Loading...
01/13/2003 - Agenda Library Steering Committee Agenda January 13, 2003 Summercreek Conference Rm, 4:00pm I. Fanno Creek Park Update (Special Guest, Dan Plaza) II. Follow-Ups • Utilities and Fencing at Houses (Greg) • Site Plan Estimated Completion Date (Gus) • Wells for Irrigation Purposes (Gus) III. Building Construction Grant Possibilities (Gus) IV. Tree Disposition (?) V. Zander Property/Wall Street Elevation (Gus) VI. Access Driveway Placement (Jim/Gus) �� � t VII. Design Development Update (Margaret) VIII. Weekly Project Meeting Update (Gus) IX. Public Information (Margaret) X. Other Issues r� XI. Agenda Building I" i � I------------ Tribu tary F,nno C E-4 rz. 3 �< U) FBtu'O CII.kdFmF 002 003 0 0 SS-2 0 0 0001 SS-30 SS-31 SS-33 SS-34 SS-35 SS-36 0 0 0 0 0 0 SS-32 0 Ss- 0 SS-21 SS-2 SS-1 25 SS-26 SS-27 SS-28 Ss-9 R 111Z )OP 0 006 0 007 0 0 008 SS-23 0 0 0 0 z Reference Point (0,0) SS-12 SS 13 SS-14 SS-15 SS-16 SS-17 -18 SS-19 SS-20 SW Omara Rd. 0 0 0 0 0 0 0 0 10 Approximate Scale in Feet SS-8 SS-9 SS-10 SS-11 LEGEND 0 0 0 Subject Property O Existing Structure Proposed Structure u5 0 d E3 Former Orchard Area z SS-3 SS4 SS-5 SS-6 SS-7 0,00 Culvert 0 0 0 0 0 — Fence 0 Sample Location Note:Be"Map provided by City of7lgard;??.dwg 0 Proposed Sample Location .-� LIBRARY COMPLETION SCHEDULE APPLICATION COMPLETENESS 4 Weeks • Application submitted on January 21, 2003 • Staff estimates application completeness in the 3`d week of February. • Application is incomplete without the Clean Water Services service provider letter. • Staff has been preparing the materials for routing. Cannot route the project without CWS service provider letter. PROCESSING 5 Weeks • Application to be routed to public and concerned agencies for two weeks • Staff report prepared and sent to applicant and Hearings Examiner within the next week • Provided that the CWS service provider letter arrives at the estimated time (3— weeks away), the hearing is tentatively scheduled for March 24th. HEARING AND DECISION 4 Weeks • Hearing Examiner will issue his decision within ten business days of closing the public hearing (Best case scenario would be April 4, 2003) • The Hearings Examiner has often times left the record open to allow for additional comments if there is any unanswered questions in his mind or the publics mind • There is a 10-day appeal period once the decision is mailed. (Assuming a decision itsuance of April 4, 2003, the appeal period would not expire any earlier than April 18, 2003) PUBLIC FACILITIES PLAN REVIEW 8 Weeks • 8-9 weeks depending on completeness and detail of the plans (Staff has no control over plan submittals) (Note: This time frame can be reduced if the Private Development Division of the Engineering staff is allowed to review the plans at various stages of development) BUILDING PLAN REVIEW • Can be concurrent with engineering plan review, but time will vary depending on Plans Examiner availability. (Need to discuss with Building Official) MISCELLANEOUS • All conditions need to be met at the appropriate time (Staff has no control over condition compliance) • ODOT permit for access needs to be approved. The New Library Resource Team will meet on February 10tH On March 3Id, the website will be updated with new renderings, plans, etc. Official groundbreaking will be held on May 17th. Margaret asked the group to provide her with names of people that should be invited to the groundbreaking. The groundbreaking will not be as large of an event as the grand opening ceremony. Other Issues: Craig requested that he receive a list of dates for when items are due for the business tax credit. He also needs a list of what costs are to be included on the application. The application needs to be submitted in early April 2003 before the GMP contract is signed with Hoffman. The City has a year from when the State certifies the application to find a tax credit partner. Gus will follow-up on the business tax credit application and date at the next Project meeting. He will share the information with Craig. The Energy Report should assist Craig in the application process as it gave energy saving recommendations that will most likely be implemented. Margaret will give her copy of the Energy Report to Craig. The Blue House bid opening will be on January 28th. Margaret noted that someone had removed all the glass doorknobs from within the house. Margaret stated that she had instructed Building Maintenance staff to remove some nice light fixtures and knobs from both the blue and white houses. There is still no decision about the white house. Greg stated that he had received results from the most recent soil tests. One test pit near the proposed building site had higher levels than first test as the soil test went deeper to about 9 inches or more. This test site has the highest level of contamination. Due to the levels, the soil will need to be removed from the site. It can be disposed of at a site in Washington County. It may be possible to use the soil as fill under the foundation. The group agreed that additional testing needs to be done in the area where the proposed courtyard will be because of future landscaping and soil disturbance. The group also agreed that this information will eventually need to be shared with staff and the public. Agenda Building: • Land Use Permitting • ' Update on Land Use Application • Design Development Costs • White House Update Grants Update 2