Loading...
Plans (63) 4 \„\ aik „...." , The Ly Jf Tigar and its RECEIVED employees shall not be APR 2 4 2019 responsible for disc epancies CITY OF TIGARD which may appea herein. BUILDING DIVISION It �✓I . g 4 x\-.s,,,,,,,,k,) ,43 \ti ,,,}y -I v OFFICE C011Y 44 x I I 1.C)4D_ti*:1.\'' / IN, g3v,), ‘__c: )li>1/4.k\:0,Aeci. ''''41-R.0'1' '''' 7 A- (4- 1..,, \ �tY' , Ar\j--.' t � ,, CITY OF CGARD pC REVIEWED FOR ODE COMPLIANCE Approved: t l -T---;17Q.0 e OTC: [fI �i Permit#: mSTao In. 001 Address: tqq(62.. s‘,..) LearA7-frr , uric By: Pr }.?ate: l i \ - , /({01; XV-' A'A434,(0t. , N.f.- Ne' g;%).' ft...._ q {gym 1 Codit 0,* ., .4 col,,,,,,f V2.,,,to,, lic Approved plans t f\_ ` 1Y \` shall be on job site. Y . C VALIDITY OF PERMIT vt, " ` THE ISSUANCE OFA PERMIT BASED ON CONSTRUCTION DOCUMENTS AND OTHER DATA SHALL NOT PREVENT THE CODE OFFICIAL FROM REQUIRING THE CORRECTION OF ERRORS.ORSC 105.4 OFFICE COPY NW General Contracting Alex Hooyman 541-337-2210 Building permit for: RECEIVED Teresa Morton-503-703-2245 APR 2 4 2019 CITY OF TIGARD 14982 SW Lookout Drive 3UILD1NG DIVISION Tigard, OR 97034 Objectives, -Take out existing handrail -Install ten 4x4 pressure treated posts -install trex transcendence 4x4 post sleeves(with cap and base) -install fortress fe26 panels to 4x4 posts using a UB04 universal bracket -handrail will nm along perimeter of deck and down one side of the stairs • H 1r 12'6" 18'6" 6'adjure*stalr Stairs '41 CA t4A 1:0J Trex Transcendence Post sleeve 6'fortress Deck FE 26 panels r ' U804 connects — — panel to house HOUSE , 40 NI m V 4 i,. N, a 4......1.. ^- IP14982 Southwest Lookout Drive 71, 1 -cs 1, ,) z Deck / A Stairs , 22.5' A . 30' ... . .-,'-'4, "0 , ale 1:-'' FASTENMASTER TECHNICAL BULLETIN DECK RAIL POST TO RIM BOARD CONNECTION DETAILS According to the current International Residential Code (IRC) and International Building Code (IBC), guardrails and handrails must be designed to withstand a single concentrated load of 200 pounds in any direction. A critical part of this connection is making a strong connection between the guardrail post and the rim board of the deck. In most cases, a 1/2" through-bolt or carriage bolt is used to make this connection. When installed as instructed in this bulletin, the ThruLOK System can replace 1/2" bolts, meeting the 200 pound design load for this part of the connection. APPLICATIONS ThruLOK' O DECK POST TO SINGLE RIM JOIST DECK POST TO DOUBLE RIM OR SINGLE RIM WITH BLOCKING INSTALLATION INSTRUCTIONS 1.Choose the correct length (6-1/4"or 8") and fastening 6. Return to driving the screw in the pattern for each post to rim application based on the remaining 1/4"to 1/8" until the illustrated conditions. washer and nut are firmly drawn ^_%MIN Line together. 2.Mark the surface of the wood with the correct pattern. ,.� 4-1 3. If a flush mounted head is required,use a 1-1 4"spade bit 7.Make sure that the point of the q / P trostenraaste4 to create a 1/4"deep recess in the rim or post. ThruLOK fastener has passed the MIN LINE"printed on the nut. --fir-- 4. Remove the pre-assembled ThruLOK nut from the screw and using a 1/2"drill on low speed/high torque setting,install 8. Repeat until all of the fasteners are the ThruLOK screw and washer into the outside face of the installed correctly according to the application until the screw is 1/4"to 1/8"from being flush. specifications contained in this bulletin. 5.Thread the ThruLOK nut onto the exposed threaded end of the fastener. Firmly twist on the nut by hand until snug. • ; ' Effective July 1, 2017. Please reference our website to ensure that you are using the most up to date version. PRO Driven 153 BOWLES ROAD,AGAWAM,MA 01001 413.789.0252 800.518.3569 WWW.FASTENMASTER.COM FASTENMASTER TECHNICAL BULLETIN CONDITION 1 — EXTERIOR MOUNTED 4X4 POST TO 2X RIM For this condition, use the 6-1/4" ThruLOK fastener 1. Install first screw 1"in from the edge of the post and 2" (+/- 1/4") from the top of the rim board 2. Install second screw 1" in from the other ©' edge of the post and 3" (+/- 1/4") 00 from the top of the rim board 3. Install third screw in the center of the © post and 2" (+/- 1/4") from the mi = bottom of the rim board CONDITION 2 — INTERIOR MOUNTED 4X4 POST TO 2X RIM For this condition, use the 6-1/4" ThruLOK fastener 1. Install first screw in the center of the post and 2" (+/- 1/4") from the top of it 0 __ 1the