PFI2019-00139 CITY OF TIGARD I_ PUBLIC FACILITIES IMPROVEMENT PERMIT
.,
1111 g�. COMMUNITY DEVELOPMENT Permit#: PF12019-00139
Date Issued: 05/01/2019
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421
Parcel: SEG3439
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE Job#M2682014
Project Description: Adjacent to 11280 SW 78th Ave. Upgrading electrical service to existing home. Overhead work.
Owner: FEES
Description Date Amount
PFI Permit Fee 05/01/2019 $300.00
PHONE:
Contractor:
PHONE:
FAX:
Applicant:
WAYNEBRABHAM
10800 SW AVERY ST
TUALATIN, OR 97062
PHONE: 503-612-2943
Total $300.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: See application
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PFI2019-00139
Type: Condition Name: Status: Severity:
PFI Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced, with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways". U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services
Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign
at each end of the construction area 72 hours(min.) before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 12 -TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI Utilities 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by
the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name> at<Insert
Phone#>,to establish a preconstruction meeting.
PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports, on a weekly basis, to the City's Inspector.
PFI_Utilities 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems,take corrective action and, in general, will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to
obtain or provide for proof of right-of-entry or easements.
PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI_Utilities 28-AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
PFI Utilities 31 -OTHER Applied Notice
Other
• RECEIVED
illCity of Tigard PFI#: ',L2.W/q — O/ g
s w ENGINEERING DEPARTMENT APR 2 5 2019
•"IGARDPublic Facihtiesj •irgyylowpt (PII) Perm• it
, ,
PROJECT INFORMATION
PGE Job # M2682014 TYPE OF WORK
Project name: R TYPE 1—Franchise Utility Work
Upgrading Electrical Service to existing home. performed by NWN,PGI.:, or utility
Brief description of project: agency
Y
Overhead Work. ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer
Work performed for the purpose of:
• Sidewalk installation or repair
• Driveway approach installation and repair
SITE INFORMATION • Sanitary sewer lateral installation and
11280 SW 78TH AVE Tigard main line tap
Location (address if available): g
❑ TYPE 3—Full Scale Development Work
c-, 1' 7(' performed with land use approval which
includes any of the following:
• Subdivisions or Partitions
APPLICANT INFORMATION • Street widening
Name: PGE [Submitted by Marsha Prichard] • Mainline installation for sanitary sewer,
storm sewer, Tigard water, and Tigard
Mailing address: 10800 SW Avery Street water service area
Cit)/State: Tualatin, OR lip: 97062 ElTYPE 4—Small Cell Technology
503-612-2943
Phone: ❑ TYPE 5—'l'igard'l'riangle
Email: prereqcoord@pgn.com Phone: NOTE: Type 1 and 2 applications may be
Contact name:
Wayne B ra b h a m emailed to rowpermits@tigard-or.gov.
Phone: 503-672-5440 Email: preregcoord@pgn.com
CONTRACTOR INFORMATION 0 Same as applicant
Name: CCB Number:
Mailing address: City/State: Zip:
Phone: Email:
ENGINEER INFORMATION
Name: N/A
Mailing address: City/State: Zip:
•
Phone: Email:
ADDITIONAL INFORMATION
Estimated value of work is required(if over$5,000): (within the public right-of-way)
Is work related to a LAND USE DECISION? DYes ❑✓ No Case number:
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of 4
APPLI CANTS
NOTE: Person specified as'Applicant" shall be designated"Permittee"and shall provide financial assurance for
work,if required by the city pursuant to TMC 15.04.140.
• With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant
are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. 'lie owner must sign this application in the space provided or submit a written authorization with this
application. Franchised or Licensed Utilities arc not required to obtain the owner's signature on the application.
I, the applicant, certify that:
• To the best of my knowledge, all the information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
Marsha Prichard Digitally signed by Marsha Prichard Marsha Prichard 4/25/19
Date:2019.04.25 13:50:08-07'00'
Applicant's or authorized agent's signature Print name Date
Property owner's signature (if required) Print name Date
STAFF USE ONLY
Case No: PP12 07 3 00/ Permit fee: 300 Received by: Date: Alt 0/
Approved by: 66 Date: y• cd et
Notified by: SL Date: CI
City of f Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of f 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PFI) Permit:
INITIAL PFI PERMIT FEE
Part 1: Required submittal fee is 10%of the Net PILI.Permit Fee.See below for calculations. Minimum of$300.
