PFI2019-00124 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PFI2019-00124
T[GAR n 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 04/17/2019
Parcel: SEG3793
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE
Project Description: Adjacent to Apple Grove Ter and Amelia St. Install conduit to energize street lights. PGE job M2631717.
Owner: FEES
Description Date Amount
PFI Permit Fee 04/17/2019 $300.00
PHONE:
Contractor:
PHONE:
FAX:
Applicant:
JOSE GRAJEDA
10800 SW AVERY ST
TUALATIN, OR 97062
PHONE: 503-672-5602
Total $300.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant ( �; VeL10-1100
Signature: VV
Issued By: L-8144414
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PFI2019-00124
Type: Condition Name: Status: Severity:,
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02 -WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced, with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OUCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign
at each end of the construction area 72 hours(min.)before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI Utilities 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities (roads, ditches, etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>, to establish a preconstruction meeting.
PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
Contact Ken fisher at 503 816 6146 or Kenny@tigard-or.gov
PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports, on a weekly basis, to the City's Inspector.
PFI_Utilities 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 26- RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to
obtain or provide for proof of right-of-entry or easements.
PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI_Utilities 28-AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
PFI Utilities 31 -OTHER Applied Notice
Other
City ofTigard RECEIVED
IINJam-_ PUBLIC WORKS --ENGINEERING APR 1 1 2019
- Public Facility Imp i`.I FI Permitr
1
TYPE OF WORK
DESCRIPTION OF WORK(in the right-of-way)
Q(TYPE 1—Franchise Utility Work
Check one: [4 Utilities ❑Sidewalk/driveway approach ❑ Streetimprovements performed by NWN, PGE
Detailed description: Install conduit to energize Street Lights and/or utility agency.
❑ TYPE 2—Sidewalk/Driveway/Sewer
PGE Job M2631717 Work performed for the purpose of:
• Sidewalk installation or repair.
• Driveway approach installation
Property address/location(s): SW Apple Grove Terrace&SW Amelia St and/or repair
Tigard, OR 97140 S9, • Sanitary sewer lateral installation
and/or main line tap
PGE [Submitted byAmySwean El TYPE 3—Full scale Development
Applicant: y� Work performed with Land use
Address: 10800 SW Avery Street approval which includes any of
City/state: Tigard. OR Zip: 97062 the following:
Phone: Email: preregcoord@pgn.com • Subdivisions or Partitions
Contact name: Jose Grajeda Phone: 503-672-5602 • Street widening
• Mainline installation for Sanitary
Contractor:
TBD - Permit needed for bid walk sewer, Storm sewer, Tigard water
and/or Tigard Water Service Area
CCB#: Expiration:
Address: SUBMIT COMPLETED APPLICATION TO:
City/state: Zip: City of Tigard
Planning/Engineering
Phone: Email: 13125 SW Hall Blvd.
Contact name: Phone: Tigard,OR 97223
Applications for"minor work in right-of-way"
only may be emailed to:
Engineer: N/A rowpermitsatigard-or.gov
Address:
FOR STAFF USE ONLY
City/state: Zip:
Phone: Email: Case No.:PF1 'o7 ci -cc 1.2 /
Contact name: Application submittal fee(.007%of
Engineer's Estimate) $ 3&o•OO
Estimated value of work is required(if over$5,000):$ Additional fees: $
(within the public right-of-way) Applicatk>C2
on ) 9
accepted: J
.
By: Date: / i�
Is work related to a LAND-USE DECISION ❑ Yes [Se No
Application reviewed:
If so,please specify (MLP,SDR,SUB,etc.) case #:
By:14• >�1 S I}ig•.Date: 4-1to ~(
Is work related to a BUILDING PERMIT? ❑ Yes [j No Applicant notified:
specifyCB �
If so,please (BUILDING PERMIT)case#: By: Date: 4 n 1.01_
I:\ENG\PermitApplications\pfi_application Rev.10/16/2017
r
Aff It (reet/t. t 4V%4 t-[�w ST 421- 1.11, G•n' ST r y tau Cs 63749.7, I
S t-r C ,Ys w, t t /LE is l 6.ve),..►d t- m/47 Cott t v L L./Z tI✓ rl.E A 11
City ofTigard • 13125 SW Hall Blvd. • f.Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated "Permittee"and shall provide financial assurance for work,if
required by the city pursuant to TMC 15.041.140.