rim board E 2. Install second screw 1"in from the other i edge of the post and 3" (+/-1/4") "© i from the bottom of the rim board I © 3. Install third screw 1"in from the edge — __ i � of the post and 2" (+/- 1/4") from the bottom of the rim board CONDITION 3 — INTERIOR MOUNTED 4X4 CORNER POST TO 2X RIM For this condition, use the 6-1/4" ThruLOK fastener 1. Install first screw 1"in from the edge of ___________A the post and 2" (+/- 1/4") from the top of the rim board O ; 2. Install second screw 1"in from the other © edge of the post and 2" (+/-1/4") from the bottom of the rim board 3. Install third screw centered on both the © i post and the rim board FASTENMASTER TECHNICAL BULLETIN CONDITION 4 — EXTERIOR MOUNTED 4X4 POST TO DOUBLE 2X RIM For this condition, use the 8" ThruLOK fastener I 1. Install first screw 1"in from the edge of — the post and 2" (+1-1/4") from the _______ top of the rim boards O 2. Install second screw 1"in from the other 0 edge of the post and 3" (+/- 1/4") from the top of the rim boards c__' 3. Install third screw in the center of the "----_..,__ 0 post and 2" (+/- 1/4") from the f bottom of the rim boards CONDITION 5 — INTERIOR MOUNTED 4X4 POST TO DOUBLE 2X RIM For this condition, use the j 8" ThruLOK fastener i 1. Install first screw in the center of the post and 2" (+/- 1/4") from the top of ---,—.1—, the rim boards O R r 2. Install second screw 1"in from the edge 1 L of the post and 3" (+/- 1/4")from the © bottom of the rim boards ©: I 3. Install third screw 1"in from the other 4)' edge of the post and 2" (+/- 1/4") from the bottom of the rim boards CONDITION 6 — INTERIOR MOUNTED 4X4 CORNER POST TO DOUBLE 2X RIM I For this condition, use the 8"ThruLOK fastener 1. Install first screw 1"in from the edge of the post and 2" (+/- 1/4") from the i top of the rim boards 0 © 2. Install second screw 1"in from the other `` 6 ; edge of the post and 2" (+/- 1/4") from the bottom of the rim boards 0 ; 3. Install third screw centered on both the post and the rim boards FASTENMASTER TECHNICAL BULLETIN CONDITION 7 — INTERIOR MOUNTED 4X4 POST TO 2X RIM WITH BLOCKING For this condition, use the 8" ThruLOK fastener j 1. Install first screw in the center of the -- post and 2" (+/- 1/4") from the top of - _ the rim board 1 2. Install second screw 1" in from the edge 3 of the post and 2" (+/-1/4")from the r 0 bottom of the rim board k© i 3. Install third screw 1" in from the other ' edge of the post and 3" (+/- 1/4") from the bottom of the rim board CONDITION 8 — INTERIOR MOUNTED 4X4 POST TO 2X RIM WITH SIDE BLOCKING For this condition, use two, 6-1/4" _____.._________j , , :.------ and one, 8" ThruLOK fasteners 1. Install first 6-1/4"screw 1"in from the edge of the post and 2" (+/-1/4") from the top of the rim board O 0 2. Install second 6-1/4"screw 1" in from the other edge of the post and 2" (+/- 1/4") from the bottom of the 0 rim board 3. Install 8"screw centered on both the i post and the rim board GENERAL FASTENING GUIDELINES Design values used to create the fastening patterns in this As with other bolted connections using wet treated wood,the bulletin were derived from individual fastener testing under nut should be inspected and tightened if needed after initial ICC Acceptance Criteria AC233 and reported in ICC-ES Evaluation drying period. Report ESR-1078. The connection details in this bulletin are an acceptable means The connection details shown in this bulletin apply specifically of transferring the load from guard post to rim joist only. to 4x4 posts and 2x8, 2x10 or 2x12 rims and/or joists. Additional blocking or hardware may be required to transfer For different dimension lumber,wood species of lower density loads from the rim to deck joists. than Hem Fir (SYP and DE are higher density and therefore Fastening patterns assume the following: All components are approved), or post heights greater than 37.5" off the top of used (screw,washer and nut), holes are not pre-drilled, and the joists, please contact FastenMaster to determine the proper posts are loaded in an outward direction from the deck. fastening solution. For questions regarding these or other connections, please contact ThruLOK is coated with mechanically applied zinc in actor- FastenMaster Technical Support at www.fastenmaster.com or by - dance with ASTM B695, Class 55. This is compliant with the calling 800.518-3569. current