NET PFI PERMIT FEE
Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee).
WATER LINE CONSTRUCTION FEE
Part 3: All public water system improvements engineer's estimate X 120/o.
FOR STAFF USE ONLY FOR STAFF USE ONLY
TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3:DETAILED SUBMITTAL
CHECKLIST REQUIREMENTS
Does applicant have a right-of-way license? 0 Yes 0 No TYPE 1 AND TYPE 2- Must include a sketch
showing:
Under the wireless facilities standards,is the proposal
El Dimensions
considered?(check all that apply): 0 Small Cell 0 Macro
❑ Street Name
How many install sites are proposed as part of this permit ID Site Address
application?
TYPE 3-Must provide 4 sets of plans(sized 24 x 36
or 22 x 34) and an electronic version of all submittal
The proposed equipment is located on which of the following: items. The plans must that include:
0 Public Right-of-Way 0 Private Property
❑ Cover—Site,Vicinity,Abbreviation,Legend
If equipment is to be located on private property,describe the ID General Notes(City,Water,Sewer,etc.)
type&use: El Street(Plan,Profile)
El Water,Storm and Sanitary(Plan Profile)
El Water Quality Facilities
❑ Grading
El Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,
Sanitary,Water,Signage,Street Lights,etc.)
❑ Details
❑ Traffic Sight Distance
El Signing and Striping
❑ Street Light Plan and Photometric
El Engineers seal/signature
El Sheet label(project land use name,revision and plan
log block,dates and sheet numbers.)
❑ Engineer's Construction Estimate
Additional Submittals
(per land use conditions,if applicable)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
E l Pathway Design
❑ Water Provider Approval
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of 4
( )
i ---; \V '')
Edge of P avement.
— Streettight
ii.
\ 41--- Ditch —1111-
.4rij,,,„:,„ ,—•—p•7•7 II. •=MI••11•11/1 I lit r MEN.•41111•10.
/ 1 IL ''-ri:r:4 .07' Ow
n Dr \ /..,
F L-•' q 't
I 1
7-775117.1s'eircov7.1".1T111
7--
.,- 1=i
;1.11 I
Existing House
cri i
Existing i
Driveway
'-iii I 01 I
Li '
•c
cif ,, i"4
._,
Po7.7„,_„,-"I
----1
..-i- I ... Existing Shop
.__
....1.5 I
werpole
i= • ,......
0-p—e rt/L-7 e-—-——L--—-
6_0)
t--
. 'IN
i I Fire Hydrant tFHt
Scale: 'I-=30'
TYPE 1 AND TYPE 2:
MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable)
North arrow Property lines&dimensions Existing utilities locations
(sewer,storm,water)
Street& street names All existing structures
Proposed work Existing curb or edge of pavement Utility&street light poles
Existing S/W or D/W apron Slope of property Trees
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 4
Page 84 2011 Edition
N Stationary Lane Closure with Flagging Diagram 320
ai
J Diagram 320 covers total closure of one lane of a two-lane, two-way
N roadway. See the detail inset for the layout if using a single flagger to control
both directions of traffic on low volume roads (less than 400 ADT)with good
sight distance as discussed below.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Flaggers at each approach are required if any of the following
conditions exist:
a. Night Operations.
b. Work space is over 200 feet in length.
c. Sight distance is less than 750 feet from each approach
through the lane closure.
d. Traffic volumes are greater than 400 ADT.
4. The length between the Flagger Ahead signs shall not exceed one
mile. Use Diagram 340— Lane Closure with Pilot Car if exceeding one
mile.
5. Cones should be used to outline the work space when curves or other
roadway alignments prevent clear direction for the motorists to pass
the work space safely.
6. Cones along the work space are recommended when posted speeds
are 45 mph or greater, when working under heavy traffic or when travel
lanes are narrower than 11 feet.
7. Extended queue signing (see Diagram 5-4) should be used when
traffic queues extend beyond the initial advance warning sign.
8. When flagging near an intersection, the "Flagger Ahead" (CW23-2)
sign should be visible to traffic entering from any side road. Additional
advance warning and Flagger Ahead symbol signs may be placed on
the side road(s).
9. Sign set-up and flagger placement shown may be used for intermittent
full road closures of 20 minutes or less.
10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should
be considered on high volume or high speed roads, or when extended
queues are expected.
