Loading...
Correspondence � � � COW, L\'�S kc- OC)C01 \ Tonja MorrisHE rr LL 11,,..�� From: Dennis Heier <dennis@vistastructural.com> V L�IV1""L) Sent: Wednesday, April 10, 2019 3:14 PM APR 1 1 2019 To: Tonja Morris Subject: FW:2016-03-1 Engineering Calculations CITY OF TIGARD BUILDING DIVISION Attachments • 2016-03 Engineering Calcs - Signed.pdf Just got this from Modern Building Systems. Note that, per email below, no additional anchorage is needed—the soil prevents sliding and there is no net overturning that would require anchorage tied into the ground. Please feel free to print this email and attach it to the calculations. If the city has any questions,they can call me directly. Dennis Heier, P.E. Vista Structural Engineering, LLC 14718 NW Delia Street Portland, Oregon 97229 Cell: 971.645.0901 VISTA 104, 11,0 STRUcTURAt.. From: Mike Lewis<mlewis@modernbuildingsystems.com> Sent:Wednesday,April 10, 2019 3:04 PM To: Dennis Heier<dennis@vistastructural.com> Subject: 2016-03-1 Engineering Calculations Dennis, Original calcs attached.You'll note that the soil prevents sliding and there is no net overturning. So no additional tie downs are needed for this type of installation. Regards, Mike Lewis Engineer II, P.E. JLD'N ModernBuildingSystems.com PH 503.749.4949 x250•FAX 503.749.4950 "The Environmentally Smart Choice" 1