* With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different
people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the
owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised
Utilities are not required to obtain the owner's signature on the application
BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT:
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject
property.
• If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
• All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and
the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application,including the policies and criteria,and understands the
requirements for approving or denying the application.
P R Su-eaWo2 si PGE: Amy Sweany for Jose Grajeda 4/11/19
ApplicantTAuthorized Agent's signature Print name Date
SIGNATURES of each owner of the subject property, if required.
Owner's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 2 of 4
DEVELOPMENT ENGINEERING FEES FOR STAFF USE ONLY
Public Facility Improvement(PFI)Permit: DETAILED SUBMITTAL
REQUIREMENTS
APPLICATION FEE
Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITY AND SIDEWALK/
DRIVEWAY AND UTILITY
PERMIT FEE CONNECTIONS,ETC.
Part 2: All non-water system improvements (work in the right of way)
Engineer's estimate X 5%(less$300.00 minimum
Sketch
submittal fee) (including information below)
Engineer's estimate X 2%Plan Review
❑ Dimensions
WATER SYSTEM FEE ❑ S• treet Name
Part 3: All public water system improvements ❑ S• ite Address
Engineer's estimate X 12%
FULL SCALE DEVELOPMENT
PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements)
There will be no permit fee charged,or assurance required
for the following types of work: Design Plans
• Sidewalk repair (less than 20 lineal feet) (6 sets,24x36 or 22x34)
• Relocate or replace mailbox ❑ Cover—Site,Vicinity,Abbreviation,Legend
• Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.)
• Weep hole repair ❑ Street(Plan,Profile)
• Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile)
• Lawn sprinkler system installation or repair ❑ Water Quality Facilities
• Street tree pruning or planting ❑ Grading
• Planter strip landscape maintenance ❑ Landscaping/Tree Plan
• Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas,
Storm,Sanitary,Water,Signage,Street Lights,etc)
❑ Details
Note: A cash/bond assurance may be ❑ Traffic Sight Distance
required per TMC 15.04.140. ❑ Signing and Striping
(customer deposit) ❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and
plan log block,dates and sheet numbers.)
Additional Submittals
(per Land Use conditions)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design(if applicable)
❑ Water Department Approval
❑ Engineer's Construction Estimate
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of 4
SAMPLE SKETCH:
SW ", r" st
Edge of Pavement
Ditch
Streetlight .� .—.—••—•—•—.—.—•—( Il —•—
_.. r
..��,„
• Dram •0 `ii:;..
f Fi.Trey, • AV -}• .a '''ML
I ', ,o Ari
I
I
I
T—'PI T)osfcrSel�w`er71iie'"
I ►i:,,,
1 a rl .
1 I
u6. d Existing House
I -t: I Existing
• • Driveway 1
`-al ' I
UI
C 1 -'a i '
o
) at 14 i
NI ., I I
oI
a
LCla
ai 1 I
oI
I
Existing Shop
1
= i
Powerpole 1 I I a - I
x.11 !D 95'
� �ropert��Line
I 'IN
.
;
I fm�
1 I Fire Hydrant(FH)
I I I
1 •
I I I Scale: *I"=30'
1 I
I I
I I I
I ;
MINIMUM SKETCH REQUIREMENTS (Put"N/A"if Not Applicable):
North arrow Property lines &dimension Slope of property
Street &street name(s) Existing building, structures Utility&street light poles
Proposed work Existing curb or edge Trees
Existing S/W or of pavement Existing utility locations
D/W apron (sewer,water,storm)
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of
a
54 — JUNCTION BOX INSTALLATIONS LIGHTING LEGEND
FOR STREET LIGHT ONLY (UNLESS OTHERWISE SPECIFIED)
__
CONTACT PGE FOR APPROVED MANUFACTURERS FACILITIESIN GREEN ARE TO BE P,=P.10:'FG
560 ar�oc,►,oue wIVII."Lew MEM
__ alwecrsor*rrlwcr Q CUSTOMER INSTALLED 1730 SECONDARY VAULT
PD-423 PGE TO PROVIDE&CONTRACTOR TO INSTALL
16'-Unknown
i,..__.,71:-__ 0
1 _ .� � �,��,b,p
2017 0....12".."11......
