Specifications (39) \\L .T \ O3 -et
GREEN MOUNTIIIN
ftf,
structural engineering NOV 1 9 2018
CITY OF TIGARD
BUILDING DI Vic110,\I
STRUCTURAL CALCULATIONS
Plan 2626
Elderberry Ridge, Lot 37
Tigard, Oregon
Contractor:
Riverside Homes
P R Op6--
‘('
49 78PE
i44
r"
OREGON ,4
001N. 12, NtitL06
7/NA MU
[EXPIRES 1(2
Project Number: 17486
November 15, 2018
Index
Structural Information
Lateral Analysis L-1 thru L-15
greenmountainse com-info@greenmountainse com-4857 NW Lake Rd..Suite 260.Camas,WA 98607
Alk
GREEN MOUNTAIN
structural engineering
STRUCTURAL DESIGN INFORMATION
GOVERNING CODE: 2015 International Residential Code(IRC)
2015 International Building Code(IBC)
This engineering pertains to the design of the Lateral Force Resisting System and a review of
the home designer's framing and foundation plans. The home designer is responsible for
making any necessary changes as required by these calculations to their framing and
foundation plans.
1. Dead Load:
A. Roof 15 psf
B. Floor 10 psf
C. Exterior walls 10 psf
D. Exterior walls with veneer 50 psf
E. Interior walls with gypboard each side 5 psf
2. Live load:
A. Floor 40 psf
B. Decks&Balconies 60 psf
3. Snow load:
A. Uniformly distributed snow load on roof 25 psf
4. Wind load-based on ASCE 7-10 CH 27 MWFRS Directional Procedure:
A. 3 Second Gust Wind Speed V=126 mph
B. Exposure B
C. Importance factor I=1.0
D. Topographical Factor Kzt=1.0
E. Wind Directional Factor Kd=0.85
F. Structure classified as enclosed
5. Seismic load-based on ASCE 7-10 Section 12.14:
A. Mapped Spectral Acceleration for short periods Ss=1.0
B. Mapped Spectral Acceleration for 1 second period S141.34
C. Soil Site Class D
D. Ductility coefficient R=6.5
E. Seismic Design Category D
6. Foundation Soil Properties:
A. Undisturbed sandy silt per IBC 2015 Table 1806.2 Soil Class#5
B. Maximum vertical bearing pressure 1500 psf
7. Retaining wall lateral loads:
A. Walls free to displace laterally at top 40 pcf
B. Walls restrained against lateral displacement at top 45 pcf
8. Concrete:
A. 28 day design strength F'c 3000 psi
B. Reinforcing bars ASTM A615,Grade 60
greenmountainse.com-info@greenmountainse.com-4857 NW Lake Rd.,Suite 260,Camas,WA 98607
GREEN M O U N TSI I N PROJECT: Riverside - Plan 2626
UP structural engineering DATE: Dec. 2017 BY: CM
JOB NO: 17486 SHEET: L-1
LATE RAL
SEISMIC DESIGN BASED ON ASCE-7-10
1617.5 Simplified analysis procedure for seismic design of buildings
1.2•Sips
SEISMIC BASE SHEAR V:= •W (EQ.12.14-11 with F=12)
R
Ss mapped spectral acceleration for Ss:= 1.00
short periods(Sec.11.4.1) from USGS web site
Ss mapped spectral acceleration for := 0.34
1 second period(Sec.11.4.1)
Fa Site coefficient(Table 11.4-1) Fa'— 1.1 Based on Soil
F„ Site coefficient(Table 11.4-2)
F„:= 1.8 Site Class D
SMS:= Fa•Ss SM5= 1.1 (Eq.11.4-1)
SM1:= F„•S1 SMi= 0.61 (Eq.11.4-2)
