = 1900.00 psi. Calculated Masonry Data: Compressive Strength, f'm = 1500.00 psi. Allowable Flexural Stress, Fb = 500.00 psi. Allowable Shear Stress, Fv = 77.46 psi. Modulus of Elasticity, Em = 1350.00 ksi. Modular Ratio, n = 21.48 ************************************************** SUMMARY OF RESULTS ************************************************** DIMENSIONS: Stem Height = 7.00 ft. Heel Length = 1.25 ft. Stem Thick. @ Top = 8.00 in. Toe Length = 0.75 ft. Stem Thick. @ Base = 8.00 in. Total Ftg. Width, B = 2 .67 ft. Footing Thickness = 12.00 in. Key Depth = 0.00 ft. Key Width = 0.00 ft. ANALYSIS RESULTS: Max Brg Press. @ Toe = 537 psf. O.K. Sliding Force = 31 Lb @ Heel = 255 psf. O.K. Resisting Force = 828 Lb Allowable Brg. Press. = 1,500 psf. F.O.S. = 26.76 O.K. Resultant Loc From C.L.= 0.16 ft. Overturn. Moment = 14 ft-lb Kern Point Loc. , B/6 = 0.44 ft. Resisting Moment = 1,256 ft-lb Limit Resultant To Mid 1/3? = No F.O.S. = 91.49 O.K. DESIGN RESULTS: Design Method, Stem: WSD, IBC 2012 (Masonry) Ftg. : Ultimate Strength ACI 318-11 Mu/Ms Vu/Vs PhiVn/V Shr As Regd. As Furn. Astl. Devel. (ft-k) (kip) (kip) Chk. (in^2) (in^2) Chk. Lgth. Stem : 0.00 0.00 5.11 O.K. 0.173 0.300 O.K. O.K. Toe 0.13 0.02 9.68 O.K. 0.259 0.600 O.K. O.K. Heel : -0.14 -0.25 10.81 O.K. 0.259 0.400 O.K. O.K. Key 0 .00 0.00 0.00 0.000 0.000 ************************************************** STABILITY ANAL Y S I S REPORT ************************************************** Stability Analysis: Governing Combination = D + L + R + H RESISTING FORCES OVERTURNING FORCES Element Weight x Arm = Moment Element Force x Arm = Moment Soil 87 108 R at Top Ftg. 387 1 . 33 516 R at Bot. Stem 583 1 .08 632 Horiz. EFP 31 0.44 14 Vert Sur Vert Sur Vert EFP Horiz Sur Toe Sur. Wind Fence Wt. Horiz line V. line Vert. line Sum WT = 1, 057 MR = 1, 256 Sum F = 31 MOT = 14 Friction Force = 528 Lb F.O.S. Sliding = RF / F = 26.76 Passive Pressure = 300 Lb F.O.S. Overturn. = MR / MOT = 91 .49 Cohesion = 0 Lb Coef. Vert. Surcharge or Line Load Resist. Force, Sum RF = 828 Lb to Horiz. = EFP / Soil Dens. = 0.318 Resultant Loc From Toe, X = (MR - MOT) / Sum WT = 1.18 ft. Eccentricity From Ftg. C.L. , e = (B / 2) - X = 0.16 ft. Soil Pressure @ Toe = (WT / B) * (1 + 6e/B) = 537 psf. Soil Pressure @ Heel = (WT / B) * (1 - 6e/B) = 255 psf. ************************************************** DETAILED DESIGN REPORT ************************************************** STEM DESIGN: Steel Design Comb = D + L + R + H Shr Strength @ Base, Phi Vn = 5.11 kip Dist From d Ms Vs As Flex. As Min. As T+S As Reqd Comb Top (ft) (in. ) (ft-k) (kip) (in^2) (in^2) (in^2) (in^2) 0.70 5.50 0.00 0.00 0.000 0.000 0.173 0.173 1 1.40 5.50 0 .00 0.00 0.000 0.000 0.173 0.173 1 2.10 5.50 0. 00 0.00 0.000 0.000 0.173 0.173 1 2.80 5.50 0 .00 0.00 0.000 0.000 0.173 0.173 1 3.50 5.50 0.00 0.00 0.000 0.000 0.173 0.173 1 4 .20 5.50 0.00 0.00 0.000 0.000 0.173 0.173 1 4 . 90 5.50 0.00 0.00 0.000 0.000 0.173 0.173 1 5. 