International Residential Code®for use in preservative E treated wood. FastenMaster'and ThruLOKeare trademarks of OMG,Inc.Copyright©2017 0MG,Inc. All rights reserved.U.S.and International Patents Pending. Fe26Traditional Panel Installation Options g4--Ball Cap Pressed Dome Cap— UB-04 UB-04 Cap Cap UB-04 0 ; ; 0 UB-04 Cup Cup UB-04 UB-04 Cap Cap UB-04 B , 1 0 UB-04 CupI3(98mm)�1 I7/8" I I� _ 11 Cup Fe FTraditional Panel r 69-1/2" or 93-1/2' (1765mm x 2375mm) Base Cover 2"X 2"(51 mm) or 3"X 3"(76mm) Fe26 Posts with base Fe26 Traditional Panel with Accent Top Panel Installation Options A4—Ball Cap Pressed Dome —10.ffl UB-04 UB-04 Cap Cap UB-04 9 i ; 94 UB-04 Cup , :oJ �oJ `oJ ;off�o��o�of �-- 1k �oJ of �oJ IV �oJ Cup D'0— UB-05 Cap UB-05 Cap UB-05 0 ► I© UB-05 Cup Cup UB-04 UB-04 Cap Cap UB-04 © ; ' Ei UB-04 Cup I 3-7/8' Fe Traditional Panel Cup (98mm) 69-1/2"or 93-1/2" (1765mm x 2375mm) Base Cover 2"X 2"(51 mm) or 3"X 3"(76mm) Fe26 Posts with base 18 UB Bracket Hole Locations for Fe-Traditional Panel Installations with Accent Top Panel F Pre-Drilling with a 3/16"drill bit is required. t r D 4 � Rail Panel ATP Panel Pre-Drill Dimensions Height Height A* B C D E F G 28"(711mm) 5"(127mm) 4'(102mm)1/2"(13mm,5/&(16mm)31"(737mm) 5"(127mm) 1/7(13mm)518"(16mm 1 G 134"(864mm) 5"(127mm) 4(102mm; 1/2"(13mm'518"(16mm 3T'(940mm) 5"(127mm) 1/2113mm)518"(16mmi D 140"(1016mm)15"(127mm) X X X X X X X F B A Dimension A positions bottom of rail 3-3/4"i 95mm above deck surface. *Dimension A is measured from the bottom surface of post base. V 1 --t- Remove all metal shavings from deck, post base cover, post,and panel before bracket is screwed to post to prevent rust stains. Fe26Traditional Panel with Accent Top Panel (ATP) Installation with UB-04 and UB-05 When using UB brackets rails MUST be cut 1/2"(13mm)shorter that the distance between posts. 1/4"(6mm) should be cut from the end of each rail to keep rail panel centered between posts. • If rails were cut to length,file cut edges and coat with 2 coats of Fortress zinc based touch-up paint. •Check fit of rail between installed posts. • If using a Base Cover install it now by sliding over the top of Fe26 Post. • Slide ATP panel over the top rail of the Fe Traditional Panel •Secure UB brackets to Fe26 Posts with provided T-25 Drive Thread Cutting Screws. Use two screws per bracket. Use low speed selling on drill. • Drop Fe26 Traditional Panel into installed UB brackets. •Secure rails with provided set screws at each UB bracket. • Install UB-04 Caps by sliding the cap over the UB Cup. Cap will snap into place. � ,,,, UB-04 Cap Slide ATP onto the top rail UB-04 Cap– _, ' _�`w P� 1 U UB-04 Cup ,[ of Few Traditional Panel UB-04 Cu• . C t I 31 UB-05 il UB-05 a r r- r1 r1 r1 r1r� r1r1r1r r1 � . `% Cap �1 I U�O O Q O� ,�_P O O. Of 0-A 0� 0�N0� ,�,II UB-05 UB-0 �[ Cup I Cup Pre Drilled Set Screw Post N. U B-N i g UB-04 ripw Cap Cap Base Cver \, C 4 2 Installed UB-04 Cup UB-04 Cup —� N\N �J ' 20 , FORTRESS Installation Instructions for Fe26 Tradit42nal Adjustable -Rt�r�'vc PRODUCTS—TS—s— Panels with Universal Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements,and to obtain all required building permits. The deck and railing installer should determine and implement appropriate installation techniques for each installation situation .The Fortress Company nor its distributors shall not be held liable for improper or unsafe installations. Fortress Fe?6 Posts must always be secured to the deck framing. Fortress Fen Posts should never be attached to only the deck boards. IRead Instructions Completely Before Starting Installation Note When cutting Fortress railing, it is very important to complete the following at cut points. Not following the below steps will result in rust at the cut areas: • Remove all metal shavings from the cut area • File any sharp edges left by cutting. Thoroughly wipe and remove any filings, grime or dirt from the railing. •Apply two coats of Fortress zinc based touch-up paint to the cut area. If touch up is at rail ends, allow paint to dry before connecting bracket to post. • Be sure to remove any metal shavings from the surface of deck, patio or balcony to prevent rust on the surface. Required Materials UB-04, UB-04 Angle Kit, Drill, 3/16"(5mm) Drill Bit, Phillips Head Screw Driver, T-25 Driver Bit, Metal Cutting Saw,Tape Measure, Wrenches, Pencil, Speed Square, Center Punch, Support Blocks, Clamps and Hammer. Fe26 Traditional Adjustable Panels Fe26 Traditional Adjustable Panel 8'(actual length 93.5"or Fe26 Traditional Adjustable Panel 6'(actual length 72" or 2375mm)Available Heights 34"(864mm) and 40"(1016mm) 1829mm)Available Heights 34"(864mm) and 40"(1016mm) Maximum rake angle 45° Maximum rake angle 45° 93.5" 72" 4 2375mm) 1 14 1829mm) 7111111111011111111 '''111 I !Milli i E ..... 1 , ,! ! ! ikt, , , ! I 11 1111111 1 illilihilltill ____. 1_±_________H i3p 11 ffe 11 11 ii 0 - 45 Ma x O 3II ` 45 Max .. ,f E; liti Ili, sl 1.„ 11 p00000 1 it ii il li r as Ip For technical assistance, please email: technicalhelp@fortressrailing.com Hours of Operation: Monday through Friday 7:00 AM to 6:00 PM, CST Phone: 1-844-909-2999 Fax: 972-372-0924 21 www.fortressrailing.com • Pre-Drill and Install Universal Bracket Post Plates • Remove c-clamps and panels. • Mark the centerline of each post. The UB Brackets will be installed on the centerline, not the locations marked in the previous step. • Use a center punch and hammer to mark the hole locations and pre-drill all bracket hole locations. • Remove Hinge Pin from UB Angle Kit Assemblies. •Attach UB Angle Kit Post Plates to post with supplied T-25 Drive Thread Cutting Screws. • Reassemble UB Angle Kit Assemblies with Hing Pins • Remove all metal shavings from deck, post base cover, post, and panel before bracket is screwed to post to prevent rust stains. /75i '1<:> of o a' a> 0 Marked hole --{-� ' T-25 locations from b a previous step Thread Cutting 7/8" I + Screws (22mm) I 41 Q UB Angle Kit ( ' Post Plate N_I Q Pre-Drill with a 1 i 3/16"drill bit I Cutting Fortress Fe26 Railing Traditional Adjustable Panels • Rake the panel back to 90° and lay on a flat surface. • Using a metal cutting blade, cut the rail at the four cutting mark locations from previous step. It is advisable to make a practice cut on a scrap piece of rail before proceeding with the finish cuts. • The distances from the first picket to the ends of the rail, will be different from the top to bottom rail.The greater the angle of the steps the more visible the difference will be.This is required in order to keep balusters pickets parallel to the post. • File cut edges and coat with 2 coats of Fortress zinc based touch-up paint. Cutting Marks Cutting Marks A ' 4v 1 I ol oh Dimension A> Dimension B B N 1I._ _ _ _ , , BI � 1 1 1 Cutting Marks Cutting Marks NIN.14111 24 1 Trexe HOW TO INSTALL STANDARD RAILING TREX TRANSCEND Installing Railing Support Brackets(RSBs) Option 1:Without TrexExpress railing template 3a a !I 3b o. eat t2 4 iiv 35-1/16" v�� ' (891 mm) or 41-1/16" - - -- - (1043 mm) _ _ — _-_ -—yam- __...�.. ` -� 5-1/2" ( ). __- . :(140 mm) ‘'S •••.. N -,.....ir__ 111000-----, IF 4 ill Read all instructions BEFORE installation. 3a. Mark 5-1/2" (140 mm) and 35-1/16" (891 mm) from deck surface OR for 42" (1067 mm) height, mark Important: Post sleeves are NOT to be cut for this 5-1/2" (140 mm) and 41-1/16" (1043 mm)from the design style. deck surface. 3b. Place RSBs directly under marks, center on posts, Installing Pressure-Treated ® and secure with 2" (51 mm)wood screws (provided Posts with post sleeve). Place top RSBs flat side up, bottom RSBs flat side down. » Posts are to be installed 2"x 8"A 6'(1.83 m) or 8' 203 mm) ,"(zs mm)min. Option 2:With TrexExpress railing template (2.44 m) on center min. to accommodate s-1/8"(130 mm)min.$ 3c O 3d appropriate railing 'ilk � h� � � length. '��. �� Z -t► �► lb- » Attach posts using 1/2" �/� (130 mm)carriage bolts. `11101. �f r r Oil » Minimum joist size isitilb- I j, lg,- 2"x 8"(51 mm x '�= �. l _ z . %J= ...1 203 203 mm). d " / -5 k » Top bolts must be 1"(25 mm)from tops of joists. c. » Bottom bolts must be 5-1/8"(130 mm)from top bolts. » Bolts can be countersunk flush with framing to allow 3c. Place RSBs in template. Place top RSBs flat side for fascia attachment. UP, bottom RSBs flat side DOWN. Secure template on post with tape or rubber band, with NOTE:Blocking can be added for extra strength. bottom of template resting on post skirt. 