11.4.43 Design spectrum response acceleration parameters
2
SDS 3•SMS SDS= 0.73 > 0.50g
SEISMIC
2 CATEGORY
Sp,:= 3•SM1 Sp,= 0.41 > 0.20g D per Table 11.6-1
12 SpS WOOD SHEAR PANELS
V W R:= 6.5 Table 9.52.2
1.2.0.73
V:_ •W V:= 0.135•W
65
12.4 Seismic Load Combinations
E:= 1.3•V (Eq 12.4-3 with redundancy factor=13 per 12.3.42)
WSD:= 0.7•E 0.7.1.3.0.135.W 0.123 W WOOD SHEAR PANELS
GREEN M O O N TSI I N PROJECT: Riverside - Plan 2626
Ile structural engineering DATE: Dec. 2017 BY: CM
.JOB no: 17486 SHEET: L-2
LATE RAL
SIMPLIFIED WIND AND SEISMIC COMPARISON
WIND
AO'
L
11 r.4
psf psf
Wind base
Shear
Length L:= 50 ft
Height Ht:= 24•ft WIND:= L•Ht•(11•psf + 7.4•psf)
SEISMIC WIND= 22080 lb
Fr Wroof
F2 — Wfloor Seismic
Wwal I
E3ase Shear
Aroof:= 50•ft•46•ft Aroof= 2300ft2
Afloor:= 42•ft•34•ft Amoor= 1428ft2
Wwaiis 4.50•ft•20•ft Wwai s =4000 ft2
SEISMIC:= (Ar00f•15•psf + Afloor•15•psf+ Wwatis•10•psf)•0.123 SEISMIC= 11798.16 lb
WIND GOVERNS DESIGN
i M r
GREEN MOUMTSIIN PROJECT: Riverside - Plan 2626
structural engineering DATE: Dec. 2017 BY: CM
JOB NO: 17486 SHEET: L-3
LATE RAL
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE
VELOCITY PRESSURE qz:_ .00256•KZ•KZt•Kd•V2•I (Eq 6-15)
EXPOSURE
WIND SPEED(3 second gust) Vas:= 126 mph
IMPORTANCE FACTOR I:= 1.0
TOPOGRAPHICAL FACTOR KZt:= 1.0
WIND DIRECTIONAL FACTOR Kd:= 0.85
(Table 6-4)
EXPOSURE COEFFICIENT 0'-15' KL:= 0.57 qz:_ .00256•KZ•KZt•Kd•V3s2•I qz= 19.69
(varies/height)
15-20' KZ:= 0.62 qZ:= .00256•KZ•KZt•Kd•V3s2•I qZ= 21.42
20'-25' KZ:= 0.66 qz:= .00256•KZ•KZt•Kd•V3s2•I qZ= 22.8
25'-30' KZ:= 0.70 q,:= .00256•KZ•Ict•Kd•V3s2•I qZ= 24.18
II
a r
GREEN MOUNTIIIN PROJECT: Riverside - Plan 2626
structural engineering DATE: Dec. 2017 BY: CM
JOB NO: 17486 SHEET: L-4
LATE RAL
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont.
WIND PRESSURE P:= gz•G•Cp G:= 0.85 Gust factor
CP pressure coefficient
AT WALLS For Working Stress Design Multiply WIND PRESSURE by 0.6 per IBC 1605.3.1
0'-15' WINDWARD P„,:= 12.4•psf•0.85 0.8 PM,= 8.43 psf
LEEWARD PL:= 12.4•psf•0.85 0.5 PL= 5.27 psf
1B-20' WINDWARD PW:= 13.49•psf•0.85.0.8 PW= 9.17 psf
LEEWARD PL:= 13.49•psf•0.85.0.5 PL = 5.73 psf
20'-25' WINDWARD PH,:= 14.36•psf•0.85.0.8 P,,,= 9.76 psf
LEEWARD P1 := 14.36•psf•0.85.0.5 PL= 6.1 psf
AT ROOF
0'-15' WINDWARD PW:= 12.4•psf•0.85.0.3 PW= 3.16 psf
LEEWARD PL:= 12.4•psf•0.85.0.6 PL= 6.32 psf
1B-20' WINDWARD PW:= 13.49 psf 0.85 0.3 Py,= 3.44 psf
LEEWARD PL:= 13.49•psf•0.85.0.6 PL = 6.88 psf
20'-25' WINDWARD P„,:= 14.36•psf•0.85.0.3 PW= 3.66 psf
LEEWARD PL:= 14.36•psf•0.85.0.6 PL= 7.32 psf
2B-30' WINDWARD PW:= 15.23 psf 0.85 0.3 PW= 3.88 psf
LEEWARD PL:= 15.23 psf•0.85 0.6 PL = 7.77 psf
II
•
GREEN MOUNTnIN PROJECT: Riverside - Plan 2626
structural engineering DATE: Dec. 2017 BY: CM
JOB NO: 17486 SHEET: L-5
LATERAL
WIND DESIGN IS BASED ON ASCE 7-10 CH 27 MWFRS DIRECTIONAL PROCEDURE cont.