60 5.50 0.00 0.00 0.000 0.000 0.173 0.173 1 6.30 5.50 0.00 0.00 0.000 0.000 0.173 0.173 1 7.00 5.50 0.00 0.00 0.000 0.000 0.173 0.173 1 Vertical Stem Reinforcement: Available Length for Hook Embedment into Footing = 9.00 in. Available Length for Straight Embedment into Stem = 82.00 in. Development Length Straight Hook Percent Spac. 50% Cut Off (in. ) (in. ) Develop. (in. ) (in. ) #4 28.77 6.50 100.00 13.89 84 .00 #5 50.35 8.13 100.00 21.53 84.00 #6 107.11 9.75 76.56 23.39 84 .00 #7 168.80 11.38 48.58 20.24 84.00 Horizontal Stem Reinforcement: Area of steel for Shrinkage and Temp. Reinforcement = 0.192 in^2 Spacing, in. Total Bars I.F. Only EA. Face I.F. Only EA. Face #4 8.00 24.00 12.00 5.00 #5 16.00 32.00 7.00 4.00 #6 24.00 48.00 5.00 3.00 #7 32.00 48.00 4.00 3.00 TOE DESIGN: * Steel Design Comb. = 1.4D + 1.4H * Thickness Design Comb. = 1.4D + 1.4H * Available Length for Hook Embedment into Stem = 6.00 in. * Available Length for Straight Embed. into Toe = 7.00 in. d Mu Vu Phi Vn As Flex. As Min. As T+S As Req'd (in. ) (ft-k) (kip) (kip) (in^2) (in^2) (in^2) (in^2) 8 .50 0.13 0.02 9. 68 0.003 0.005 0.259 0.259 Development Length Straight Hook Percent Spac. (in. ) (in. ) Develop. (in. ) #4 12.00 6.64 58.33 5.40 #5 14.23 8.30 49.19 7.06 #6 17.08 9.96 40. 99 8.35 #7 24. 90 11. 62 28.11 7.81 #8 28.46 13.28 24.60 9.00 #9 32.10 14.98 21.80 10.09 #10 36.14 16.87 19.37 11.39 #11 40.42 18.73 17 .32 12.51 HEEL DESIGN: * Steel Design Comb. = 1.4D + 1.4H * Thickness Design Comb. = 1.4D + 1 .4H * Available Length for Straight Embedment into Toe = 15.00 in. * Available Length for Straight Embedment into Heel = 13.00 in. d Mu Vu Phi Vn As Flex. As Min. As T+S As Req'd (in. ) (ft-k) (kip) (kip) (in^2) (in^2) (in^2) (in^2) 9.50 -0 .14 -0 .25 10.81 0.003 0.004 0.259 0.259 Development Length Straight Hook Percent Spac. (in. ) (in.) Develop. (in. ) #4 12.00 6.64 100.00 9.26 #5 14.23 8.30 91.35 13.11 #6 17 .08 9.96 76.13 15.51 #7 24.90 11.62 52.20 14.50 #8 28.46 13.28 45.68 16.71 #9 36.21 14. 98 35.90 16. 62 #10 45.90 16.87 28.32 16.65 #11 56.58 18.73 22.98 16.59 • LONGITUDINAL FOOTING REINFORCEMENT (TEMP & SHRINK ONLY) : Spacing (in. ) #4 9.26 #5 14 .35 #6 20.37 #7 27 .78 I c: Y OF TV 1RD Appro - in CITY OF TIGAR[� �� , g Approved y Panning Date: ���� CATCH BASIN,. . Date. Initials: Am N / / Initials: S UQ / - - --.-- .. ——__ 24'DRIVEWAY _ / / /_ 1 _ _], S.W.CORAL STRE�T _ ia�S .ss _ 0 30 60 SCALE IN FEET / / , r D /1 //--- 8"EXTRUDED i / 1 , ..:•:•,;(•./: •!-. R , fiw`.� / / CONCRETE CURB 'Q / m... / ,, :3'VEHICLE OVERHANG i�� �: �(` >o / / INTO LANDSCAPE AREA /.' '�C"\ ` 42019 / / ;/ KVWK KOPY �' - S•'r•, z. s I / __._ AP 1 / f> . IGARD Tom/ w♦ s i '£. K 0 RIM 2229 ASPHALT jar: , 'S w�h CI NEERING FR ED wIT✓DEBRIS \, / PAVEMENT 8 _.., : 4I rt• ,,A1 PLAN' G/E // RETAINING WALL \ rad hp"'" - � - / 47 TOTAL NEW PARKING SPACES REMOVED EXISTING DRIVEWAYS AND -< - S883t'4 -.�. a TOPS y. • Y N REPLACED'MTH CURB AND SIDEWALK ,< -- - \ �'' 28 STANDARD / j E �• 1 _ . 19 COMPACT E -' /. /_ / / ,• �' .,- - J'4EHIClE OVERHANG ��/ �� f \\` �••'�04 INTSCAPE AREA _ a� �\ log �1 LEGEND ABBREVIATIONS h : $. ,�...' Cl ,iia ':, y/7 9r / Y y, ' s r ` ❑ EXISTING CATCH BASIN AC ASPHALTIC CONCRETE / a - d 'NO P> 1 Q 'yDa CB CATCH BASIN / 1g - • 3 a } �p},ls • t f AREA, y. I EXISTING MANHOLE DD/W CENTER DRIVEWAY NE I O '''•r"/- e ..•.\ --..q[h -,_. /.•l "�..{�m '/- \, ® ELECTRIC BOX :\ —�. �cf' / y EXISTING SPOT ELEVATION PROPERTY UNE S11•30•581V 5' M ?" `^p y —-- DOG EXISTING 0.31' SIDEWALKS NM / Id a� •4 iiiki FD BOOR DRAM T!' S8IEWST:E MI v9• 0... .. l -- PROPOSED R.O.W.DEDICATION GA GW ANCHOR -rtq\\ _ �,�® _ r t' (' t "c( EXISTING OVFRN[;AO UTILITY UNE HR HANDRAIL • EN ELECTRIC METER / ! Cbli P \\ - �. .- `,' -_ I -- .. ,� � NEW TRASH ENC�O zuRE — —G— —EXISTING GAS UNE TIE INVERT EUGHT LATION /h V \ / T \\ / 'ETAININC//1I1 r.i 3'VEHICLE OVERHANG m. — EXISRNG STORM SEWER MB MPJL BOX I / / \ ! Flw5HE0 FLOOR WALL / INTO LAND AREA MH MANHOLE / I I • ' - - --EXISTING SANITARY SEWER PL PROPERTY UNE /7- „ \ , LCBBY LEVEL.209.80' \ / I I"2 9 ( SECCND BOOR 219.9,. E_'., a0 PP POWER POLE EXISDNG WATER UNE RD ROOF DRAIN 03 ( \ 7 THIRD FLOOR 228.88' \ // I \ chin RS ROOF SUPPORT / 2 /1- t4 - \/ \� r- J \\ /l`/ f d CASTING CURB SIN SWRARY IU / s / [ ! ` / - ,- UTCH • e7slry \\ PROPOSED CURB SP TRAFFlC SIGNAL POLE l/(Cg. ,. 7 r,�/ CAicH BASIN - RIM=209.51 f \ I. SB TRAFFIC SIGNAL CONTROL BOX ,FTRI Nil: IE=208.56' / ,F;r !j r.208:69' / -I 1 .� - EXISTING FENCE SON SIGN / / I �.�-7/ C / / ^I 4 .4. ..........• 2r o' I STTIR SPRINKLER TOORM L£R CONTROL RIGHT-OF-WAY -z' / - / n_ DEDICATION / •'h''f '.�- / �— S/W CONCRETE SIDEWALK TP TELEPHONE PEDESTAL "�i�=+F / / w TY/ TOP OF WALL f�\ 41ElGHf OF ENCLOSV�,E_ 7 ! WCR WHLTICHNRRAMP J / / / ^N,./� _' '` I / '� WM WATER METER / _ /-�� / PI WV WATER VALVE / • 49 / . r ! // i // I - / EXPAND EXISTING / / /// _ / I T. — DETENTION POND / i- ./ e / I ' RI e` I (SEE DETAIL) (; POND TON / I / / / ^Q ,`03.97 -__.1_i__�IL SEYL__� - f._•�• I _. - b \ MUST'm I XIML.L. / 58894'51•P.`222.04 = • _ '-. CATCH BASH, / u tt — - i Rw.207 76' I CATCH BASINS I _— _-- _ --.. .._.� .E OgA6' I I _ CATCH BASIN I ./ 1 — 1 S.W.LOCLOSUTREET 1_- I I STM / I ,--_—r I I qfi7E ok... tool& \\ __ I _.�_-..—I--SEW MH �, I 5111 SEW. J RIM-208.5 30z� c tir / / ./ IE @5T-6.0VH' I - I 3 , - I SEPED N o,-, `' W♦14.4949�� / Al • VIP'S INDUSTRIES, INC DRAWING NO. T R 0°`� TRT ENGINEERING,INC. 29757 SW BOONES FERRY ROAD P??6,+9'1 WILSONVILLE, OREGON - (503) 682-9284 y yr R.SJ ijsq 2636 SE.MARKET STREET 45—UNIT ADDITION — PHOENIX INN Nr, `l7�ct REY SAYE DEBCAPTRI DWe BY ms 8T Det Br of ITT PORTLAND,OREGON 97214 PROJECT 9 tR� (503)235-759s 9575 SW LOCUST ST — TIGARD, OREGON PRECT Na ♦ N t s`s "4: tRt BY / REVISED SITE PLAN (7/26/00) VPTGDT Alm DAdam-aria a° Ilimmm 9/.. g)1071.1410 g)t .1410 -f-.5. L �^] a f �S 49 ( 1 / ,/- __ 1 : i. d,,. exiivau. t„,..to 6 d : t�Jd 1:: ` �. R ��1 I ! A, . Double.\-041 ' i i N ii ' ?y Caws. (3ol+ . 1 l . ,+slat , H ' ' ' . •-•' r.. 1 -�. _ CITY OF TIGARD 'Appr... . ,. .. . .,.... ... ., ... ...,..���. .�. :oveming •� ate Zo Data: /� -/i Initials: s k2 R� p,PR 2019 tt 0 G ENG Aegy0*. CURB•ACCENTS, Inc. p�N PROFESSIONAL CONCRETE EDGING AND FLAT WORK ��_n 3001 NE 133rd Ct. �jp'�' 1� `�`�''"� Vancouver,WA 98682 .