3d. Secure RSBs with 2" (51 mm)wood screws Installing Post Sleeve 2 (provided in railing kit)and remove template. Skirts and Post Sleeves 2. Slide post sleeve skirt1 NOTES:Special steps are necessary when using over post and down to 6"x 6"(752 mm x 752 mm)plastic TrexExpress template. rest on decking surface. �� » Cut off 1/2"(13 mm)from the bottom(blue arrows Slide post sleeve over up)of the tool BEFORE first use. post and position inside » Positron top RSBs ONLY, 6"(752 mm)higher for post sleeve skirt. _— 42"(1067 mm)rail height. » Secure RSBs with 2-7/2"(64 mm) wood screws NOTE:Shims can be used to plumb post sleeves. (provided with post sleeve)and remove template. 131 Have Questions? NOTE:Construction methods are always improving. Please ensure you 1-800-BUY-TREX have the most up-to-date installation instructions by visiting:treX.Com TRR-0318 NW General Contracting Alex Hooyman 541-337-2210 Building permit for: RECEIVED APR 2 4 2019 Teresa Morton-503-703-2245 CITY OF 3 ICaAl3 BUILDING DIVISION 14982 SW Lookout Drive Tigard,OR 97034 Objectives, -Take out existing handrail -Install ten 4x4 pressure treated posts -install trex transcendence 4x4 post sleeves(with cap and base) -install fortress fe26 panels to 4x4 posts using a UB04 universal bracket -handrail will run along perimeter of deck and down one side of the stairs • 12'6" 18'6" 6'adjustable stair -- --- --12'7" -- '4' Trex'Transcendence I. Y i+ ; + ; w4 i . a :i o, . a w r:, Post sleeve 6'fortress FE 26 panels� c �_ . . Deck 60 UB04 connects panel to house HOUSE A N 1 \. •14982 Southwest Lookout Drive z T [ _ Deck Stairs 223' tr, A 30' n I o N r V1 r FASTENMASTER TECHNICAL BULLETIN DECK RAIL POST TO RIM BOARD CONNECTION DETAILS According to the current International Residential Code (IRC) and International Building Code (IBC), guardrails and handrails must be designed to withstand a single concentrated load of 200 pounds in any direction. A critical part of this connection is making a strong connection between the guardrail post and the rim board of the deck. In most cases, a 1/2" through-bolt or carriage bolt is used to make this connection. When installed as instructed in this bulletin, the ThruLOK System can replace 1/2" bolts, meeting the 200 pound design load for this part of the connection. APPLICATIONS ThruLOK' yLL DECK POST TO SINGLE RIM JOIST DECK POST TO DOUBLE RIM OR SINGLE RIM WITH BLOCKING INSTALLATION INSTRUCTIONS 1. Choose the correct length (6-1/4"or 8") and fastening 6.Return to driving the screw in the n pattern for each post to rim application based on the remaining 1/4"to 1/8" until the illustrated conditions. washer and nut are firmly drawn together. «� ,MLine 2.Mark the surface of the wood with the correct pattern. — 3. If a flush mounted head is required,use a 1-1/4"spade bit 7•Make sure that the point of the (reAenMaster) to create a 1/4"deep recess in the rim or post. ThruLOK fastener has passed the "MIN LINE"printed on the nut. —TF- 4. Remove the pre-assembled ThruLOK nut from the screw and using a 1/2"drill on low speed/high torque setting,install 8. Repeat until all of the fasteners are the ThruLOK screw and washer into the outside face of the installed correctly according to the application until the screw is 1/4"to 1/8"from being flush. specifications contained in this bulletin. 5.Thread the ThruLOK nut onto the exposed threaded end of the fastener. Firmly twist on the nut by hand until snug. Effective July 1, 2017. Please reference our website to ensure that you are using the most up to date version. FOStllll�=�!: PRODriven 153 BOWLES ROAD,AGAWAM,MA 01001 413-789-0252 800-518-3569 WWW.FASTENMASTER.COM FASTENMASTER TECHNICAL BULLETIN CONDITION 1 — EXTERIOR MOUNTED 4X4 POST TO 2X RIM For this condition, use the 6-1/4" ThruLOK fastener 1. Install first screw 1"in from the edge of the post and 2" (+/- 1/4') from the top of the rim board 2. Install second screw 1"in from the other edge of the post and 3" (+1-1/4") from the top of the rim board 3. Install third screw in the center of the ©. post and 2" (+/- 1/4") from the _ �_... bottom of the rim board CONDITION 2 — INTERIOR MOUNTED 4X4 POST TO 2X RIM For this condition, use the 6-1/4" ThruLOK fastener 1. Install first screw in the center of the post and 2" (+/- 1/4") from the top of -- the rim board O 02. Install second screw 1"in from the other 9 edge of the post and 3" (+/- 1/4") © from the bottom of the rim board © 3. Install third screw 1" in from the edge of the post and 2" (+/- 1/4")from the bottom of the rim board CONDITION 3 — INTERIOR MOUNTED 4X4 CORNER POST TO 2X RIM For this condition, use the 6-1/4" ThruLOK fastener 1. Install first screw 1"in