3 44 Assume
6.88
Cp-0.3 psf PO 8 := 35
'11 ' Cp--O 6
8.5f<
8 ft `1
9.17
psf 6.1
psf
9f
Mean Roof Height
18+ 25
= 21.5
2
Loads at Roof roof-max roof ave
Windward 3.44•psf.8.5•ft= 29.24pIf 3.44•psf 5ft=17.2plf
Leeward 6.88•psf•8.5•ft= 58.48pIf 6.88 psf.5ft= 34.4 plf
Wall loads at upper level at main level
Windward 8.43psf4.ft= 33.72pIf 8.43.psf.8.5•ft= 71.66 pIf
Leeward 5.73•psf4.ft= 22.92pIf 5.73•psf•8.5.ft=48.71pIf
II
t •r
GREEN MOUNTilIN PROJECT: Riverside - Plan 2626
UPstructural engineering DATE: Dec . 2017 BY: CM
JOB NO: 17486 SHEET: L-6
LATERAL
‘hr1Tio t/bo u ,,
� + iii
roof core) ii ii
i.
el� � .,
�� ..H
II
>I?)*6
II
II
I
❑ ❑ 11 r== 0
I o 11:11r---3F 7 i
„a- [= 111==8.1 t ....1-
r--- 0 r--
. , ° ja L.
to
-1- r -
� � ........._..._.__I U
El
° °
°' ------
- ---
� r- IT.1- ♦��7.•/:--- 1
AK 1 a
1 V. * in
kip
i-- —
° ► 1 .
❑ !H
i40til
-.....________t_______J______
II
. &Tii.
i'l
GREEN MOUMTIIIN PROJECT: Riverside - Plan 2626
IIIIW structural engineering DATE: Dec . 2017 BY: CM
JOB NO: 17486 SHEET: L-7
LATERAL
I II o
i — V
-„ 91 "!
116 *Lc
. . _3T
I
I
r.
2 II
II 1
IN
IM
IAappy
Wi
1 1_Ill_
1 1
IIILOFT td MSN
le BD
M „Ni 4' ; ('
IIII
I r—n +
IH 1
I "= 0 I i 4" ---..i_-+i--- �--�
'W
2t551 le-
1.PARThL
1o.6VATOR FOR'a in 0.
L-----
t, I t t
-It 7k,,
A
� � C
GREEN M O U M TSI I N PROJECT: Riverside - Plan 2626
structural engineering DATE: Dec . 2017 BY: CM
JOB NO: 17486 SHEET: L-8
LATERAL
kvtu+c (.okra raj 19
Cl
r' Tait: vItg-
II r°Taiw 'IlliI
MQOK
Vee�y ROOM
ice^
AO7
1 . ) _J
if e
i ii
-71-741rm--- 1 -1 i ..% 1‘
mitill
121141 11111111
1111111
ak-
I
���� a N
ii.