Chapter 5 December 2011
2011 Edition Page 85
N
SD
Stationary Lane Closure with Flagging Diagram 320sp
CN
pY �\ `.<
00, O
_
ro
ZW o
< aQoso
- u,�z
OZ / a)
----i
ICC CD
WQOm
rn 1t 0
o / _ / .t. I I--
•r can
• a a�
• )O Q
,�a. ,_c al
11 •
a
<> < — E • el
--
w8
r
C > • ce
ai 0S:" a •
•
a- Ii •
>v • .�
•'
m • O
O W Q
�
� 1 t .1 m .\m UJ
m
Sign Spacing and Buffer Lengths(feet) 1 t V Wo -_,-•
u�
ERRATA: Posted Spacing Between Signs Buffer W¢O= o
Speed A B C Space z¢< On
20 50 \\P
/
Supplement Table 25 100 100 100 75
30 100
(Updated:t-ebruary12, 35 125 CI Y aQ
12016 40 350 350 350 150 ( O O cC =
By:0001 Irak Roadway 45 180 _ Q
Section 50 500 500 500 210
55 250 //
Sign Spacing and Buffer Lengths(feet)Supplement
Posted Spacing Between Signs "'Buffer"
December 2011 Speed A B C space
Chapter 5
P
60 285
65 700 700 700 325
70 365
5055 SINGLE FAMILY LEGEND
45'4
1573
A 50 2644 - - NEW PGE FACILITIES TO BE INSTALLED
,11
' (UNLESS OTHERWISE SPECIFIED)
- INSTALL 1-2/0 AL-TX OH SECONDARY
o
0
aa
wa
CI 1-36C
U
S
A 167 714,-•`F`2.--r/
VT-12032.4
•
45-1
1973
r 1
60'
ti •*. I_ ABC 11
A120240V
a° h 3-GANG METER RASECO vT\OT SERVICE COORDINATOR
'd r AND
IN LTION PRI0
4
E SExRflVttICEECWYOEOTRtiDTININATOL
WIRE1 2228FO -I H L BAC/011115D PGE CONSTRUCTION DRAWING
- - 2.85AAft LKR 503-323-6700 OR 800-542-8818
2,8533A DATE 4/2/2019 SCALE NTS ACCOUNT:1070001 I AWO: 1000004597 'JOB NO M2682014
ANY DEVIATION FROM THIS DESIGN MUST TITLE
_ RockyMountain Electric
BE APPROVED BY PGE PROJECT MANAGER CIRCUIT SIZE
WEST PORTLAND-NORTH 11x17
ATTENTION: CALL 811 BEFORE YOU DIG i PG? LOCATION
OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED 11280 SW 78TH AVE,TIGARD
THINK RIGHT-OF-WAY PERMIT NOTICE: BY THE OREGON UTILITY NOTIFICATION CENTER. 81
` DESCRIPTION
A PERMIT FROM THE LOCAL JURISDICTION IS REQUIRED BEFORE ANY THOSE RULES ARE SET FORTH IN OAR 952-001-0010 Upgrade 1 p 120/240 to 3204 3pk MB for existing home,adding ADU,&future Svc
SAFETY WORK IN THE RIGHT-OF-WAY MAY BE PERFORMED. ONLY PGE APPROVED THROUGH 952-001-0090.YOU MAY OBTAIN COPIES OFCOUNTY SECTION(S) WORK WITH SHEET
CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHER SPECIAL THE RULES BY CALLING THE OREGON UTILITY WASHINGTON C11-36C
p p� NOTIFICATION CENTER ADMINISTRATIONBEAVERTON 1 OF 1
P'I�W i�, AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER PGE'S PERMIT. @ (503-232-1987) - .....` LINE CREW CENTER
THE CONTRACTOR MUST NOTIFY THE LOCAL JURISDICTION 48 HOURS t REQUESTLOCATES WayneaBY PHONE-540 DRAWNANEBY
_` TFICAYOENR,81TAT OREGON Know what's below. az,asw 153RD OR Brabham 672-5440 LANE WHITNEY
BEFORE WORK IS TO BEGIN.A COPY OF THE PERMIT M11UST BE ON SITE. UTILITY NOTIFICATION CENTER,811 AT LEAST BEAVERTON.OR 97006
2 BUSINESS DAYS PRIOR TO EXCAVATION. Call before you dig. 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED