Permit (171) CITY OF TIGARD MECHANICAL PERMIT
COMMUNITY DEVELOPMENT Permit#: MEC2019-00236
Date Issued: 04/29/2019
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439
Parcel: 2S101AD00100
Jurisdiction: Tigard
Site address: 12725 SW 66TH AVE
Project: Executive Center Subdivision: WEST PORTLAND HEIGHTS Lot: 9
Project Description: Boiler and cooling tower replacement in exterior enclosure.
Contractor: WILLAMETTE HVAC LLC Owner: MILLER, RICHARD ALAN TRUST
3075 SW 234TH AVE.#206 50 VULCAN STAIRWAY
HILLSBORO, OR 97123 SAN FRANCISCO, CA 94114
PHONE: 503-259-3200 PHONE:
FAX: 503-848-2597
FEES
Specifics: Description Date Amount
Type of Use: COM Permit Fee 04/29/2019 $3,715.39
Class of Work: ALT Type of Const: VA Plan Review 04/29/2019 $928.85
Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 04/29/2019 $445.85
Info Process/Archiving-Lg$2.00(over 04/29/2019 $4.00
Stories:
11x17)
Project Valuation: $137,900.00 Info Process/Archiving-Sm$0.50(up to 04/29/2019 $6.00
11x17)
Fuel Air Handlers
Fuel Types: Natural Gas Units< 10000 cfm:
Gas Pressure: Units> 10000 cfm:
Furnaces Boilers&Compressors
Furnaces< 100K BTU: 0-3 HP:
Furnaces>= 100K BTU: 3-15 HP:
Floor Furnaces: 15-30 HP:
Unit Heaters: 30-50 HP:
Vents w/o Appliances: 50 or Greater HP:
Air Conditioning:
Heat Pump:
Appliances
Vent Fans: Vent Systems: Total $5,100.09
Hoods: Comm Incinerators:
Required Items and Reports(Conditions)
Woodstoves: Gas Fireplaces:
Clothes Dryers: Other Mech Units:
Gas Outlets: Other Desc:
Duct Work:
Fire/Smoke Dampers:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other
applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of
issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon
Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. Ye may obtain a; copy of the rules
or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. - //
Issued By: / Permittee Signature:
-'
' Ca 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Mechanical Permit Application - City of Tigard
Page 2 - Supplemental Information
Commercial& Multi-Family Fee Schedule:
Total Valuation: Permit Fee:
$0.00 to$500.00 Minimum fee$69.06
$500.01 to$5,000.00 $69.06 for the first$500.00 and
$3.07 for each additional$100.00 or
fraction thereof,to and including
$5,000.00.
$5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and
$2.81 for each additional$100.00 or
fraction thereof,to and including
$10,000.00.
$10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and
$2.54 for each additional$100.00 or
fraction thereof,to and including
$50,000.00.
$50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and
$2.49 for each additional$100.00 or
fraction thereof,to and including
$100,000.00.
$100,000.01 and up $2,608.71 for the first$100,000.00 and
$2.92 for each additional$100.00 or
fraction thereof.
Note: All new commercial buildings require 2 sets of plans.
I:\Building\Permits\MEC-PermitApp.doc 03/07/12 2