"D7�w'O�I em►o.icarwmcoINSTALL 1-1/0 AL-TX ST LT CIRCUIT IN 1-3"SCH40 PVC
13
11 6 Ab ~in_ noorwroica
� CONDUIT,PROVIDED&INSTALLED BY PGE CONTRACTOR
1I I yaw.aslnnwRorrFot
1 sw�arE�rr�o INSTALL 1-#10 CU-TX ST LT CIRCUIT IN 1-1"or 1-2"SCH40 PVC
1 rrr - CONDUIT,PROVIDED&INSTALLED BY PGE CONTRACTOR
1
...........:2111-111
Mrwrse
• 11 �uro� )'�� r�csem.oarsl+eectanrlr
IPLXff '�°`"°""�"'°" CONSTRUCTION NOTES: SLCST
1 PGE TO DISCONNECT SL LTA
CIRCUIT
FROM PD-596&JBOX AND ABANDON '+ ��"��' �+'�W 1.CUSTOMER TO PROVIDE ALL TRENCHING,BACKFILLING,CONDUIT,ELBOWS,JUNCTION
1 _ '0R rP� ��'��'��� a BOXES.VAULTS AND PADS,JOINT USE TRENCH WITH GAS,TRENCH TO BE
1 ---- -- rtt+Fncwt oreuu iawr�e�r OW OM MVO= 48 INCHES DEEP AND 30 INCHES WIDE.MEASURED FROM FINAL GRADE.
:\
--- ssase0rran ������
ALL PGE CONDUCTOR
S TO BE INSTALLED IN GRAY.SCHEDULE 40,ELECTRICAL
1 fOiYMr' GRADE,PVC CONDUIT WITH NYLON PULL STRINGS(MIN.500 LBS.TEST) .
1
''.....7.......... .
aw w�� PGE TO DETERMINE THE SIZE AND NUMBER OF CONDUITS REQUIRED.
MAINTAIN 12 VERTICAL INCHES AND 24 HORIZONTAL INCHES CLEARANCE BETWEEN
y 1 rw" GAS AND OTHER UTILITIES. ALL ELBOWS 4 INCH 8 SMALLER TO BE 36 INCH RADIUS.
cI I •`�' ^""� RIGID STEEL OR PGE APPROVED FIBERGLASS BENDS ARE REQUIRED FOR RUNS OF
c ..1 N,��v'00� 151 FEET OR LONGER.OR FOR ANY LENGTH RUN WITH MORE THAN 180 DEGREES
T. I rwr IN BENDS.PVC SCHEDULE 40 BENDS ARE ACCEPTABLE FOR RUNS OF 150 FEET OR
`0'01` LESS.THE MAXIMUM TOTAL BENDS IN ANY CONDUIT RUN IS 270 DEGREES.ALL
1 BENDS MUST BE FACTORY MADE.REFER TO LETTER OF RESPONSIBILITY FOR
r" 170''1 it' FURTHER DETAILS.
m F 2.A PGE STANDBY CREW IS REQUIRED FOR OPENING ALL ENERGIZED PGE VAULTS,
13 1 Q 131`7 Q JUNCTION BOXES AND EQUIPMENT/FACILITIES,INCLUDING CONNECTION OR INSTALLATION
1 ~B OF CONDUITS AND PULL STRINGS.CALL SERVICE COORDINATION AT 503-323-6700
0 I 4� R t TO SCHEDULE A PGE STANDBY CREW.
c 1 m CO e eao 1,..\--
m
I
--1 I ,D-596 - - PD-328 3.ALL CONCRETE FOOTINGS NEED TO BE INSTALLED WITH TOP OF BASE
m I _ FLUSH TO CURB/SIDEWALK.
3 'I 4.CUSTOMER RESPONSIBLE FOR ROAD CROSSINGS. ALL CROSSINGS MUST EXTEND
'I FROM PROPERTY LINE TO PROPERTY LINE.CROSSINGS TO BE 48 INCHES DEEP,
IrD MEASURED FROM FINAL GRADE.
I 5.DIRECTIONAL BORING REQUIREMENTS:BLACK HDPE(HIGH DENSITY POLYETHYLENE) DUCT
s' 57 X OR SCHEDULE 40 PVC WITH A MECHANICAL CONNECTION (CERTA-LOK OR LIKE MECHANICAL
n ))- SCONNECTION PRODUC AS AN ALTERNATIVE TO HDPE DUCT.HDPE SHALL MEET THE
I, M REQUIREMENTS OF PGE SPECIFICATION LC20515(AVAILABLE ON REQUEST FROM PGE PROJECT
'1 l U MANAGER) FOR SAFETY REASONS THE DUCT SHALL BE BLACK WITH THREE EQUALLY SPACE
1;- o EXTRUDED RED STRIPES WHICH IS A SPECIFICATION REQUIREMENT MANDREL TEST OF
164-Unknown \\ B 50 1210 m HDPE PIPE IS REQUIRED AFTER INSTALLATION WITH PGE INSPECTOR'RESENT.