� ,�y o� •ilf ___ir '
6.51
t '°4
-�- Z.,:1
Mil t:+
LL J wit 9.ROda
1119.1.111 ••••11
A ,:._ 1 oet
1r-it
1 "°-
'lam '
Inail.-
1111
GREEN MOUMTnIN PROJECT: Riverside - Plan 2626
structural engineering DATE: Dec. 2017 BY: CM
JOB NO: 17486 SHEET: L-9
LATERAL
SHEAR WALL DESIGN
Pd Pd
4,___WdI__4,
j p P:= wind
V := sRlsmir,
h
R=Hol down
Force
Based on IBC Basic Load Combinations
0.6D+ W (Equation 16-11)
0.6•D+ 0.7•E (Equation 16-12)
Overturning Moment: Mat:= P•h
L2
Resisting Moment: Mr:= 0.6.�Wdi +Wwaii) (2 + 0.6•Pdi•L
Mat— Mr
Holdown Force R
L
II
GREEN MOUNTVIIN PROJECT: Riverside - Plan 2626
thlOP structural engineering DATE: Dec. 2017 BY: CM
JOB NO: 17486 SHEET: L-10
LATE RAL
Left Elevation Exterior Walls
Second Level
Wind Force P:= 1700.1b P= 1700 Ib
Length of wall L:= 3.5.ft+ 6•ft+ 11.ft L= 20.5ft
P
Shear v:= — v- 82.93pIf A
3.5
Overturning Mot:= P•8•ft Mot= 2321.95lb•ft
Moment 20.5
(3.5•ft)2
Resisting Mr:= 0.6.(15.psf.17•ft + 10 psf•8•ft)• 2 + 0.6.600•lb•3.5 ft
Moment
M = 249113 lb ft
Mat- Mr
Holdown = -48.34 lb
Force 35ft
Main Level
Wind Force P:= 4400•Ib P=44001b
Length af wall L:= 4•ft+4•ft+ 6•ft+ 13-ft L= 27ft
P
Shear v:= - v=162.96 plf B
4
Overturning Mot:= P.9-ft•27 Mot= 5866.67lb•ft
Moment
(4.ft)2
Resisting Mr:= 0.6 (15 psf•17 ft + 10•psf.17•ft) 2 + 0.6.800•Ib•4•ft
Moment
M. - 3960lb•ft
Mot- Mr
Holdown =476.671b
4.ft
Force
GREEN MOUNThIN PROJECT: Riverside - Plan 2626
Ur structural engineering DATE: Dec. 2017 BY: CM
JOB NO: 17486 SHEET: L-11
LATERAL
Front Elevation Exterior Walls
Second Level-ElevA Gov design
Wind Force P:= 2859•lb P= 2859 lb
Length of wall L:= 5•ft•2+ 3.5•ft•2 L= 17ft
P
Shear v:= — v= 168.18 pif S
3.5
Overturning Mot:= P•8•ft•— Mat=4708.94 lb ft
Moment 17
(3.5•ft)2
Resisting Mr:= 0.6•(15•psf•4•ft+10•psf•8•ft)• 2 + 0.6.600 lb-3.5—ft
Moment
Mr = 1774.5lbft
Mot— Mr
Holdown = 838.41 lb
Force 3.5ft
Main Level -not considering the 3rd car garage
Wind Force P:= 3680-lb P= 3680 lb
Length of wall L:= 2.25•ft+ 2.25•ft+ 2.25•ft L= 6.75ft
2.25.3.5= 7.88
P
Shear Wind v:= — v= 545.19plf E
L
2.25
Overturning Mot:= P•7.88•ft Mot= 9666.13lb•ft
Moment 6.75
(2.25•ft)2
Resisting Mr:= 0.6 (15•psf•4•ft+10•psf•8•ft)• 2 + 0.6.800•Ib•2.25•ft
Moment
MOt- Mr Mr= 1292.63 Ib ft
Holdown = 3721.56lb
Force 2.25•ft
HITS
11
GREEN MOUNTPIIN PROJECT: Riverside - Plan 2626
UP structural engineering DATE: Dec. 2017 BY: CM
JOB NO: 17486 SHEET: L-12
LATE RAL
Right Elevation Exterior Walls
Second Level