from the edge of the post and 2" (+/-1/4") from the "''------ top of the rim board 2. Install second screw 1" in from the other © 0 edge of the post and 2" (+/-1/4") from the bottom of the rim board 3. Install third screw centered on both the ©r post and the rim board FASTENMASTER TECHNICAL BULLETIN CONDITION 4 — EXTERIOR MOUNTED 4X4 POST TO DOUBLE 2X RIM For this condition, use the 8"ThruLOK fastener 1. Install first screw 1"in from the edge of the post and 2" (+/-1/4")from the . R 3 top of the rim boards O 2. Install second screw 1" in from the other © edge of the post and 3" (+/- 1/4") from the top of the rim boards 3. Install third screw in the center of the © post and 2" (+/- 1/4") from the bottom of the rim boards CONDITION 5 — INTERIOR MOUNTED 4X4 POST TO DOUBLE 2X RIM For this condition, use the I8" ThruLOK fastener 1. Install first screw in the center of the post and 2" (+/- 1/4") from the top of the rim boards O 2. Install second screw 1"in from the edge of the post and 3" (+/- 1/4")from the 0 bottom of the rim boards © 3. Install third screw 1"in from the other edge of the post and 2" (+/-1/4") from the bottom of the rim boards CONDITION 6 — INTERIOR MOUNTED 4X4 CORNER POST TO DOUBLE 2X RIM For this condition, use the 8" ThruLOK fastener 1. Install first screw 1"in from the edge of the post and 2" (+7- 1/4") from the top of the rim boards O 2. Install second screw 1"in from the other edge of the post and 2" (+/- 1/4") from the bottom of the rim boards © a 3. Install third screw centered on both the "�� post and the rim boards FASTENMASTER TECHNICAL BULLETIN , CONDITION 7 — INTERIOR MOUNTED 4X4 POST TO 2X RIM WITH BLOCKING I For this condition, use the ____A 1 8" ThruLOK fastener 1. Install first screw in the center of the post and 2" (+/-1/4") from the top of the rim board 0 ..,.a— 2. Install second screw 1"in from the edge `, of the post and 2" (+/- 1/4")from the 0 bottom of the rim board © 3. Install third screw 1" in from the other edge of the post and 3" (+/-1/4") 11� _ from the bottom of the rim board Pr CONDITION 8 — INTERIOR MOUNTED 4X4 POST TO 2X RIM WITH SIDE BLOCKING For this condition, use two, 6-1/4" and one, 8" ThruLOK fasteners 1. Install first 6-1/4"screw 1" in from the -------------- " edge of the post and 2" (+/-1/4") �.�:_ from the top of the rim board 0 - ' 2. Install second 6-1/4"screw 1" in from the other edge of the post and 2" . (+/- 1/4") from the bottom of the 0 ' rim board { 3. Install 8"screw centered on both the post and the rim board GENERAL FASTENING GUIDELINES Design values used to create the fastening patterns in this As with other bolted connections using wet treated wood,the bulletin were derived from individual fastener testing under nut should be inspected and tightened if needed after initial ICC Acceptance Criteria AC233 and reported in ICC-ES Evaluation drying period. Report ESR-1078. The connection details in this bulletin are an acceptable means The connection details shown in this bulletin apply specifically of transferring the load from guard post to rim joist only. to 4x4 posts and 2x8, 2x10 or 2x12 rims and/or joists. Additional blocking or hardware may be required to transfer For different dimension lumber,wood species of lower density loads from the rim to deck joists. than Hem Fir (SYP and OF are higher density and therefore Fastening patterns assume the following: All components are approved), or post heights greater than 37.5" off the top of used (screw,washer and nut), holes are not pre-drilled, and the joists, please contact FastenMaster to determine the proper posts are loaded in an outward direction from the deck. fastening solution. For questions regarding these or other connections, please contact ThruLOK is coated with mechanically applied zinc in actor- FastenMaster Technical Support at www.fastenmaster.com or by dance with ASTM 8695, Class 55.This is compliant with the calling 800.518.3569. current International Residential Code®for use in preservative treated wood. FastenMasterand ThmIOPare trademarks of OMG,Inc.Copyright©2017 OMG,Inc. All rights reserved.U.S.and International Patents Pending. • Fe26Traditional Panel Installation Options i go---Ball Cap Pressed Dome Cap-104M UB-04 UB-04 00 Cap Cap UB-04 0 ( _ _ ( © UB-04 Cup Cup UB-04 UB-04 Cap Cap UB-04 0 ( ( 8 UB-04 Cup 3-7/8" _ III— I Cup (98mm) Fe` Traditional Panel r 69-1/2"or 93-1/2" (1765mm x 2375mm) I Base Cover 2"X 2"(51 mm) or 3"X 3"(76mm) Fe26 Posts with base Fe26 Traditional Panel with Accent Top Panel Installation Options gel—Ball Cap Pressed Dome Cap—* UB-04 UB-0404 �� Cap Cap ( ©4 UB-04 P4 0} .