2017 6.TRANSFORMER PADS ARE TO BE SET SO THAT THE TOP IS 2 INCHES ABOVE
B 2 AL u B 350 AL-TX FINAL GRADE. CONDUIT IS TO BE INSTALLED IN PAD AS INDICATED IN DETAIL
LMON 2 FEE ww[N AND TO EXTEND 1 INCH ABOVE THE PAD.
-.- D-200 "..
ALL PGE TRANSFORMERS TO BE INSTALLED B FEET(MIN) FROM ANY COMBUSTIBLE
20',}� BUILDING,WALL OR OVERHANG AND 4 FEET(MIN) FROM ANY FIRE HYDRANT.
J`1 VT-759 -- PGE TRANSFORMERS MUST BE WITHIN 15 FEET OF A DRIVEABLE AREA.
2 ALWAYS MAINTAIN 10 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS.
16'-Unknown STEELBARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED
2017 TOVEHICLES.ANEEDED-FRONTLOTPUBLICUTILITYEASEMENTI P,V.E� TOBE6FEET(MIN) ,10EET(PREFERRED)SW AMELIA$T .CONSULT WITH PGE REPRESENTATIVE 2 WEEKS BEFORE STARTING MAIN POWER
TRENCHING FOR A PRECONSTRUCTION CONFERENCE. INCLUDED IN THIS CONFERENCE
WILL BE EXCAVATOR,PGE.TELCO,CATV.AND GAS.
11,CUSTOMER TRENCH AND ELBOW CONFIGURATIONS,ALL CONDUIT,VAULT AND PAP
INSTALLATIONS MUST BE INSPECTED BY PGE PRIOR TO BACKFII LING.WHFN YOU ARF
READY FOR PGE TO INSPECT(AFTER INSTALLATION IS COMPLETE) CALL 503-736-5456
CONTRANCTOR TO CALL SERVICE COORDINATOR @ OR 503-463-4348(SALEM AREA ALLOW UP TO 2 WORKING DAY FOR INSPECTION TO OCCUR.
12.REFER TO THE PGE ELECTRIC SERVICE REQUIREMENTS BOOKLET FOR SPECIFIC REQUIREMENTS.
503-323-6700 FOR A STANBY CREW WHEN PLUMBING 13.DESIGN IS BASED ON STANDARD UNDERGROUND EQUIPMENT.NON-STANDARD UNDER-
INTO TRANSFORMER B 50 121016 GROUND EQUIPMENT MAY BE AN OPTION AT AN ADDITIONAL COST TO THE CUSTOMER.
PGE CONSTRUCTION DRAWING
DATE:3/19/19 SCALE:NTS (ACCOUNT:1070001 I AWO: 1000004600 (JOB NO.M2631717
TITLE
PGE POLES 255&259
CIRCUIT SIZE
THINK CALL 811 BEFORE YOU DIG PGE SCROLLS FERRY-ROY ROGERS 11x17
ATTENTION: / LOCATION
1 OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED ` SW APPLEGROVE TERR N/O SW AMELIA,TIGARD
SAFETY CONTACT SERVICE COORDINATOR' BY THE OREGON UTILITY NOTIFICATION CENTER. DESCRIPTION•INSTALL(/SALTXFROM TRFMR121018TO17X30STLTJBOXTOENERGIZE
FOR TRENCH AND CONDUIT INSPECTION PRIOR THOSE RULES ARE SET FORTH IN OAR 952-001-0010 ab 2-PGE OPT A LIGHTS-CONNECT@ 240V
FIRST! TO BACKFILL.PGE WILL NOT INSTALL WIRE THROUGH 952-001-0090.YOU MAY OBTAIN COPIES OF COUNTY SECTION(S) WORK WITH SHEET
UNTIL TRENCH IS 100%BACKFILLED. THE RULES BY CALLING THE OREGON UTILITYle/
WASHINGTON C21-060
NOTIFICATION CENTER ADMINISTRATION @ (503-232-1987) BEAVERTON 1 OF 1
SERVICE COORDINATOR LINE CREW CENTER DESIGN BY PHONE(503) DRAWN BY
TO REQUEST UTILITY LOCATES CALL THE OREGON Know what's below. 2213 SW 153RD DR JOSE GRAJEDA 672-5602 CESAR DEL ROSARIO
503-323-6700 OR 800 542-8818 UTILITY NOTIFICATION CENTER.811 AT LEAST BEAVERTON.OR 97W6
2 BUSINESS DAYS PRIOR TO EXCAVATION. Call before you dig. ®PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED
2011 Edition Page 119
Lane Closure at Intersection with Flagging Diagram 620
ROAD
WORK 1
MEAD
ONE LANE C 1 1
(0000110 ROAD *
AHEAD
BE
B
PREPARED
TO STOP
ii> B
A (optional)
1 •
. ONE LANE
• 41114011°
ROAD
100 R.Max. PREPARED AHEAD ROAD
• WORK
TO STOP AHEAD
•
I A I B !� B C
I
Buffer_ \\ / ••
1— 1. cl
• .•• m
• ® . 0 14 z,
o/ m
• 4 \\ ®•
__icon.M.x.}
C B B A T
ROAD • i
WORK PREPARED •
AHEAD TO STOP 100 R Max.