Wind Force P:= 1700•Ib P= 1700 lb
Length of wall L:= 3-ft+ 6-ft+ 10•ft L=19ft
P
Shear v:= — v= 89.47pIf A
6
Overturning Mot:= P 8•ft 19 Mot=4294.74 I b ft
Moment
(6•ft)2
Resisting Mr:= 0.6•(15•psf 17'ft + 10•psf•8-ft)• 2 + 0.6.600•Ib•6•ft
Moment
Mr= 5778lb.ft
Mot Mr
Holdown = --247.21 lb
Force 6ft
Main Level
Wind Force P:= 4400•Ib F'= 4400 lb
Length of wall L:= 15•ft+ 7•ft+4•ft L= 26ft
P
Shear v:= — v= 169.23 plf
4
Overturning Mot:= P•9.ft•26 Mat= 6092.31 Ib.ft
Moment
(7•ft)2
Resisting Mr:= 0.6•(15•psf•17.ft+ 10•psf 17•ft)• 2 + 0.6.800-Ib•4-ft
Moment
Mr= 8167.5Ib•ft
Mot- M1
Holdown = 518.8lb
Force Oft
GREEN MOUNTVIIN PROJECT: Riverside - Plan 2626
structural engineering DATE: Dec. 2017 BY: CM
JOB NO: 174 8 6 SHEET: L-13
LATE RAL
Rear Elevation Exterior Walls
Second Level
Wind Force P:= 3043-lb P= 30431b
Length of wall L:= 8•ft+ 7•ft L= 15ft
P
Shear v:= L v= 202.87 plf S
7
Overturning Mot P•8•ft•15 Mot=11360.53 Ib-ft
Moment
(7.ft)2
Resisting Mr:= 0.6.(15•psf•2 ft + 10•psf 12•ft)• 2 + 0.6.600.1b•Tft
Moment
Mr = 4725 Ib ft
Mot— Mr
Holdown = 947.93 lb
Force 7•ft MSTC40
Main Level
Wind Force P:= 4303•Ib P=4303lb
Length of wall L:= 3•ft+4.ft+ 3.5.ft L=10.5ft
P
Shear Wind v:= L v= 409.81 plf D
3
Overturning Mot:= P•9-ft•105 Mot= 11064.861b ft
Moment
(3 ft)2
Resisting Mr:= 0.6•(15•psf•4•ft+ 10.psf.8•ft)• 2 + 0.6.800•lb•3.ft
Moment
Mot— Mr Mr= 18181b.ft
Holdown = 3082.29 lb
Force aft
HITS
II
GREEN M O U N TSI I N PROJECT: Riverside - Plan 2626
glif structural engineering DATE: Dec. 2017 BY: CM
JOB NO: 17486 SHEET: L-14
LATE RAL
Interior Shear Walls at Garage
Main Level
Wind Force P:= 3797•Ib P= 37971b
Length of wall L:= 12•ft L= 12ft
P
Shear Wind v:= — v= 316.42plf C
L
Overturning Mot:= P•9•ft Mot= 34173lb•ft
Moment
(12•ft)2
Resisting Mr:= 0.6•(10•psf•12•ft+ 10 psf•9•ft)• 2 + 0.6.1200•Ib•12•ft
Moment
Holdown Mot Mr 1371.75 lb
M = 17712lbft
Force 12ft
HTT5
hi
GREEN MOUNThIN PROJECT: Riverside - Plan 2626
structural engineering DATE: Dec. 2017 BY: CM
JOB NO: 17486 SHEET: L-1 5
LATE RAL
WIND ON PORCH ROOF
126 MPH,EXP S w:= 6•ft•(4.43 psf + 8.86•psf) w = 79.7 plf
11
' II
� II
II ` II
II
Y
/ I
DESIGN ROOF TO CANTILEVER FROM HOUSE L:= 10-ft D:= 12-ft
w•L2
M:= 2 M= 3987 lb ft
support beam on post in wall at house with
M Simpson HUCQ-SDS
C:= T:= C C= 398.7 Ib 12 SDS 1/4x21/4 screws(min)x172 lbs=2064
in combined withdraw
w•L Nail top and bottom chord of first truss to wall with
v:= D v= 66.45 plf (2)16d nails at 16"o.c.(web to studs)
II