�J �10) } OJ .QJ\Qi _, `0. .OJ 0 Q BOJ Cup UB-05 Cap UB-05 Cap UB-05 9 I t 0 UB-05 Cup Cup UB-04 UB-04 Cap Cap UB-04 9 ► � ,© UB-04 Cup 3 7/8" I._ Fez'Traditional Panel '1 Cup t (98mm) 69-1/2"or 93-1/2" (1765mm x 2375mm) Base Cover 2"X 2"(51 mm) or 3"X 3"(76mm) Fe26 Posts with base 18 UB Bracket Hole Locations for Fe-Traditional Panel Installations with Accent Top Panel r F Pre-Drilling with a 3/16"drill bit is required. 3 i C E t Rail Panel ATP Panel Pre-Drill Dimensions Height Height A* B C D E F G 28"(711 mm) 5"(127mm) 4"(102mm)1/2"(13mm'5/8"(16mm)31"(737mm) 5"(127mm) 112"(13mm)5/8"(16mmi G l 134"(864mm) 5"(127mm) 4"(102mm; 1/2"(13mm'5/8"(16mm37"(940mm) 5"(127mm) 1/7(13mm)5/8"(16mmi D 140"(1016mm1 5"(127mm) X X X X X X X F B A * sITurface. A positions bottom edge of rail 3,314 (95mm)above deck *Dimension A is measured from the bottom surface of post base. Remove all metal shavings from deck, post base cover, post,and 1 — —f panel before bracket is screwed to post to prevent rust stains. Fe26Traditional Panel with Accent Top Panel (ATP) Installation with UB-04 and UB-05 When using UB brackets rails MUST be cut 1/2"(13mm)shorter that the distance between posts. 114"(6mm) should be cut from the end of each rail to keep rail panel centered between posts. • If rails were cut to length, file cut edges and coat with 2 coats of Fortress zinc based touch-up paint. • Check fit of rail between installed posts. • If using a Base Cover install it now by sliding over the top of Fe26 Post. •Slide ATP panel over the top rail of the Fe26 Traditional Panel • Secure UB brackets to Few Posts with provided T-25 Drive Thread Cutting Screws. Use two screws per bracket. Use low speed setting on drill. • Drop Fe26 Traditional Panel into installed UB brackets. • Secure rails with provided set screws at each UB bracket. • Install UB-04 Caps by sliding the cap over the UB Cup. Cap will snap into place. -O► UB-04 Cap UB-04 Cap-4i_ aft.. Slide ATP onto the top rail � p� 1-1 of Fe26 Traditional Panel ,, UB-04 Cup UB-04 Cu. UB-05lic i r1r1 �1r`rrlr � 1 �1 '� �� �1 1 i 31 UB-05 -,. + Cap � I coo o o or c nor ���J • r Cap U B-0 c ' ' 3 UB-05 r r,-, Cup Cup Pre-Drilled Set Screw Post ;i U B-04 It 1 UB-04 4 k Cap Ca d Ca IBasEver \` ° r , Installed UB-04 Cup UB-04 Cup _4__i J� 20 ' FORTRESS Installation Instructions for Fe26 Traditk2nal Adjustable —xt�1z RAILING PRODUCTS— Panels with Universal Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain all required building permits. The deck and railing installer should determine and implement appropriate installation techniques for each installation situation . The Fortress Company nor its distributors shall not be held liable for improper or unsafe installations. Fortress Fe26 Posts must always be secured to the deck framing.Fortress Fe26 Posts should never be attached to only the deck boards. IRead Instructions Completely Before Starting Installation Note When cutting Fortress railing, it is very important to complete the following at cut points. Not following the below steps will result in rust at the cut areas: • Remove all metal shavings from the cut area • File any sharp edges left by cutting. Thoroughly wipe and remove any filings, grime or dirt from the railing. •Apply two coats of Fortress zinc based touch-up paint to the cut area. If touch up is at rail ends, allow paint to dry before connecting bracket to post. • Be sure to remove any metal shavings from the surface of deck, patio or balcony to prevent rust on the surface. Required Materials UB-04, UB-04 Angle Kit, Drill, 3/16"(5mm) Drill Bit, Phillips Head Screw Driver, T-25 Driver Bit, Metal Cutting Saw,Tape Measure, Wrenches, Pencil, Speed Square, Center Punch, Support Blocks, Clamps and Hammer. Fe26 Traditional Adjustable Panels Fe26 Traditional Adjustable Panel 8'(actual length 93.5"or Fe26 Traditional Adjustable Panel 6'(actual length 72" or 2375mm)Available Heights 34"(864mm) and 40"(1016mm) 1829mm)Available Heights 34"(864mm) and 40"(1016mm) Maximum rake angle 45° Maximum rake angle 45° 2375mm) 1 1829mm) —41i 1 Ii\ 1 1 1 1 , , i6. : , . , , I 111111111111 1 1 II I INJ .: 1101111111111 11 11 11 ' 11 II 11 11F - H it 45° Max a II ; 4511 II 11 II II 11 II II II II Ni° Max .. 