j
•ELANE •
ROAD •
AHEAD •
•
(Optional) AB
•
BE
e PREPARED
TO STOP
B (optional)
• LANE
1 1C EROAD
AHEAD
ROAD
WORK
AHEAD
September 2016 Chapter 5
Machine Mill The Sand And Seal
12" Area For A 1-1/2" Paving Joints With
Exsting Min — -, Blanket Into Hot Paving Grade
Asphaltic 12' y Oil (pg 64-22 Or
Concrete Min -6.;.. See Notes Below Equivalent
)
, 'V r \ .\•�
Exsting
Road --j. _i �-, °J" il_, _.,?� • - 1 1'� ; i,-� a
Base ,� �."• „ • ��`J _i - ��
•
` ..1 ,,_,.,.- _, .• ,.moi )
-11 l l 1 ► I I I I Non-Compressible • 1 1-11 1
-; I I— ' I I-- ---i — Backfill-Cement —
_ Slurry •, '-� � 1--------
I I •. •• (for Major Roads Or As . i
Asphaltic Concrete Pavement
—I ! Specified) Undisturbed
"T" Patch, 6" Thick Or Match • 711 '
Ground
•
Existing Pavement (whichever Is _1 I +f� r ' 1 =
Greater) Up To The Level Of ..'• • I ► 1=1
Original g Pavement. 1-----'1 • • - . 1 I (;
' % ,• d I
- 1 1 fs • .. • •-'. •' ' '':-111:-H1_iF- 1
I • r
1= 1 MIO-r WO ljek14,4,44,1-100 0011=1 I ; --
1—I I !' Crushed A re ate !1'1—ii
_ � Or Granular Pipe .).•t ! II-
_
__1I `�ks•
d Zone 'Z= -I
Backfill 1'I� _ Material I
tagiP1W4149a14014:1 I I=
--1-i torgiviri as
E -- 1 1 /1 /1 11 0 1,.� , 1 .
11 }.-FT...--Li
X11 I I 1—=I 1 = =I 11-_I I Iii I
1 ! I I=
�a
'— 111-11 I1-1 I----, / 1 1
a�
a 2 Trench Width
W Per Plan or
pb pp(Zj
*Notes:co 6
As Specified
� • Blanket Patches To Be Constructed With Level 2, 1/2 Inch, Dense, Pg-64-22
Hmac In Dry Pavement Conditions, Where Existing Pavement Is At Least 60' F
�•• And Rising.
J
• Tack All Pavement To Be Inlaid With Emulsified Asphalt.
�
� • The City Engineer Shall Determine the Final Width and Length of the Inlay Patch
to Best Fit Travel Patterns.
3
�
to
I.8
O
i 1,'''''-':•:•'''. ;' ` CAPITAL CONSTRUCTION AND
b • ',, TRANSPORTATION DIVISION City of Ti g a rd FIGURE
01
111
13125 5.W. HALL BLVD. Blanket Inlay
I Y1
F 71GARD, OREGON 97223 yzVt710E 503-6,39-4171
q V i FAX.• 503-624-0752
� `IGA1ta, www.ncaRa-o1?.cov FILE NO
L ..__,-. . ,I Detail
n/o