11 11 li t° _ E [iII II aii li ii ii H 11 li For technical assistance, please email: technicalhelp@fortressrailing.com Hours of Operation: Monday through Friday 7:00 AM to 6:00 PM, CST Phone: 1-844-909-2999 Fax: 972-372-0924 21 www.fortressrailing.com Pre-Drill and Install Universal Bracket Post Plates • Remove c-clamps and panels. • Mark the centerline of each post. The UB Brackets will be installed on the centerline, not the locations marked in the previous step. • Use a center punch and hammer to mark the hole locations and pre-drill all bracket hole locations. • Remove Hinge Pin from UB Angle Kit Assemblies. •Attach UB Angle Kit Post Plates to post with supplied T-25 Drive Thread Cutting Screws. • Reassemble UB Angle Kit Assemblies with Hing Pins • Remove all metal shavings from deck, post base cover, post, and panel before bracket is screwed to post to prevent rust stains. 17;1 4<r>0 d o a) 0 ° Marked hole iloc �a Thread Cutting—� ° T-25 � b previous step , 7/8" Screws (22mm) -1 t Q UB Angle Kit Cl Post Plate v Pre-Drill with a 1 3/16"drill bit Cutting Fortress Fe26 Railing Traditional Adjustable Panels • Rake the panel back to 90° and lay on a flat surface. • Using a metal cutting blade, cut the rail at the four cutting mark locations from previous step. It is advisable to make a practice cut on a scrap piece of rail before proceeding with the finish cuts. • The distances from the first picket to the ends of the rail, will be different from the top to bottom rail.The greater the angle of the steps the more visible the difference will be. This is required in order to keep balusters pickets parallel to the post. • File cut edges and coat with 2 coats of Fortress zinc based touch-up paint. Cutting Marks Cutting Marks A 1 1 ' , _ I oh Dimension A> Dimension B B B I 1111 NsN t 4 Cutting Marks Cutting Marks X11 14— A 24 e Trex M Ilt HOW TO INSTALL STANDARD RAILING TREX TRANSCEND Installing Railing Support Brackets(RSBs) IiiiP --` "---- Option 1:Without TrexExpress railing template El _...._-- .<, 1 3b N-91 tom 35-1/16" 414 1 (891 mm) or �, — ' ' 41-1/16" � ' .. _ - 1043 mm) 01' 5 WU. 0400 mmmm)) i lifird Read all instructions BEFORE installation. 3a. Mark 5-1/2" (140 mm)and 35-1/16" (891 mm)from deck surface OR for 42" (1067 mm)height, mark Important: Post sleeves are NOT to be cut for this 5-1/2"(140 mm)and 41-1/16" (1043 mm)from the design style. deck surface. 3b. Place RSBs directly under marks,center on posts, Installing Pressure-Treated El and secure with 2" (51 mm)wood screws(provided Posts with post sleeve). Place top RSBs flat side up, bottom RSBs flat side down. » Posts are to be installed 2"x 8"" 6'(1.83 m) or 8' Zo3 mm ) 1"(25 mm)min. Option 2:With TrexExpress railing template (2.44 m)on center min. to accommodate y5-1/8"(130 mm)min.} 3c ••4::>, 3d Iappropriate railing ®yi. 0 Ti � length. ►� '� -1101P OH • Attach posts using 1/2" "'\� 011111.1.''.11.111.110 � (130 mm)carriage bolts. �. I 3 f • Minimum joist size is / Op' 1: t4 2"x 8"(51 mm xIS i.' �'/ SII 203 mm). �5�� » Top bolts must be 1"(25 mm)from tops of joists. ���_ i » Bottom bolts must be 5-1/8"(130 mm)from top bolts. » Bolts can be countersunk flush with framing to allow 3c. Place RSBs in template. Place top RSBs flat side for fascia attachment. UP, bottom RSBs flat side DOWN. Secure template on post with tape or rubber band, with NOTE:Blocking can be added for extra strength. bottom of template resting on post skirt. 3d.Secure RSBs with 2"(51 mm)wood screws Installing Post Sleeve 2 (provided in railing kit)and remove template. Skirts and Post Sleeves 2. Slide post sleeve skirt i NOTES:Special steps are necessary when using over post and down to �MI = 6"x 6"(152 mm x 152 mm)plastic TrexExpress template. rest on decking surface. `'1, » Cut off 1/2"(13 mm)from the bottom(blue arrows Slide post sleeve over up)of the tool BEFORE first use. post and position inside » Position top RSBs ONLY, 6"(152 mm)higher for post sleeve skirt. _,— 42"(7067 mm)rail height. )} Secure RSBs with 2-1/2"(64 mm)wood screws NOTE:Shims can be used to plumb post sleeves. (provided with post sleeve)and remove template. MI Have Questions? NOTE:Construction methods are always improving.Please ensure you 1-800-BUY-TREX have the most up-to-date installation instructions by visiting:trex.com -TRR-0318